biddoc.pdf
PDF 42 KB Posted
- Attached to
- Foothills Executive 9 Pump Station
- Solicitation number
- 26GF006-710
- Issued by
- Jefferson County, Denver City, Colorado
About this file
This is a Scope of Work document for the Foothills Executive Golf Course Pump Station Replacement Project issued by Foothills Park & Recreation District in Denver, Colorado. The project encompasses removal of the existing pump station, installation of a new owner-provided Watertronics pump station, connection to existing infrastructure, and associated site work including furnishing and installation of up to 60 feet of 3-inch HDPE pipe, new electrical conduit and conductors, a new commercial-grade double door, a 14-foot by 5-foot by 6-inch concrete slab, and turf restoration. The contractor must provide Watertronics Factory Authorized and Trained personnel to set and start the pump station and furnish support for a two-year factory warranty. A highly recommended pre-bid conference and site visit will be held on November 20, 2026 at 10:00 AM at Foothills Golf Course, 3901 South Carr Street. Questions must be submitted via email to Tim Sanchez, Golf Course Superintendent, by 5:00 PM on November 27, 2026, with responses posted to Bidnet by 3:00 PM on December 4, 2026. Bids must be uploaded to the provided link by 11:00 AM on December 11, 2026, with the signed BID FORM included in all submissions. Work is anticipated to commence upon Notice to Proceed on January 1, 2027, with pump station delivery in February 2027 and substantial installation completion by March 26, 2027.
The Scope of Work specifies that all electrical work must be performed by a licensed electrician and that vendors must provide proof of compliance with State HB21-1110 web content accessibility guidelines for remote monitoring. The contractor has discretion in removal methodology for the existing pump station and is responsible for verifying all dimensions prior to work commencement. No pricing information, set-asides, incumbent contractor details, or funding sources are identified in this document.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Foothills Executive Golf Course Pump Station Replacement Project Scope of Work
1. Remove and dispose of existing pump station.
2. Install new owner-provided Watertronics pump station as specified in viewports #3a and #3b.
3. Connect new pump station to the existing 8" HDPE mainline pipe inside of the existing building.
4. Provide Watertronics Factory Authorized and Trained persons, specializing in golf course pump stations, to set and start the pump station
5. Provide support for the (2) year factory warranty
6. Furnish and install up to 60' of 3" DR13.5 HDPE pipe from the wye strainer flush to the edge of the pond as shown in viewport #1. The flush line will require a penetration through the building wall. Patch wall penetration to match existing building condition.
7. It is the Contractors discretion to remove the roof of the building to facilitate removal of the pump station or remove the pump station through the door. If the roof is removed, it will have to be replaced and match the same condition as prior to removal.
8. Existing electrical service is a 200 amp with disconnect.
9. Furnish and install all new electrical conduit and conductors to enter above the new pump station control panel. New power will enter the building from above. Any new conduit on the exterior of the building will be placed on the west wall.
10. Remove existing electrical conduit and hardware that extends from the floor. See note on the pump drawing 'Existing Power to be Relocated', near item 'C'. Conduit can be cut flush to the concrete floor and filled with non-shrinking grout.
11. Remove existing 2" steel filter flush line located near item 'S'. Flush pipe can be cut flush to the concrete floor and filled with non-shrinking grout.
12. WCAG, (web content accessibility compliance) For remote monitoring to meet digital accessibility guidelines in order to conform with State HB21-1110, vendors will be required to provide proof of compliance with those guidelines.
13. Contractor to verify all dimensions prior to work starting.
14. All electrical by a licensed electrician.
15. Furnish and install new 72" commercial-grade double door as specified viewport #2b.
Provide and relocate new exhaust fan on the south wall that impacts the new double door installation. Fan can be moved nearer the east corner of the south wall.
16. Furnish and install new 14' x 5' x 6" 4,000 psi fiber mesh concrete slab on the south side of the existing building
17. Repair any turf areas damaged during equipment installation, to include grading, leveling and re-sodding of areas.
18. A highly recommended Pre-Bid conference and Site Visit will be held on November 20, 2026 at 10:00AM. The Pre-bid conference will begin promptly at 10:00AM at Foothills Golf Course, 3901 South Carr Street, at the existing pump station located along the entrance to the Golf Course Maintenance facility, south of the Clubhouse
19. All questions will be submitted via e-mail to Tim Sanchez, Golf Course Superintendent, Foothills Park & Recreation District, tsanchez@fhprd.org.
20. All questions due by 5:00 PM, November 27, 2026.
21. Question responses will be posted to Bidnet by 3:00PM on December 4, 2026.
22. Bid Submission:
a. Bids must be uploaded to the provided link below by 11:00AM on December 11, 2026 in order to be considered.
b. Included BID FORM must be completed and signed by bidder and included in submitted bid