biddoc.pdf
PDF 393 KB Posted
- Attached to
- Transfer Station Operator
- Solicitation number
- 2026-0052
- Issued by
- La Plata County, Colorado
About this file
This is a bidding document for the City and County of Durango, Colorado, seeking proposals from qualified contractors to operate the Durango Transfer Station (DTS) and transfer solid waste to an appropriately permitted disposal facility. The DTS is a Colorado Department of Public Health and Environment permit-exempt facility that processes approximately 112,000 tons of solid waste annually from residential and nonresidential collection routes, as well as from La Plata County and City of Durango residents, businesses, and private solid waste collection providers. The City of Durango will continue to provide collection services and operate the Durango Recycle Center independently, while transferring collected solid waste to the DTS for the contractor's handling and disposal. The document references Attachment A for itemized annual collection history from 2015 through 2025, though specific response dates, bid due dates, site visit schedules, bidders' conferences, award dates, and contract term details are not explicitly stated in the provided excerpt.
The document does not provide explicit pricing terms, set-asides, incumbent contractor information, or specific funding requirements and sources in the available excerpt. Notably, Durango does not guarantee monthly or annual collection volumes, tonnage amounts, or material type or quality, placing volume risk on the selected contractor. Additional details regarding compensation structure, performance requirements, insurance obligations, and other salient contractual terms would be contained in the complete bidding document or related attachments not fully detailed in this summary.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Durango Finance Office
2026-0052 City of Durango Transfer Station Operator
REQUEST FOR PROPOSALS
ISSUE DATE: November 11, 2026
CLOSING DATE: December 9, 2026
949 East 2nd Avenue
Durango, CO 81301
(970) 375-4994 www.DurangoCO.gov http://www.durangoco.gov/
The City of Durango Colorado, by and through its Purchasing Manager, is accepting proposals from qualified firms to operate the Durango Transfer Station in accordance with the terms, conditions, and specifications contained in these documents.
Bidders wishing to participate should ensure they have all addenda prior to submission of bid.
Failure to acknowledge receipt of any addenda applicable to this project could result in the rejection of your bid.
This request for information and any subsequent addenda will be posted to the Rocky Mountain E- Purchasing System website (www.bidnetdirect.com/colorado) then click on Vendor Login or Vendor Registration if you have not already registered. Firms are encouraged to register with RMEPS for all City bid opportunities.
Mandatory Pre-Proposal Meeting: A mandatory pre-proposal meeting will be held on Thursday November 19, 2026 at 10:00 A.M. Local Time (MDT) at the Durango Transfer Station 790 Tech Center Dr, Durango CO 81301 and will include a tour of the facility. Potential Proposers are encouraged to submit written questions prior to the pre-proposal meeting. During this meeting, potential Proposers may ask and Durango staff will answer questions. A summary of these questions and answers will be issued as Addendum #1.
Questions: All questions must be submitted via Rocky Mountain E-Purchasing System website:
(www.bidnetdirect.com/colorado).
Question Deadline: November 24, 2026 (Local Time): 3:00 p.m. (MDT) Questions received after the deadline may not be accepted.
Responses to Questions: December 1 , 2026 (Local Time): 3:00 p.m. (MDT)
Submittal Instructions: Submittal requirements are outlined in Section III of this RFP.
Project Title: 2026-0052 City of Durango Transfer Station Operator
Bid Due Date and Time: December 9, 2026 (Local Time): 3:00 p.m. (MDT)
Deliver Proposals via: Rocky Mountain E-Purchasing Systems, www.bidnetdirect.com/colorado.
It is the sole responsibility of the respondent to see that the proposal is received before the submission deadline. Late proposals will not be considered.
All proposals submitted shall be binding upon the respondent if accepted by the City within sixty (60) calendar days of the submission date. Negligence upon the part of the respondent in preparing the proposal confers no right of withdrawal after the time fixed for the submission of proposal.
