Summary of RFP #26500395: Demolition Services for 575 Bush Street

This Request for Proposal is issued by the City of Brighton, Colorado, for complete demolition and debris disposal services at 575 Bush Street in Brighton, CO 80601. The project involves demolishing a historically designated 1919 red brick building (approximately 6,404 total square feet including a 1986 addition) and associated structures, including a meter building and parking lot. Respondents must attend a mandatory pre-proposal meeting scheduled for Thursday, November 12, 2026, at 1:00 PM MT at the project site; only attendees will be eligible to submit proposals. Written questions are due by Wednesday, November 18, 2026, at 10:00 AM MT, with an addendum (if necessary) issued by Wednesday, November 25, 2026. Proposals must be submitted electronically via BidNetDirect.com by Thursday, December 10, 2026, at 10:00 AM MT. The anticipated project start date is mid-December 2026, with a completion deadline of February 28, 2027. Standard working hours are Monday through Friday, 7:00 AM to 7:00 PM MT, with weekend and holiday work requiring City approval.

The scope of work includes interior deconstruction, structural demolition to grade, site clearing, debris removal and lawful disposal, utility abandonment coordination (water, sewer, irrigation, and well), erosion control, site restoration to rough grade, and all required permitting (with City of Brighton permit fees waived). Contractors must comply with the Keep Jobs in Colorado Act, employing at least 80 percent Colorado labor. The contractor is responsible for asbestos-containing material (ACM) abatement on roofing materials, which have been tested but not previously abated. Historic artifact preservation and other hazardous materials abatement will be completed under a separate contract prior to demolition commencement. The evaluation committee will award the contract based on 100 total points, weighted as follows: Price and Terms (25 points), Project Approach and Project Management (15 points each), Technical Qualifications and Historic Satisfaction/Service Level/Quality (15 points each), Schedule/Timeline (10 points), and Safety (5 points). No specific set-asides are identified in this solicitation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

Number: 26500395

Title: Demolition Services for 575 Bush St

COVER SHEET

RFP Issue Date: October 28, 2026 Pre-Proposal Meeting: MANDATORY

Thursday, November 12, 2026 @ 1:00pm MT

575 Bush St Brighton, CO 80601 RFP Questions Due: Wednesday, November 18, 2026 @ 10:00am MT Addendum (if necessary): Wednesday, November 25, 2026 Proposal Due Date: Thursday, December 10, 2026 @ 10:00am MT Proposal will be received at: BidNetDirect.com

(Only electronic submissions via BidNet Direct are accepted)

Procurement Point of Contact: Kelsey Archuleta

Email Address: procurement@brightonco.gov

The individual listed above is the sole point of contact for this solicitation. Initiating contact with anyone other than this individual will result in disqualification of the Respondent’s proposal.

The undersigned hereby affirms that (i) they are a duly authorized agent of the Contractor, (ii) they have read all terms and conditions and technical specifications which were made available in conjunction with this solicitation and fully understand and accept them unless specific variations have been expressly listed in their Response, (iii) they acknowledge receipt of each addendum issued pursuant to the Solicitation, (iv) the Response is being submitted on behalf of the Contractor in accordance with any terms and conditions set forth in this Solicitation, and (v) the Contractor will accept any awards made to it as a result of the Response submitted herein for a minimum of ninety (90) calendar days following the date of submission.

COMPLETE ALL INFORMATION BELOW:

Addendum No. _____ Issue Date: ____________ Addendum No. _____ Issue Date: ____________

Addendum No. _____ Issue Date: ____________ Addendum No. _____ Issue Date: ____________

Name of Company: _________________________________ Federal Tax ID: _________ Address: ____________________________________________________________________ City, State: _______________________________________ Zip: __________________ Contact Person: ___________________________________ Title: _________________ Email Address: ____________________________________ Phone: _______________

Authorized Signature: _______________________________ Date: ________________ Signatory Name: ___________________________________ Title: _________________ Email Address: ____________________________________ Phone: _______________

2025.05.29 Page 2 of 12 RFP# 26500395

26500395

Demolition Services for 575 Bush St

SUBMISSION INSTRUCTIONS

PROJECT SUMMARY: The City of Brighton seeks the proposal of qualified Respondents to provide complete demolition and debris disposal services of the facility located at 575 Bush Street in Brighton, CO 80601. The City of Brighton by and through its Division of Procurement & Contracts is accepting Proposals from qualified Respondents to furnish all labor, equipment, supplies, and materials as necessary for Demolition Services for 575 Bush St stated herein this Request for Proposal.

