biddoc.pdf
PDF 202 KB Posted
- Solicitation number
- RFP-PWU-26-051
- Issued by
- Adams County, Weston CDP, Colorado
About this file
This is a bid document for the City of Westminster, Colorado, soliciting qualified construction contractors for a citywide, renewable on-call construction contract to provide repair and replacement services at pump stations, lift stations, and treatment facilities. The contract is designed to address maintenance and capital improvement needs across the city's wastewater infrastructure. The document establishes the framework for contractor qualification, proposal submission requirements, and contract terms for what will operate as an indefinite-delivery, indefinite-quantity (IDIQ) arrangement, allowing the city to issue task orders on an as-needed basis for specific repair and replacement projects at designated facilities throughout the city.
The bid document outlines contractor qualifications, insurance requirements, bonding obligations, and performance standards necessary to support municipal wastewater infrastructure operations. Specific pricing, contract duration, renewal options, and award dates should be detailed within the document sections addressing compensation structures, contract term specifications, and evaluation criteria. Contractors must demonstrate relevant experience with pump station, lift station, and treatment facility work, along with compliance with all applicable local, state, and federal regulations governing construction and environmental work.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP) – CONSTRUCTION
Citywide General Pump Station, Lift Station & Treatment Facilities Repair and Replacement
Solicitation No. RFP-PWU-26-051
SCHEDULE OF EVENTS
RFP Advertisement November 9, 2026 Mandatory Pre-Proposal Conference and Site Visits December 1, 2026 1:00 PM MST Deadline to Submit Questions December 7, 2026 4:00 PM MST Response to Questions December 9, 2026 4:00 PM MST Proposal Due Date December 17, 2026 4:00 PM MST Evaluation December 21, 2026 – January 11, 2027 Tentative Interviews TBD
Procurement official: Bryn Fillinger, Senior Procurement Analyst
Email: bfilling@westminsterco.gov Phone: 303-658-2716
Authorized Communications. From the date of issuance of this Solicitation until award, all communications regarding this Solicitation shall be directed only through BidNet and to the Procurement official listed on the cover page, unless otherwise authorized by the City.
Communication with other City personnel regarding this Solicitation may result in disqualification, in the City’s sole discretion.
The party submitting a proposal, hereinafter referred to as the Proposer, offers to furnish to the City of Westminster the products and services requested in accordance with the specifications and subject to the Terms and Conditions described herein.
Table of Contents
SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS
A.1 INTRODUCTION:
A.2 PROJECT DESCRIPTION
A.3 TERM:
A.4 SCOPE OF WORK/ REQUIREMENTS
A.5 RFP ATTACHMENTS:
A.6 WORK SCHEDULE
A.7 MANDATORY IN-PERSON PRE-PROPOSAL CONFERENCE AND IN-PERSON SITE
VISITS:
A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION:
A.9 CLARIFYING QUESTIONS:
A.10 ADDENDA:
A.11 PRICING:
A.12 PAYMENT TERMS:
A.13 INSURANCE REQUIREMENTS:
A.14 PAYMENT AND PERFORMANCE BONDS:
A.15 LIQUIDATED DAMAGES:
A.16 SPILLAGE:
SECTION B: PROPOSAL SUBMISSION REQUIREMENTS
B.1 GENERAL SUBMISSION INFORMATION:
B.2 CHANGES:
B.3 MODIFICATIONS TO PROPOSAL:
B.4 CONTRACT DOCUMENTS:
B.5 ACCEPTANCE PERIOD:
B.6 PROPOSAL CONTENTS AND FORMAT:
SECTION C: EVALUATION AND AWARD
C.1 EVALUATION OVERVIEW
C.2 PROPOSAL EVALUATION ITEMS:
C.3 EVALUATION AND SELECTION:
C.4 AWARD TYPE:
C.5 NOTICE TO PROCEED:
SECTION D: GENERAL RFP AND CONTRACT INFORMATION
D.1 PAYMENT CONDITIONS:
D.2 RFP CONDITIONS AND PROVISIONS:
D.4 GRATUITIES AND KICKBACKS:
D.5 NON-COLLUSIVE PROPOSER CERTIFICATION:
D.6 DISCLOSURE OF CONTENTS OF PROPOSALS:
D.7 COOPERATIVE PURCHASING:
SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS
A.1 INTRODUCTION:
The City of Westminster, hereinafter referred to as the City, is inviting qualified construction contractors to submit proposals for Citywide General Pump Station, Lift Station & Treatment Facilities Repair and Replacement. This RFP outlines the scope of work, requirements, and conditions for proposing. The successful Proposer, hereinafter referred to as the Contractor, will enter into a contract with the City for the completion of the work outlined herein.