This project is being bid in accordance with the City of Durango Purchasing Policy.
http://www.bidnetdirect.com/colorado
Ian Grammatica Purchasing Manager
Advertised: November 11 and 13, 2026
I. INVITATION AND BACKGROUND
A. General Information and Scope of Work
Scope of Work: Durango Transfer Station Operator Services City of Durango, Colorado
I. Introduction The City of Durango (Durango) owns and operates a municipal solid waste transfer station physically located at 790 Tech Center Drive, Durango, Colorado 81303. The current Durango population is approximately 20,000. Durango staff operates trash and recycling collection routes to service approximately 5,400 residential curbside trash and recycling collection accounts, 1,585 non-residential accounts, and owns/operates the Durango Recycle Center and the Durango Transfer Station (DTS).
Republic Services is currently contracted to operate the DTS through March 31, 2027. The DTS serves as the primary collection location for solid waste within Durango for La Plata County and City of Durango residents and businesses that do not receive Durango and/or private solid waste collection/disposal services. Material collected at the DTS is currently transported to the Bondad Landfill for disposal.
Durango requests proposals from qualified contractors to operate the DTS and transfer/haul solid waste to an appropriately permitted disposal facility. Durango will continue to provide residential and non-residential collection routes and will transfer collected solid waste to the DTS. La Plata County and City of Durango residents, businesses, and private solid waste collection providers also use the DTS. Durango will continue to operate the Durango Recycle Center. The DTS is a Colorado Department of Public Health and Environment (CDPHE) Permit exempt facility and has not been assigned a Certificate of Designation Number. Approximately 112,000 tons of solid waste is collected at the DTS annually. See Attachment “A” for the itemized 2015 - 2025 annual collection history. Durango does not guarantee DTS monthly and/or annual collection volumes/tons or material type/quality.
II. Project Objectives The selected DTS Operator shall be responsible for operating and maintaining the DTS, including facility sweeping and snow removal, during designated days/hours, and for transporting and disposing of DTS solid waste to an appropriately permitted landfill. The DTS operates throughout the year each Monday through Friday, from 8:00 A.M to 5:00 P.M., Saturday from 9:00 A.M. to 1:00 P.M., and is closed on Sundays. However, it is likely that the DTS will transition away from Saturday operations in 2027. The DTS does not typically operate on the following Durango recognized holidays, although the DTS Operator shall coordinate opening and/or operation of the facility to accommodate Durango collection truck disposal on these days and/or the day prior to or after the holiday:
New Year’s Day Martin Luther King Jr. Day
Presidents’ Day Memorial Day
Independence Day Labor Day
Veteran’s Day Thanksgiving Day
Day after Thanksgiving Christmas Eve Christmas Day
Use of the DTS facility is limited to the collection, transportation, and disposal of solid waste material as detailed in the CDPHE permit, Certificate of Designation, and terms/conditions of the fully executed Operating Agreement. Durango proposes an initial agreement term of ten (10) years with a maximum of two (2) optional five (5) year extension periods. Durango agrees to waive the monthly facility lease payment through the initial Agreement term.
The selected DTS Operator shall sign the attached Agreement (Attachment “B”) no later than TBD.
Durango retains the right to make non-substantial changes to the final Agreement prior to execution by both parties. It is anticipated that the Durango City Council will consider Agreement approval
TBD
III. Scope of Services
Durango Transfer Station Operator Responsibilities The selected firm shall:
• Commercial Truck Scale Purchase/Installation – The selected DTS Operator shall be required to purchase and install, no later than April 1, 2027, and maintain two (2) Southwest Scales Company, Inc. Sidewinder LPS 50 scales. Scales shall be 50’x11’ with a capacity of seventy (70) tons, two (2) module design, six (6) load cells and concentrated load capacity of 56,000 pounds with traffic light options on each scale, and with integrated WeighVue DeskTop scale software, including initial and annual software licenses, or equal equipment approved in advance by Durango. Ownership of the scales and associated computer systems shall automatically transfer to Durango upon installation and acceptance by Durango staff. One (1) scale shall be used to determine the gross weight of Durango solid waste collection trucks, private hauler collection trucks, and privately owned light-duty vehicles and small trailers entering the DTS to dispose of solid waste. The second scale shall be used to determine the tare weight of Durango solid waste collection trucks, private hauler collection trucks, and privately owned light-duty vehicles and small trailers exiting the DTS after disposal of solid waste. The scales shall automatically record these weights within approved software to determine the actual solid waste weight. The DTS Operator shall propose a scale measuring alternative to ensure continuity of operations during operating days/hours when scales are being maintained.