PRE-PROPOSAL MEETING DETAILS:

The purpose of this meeting and/or site visit is to allow Respondents which may submit a proposal the opportunity to present questions and obtain clarification relative to any facet of this solicitation.

If anything of importance is asked and not answered during this conference, please submit in writing to obtain an answer.

Pre-registration Policy: It is requested for planning purposes that each Respondent notify the City of their attendance at the pre-proposal meeting and only one representative per company may attend . Please email procurement@brightonco.gov using the subject line “RSVP Pre-Proposal 26500395” and include the name, phone number, and email address of the person who will be attending.

If noted as mandatory: Due to the importance of all Respondents having a clear understanding of the scope of the work and requirements of this solicitation, a Respondent must be in attendance during the entire pre-proposal conference in order to submit a proposal. Proposals will only be accepted from those in attendance.

If noted as recommended: Attendance is not a prerequisite for submitting a proposal.

Attendance at the meeting will be evidenced by identification of the prospective Respondent and the signature of the Respondent’s representative on the attendance roster. The representative of each Respondent attending is expected to bring a copy of the solicitation documents and any drawings and plans for reference during the conference. Any changes resulting from this conference as well as the attendance list will be issued in a written addendum to the solicitation.

No two Respondents may be represented by the same person or entity. No person or entity may later submit a proposal on behalf of a Firm which the person or entity did not represent at the pre- Proposal meeting.

Attendees must wear appropriate Personal Protective Equipment (PPE), as deemed necessary based upon site conditions, at all times during the pre-proposal meeting. The City shall not provide PPE to attendees.

Issuance of this invitation does not commit the City of Brighton to award any contract or to procure or contract for any equipment, materials or services.

2025.05.29 Page 3 of 12 RFP# 26500395

RESPONSE FORMAT:

Each response shall consist of the following, in one single Word or PDF document, and in the following order, unless otherwise specifically requested in the specifications/scope of work.

Should Respondents include an optional cover letter or executive summary, it shall not exceed one (1) page. Information that is reasonably considered proprietary or confidential should be clearly marked as such in the submitted Response.

CAPABILITIES AND EXPERIENCE:

Provide specific information regarding the Firm’s experience and capabilities on similar projects or related services. Focus, to the greatest extent possible, on the Firm’s past or present experience with projects similar to this scope. Include experience with other past projects for the City of Brighton which would be of benefit to this service. Provide a summary of the Firm’s local in-house capabilities in all disciplines that may be applicable.

Provide an organizational chart that identifies each of the project members and the respective reporting hierarchy.

The City desires to work with one point of contact within the Firm or company, identify this person within the Proposal. The Project Manager shall be one individual that shall have the responsibility for things such as construction inspection, meeting attendance, as well as all other requirements as set forth in the specific requirements as needed.

Provide a list of completed projects of similar size and nature within the last five (5) years. The project list shall include the name of the customer, date of service, project budget/original contract amount, number of approved change orders, total dollar amount of approved change orders, and final contract amount. For each referenced project, identify which of the proposed project members contributed to the project.

EQUIPMENT & FLEET LIST: Provide satisfactory evidence that the Company is familiar with the class of work specified and that it has the necessary personnel, capital, tools, machinery, and other equipment necessary to conduct the work in a good and workmanlike manner to the satisfaction of the City within the time specified. Provide a list of applicable equipment intended to be used to fulfill the services listed herein.