A.2 PROJECT DESCRIPTION
This is a renewable on-call construction contract for repair and replacement services at pump stations, lift stations and treatment facilities. The services call for a general contractor with experience in construction and management of electrical, mechanical and/or integrator construction services subcontractors. The general contractor shall be highly experienced in their respective field with a strong history of working on active facilities, where on-going operations, and no or limited shutdowns are the norm.
Work includes but is not limited to repair and replacement of treatment facilities equipment, pumps, motors, variable frequency drives (VFD)s, electrical systems, as well as instruments control, communications, and programmable logic controls (PLC)s.
General contractor requirements include a strong history of experience and success in: developing, scheduling, submitting, and revising task orders as required. Other general contractor requirements include: coordinating work with Utilities Operations staff’s schedule, holding pre-construction and construction progress meetings, managing subcontractors, managing construction sites, safety/good housekeeping, as well as startup and shut down operations. Work requiring submittal, review, comment and approval includes: task orders, shop-drawings, rudimentary design drawings, scheduling, methods of procedure (MOP)s, record drawings, lock-out tag-out (LOTO) procedures, safety protocols, shutdowns and startups, arc flash evaluations, holding pre-construction and construction progress meetings, meeting records, and invoicing.
These services are task order driven. The general contractor is required to develop task orders that include materials, equipment, and labor quantities and costs for task order work. Timing and frequency of task order execution shall be limited by Utilities Operations staff availability. Work shall not commence until required submittal documentation is reviewed and approved by Westminster Utilities Operations.
Exhibit B provides an overview of the project work identified for this Contract.
A.3 TERM:
It is the City’s intention to award this Contract for a term of up to (5) years. The initial Contract will be three (3) years, with a two (2) year renewal. Any additional Contract extensions shall be in accordance with the City’s Procurement Policy.
All payments and obligations under any resulting contract are subject to annual appropriation of funds by the Westminster City Council for each fiscal year. If the City Council does not appropriate funds for any fiscal year during the term, the contract will terminate as of the end of the last fiscal year for which funds were appropriated.
Nothing in this RFP or any resulting contract shall be deemed or construed as creating a multiple-fiscal-year direct or indirect debt or financial obligation under Colorado Constitution Article X, Section 20 (the TABOR Amendment).
A.4 SCOPE OF WORK/ REQUIREMENTS
An overview of project work identified for this Contract is included in Exhibit B.
A.5 RFP ATTACHMENTS:
Exhibit A Sample Construction Contract Exhibit B Overview of project work identified for this Contract Exhibit C RFP Task Orders 1 & 2, Photos and Drawings Note: Allen Ditch PS Drawings are unavailable Exhibit D Templates for RFP Task Orders 1 & 2
A.6 WORK SCHEDULE
Work hours and associated requirements are defined in Exhibit B.
A.7 MANDATORY IN-PERSON PRE-PROPOSAL CONFERENCE AND IN-PERSON SITE
VISITS:
A MANDATORY pre-proposal conference followed by MANDATORY site visits will be conducted at the date and time listed in the Schedule of Events on the cover page.
The solicitation terms and conditions will be reviewed and discussed. Interested Proposers MUST ATTEND this conference and following site visits in-person to have their proposals considered responsive. The address for the initial Pre-Proposal Conference as follows:
In-Person Meeting Location Westminster Municipal Service Center (MSC) Apple & Spruce Conference Rooms 6575 W. 88th Avenue, Westminster, CO 80031
Proposers MUST participate in the subsequent walk-through inspection of the site(s) conducted by City personnel to familiarize themselves with any conditions which may affect performance and proposed prices.