• Operations – The DTS Operator shall meet or exceed minimum regulatory agency permit requirements, City codes, DTS Operations Plans, and other legally imposed requirements.
This includes implementing control measures to ensure solid waste material is retained onsite and is not blown or otherwise conveyed offsite. All loads entering DTS must be covered and secured when entering the DTS. The DTS shall be operated as a traditional transfer station facility, and customers shall deposit refuse directly onto the tipping floor in specific locations designated by the DTS Operator (see attached DTS Floorplan). The DTS Operator shall immediately move this material into a staged trailer positioned in the DTS Operator Trailer Pit that the DTS Operator will park throughout facility operating hours. It is anticipated that commercial haulers will access the DTS facility through three (3) large roll-up doors on the west side of the facility and will dump loads directly onto tipping floor, after which the DTS Operator shall immediately move this material into the staged trailer positioned in the DTS Operator Trailer Pit. It is also anticipated that individual private haulers will access the DTS facility through three (3) smaller roll-up doors on the north side of the facility and will manually toss refuse directly onto the tipping floor, after which the DTS Operator shall immediately move this material into the staged trailer positioned in the DTS Operator Trailer Pit. In no case shall refuse remain on the DTS facility floor for periods exceeding fifteen (15) minutes. Within one (1) hour after the DTS facility operating hours each day, the DTS Operator shall remove all refuse from the DTS facility and dispose of it at a permitted facility. This includes loose refuse remaining on the DTS facility floor, refuse deposited into the parked walking floor trailer, and ancillary material collected during the daily facility cleanup. The Contractor shall provide a means-and-methods for meeting this requirement during storm events, when the permitted disposal facility is closed, etc.
• Hazardous Waste Separation – The DTS Operator shall develop and implement a Hazardous Waste Exclusion Program (HWEP) and be responsible for inspecting DTS solid waste, removing, isolating, and properly managing hazardous waste materials from incoming truck/vehicle loads. Managing and disposal of hazardous waste produced by the DTS Operator (i.e., truck/equipment oil and anti-freeze, grease, etc.) is the sole responsibility of the DTS Operator.
• Security – The DTS Operator shall be solely responsible, at its own cost, for DTS facility security and security of all on-site equipment, including rolling stock, trucks, trailers, and other operating tools and equipment.
• Facility Loss/Damage – The DTS Operator shall be responsible for repairing and/or replacing in a timely manner, at no cost to Durango, any loss of or damage to Durango owned or leased equipment or facility components caused by the DTS Operator, its employees, subcontractors, or customers, whether by neglect or by committing a wrongful act. The DTS Operator shall be required to notify Durango staff when any loss of or damage to Durango owned or leased equipment or facility components within three (3) working days after discovery and shall document the incident using Durango provided incident report forms.
Replacement and/or repaired equipment, components, or parts shall be of a quality at least equivalent to that of the original equipment, components, or parts as solely determined by the Durango Public Works Director. If loss or damage caused by the DTS Operator, its employees, subcontractors, or customers is not replaced and/or repaired as prescribed herein and to the Durango Public Works Director’s satisfaction, Durango shall duly notify the DTS Operator and reserves the right to replace and/or repair equipment or facility components and recover costs from the DTS Operator.
• Permits – The DTS Operator shall secure, maintain current, and make available for Durango inspection all permits and licenses required to successfully perform its scope-of-work. All trucks, trailers, flatbeds, trailer bodies, employees, and subcontractors shall be appropriately licensed and copies of all permits and registrations, including overweight permits, shall be provided to Durango staff prior to the Agreement effective date.