PROJECT APPROACH: Provide a comprehensive plan incorporating the requirements of the scope of work, applicable regulatory agency requirements, and the Firm’s suggested value-adding services for the project. Include tasks and details of all phases, should the scope require a phased approach in the opinion of the Respondent. The approach shall outline the methodology to be followed; describe the objectives, deliverables, and outcomes; and identify risks, constraints, and assumptions. Outline an approval and monitoring process that the Respondent plans to follow related to potential change orders. Describe the information that the City will need to be prepared to provide to the Respondent upon request to complete the required deliverables.

GANTT CHART: Provide a proposed timeline for each phase, if a phased approach is applicable.

The timeline shall include all major milestones between the start and finish of the project. Provide the timeline without being date specific, use days, weeks, months, etc. as units of measure.

FEE SCHEDULE: Respondents shall include a table of costs/fees labeled Fee Schedule with submission. Prices shall include per-unit rates for all costs in connection with the proper and

2025.05.29 Page 4 of 12 RFP# 26500395

successful completion of the work, including furnishing all materials, equipment and tools, and performing all labor and supervision to fully complete the work to the City’s satisfaction. Per hour charges shall include but are not limited to all on-site visits, inspections, report preparation, copies, travel time, meeting attendance, photographs, schedule reporting, final inspections, occupancy coordination, etc. The schedule shall contain a total for all tasks/items combined.

WORK IN PROGRESS: List the projects the Firm currently has in progress including the location and name of project, original contract amount, number of approved change orders, current contract amount, percentage of completion, and scheduled completion date. The intent of this request is to understand the Respondent’s capacity to perform the work stated in the scope of work/specifications. Respondents are not required to provide a comprehensive work in progress list; however, it should encompass enough detail to accurately reflect the Respondent’s capacity to perform the work associated with the City of Brighton’s project.

SAFETY RECORD: Provide a copy of the Company’s Experience Modification Rating (EMR) letter produced by the Company’s insurance agency to explain the Company’s Workers compensation experience rating and safety record during the past five (5) years; not to exceed one (1) page in length.

In one (1) page or less, describe the Company’s Occupational/Workplace Health and Safety Policy and training program.

CERTIFICATE OF FACT OF GOOD STANDING: The Submission shall contain a currently-dated Certificate of Fact of Good Standing from the State of Colorado. In order to do business with the City of Brighton, the Submitter must be registered and authorized to do business and in good standing with the State of Colorado.

SUBCONTRACTOR & MATERIAL SUPPLIER LIST: On the City’s form, provide a complete list of subcontractors and material suppliers proposed for the project and include with the submission.

QUALIFICATION STATEMENT: Complete the City’s form in its entirety and include with the submission.

DISADVANTAGED BUSINESS ENTERPRISE SELF-CERTIFICATION FORM: Complete the City’s form in its entirety and include with submission.

AFFIDAVIT OF RESIDENCY: Complete the City’s form in its entirety and include with submission.

DISCLOSURE OF GENERATIVE ARTIFICIAL INTELLIGENCE USAGE: Complete the City’s form in its entirety and include with submission.

SIGNATURE: Solicitation Cover Sheet must be completed and signed by an authorized signatory, acknowledging all addendums issued during the solicitation period. This signature validates the Response and verifies that the entire submission is a true representation of the organization submitting.

SPECIAL CONDITIONS:

KEEP JOBS IN COLORADO ACT (C.R.S. 8-17-101)

Pursuant to the Keep Jobs in Colorado Act, C.R.S. § 8-17-101, et seq. (the "Act"), and the rules adopted by the Division of Labor of the Colorado Department of Labor and Employment