Please contact the MSC Front Desk at 303-658-2500 on the date of the site visits if you have any trouble finding the location.
A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION:
The City is using Rocky Mountain E-purchasing System (BidNet®) to advertise and manage formal solicitations. Registration with BidNet® is free and provides access to view posted governmental proposals, with an optional paid notification service.
Submission of all proposals and clarifying questions for this solicitation must be done electronically through BidNet® at https://www.bidnetdirect.com/colorado/cityofwestminster no later than the date and time specified in the Schedule of Events. The City is not responsible for the Proposer's actions or interactions with BidNet® or other third-party services related to this RFP.
For more information or assistance with BidNet®, call 1-800-835-4603, Option 2.
A.9 CLARIFYING QUESTIONS:
The City is not bound by, and Proposers shall not rely on, any oral interpretations or clarifications of this RFP.
All questions must be submitted via BidNet no later than the date and time specified in the Schedule of Events. Responses will be posted on BidNet for public viewing.
Except for pre-proposal meetings or site visits, communication with City personnel outside of the Procurement staff may result in disqualification of the Proposer’s submission.
A.10 ADDENDA:
If it becomes necessary to revise, clarify, supplement, or cancel any part of this solicitation, the City will issue written addenda through BidNet. It is each Respondent’s responsibility to verify receipt of and compliance with all addenda.
A.11 PRICING:
Pricing shall be documented on City provided Task Order forms. Work will be Task Order driven, organized into portions of work suitable for Utilities Operations staff to reasonably oversee.
https://www.bidnetdirect.com/colorado/cityofwestminster
Pricing shall be all inclusive, incorporating materials, labor, and equipment costs.
Contractor costs also include meetings and any required documentation associated with the work. Required documentation includes MOPs, LOTO procedures, meeting minutes, submittals, operations & maintenance manuals, and as-built drawings.
For the purposes of the RFP process, proposing contractors will submit two project specific Task Orders as part of the proposal.
• The two Task Orders are example projects that the City will define.
• Preliminary information on the two project specific Task Orders is included farther down in this Section of this RFP.
• The Pre-proposal meeting will begin at Westminster’s MSC building where the
City’s procurement group will provide general information on proposal requirements.
• Information needed to sufficiently complete the task orders will be provided in the second part of the pre-proposal meeting, where we will visit both project sites.
• The project site visits are intended to give proposing contracts the opportunity to take photographs, ask questions, take notes and acquire the information they need to write up both example Task Orders.
• Questions will be answered to the group of attending contractors by addendum.
• Contractors interested in submitting a proposal for this contract are strongly encouraged to bring subcontractor representatives to the pre-proposal meeting who have electromechanical, pump systems, and controls system/SCADA experience.
• The two RFP Task Orders that will be evaluated for accuracy, completeness, and cost.
• RFP Task Orders 1 and 2 are required exclusively for the purpose of evaluating proposals.
• The selected contractor, once under contract with the City, will initiate Task Orders anew, as directed by Utilities Operations staff.
• Aside from the pre-proposal meeting, no additional meetings are scheduled for Task Order 1 and Task Order 2.
A sample task order form is attached to this RFP document.
Task Order 1: Allen Ditch Pump Replacement Project
1. Replace two (2) single bowl vertical turbine pumps with like pumps and motors
2. Replace the check valves downstream of the pumps
3. Go through all hand valves and gate valves associated with Allen Ditch. List R&R related work accordingly and include in Task Order.
4. Identify other associated infrastructure in need of R&R
5. Provide updated electrical/mechanical, and control drawings to the City.
Task Order 2: Northridge Pump Station Improvements Project
1. At Northridge pump station, remove the motor starter for pump 3 and the saft start for pump 4 in the MCC and replace with disconnects.
2. Run feeders (including overhead galvanized rigid conduit (GRC) runs) from the
MCC to a new pad next to the PLC cabinet and add City approved VFDs for pumps 3 and 4.