• Employees – The DTS Operator shall provide experienced and qualified employees and subcontractors to successfully perform the scope-of-work. Equipment, truck, and vehicle operators shall be appropriately licensed and shall have obtained all required medical certifications as to fitness to operate the designated class of equipment, truck, and vehicle.
The DTS Operator shall monitor the status of employee and subcontractor licenses and registrations at appropriate frequencies to ensure compliance with this requirement. The DTS Operator shall ensure that a minimum of one (1) qualified facility operator remains onsite during DTS operating hours. The DTS Operator shall also ensure that a minimum of one (1) fully trained and qualified manager, foreperson, or supervisor who is designated and authorized to direct and implement all operational decisions and who shall also serve as the designated emergency coordinator shall remain onsite during DTS operating hours. All DTS Operator employees and subcontractors shall be competent and skilled in their assigned work tasks. The DTS Operator shall be responsible for its employees’ and subcontractor’s acts, personal conduct, and work, and that services are performed in a professional, polite, courteous, and respectful manner. All DTS employees and subcontractors shall refrain from the use of profanity and derogatory language and shall dress appropriately for assigned work tasks, including personal protective equipment, provided by the DTS Operator at its sole expense, as appropriate.
• Coordination – The DTS Operator shall be responsible for coordination between the DTS and disposal facility hours of operation to ensure efficient and timely transportation and disposal of materials such that the DTS always remains clean and sanitary.
• Facility Maintenance Reporting/Inspection – Quarterly on or before March 31, June 30, September 30, and December 31 of each contract year, the DTS Operator shall provide Durango with a written report evidencing that all necessary DTS facility and equipment maintenance, repairs, and replacements have been completed and that the DTS is in the same working order, condition, and repair as it was on the effective date of the Agreement.
The report shall certify that equipment installed or used to operate the DTS has been maintained in accordance with manufacturer’s maintenance warranties and service manuals. The DTS Operator shall join Durango staff on a quarterly walking tour of the DTS to demonstrate that all Agreement requirements have been met.
• Equipment Storage – The DTS Operator may park empty bins/trailers, trucks, and equipment within the fenced DTS area in locations that do not hinder access and operation of the DTS.
Only empty bins/trailers, trucks, and equipment necessary for the normal operation of the DTS may be parked onsite. Equipment may not be fueled or repaired onsite and only minor routine maintenance may occur onsite. The DTS Operator shall make arrangements, at its sole expense, for an offsite location at which non-routine maintenance and repair of equipment may occur.
• Title To Waste – Title to all solid waste delivered to the DTS shall transfer to the DTS Operator at the time it is accepted by and deposited to the DTS facility
• Facility Modifications – The DTS Operator shall not modify, alter, or otherwise change any portion of the DTS facility and/or equipment without prior written approval by the Durango Public Works Director, who will only consider approval when such modifications, alterations, or changes:
Improve the DTS facility’s performance (i.e., service quality, operating cost, scheduling efficiency, etc.);
Are described by the DTS Operator in writing to the Durango Public Works Director;
• Fire Prevention/Fire Safety Equipment – The DTS Operator shall implement and follow best management practices to prevent fire hazards, including but not limited to preventing the buildup of litter and debris, preventing the accumulation of excessive dust on equipment, and preventing conditions conducive to spontaneous combustion. The DTS Operator shall be responsible for ensuring that fire safety equipment is maintained in good working condition in accordance with all laws, codes, and manufacturer’s recommendations. The DTS Operator shall be responsible for performing all inspections required by the Durango Fire Protection District and/or the City of Durango, including scheduling and coordinating quarterly fire safety equipment inspections, to be conducted by qualified personnel, and maintaining current certifications for such devices. The DTS Operator shall conduct and document internal inspections of all safety equipment and facilities at least monthly.
• Adjacent Landowner Respect/Coordination – The DTS Operator shall operate the facility in a manner that prevents interference with the operation of facilities located on adjacent properties and shall be respectful of neighboring land owners at all times.