2025.05.29 Page 5 of 12 RFP# 26500395

implementing the Act (the "Rules"), Contractor shall employ Colorado labor to perform at least eighty percent (80%) of the work under the Contract and shall obtain and maintain the records required by the Act and the Rules. For purposes of this Section, "Colorado labor" means a person who is a resident of the state of Colorado at the time of the Contract, without discrimination as to race, color, creed, sex, sexual orientation, marital status, national origin, ancestry, age, or religion except when sex or age is a bona fide qualification. A resident of the state of Colorado is a person with a valid Colorado driver's license, a valid Colorado state-issued photo identification, or documentation that they have resided in Colorado for the last 30 days. By submitting a Response, Contractor represents that it is familiar with the requirements of the Act and the Rules and will fully comply with same. The City shall waive the eighty percent (80%) requirement if there is reasonable evidence to demonstrate insufficient Colorado labor to perform the work of the project and if compliance with this article would create an undue burden that would substantially prevent a project from proceeding to completion. The City shall not impose contractual damages on a contractor for a delay in work due to the waiver review process. This Section shall not apply to any project for which appropriation or expenditure of moneys may be reasonably expected not to exceed $500,000 in the aggregate for any fiscal year.

REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK.

2025.05.29 Page 6 of 12 RFP# 26500395

Scope of Work

INTRODUCTION

Constructed in 1919, the building located at 575 Bush Street has served multiple civic functions throughout its history. The structure is locally designated as a historic resource and has remained vacant since 2012. The original building is 50 feet by 85 feet and constructed of red brick. The main floor is 8 feet above grade, allowing for a basement with 17 feet high ceilings.

A sheet metal cornice wraps the building and parapet walls extend above the roof on the east, west, and south sides. The low-slope roof drains to a gutter on the north side of the original building. The main entry to the original building faces Bush Street to the south, and features a single door with a side panel, sidelights, and a transom.

Concrete steps lead to a concrete landing. Under the landing is an entry to the basement. The upper-level windows are paired wood double hung with transom windows above. The basement windows are paired wood double-hung windows. The exposed portion of the basement walls are parged and painted. The interior of the upper level has been subdivided into offices, a clinic space, an activity/dance room, and a craft area. The basement level contains a boiler, abandoned pumps and piping, and storage. The upper floor and basement are 2,852 square-feet each, while the north wing is 274 square-feet.

The single-story 1986 addition is attached to the east side of the original building and is frame construction clad in an exterior insulation and finish system (EIFS). The center portion of the building has a shed roof clad in standing-seam metal. The north and south ends of the addition have flat roofs with a modified bitumen membrane. A gable-roofed entry element faces east toward 6th Avenue. The addition windows are double-hung metal-clad windows. The addition is 3,278 square-feet. The interior of the addition is one large space with a dining area to the north, a lounge and reception counter in the center, and a billiard room to the south. To the north of the original building is a single-story wing at grade which was constructed as a part of the original building.

The exterior walls are a mix of red brick and stucco. The wing has a flat roof. The wing houses a kitchen serving the 1986 addition. An entry vestibule with a standing-seam metal shed roof is located on the north side of the 1986 addition. The west elevation of the original building has a wood frame porch at the upper level, and an entry to the basement is located under the porch.

PROJECT BACKGROUND

The selected Contractor shall be responsible for complete demolition including debris removal and disposal of the building, parking lot, and meter building located at 575 Bush Street, in Brighton, Colorado. City Council has approved demolition of the structure following an extensive evaluation of the building’s condition, environmental hazards, and the economic feasibility of rehabilitation. Historic artifact preservation and salvage as well as asbestos and hazardous materials abatement, with the exception of roofing materials, will be completed under a separate contract prior to the start of demolition work. The selected Contractor shall not begin demolition activities in any area of the structure until the City has confirmed in writing that

2025.05.29 Page 7 of 12 RFP# 26500395

preservation and abatement work is complete in that area. The selected Contractor shall perform complete demolition of the main structure, the meter building on the north end of the property, and the parking lot including site clearing, debris removal, and rough grading in accordance with applicable federal, state, and local requirements.

Prior to Notice to Proceed for demolition activities in any given area, the demolition Contractor will be provided with a written abatement clearance package confirming that all identified hazardous materials in that area have been removed and that designated historic artifacts have been salvaged.