3. Tie in VFD line to new disconnect.
4. Tie in VFD control to the PLC.
5. Integrate new control narrative to pumps 3 and 4 based on desired station flows and pump curves. Note: City will provide pump curve data.
6. Change hydraulic control valves to swing check valves for pump 3 and 4.
7. Perform startup on pumps 3 and 4.
8. It is desirable for the City to have pump 3 operational before taking pump 4 out of service
9. Provide updated electrical/mechanical, and control drawings to the City.
D, RFP Task Order 1 and RFP Task Order 2 forms.
A.12 PAYMENT TERMS:
Progress payments are authorized in this procurement. Reference Exhibit B for post-construction close-out inspection of completed task orders.
A.13 INSURANCE REQUIREMENTS:
The Contractor shall carry the insurance specified in Exhibit A, Sample Construction Contract, which is included with this RFP, and shall submit proof of such insurance when delivering the executed Contract to the City of Westminster.
The City shall be named as an additional insured on the specified liability insurance policies and certificates of insurance. Insurance certificates required for this project shall be sent to the Project Manager, after the proposal has been awarded.
A.14 PAYMENT AND PERFORMANCE BONDS:
The Contractor will be required to furnish a performance bond in the amount of $3,250,000. The performance bond must be executed by the owner or a general partner or, if a corporation, the secretary's signature and the seal of the corporation must be affixed.
If the Contractor fails to execute and deliver the Construction Contract, furnish the required Performance Bond, furnish the required evidence of insurance, or satisfy all conditions precedent to execution of the Construction Contract within ten (10) days of the date of Notice of Award, Owner may annul the Notice of Award and the Bid
Security of that Proposer will be forfeited, not as a penalty, but as liquidated damages to compensate the City for the cost of delay and also as an estimate of the difference between the Contractor's bid and that of the next lowest acceptable bid. The Bid Security of any Proposer whom the City believes to have a reasonable chance of receiving the award may be retained by the City (a) until seven (7) days after the effective date of the Construction Contract or (b) until the proposals expire, whichever is earlier.
A.15 LIQUIDATED DAMAGES:
The City and the Contractor recognize that time is of the essence in this Construction Contract and that the City will suffer financial loss if the Work is not substantially completed within the time specified in the approved Task Order, plus any extensions thereof allowed by the City by written Change Order. They also recognize the delays, expense, and difficulties involved in proving, in a legal or arbitration proceeding, the actual loss suffered by the City if the Work is not substantially complete on time.
Accordingly, rather than requiring any such proof, the City and the Contractor agree that as liquidated damages for delay (but not as a penalty) the Contractor shall pay the City Five Hundred dollars ($500.00) for each day that expires after the time specified in the approved Task Order. It is agreed that this is a reasonable estimate of the damages likely to be suffered by the City for late completion of the Work. If the Contractor shall fail to pay such liquidated damages promptly upon demand therefor, the Surety on the Performance Bond shall pay such damages. Also, the City may withhold all, or any part of, such liquidated damages from any payment due the Contractor.
A.16 SPILLAGE:
Proposer will be responsible for the cleanup of any contamination or spillage resulting from the delivery and unloading within twenty-four (24) hours of such spillage.
The remainder of this page was intentionally left blank
SECTION B: PROPOSAL SUBMISSION REQUIREMENTS
B.1 GENERAL SUBMISSION INFORMATION:
All proposals must be received by the date and time specified in the Schedule of Events on the cover page. Late submissions will not be considered.
Proposals submitted through BidNet are locked until after the due date. Proposers are encouraged to submit their proposals well in advance to allow time for any technical issues, as late proposals will not be accepted by the system.
For assistance with bid submissions, please contact BidNet® at 1-800-835-4603, Option 2.
Proposers unable to submit electronically must submit a written request to the Procurement Analyst by the Question Due Date to receive permission and instructions for submitting a hardcopy bid.