• Complaint Resolution – The DTS Operator shall designate a “DTS Manager” to receive and resolve complaints related to operation and maintenance of the DTS and shall ensure that complaints are not directed to Durango staff. The DTS Manager shall compile a log of complaints indicating the complaint date and time, the complainant’s name, address, and telephone number, a description of the complaint, the date, time, and description of the complaint resolution, and the date and time the complaint resolution was discussed with the complainant. This complaint log shall be delivered to Durango staff before the final working day of each month.
• Disclaimer: Please note that the yardage and tonnage data presented in this report may not be fully complete. While every effort has been made to compile and verify available information, some records were unavailable, incomplete, or could not be validated at the time of reporting. As a result, totals and analyses should be considered estimates based on the data currently accessible.
City of Durango Responsibilities The City of Durango shall:
• Security – Durango shall provide general, physical DTS facility security including fencing and access control.
• Facility Maintenance – Durango shall provide routine, periodic maintenance of DTS facility elements including but not limited to fencing, gates, driving/maneuvering surfaces, gate house, scales and associated equipment (after ownership transfers to Durango), DTS facility structural elements, firefighting equipment and measures, and lighting.
• Utilities – Durango shall pay all DTS facility utility costs including electricity, water, sewer, natural gas, and communications.
• Permits – Durango shall submit and maintain current all permits necessary to operate the DTS facility.
• Employees – Durango shall identify a City employee as the point of contact for all DTS operations and shall assign a City employee to operate the gate house during all DTS facility operating hours.
• Rates –The City is not able to invoice customers directly through its billing system. All residential DTS customers shall be required to pay at the gatehouse at the time of service via cash or credit card. Commercial haulers will need to establish an account with the city to be invoiced monthly by the City.
• Exclusive Rights – Durango shall grant the selected company an exclusive right to operate the DTS and covenants that it will not engage other companies/individuals or itself become engaged in the operation of a solid waste transfer station within the Durango City limits.
II. PROPOSED SCHEDULE
RFP 1st Publication November 11, 2026
RFP 2nd Publication
Mandatory Pre-Proposal Meeting
November 13, 2026
November 19, 2026, 10:00 a.m. (local Time)
Contractor Questions Due November 24, 2026, 3:00 p.m. (Local Time)
Final Addendum Issued by Purchasing December 1, 2026, 3:00 p.m. (Local Time)
Proposals Due December 9, 2026, 3:00 p.m. (Local Time)
Interviews if necessary TBD
Notice of Award TBD
Notice to Proceed TBD
III. INSTRUCTIONS TO PROPOSERS
A. General
1. Submit Bids electronically via www.bidnetdirect.com/colorado prior to the deadline.
Please submit all your required documents in a single pdf file in the bidder’s company name. Late proposals will not be accepted.
2. All Bids must be a maximum of 30 pages in a minimum 12-point font. All pages with words count towards the page limit.
3. Retain one copy for your records.
4. A successful Contractor must have or obtain a current City Business License upon award of the contract.
5. Successful Contractor must complete a W-9 form (Taxpayer Identification No.) upon award.
6. The City of Durango is exempt from all local, state, and federal taxes.
7. The City of Durango reserves the right to reject any and all proposals, to waive any informalities or minor irregularities in proposals, and to accept the proposal deemed, in the opinion of the City, to be in the best interest of the City.
8. Direct contact with city elected officials or city staff, other than the Purchasing Manager, during the proposal process may render the proposal non-compliant. At the Purchasing Manager’s discretion, no further consideration may be given to the proposal.
RFP responses must be prepared in a form that provides an insightful, straightforward, and concise overview of the capabilities of your company's capabilities. Elaborate proposals beyond what is requested in this RFPS are neither necessary nor desired. Additional facts and information other than those listed below may be included if they help to highlight your firm’s qualifications and experience.
Proposals shall demonstrate the company’s experience operating similar facilities regulated by CDPHE permits and shall provide copies of all facility permits where material collected at the DTS will be transported for disposal.
Proposals shall demonstrate the company’s experience maintaining certified scales and associated computer systems.