Existing information to be used in connection with the proposal and incorporated herein by reference, include the following:

• Existing Building Plans

• Asbestos Inspection Report (White Hat Services LLC, dated January 5, 2026)

• Historic Structure Assessment (Bret Johnson Architecture, dated May 1, 2025)

• Utilities Map

SCOPE OF SERVICES

The selected Contractor shall provide all labor, materials, supervision, equipment, transportation, and coordination necessary to completely demolish all of the structures at 575 Bush Street, as well as the parking lot, including:

• Interior deconstruction and removal of remaining non-structural and structural elements;

• Structural demolition of the building, including exterior walls, roof, and foundation to grade or as otherwise directed by the City;

o Roof materials have been tested for ACM but have not been abated. Contractor is responsible for abatement as part of this scope of services. Refer to the attached ACM testing report.

• Abandon existing site utilities in coordination with utility providers and City staff. Known utilities include but are not limited to:

o Water, sanitary sewer, wastewater; service provider is City of Brighton Proper abandonment of the 6-inch PVC water main on the north end. This includes cutting and capping both the east and west sides, with the addition of placing a thrust block on both ends for safety measures. This also includes the abandonment of an irrigation line that is tapped off of this 6-inch water main.

There is an existing well sitting adjacent to the old meter shop that needs to be properly abandoned. Coordination with both the City and State will be required, with the due burden falling on the Contractor to communicate with the State once it has been properly abandoned per their criteria.

There are multiple sanitary sewer service lines that connect to the old buildings that will need to be abandoned, ripped, and grouted within the manholes to prevent inflow and infiltration.

There is an existing water service line that connects to the main building on the south side that shall be cut and capped outside of the meter vault. The meter vault itself shall be removed from the premises entirely.

Refer to the attached images that indicate location of services that need to be abandoned and gauge the individual service lines inside the manholes.

o Other Contractor is responsible to investigate and identify other utilities within the project limits.

2025.05.29 Page 8 of 12 RFP# 26500395

Contractor is responsible to contact and coordinate disconnection with each service provider.

• Site safety, dust and debris control, and protection of adjacent structures, sidewalks, and public rights-of-way;

• Erosion control measures, including inlet protection and curb socks at a minimum;

• Removal and lawful disposal or recycling of all demolition debris;

• Site footprint shall be backfilled, compacted, rough graded, and include erosion control measures (such as seeding, mulch, and curb differential); and

• Investigate and acquire all required demolition and other related permits, including ESC, State Stormwater, and CDPHE Municipal separate storm sewer system (MS4);

o Fees for permits required by City of Brighton will be waived.

Contractor is responsible for excavation of all subsurface work and removal and disposal of unneeded spoils, debris, and unused items. The Contractor must appropriately secure any open excavations at all times.

Restoration of any damages to the site outside the project limits that are caused by the Contractor will be the sole responsibility of the Contractor. Restoration and repairs must meet the expectations of the City of Brighton.

The Contractor is responsible to provide temporary fencing to secure the site and any of their equipment or materials left on location and unattended.

Coordination Requirements: The Contractor shall coordinate directly with the City, and with the contracted preservation and abatement Contractor if still mobilized on site, to confirm that all designated historic artifacts have been removed and all identified hazardous materials have been abated and cleared prior to beginning demolition in any given area. If suspect materials not identified in the Asbestos Inspection Report are discovered during demolition, work in the affected area shall stop immediately, the material shall be treated as presumed asbestos containing materials (ACM), and the City shall be notified so that sampling or abatement can be arranged.

The Contractor is responsible for notifying residents and businesses in the surrounding area at least 24-hours in advance about any temporary utility service disruption that may occur, including a timeline for such disruption and brief restoration plan. Additionally, notices must be provided at least 24-hours in advance of any parking restrictions or traffic detours. Notices must be delivered in both English and Spanish. It is encouraged that the Contractor collaborate with the City’s Public Information Office to provide notification through the City’s established media channels.

Timeline: Project shall be completed no later than February 28, 2027, with an anticipated start date of mid-December. If this duration is not enough time to complete the project, in the opinion of the Contractor, provide a written response justifying the extended duration. The City will consider alternative schedules on a case by case basis.