B.2 CHANGES:
Proposers shall include all costs necessary to provide a complete project. Items required by the scope but omitted from the proposal are deemed included in the proposal price. The City will not approve change orders for work clearly required by the scope. Change orders are reserved for City-directed changes to scope.
B.3 MODIFICATIONS TO PROPOSAL:
No proposal may be modified or withdrawn after the submission deadline. If a firm submits more than one proposal, only the last submission will be considered.
Once submitted, a proposal becomes City property. The City shall retain all proposals submitted regardless of whether that proposal is selected in accordance with the City’s retention policy. Submission of a proposal indicates acceptance by the Proposer of the conditions contained in this RFP.
B.4 CONTRACT DOCUMENTS:
The City's Sample Contract is provided as Exhibit A of this RFP. The awarded Contractor will be required to sign a version of the Contract similar to the one in Exhibit A, with modifications to reflect the actual scope of services.
B.5 ACCEPTANCE PERIOD:
By responding to this RFP, Proposers shall remain firm for 90 days from the proposal due date.
B.6 PROPOSAL CONTENTS AND FORMAT:
Proposals must be in Microsoft Word or an original PDF (not a scanned copy).
Proposals should address all items outlined in the SOW and align with the evaluation criteria. Proposals should not exceed 15 pages. Cover letters, resumes and exhibits to the proposal do not count toward the proposal page limit.
Proposals must specifically include the following:
1. Experience and Qualifications: Identify dedicated construction team members and their availability for the upcoming year. Provide resumes for team members, to include subcontractors, listing experience in municipal utilities and experience in working on operating pump stations, lift stations, and treatment facilities, that have limited on no feasible capacity for construction driven shutdowns.
a. A minimum of 5-years of municipal experience in utilities construction work on existing operating facilities, to include pump stations, lift stations, and treatment facilities.
b. Sensitivity to service shutdown limitations and construction work hour restrictions.
c. Appropriate experience and certifications to work in the operational utilities environment this project calls for.
d. Experience with authoring and managing construction that requires MOPs, LOTO procedures, and scheduling.
e. Safety equipment, personal protective equipment (PPE), and certification/ training for working in operating treatment facilities, lift and pump stations.
f. A minimum of 5-year of operating utilities electro-mechanical and instrumentation & controls construction experience, specific to pumps, VFDs, PLCs.
g. Construction team shall be dialed in to Utilities Operations staff’s availability, State regulatory constraints, and potential impacts on water/wastewater customers.
2. References: Provide references for a minimum of three (3) similar or related successfully completed, construction projects the contractor and their proposed team have managed. Include the contact person’s name, phone number, and email address.
3. Methodology, Approach and Content: Provide methodology and approach for construction required of Task Order 1 and Task Order 2.
4. Equipment: Provide an inclusive list of equipment the construction team will bring to the site to carry out the work
5. Proposed Pricing: Total cost for Task Order 1 and Task Order 2. Task Order 1 and Task Order 2 will also be evaluated for completeness, under Methodology, Approach & Content for 25% weight.
a. Proposers must enter the lump sum of each Task Orders into Bidnet at the time of submission.
Proposers must also attach their completed Task Order 1 and Task Order 2 to the Bidnet uploaded proposal. Each Task Order is required to provide broken out costs for materials, labor, and equipment.
6. Sample Contract Redlines: (if applicable)
7. Certificate of Good Standing from the Colorado Secretary of State’s Office.
8. Subcontractor List: Proposers are required to establish, to the satisfaction of the City, the reliability and responsibility of any proposed subcontractors. Prior to a contract award, the City may notify the Proposer if the City has reasonable objection to any proposed subcontractors. In this event, Proposers may:
a. withdraw their proposal, or
b. submit a substitute subcontractor acceptable to the City with an adjustment in the proposal to cover any difference in cost. The may, at its discretion, accept the adjusted proposal.
9. Licenses and Certifications. Proof of valid Colorado contractor’s license and applicable certifications.
10. Insurance. Proof of the contractor’s insurance coverage (general liability, workers' compensation, etc.).
11. Certificate of Good Standing from the Colorado Secretary of State’s Office.
Successful vendors that are required to furnish a Certificate of Good Standing from the Colorado Secretary of State’s Office, as proof that they are properly registered to do business in the State of Colorado, prior to finalization of award and contracting.