Proposals shall acknowledge understanding that no outside advertising and/or promotion of the DTS without prior written consent of the Durango Public Works Director or his/her designee is allowed.
Proposals shall acknowledge understanding that onsite commercial and/or political displays, advertising, or promotions are not allowed without prior written consent of the Durango Public Works Director or his/her designee.
Proposals shall include a statement explaining the means and methods, including equipment and frequency, of transporting solid waste from the DTS to an appropriately permitted landfill.
Proposals shall indicate the primary disposal facility to which DTS solid waste will be transported, as well as a secondary disposal facility to which DTS solid waste will be transported if/when the primary facility is unavailable for use.
Proposals shall acknowledge understanding that the fully executed Agreement scope-of-work requires the company to receive, transport, and dispose of a maximum of 3,500 tons of municipal solid waste collected from Durango facilities (i.e., City parks, City buildings, etc.) and significant Durango special events (i.e., spring/fall cleanup, holiday parades, etc.), which shall be monitored and itemized separately from all other DTS solid waste. Any additional Durango sweeping operation debris and/or Durango construction debris shall be charged at contract rates.
Proposals shall disclose anticipated use of any sub-contracted services necessary to successfully perform the Agreement scope-of-work.
All materials submitted in response to this RFP shall become the property of the City of Durango and shall be considered a part of the public record of the city, except for any proprietary financial information that should be clearly marked as confidential.
The City reserves the right to negotiate any and all elements of any proposal. The successful bidder must provide all equipment and personnel necessary to perform the required services. This RFP includes a project description, scope of work, submission requirements, selection process and criteria, insurance requirements, and Sample Standard Form of Agreement between the City and Consultant for Consultant Services Agreement. The Sample Agreement is for reference only and is non-negotiable. Any bid that fails to conform to the essential requirements of the Request for Proposals will be rejected:
a. Any bid that does not conform to the applicable specifications shall be rejected unless the invitation authorizes the submission of alternate bids and the items or services offered as alternates meet the requirements specified in the RFP.
b. Bid shall be rejected when the bidder imposes conditions that would modify requirements of the invitation or limit the bidder's liability to the Owner, since allowing the bidder to impose such conditions would be prejudicial to other bidders. For example, bids shall be rejected in which the bidder:
1. Protects against future changes in conditions, such as increased costs, if total possible costs to the Owner cannot be determined
2. Fails to state a price and indicates that price shall be “price in effect at time of delivery”.
3. Takes exceptions to the RFP terms and conditions.
4. Inserts the bidder’s terms and conditions.
Prospective firms are encouraged to carefully read this RFP in its entirety.
B. Rates and Fees Each DTS Operator proposal shall identify the following initial rates to be implemented on the Agreement Effective Date:
1. City of Durango compacted solid waste ($/CY)*
2. City of Durango non-compacted solid waste ($/CY)*
3. Transient compacted solid waste ($/CY)*
4. Transient non-compacted solid waste ($/CY)*
5. Transient light construction solid waste ($/CY)*
6. Transient heavy construction solid waste ($/CY)*
7. Transient uncovered solid waste ($/CY)*
*NOTE – These rates shall apply only until the DTS Operator provides, installs, and makes operational ingress and egress commercial certified truck scales.
Each DTS Operator proposal shall also identify the following rates to be implemented when ingress and egress commercial certified truck scales are provided, installed, and operational (No later than April 1, 2027):
8. City of Durango compacted solid waste ($/Ton)*
9. City of Durango non-compacted solid waste ($/Ton)*
10. Transient compacted solid waste ($/Ton)*
11. Transient non-compacted solid waste ($/Ton)*
12. Transient light construction solid waste ($/Ton)*
13. Transient heavy construction solid waste ($/Ton)*
14. Transient uncovered solid waste ($/Ton)*
*NOTE – These rates shall apply beginning on the date the ingress and egress commercial certified truck scales are provided, installed, and operational and shall apply through the remaining Agreement period, subject to approved annual rate adjustments herein.