Working hours are Monday through Friday from 7:00am to 7:00pm with weekend and holiday work as approved by the City in writing.

2025.05.29 Page 9 of 12 RFP# 26500395

Deliverables: Complete demolition of the structures to grade; site restored to rough grade with all debris removed; debris disposal/recycling documentation; and as-demolished site condition photos and subsurface survey conditions.

REMAINDER OF THIS PAGE INTENTIONALLY LEFT BLANK.

2025.05.29 Page 10 of 12 RFP# 26500395

Response Checklist

Respondents are encouraged to utilize the following checklist as a tool to verify that all components of the solicitation requirements have been addressed. It is not necessary to return this document with the submitted response as it is not a criterion of evaluation.

Response Format � One, single file PDF or Word document � Optional cover letter or executive summary, not to exceed one (1) page in length � Confidential and/or proprietary information, if any, is clearly labeled � Submission is in the correct order, as specified by the Submission Instructions

Written or narrative components that require the Respondent to provide information include:

� Capabilities and experience � Organizational chart � Identify main point-of-contact � List of past completed projects � Equipment and Fleet list � Project approach � Gantt chart � Work in progress � Safety record and/or safety program � Review of form Contract

Documents must be submitted with the response:

� Complete and return the enclosed City of Brighton Cover Sheet � Complete and return the enclosed City of Brighton Subcontractor and Material Supplier List � Complete and return the enclosed City of Brighton Qualification Statement form � Complete and return the enclosed City of Brighton Disadvantaged Business Enterprise Self-

Certification Form � Complete and return the enclosed City of Brighton Affidavit of Residency form � Complete and return the enclosed City of Brighton Disclosure of Gen AI form � Provide Certificate of Fact of Good Standing produced by the State of Colorado � Provide Fee Schedule

REMAINDER OF PAGE INTENTIONALLY LEFT BLANK.

Evaluation Criteria It is the intent of the City of Brighton to award a contract to the Contractor whose Response has been deemed the most responsive and responsible of those received by the City’s designated Evaluation Committee. Notwithstanding the foregoing, the City reserves the right to alter this method of award if such alteration is in the best interests of the City. Only those Responses which have been deemed Responsive by the City’s Procurement & Contracts Division will qualify for review by the Evaluation Committee. The Evaluation Committee will determine the Responsibility of Responses based on the following criteria, listed in no particular order:

Responsible Criterion Standard Points

Project Approach Does the Response demonstrate a full understanding of the requirements and project objectives? 15 Project Management Does the Response include a project management plan, including methodology, and operation plan that aligns with the City’s expectations?

Technical Qualifications Does the Response demonstrate the Contractor’s experience, capabilities, personnel, and/or equipment required to satisfactorily complete the project?

Schedule/Timeline Does the Response contain a schedule/timeline that satisfies the needs or requirements of the City? 10 Price and Terms Does the Response include a fee schedule that is reasonable and appropriate, and is it within the appropriated project budget? Does the Response include exception(s) to any of the City’s standard Contract Terms and Conditions?

Historic Satisfaction, Service Level, Quality

Does the Response demonstrate the Contractor’s consistent satisfactory completion of past projects within budget and on time? Does the Response include the Contractor’s relevant experience with projects similar to the size and scope of work stated within the Solicitation? Does the Response demonstrate the Contractor’s ability to predict, mitigate, and resolve project risks and constraints?

Safety Does the Response demonstrate the Contractor’s history of safe workplace practices? Does the Response describe the Contractor’s enforcement method for safe and healthful working conditions as prescribed by the Occupational Safety and Health Administration (OSHA)?

Total Points Possible 100

THIS PAGE INTENTIONALLY LEFT BLANK.

CAPABILITIES AND EXPERIENCE:
KEEP JOBS IN COLORADO ACT (C.R.S. 8-17-101)
INTRODUCTION
PROJECT BACKGROUND
SCOPE OF SERVICES

File details come from the government source that posted it. Updated .