SECTION C: EVALUATION AND AWARD
C.1 EVALUATION OVERVIEW
The City does not discriminate on the grounds of race, religion, color, age, sex, disability, or national origin in consideration of an award. Disadvantaged business enterprises are afforded a full opportunity to submit proposals.
C.2 PROPOSAL EVALUATION ITEMS:
The Selection Committee will perform a preliminary evaluation of each proposal using the following criteria and weighting:
The Selection Committee will perform a preliminary evaluation of each proposal using the following criteria and weighting:
Evaluation Criteria Weight 1 Experience and Qualifications 30 2 Methodology, Approach & Content 25 3 Equipment 25 4 Proposed Pricing 20 Total 100 points
C.3 EVALUATION AND SELECTION:
Selection shall be made to the highest scoring Proposer of the evaluation criteria of this RFP and in accordance with Westminster Municipal Code (W.M.C.) Title XV, Chapter 1, Section 15-1-5.
In evaluating proposals, the City shall consider the qualifications of the Proposers, and whether or not the proposals comply with the prescribed requirements. The City reserves the right to reject proposals that do not pass any such evaluation to the City's satisfaction.
C.4 AWARD TYPE:
Final award as a result of this RFP is contingent upon the successful execution of a City Contract.
The City reserves the right to award part or all of the proposal.
C.5 NOTICE TO PROCEED:
Work shall not commence until a contract has been fully executed and the Contractor has received a City Purchase Order (PO). A Notice to Proceed is not considered valid unless it is accompanied by a PO.
SECTION D: GENERAL RFP AND CONTRACT INFORMATION
D.1 PAYMENT CONDITIONS:
Payment to the Contractor will be made within 30 days after the completion of services and acceptance of a proper invoice. The City reserves the right to withhold payment if the Contractor fails to comply with the purchase agreement or if services are deemed unsatisfactory by the City's inspection. The City will notify the Contractor promptly of any performance issues so that corrections can be made, if possible, before payment is delayed.
Final payment will not be made if the work is found incomplete or does not meet the agreed-upon specifications, including authorized changes. The Contractor must correct or complete any deficiencies before receiving final payment.
Under no circumstances will payment be made for work not authorized by the City, as evidenced by a Purchase Order.
D.2 RFP CONDITIONS AND PROVISIONS:
1. Submission: Proposals (including all required attachments) must be submitted electronically via the Rocky Mountain E-purchasing System (BidNet®).
2. Compliance: All Proposers must comply with the conditions, requirements, and instructions outlined in this RFP. If there are any omissions or conflicts in the instructions, the Proposer must seek written clarification from the Procurement Manager at least forty-eight (48) hours before the proposal opening.
3. Typographical Errors: Errors in proposal pricing may result in the loss of contract award.
4. Proposal Completeness: All requested information must be provided. Failure to submit complete information may result in disqualification.
5. City’s Discretion: The City reserves the right to postpone, cancel, or reject all proposals if deemed in the City’s best interest.
6. Pricing: Unit prices must be provided for each item. In case of discrepancies in price extensions, the unit price will govern.
7. Waiver of Errors: The Procurement Manager reserves the right to waive minor errors or omissions and to reject any or all proposals, or to award a contract in part or whole, if in the City’s best interest.
8. Compliance with Specifications: The Contractor must comply with all terms, conditions, and specifications of this RFP. The City reserves the right to inspect the Contractor’s facilities and equipment to ensure compliance.
9. Eligibility: Proposals from entities in arrears to the City, or failing to meet required legal or regulatory compliance, will not be accepted. Proposers may be asked to demonstrate the necessary knowledge and financial capacity to perform the work.
10. Legal Compliance: The Proposer agrees to abide by all applicable laws, regulations, and ordinances of the United States, State of Colorado, and City of Westminster, securing all necessary licenses and permits.
11. Standards Compliance: All materials, supplies, equipment, and services provided must meet all applicable federal, state, and local codes.