The DTS Operator may increase these rates annually on the Agreement Effective Date by an amount equal to the U.S. Bureau of Labor and Statistics Consumer Price Index – Denver, Aurora, Lakewood area – Less Food and Energy.
C. Single Proposer Responsibility Single proposer responsibility is required under this RFP. Each proposer responding to this RFP must bid on all services, special services, equipment, materials, and supplies to fulfill the terms of this RFP and, if awarded the contract, must be the sole contracting party with the City of Durango, responsible for all aspects of the project. The requirement for single-point responsibility does not prohibit subcontracts or joint ventures, provided that the single successful proposer assumes the following responsibilities:
1. Serves as the sole contractor with the City of Durango.
2. Assumes full responsibility for the performance of all its subcontractors, joint ventures, and other agents.
3. Provides the sole point of contact for all activities through a single individual designated as project manager.
4. Submits copies of all contracts and other agreements proposed to document such arrangement.
D. Content of Proposal The proposal shall be organized using the following format:
1. Table of Contents
2. References and Experience: List those projects your Project Team has completed within the past five (5) years, or those that are ongoing, that are similar to those requested by this RFP.
Special attention should be given to projects that your team has completed for the City of Durango or other governmental entities. With each reference, include the name, address, persons to contact, telephone number, a description of the project completed, and the time required to complete the project.
3. Project Organization: List of key personnel who will be assigned to the project. List the person’s name, title, project assignments, years of experience, licenses, and any other qualifications relevant to the City’s project. List the names, addresses, telephone numbers, credentials, and roles of all team members. Provide the same information for all sub-consultant personnel. Include which sub-consultants of the team worked together on previous projects.
4. Work Plan and Narrative Approach: Describe your firm’s work plan for the project based upon the scope of services defined in this RFP. Include a proposed timeline that includes each item within the Scope of Work and a statement identifying how elements of the Scope of Work were prioritized. Provide a discussion of your team’s volume of previous awards, current workload, and anticipated workload. Identify how the City may add or re-prioritize tasks in the work plan based on mutual agreement.
5. Identify any services that will not be included in the contract and are expected to be provided by the City of Durango.
Include a statement that the firm maintains the insurance required in this RFP.
E. Further Notice to Proposers This RFP does not commit the City of Durango to negotiate a contract, nor does it obligate the City to pay for any costs incurred in the preparation and submission of proposals or in the submission of a contract.
IV. AWARD CRITERIA AND SELECTION PROCESS
A. General A Selection Committee composed of City personnel and, at the City’s sole discretion, City consultants or partner entities, will review all qualified proposals. All respondents must initially represent themselves solely by their written submittal. The Selection Committee reserves the right to contact any or all the Proposers during the review process for clarification and/or understanding.
Additionally, Proposer(s) may be asked to sit for a committee interview (anticipated to be a virtual interview). Questions and interviews are at the sole discretion and option of the committee and may not be afforded to any or all Proposer(s). Any interviews will be at the sole expense of the respondents. The quantity and quality of responses will dictate this process.
The City will consider the following in determining the most responsive, responsible, and reasonable Proposal:
1. Strength and capability of project team
2. The experience of the project team, working together, in providing similar services;
3. Key personnel that will be assigned to the project, and their experience with similar projects;
4. Narrative and project approach including goals, controls, concepts, and critical issues;
5. Ability to provide ongoing, consistent service to the City for the duration of the project period; and
6. Overall responsiveness to the RFP.
Direct contact with city elected officials or city staff, other than the Purchasing Manager, during the proposal process may render the proposal non-compliant. If such an infraction is determined, at the Purchasing Manager’s discretion, no further consideration may be given to the proposal.
B. Numeric Evaluation Criteria
The Selection Committee will review and rate each proposal based on the following numeric criteria:
Criteria Possible Points Narrative and Project Approach 0-20 Firms' Experience/References & Qualifications of Key Personnel 0-20
Project Schedule and Ongoing Service 0-20 Overall Responsiveness to the RFP 0-20 Price 0-20
C. Final Selection
The City of Durango will select a firm based upon the recommendation of the Selection Committee.