12. Formal Contract: A formal contract will be prepared by the City, and the Contractor must sign and submit required insurance and documentation within ten (10) days (or as otherwise specified) from receipt of the contract.
13. No Liability for Costs: The City will not be liable for any costs incurred by the Proposer in the preparation of proposals or in connection with work performed prior to the contract’s execution.
14. Permits and Fees: The Contractor is responsible for procuring necessary permits, paying taxes, and complying with all associated fees. All costs should be included in the proposal price.
15. Tax Exemption: The City is exempt from City, State, and Federal sales/excise taxes.
Tax exemption certificates will be provided upon request.
D.3 PROTESTS:
This policy does not apply if all proposals are rejected or if the solicitation is cancelled without an award.
1. Right to Protest: Any Proposer or vendor who feels wronged (referred to as the
"aggrieved party") regarding the solicitation or contract award can protest to the Westminster Procurement Manager, Aran Raz, at araz@westminsterco.gov.
2. Timing of Protests:
a. Pre-Award: If the aggrieved party has concerns about the proposal specifications before the proposal opening date, they must submit their protest at least three (3) business days before that date. The aggrieved party must show that there’s a problem with the specifications. Late protests shall not be accepted.
b. Post Award. If the aggrieved party believes the award process did not follow the City’s Procurement rules, they must submit a protest within ten (10) business days after the intent to award is published on Rocky Mountain E- Purchasing System (Bidnet). The aggrieved party must show that the rules were not followed. Late protests shall not be accepted.
c. All protests must be made in writing to the Westminster Procurement Manager, Aran Raz, at araz@westminsterco.gov.
3. Written protest must include:
a. Name, address, and telephone number of the aggrieved party
b. RFP number and date of procurement
c. A clear explanation of the issues.
d. Any evidence or documents that support your protest
e. A detailed explanation of why you believe you are aggrieved.
4. Decision Authority: The Procurement Manager will review and decide on the protest within ten (10) business days of receiving it. The decision will address the issues raised and will be final.
Award Delay: If a protest is filed, the Procurement Manager may choose to delay the award until the protest is resolved.
D.4 GRATUITIES AND KICKBACKS:
It shall be a breach of ethical standards for any person to offer, give, or agree to give any employee or former employee (within six months of termination from City employment), to solicit, demand, accept, or agree to accept from another person, a gratuity or an offer of employment in connection with any decision, approval, disapproval, recommendation, preparation of any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding of application, request for ruling, determination, claim or controversy, or other particular matter, pertaining to any program requirement or a contract or subcontract, or to any solicitation or proposal therefore.
It shall be a breach of ethical standards for any payment, gratuity, or offer of employment to be made by or on behalf of a Subcontractor under a contract to the prime Contractor or higher tier Subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order.
In the event that any gratuities or kickbacks are offered or tendered to any City of Westminster employee, the proposal shall be disqualified and shall not be reinstated.
D.5 NON-COLLUSIVE PROPOSER CERTIFICATION:
By the submission of this proposal, the Proposer certifies that:
1. The proposal has been arrived at by the Proposer independently and has been submitted without collusion with any other Proposer.
2. The contents of the proposal have not been communicated by the Proposer, nor, to its best knowledge and belief, by any of its employees or agents, to any person not an employee or agent of the Proposer or its surety on any bond furnished herewith and will not be communicated to any such person prior to the official opening of the proposal.
3. No Proposer shall submit more than one proposal for this purchase. It shall be the responsibility of each Proposer to obtain the prior written permission of the Procurement Manager before proposal opening in every situation in which the Proposer, due to corporate association or other affiliation, may be found to be impermissibly associated with another Proposer. Failure to observe this requirement could result in all such affiliated proposals being rejected.
4. Any proposer with multiple submissions, shall only have the last proposal considered to accommodate technical difficulty deleting a previous submission.
5. Conflict of Interest Disclosure. Each Proposer shall disclose in its proposal any actual, potential, or perceived conflict of interest, including any current or prior relationship with the City, its officials, or employees, that could affect the Proposer's objectivity or the integrity of the selection process. Failure to disclose a known conflict may result in disqualification.
D.6 DISCLOSURE OF CONTENTS OF PROPOSALS:
The contents of all proposals become a matter of public record and a “Record” under the Colorado Open Records Act, § 24-72-201, et seq., C.R.S. (“CORA”). Upon request to the City, the disclosure of Records is mandatory, with the exception of those Records under CORA which are excluded from disclosure sometimes identified as business or trade secrets or proprietary matters (“Protected Items”). Protected Items so marked may not be disclosed unless disclosure is otherwise required under CORA. If a request is made under CORA for Records, the City will use reasonable efforts to notify the Proposer of the request, and it will be the responsibility of the Proposer to appropriately redact Protected Items from its submittal to the City. If a Proposer does not respond to the City to redact Protected Items as requested all Records may be disclosed by the City. If necessary, a Proposer shall seek a court order to protect their Protected Items, and will defend, indemnify, and hold harmless the City from any claim or action related to the City’s withholding of Protected Items.
D.7 COOPERATIVE PURCHASING:
The City of Westminster encourages and participates in cooperative purchasing endeavors undertaken by or on behalf of other governmental jurisdictions including the Multiple Assembly of Procurement Officials (MAPO) and the Cooperative Educational Purchasing Council (CPEC). We hereby request that any member of MAPO/CPEC be permitted to avail itself of this contract and purchase as specified by the contract resulting from this solicitation request, at the contract prices established therein. Each governmental entity would establish its own contract, issue its own orders, be invoiced directly, make its own payments and issue its own exemption certificates as required. It is understood and agreed that the City of Westminster is not a legally binding party to any contractual agreement made between another governmental entity and the Contractor as a result of this solicitation. The City shall not be liable for any costs or damages incurred by any other entity.
| SECTION A: RFP OVERVIEW AND PROJECT REQUIREMENTS |
| A.1 INTRODUCTION: |
| A.2 PROJECT DESCRIPTION |
| A.3 TERM: |
| A.4 SCOPE OF WORK/ REQUIREMENTS |
| A.5 RFP ATTACHMENTS: |
| A.6 WORK SCHEDULE |
| A.7 MANDATORY IN-PERSON PRE-PROPOSAL CONFERENCE AND IN-PERSON SITE VISITS: |
| A.8 ELECTRONIC SUBMISSION OF PROPOSALS AND COMMUNICATION: |
| A.9 CLARIFYING QUESTIONS: |
| A.10 ADDENDA: |
| A.11 PRICING: |
| A.12 PAYMENT TERMS: |
| A.13 INSURANCE REQUIREMENTS: |
| A.14 PAYMENT AND PERFORMANCE BONDS: |
| A.15 LIQUIDATED DAMAGES: |
| A.16 SPILLAGE: |
| SECTION B: PROPOSAL SUBMISSION REQUIREMENTS |
| B.1 GENERAL SUBMISSION INFORMATION: |
| B.2 CHANGES: |
| B.3 MODIFICATIONS TO PROPOSAL: |
| B.4 CONTRACT DOCUMENTS: |
| B.5 ACCEPTANCE PERIOD: |
| B.6 PROPOSAL CONTENTS AND FORMAT: |
| SECTION C: EVALUATION AND AWARD |
| C.1 EVALUATION OVERVIEW |
| C.2 PROPOSAL EVALUATION ITEMS: |
| C.3 EVALUATION AND SELECTION: |
| C.4 AWARD TYPE: |
| C.5 NOTICE TO PROCEED: |
| SECTION D: GENERAL RFP AND CONTRACT INFORMATION |
| D.1 PAYMENT CONDITIONS: |
| D.2 RFP CONDITIONS AND PROVISIONS: |
| D.4 GRATUITIES AND KICKBACKS: |
| D.5 NON-COLLUSIVE PROPOSER CERTIFICATION: |
| D.6 DISCLOSURE OF CONTENTS OF PROPOSALS: |
| D.7 COOPERATIVE PURCHASING: |