V. INSURANCE
A. The Successful Contractor shall not commence work under this Agreement until it has obtained all insurance required by the contract documents and such insurance has been approved by the City. The Contractor shall not allow any subcontractor to commence work on this project until all similar insurance required of the subcontractor has been obtained and approved. For the duration of this Agreement, the Contractor must maintain the insurance coverage required in this section.
B. The Successful Contractor shall procure and maintain, at its own cost, the following policy or policies of insurance. The Contractor shall not be relieved of any liability, claims, demands, or other obligations assumed pursuant to the contract documents by reason of its failure to procure or maintain insurance or by reason of its failure to procure or maintain insurance in sufficient amounts, durations, or types.
C. Successful Contractor shall procure and maintain and shall cause each Subcontractor of the Contractor to procure and maintain (or shall insure the activity of Contractor’s Subcontractors in Contractor’s own policy with respect to), the minimum insurance coverages listed below.
Such coverages shall be procured and maintained with forms and insurers acceptable to the City. All coverages shall be continuously maintained from the date of commencement of the Work. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage.
1. Worker’s Compensation insurance to cover obligations imposed by the Workers’ Compensation Act of Colorado and any other applicable laws for any employee engaged in the performance of Work under this contract, and Employers’ Liability insurance with minimum limits of One Million Dollars ($1,000,000) each accident, One Million Dollars ($1,000,000) – policy limit, and One Million Dollars ($1,000,000) disease
– each employee.
2. Comprehensive General Liability insurance with minimum single limits of One Million Dollars ($1,000,000) each occurrence and Two Million Dollars ($2,000,000) aggregate.
The policy shall be applicable to all premises and operations. The policy shall include coverage for bodily injury, broad form property damage (including completed operations), personal injury (including coverage for contractual and employee acts), blanket contractual, independent contractors, products, and completed operations.
The policy shall include coverage for explosion, collapse, and underground hazards. The policy shall contain a severability of interests provision.
3. Comprehensive Automobile Liability insurance with minimum combined single limits for bodily injury and property damage of not less than Five Hundred Thousand Dollars ($500,000) each occurrence and One Million Dollars ($1,000,000) aggregate with respect to each of Contractor’s owned, hired and/or non-owned vehicles assigned to or used in performance of the services. The policy shall contain a severability of interests provision.
D. The policies required above, except for the Workers’ Compensation insurance and Employer’s Liability insurance, shall be endorsed to include the City, and its officers and employees, as additional insured. Every policy required above shall be primary insurance, and any insurance carried by the City, its officers, or its employees shall be excess and not contributory insurance to that provided by Contractor.
E. The additional insured endorsement for the Comprehensive General Liability insurance required above shall not contain any exclusion for bodily injury or property damage arising from completed operations. The Contractor shall be solely responsible for any deductible losses under each of the policies required above.
F. Certificates of insurance shall be completed by the Contractor’s insurance agent as evidence that policies providing the required coverage, conditions, and minimum limits are in full force and effect, and copies of such certificates shall be forwarded to the City prior to the start of Work. Each certificate shall identify the Project and shall provide that the coverage afforded under the policies shall not be cancelled, terminated, or materially changed until at least 30 days' prior written notice has been given to the City. If the words “endeavor to” appear in the portion of the certificate addressing cancellation, those words shall be stricken from the certificate by the agent(s) completing the certificate. The City reserves the right to request and receive a certified copy of any policy and any endorsement thereto.
G. Failure on the part of the Contractor to procure or maintain policies providing the required coverages, conditions, and minimum limits shall constitute a material breach of contract upon which the City may immediately terminate the contract, or at its discretion may procure or renew any such policy or any extended reporting period thereto and may pay any and all premiums in connection therewith, and all monies so paid by the City shall be repaid by the Contractor to the City upon demand, or the City may offset the cost of the premiums against any monies due to Contractor from the Owner.
VI. ATTACHMENTS
File details come from the government source that posted it. Updated .