This is a Request for Proposals (RFP) issued jointly by the City and County of Denver's Denver Bond Office and Department of Transportation & Infrastructure for Construction Manager/General Contractor (CM/GC) services for the Boettcher Concert Hall Renovation project located at 1000 14th Street, Denver, Colorado. The project involves comprehensive renovation and rehabilitation of the existing Boettcher Concert Hall within the Denver Performing Arts Complex, including critical building system upgrades (HVAC, fire protection, life safety, data, technology, stage lighting, and audiovisual systems), new interior finishes, seating, acoustic improvements, floor plan modifications for improved circulation and ADA compliance, and exterior work including roofing and facade repairs. The project also evaluates potential pavilion expansion and west-side addition to activate the adjacent sculpture park. Phase 1 proposals are due December 2, 2026, at 2:00 p.m. via BidNet Direct. A pre-proposal meeting is scheduled for October 28, 2026, at 11:00 a.m., and an optional site visit is offered November 2, 2026, from 10:00 a.m. to 12:00 p.m. The deadline for submitting questions is November 17, 2026, at 2:00 p.m. Shortlist notification is anticipated for December 18, 2026, with Phase 2 submittal due in January 2027, interviews in January 2027, notice of selection in January 2027, and preconstruction Notice to Proceed in March 2027.
The project budget is $120,000,000 with an anticipated preconstruction and construction budget estimate of $100,000,000, funded by the Vibrant Denver Bond (approved by voters in 2025). The contractor must be prequalified in category 2B General Building—Occupied Buildings at the $50,000,000 monetary level. MWBE participation requirements are zero percent for the preconstruction phase and 17 percent for the construction phase, with participation to be met through certified firms or demonstrated good faith efforts. The project is subject to prevailing wage requirements per Denver Revised Municipal Code Sections 20-76 through 20-79, City Minimum Wage requirements per Sections 20-82 through 20-84, and Workforce Ordinance requirements per Article XI of Chapter 28, including vertical construction apprentice utilization and target hire requirements. Liquidated damages are set at $5,000 per calendar day for failure to achieve substantial completion by the specified Construction Time. The CM/GC will be compensated for preconstruction services on a lump-sum basis with monthly payments, with compensation for construction services contingent upon successful Guaranteed Maximum Price (GMP) negotiation; cost savings shall revert entirely to the City with no shared savings to the CM/GC. The project requires LEED Gold certification per Executive Order 123 and compliance with the City Platform for all project-related communications and documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY AND COUNTY OF DENVER
STATE OF COLORADO
THE DENVER BOND OFFICE AND
DEPARTMENT OF TRANSPORTATION
& INFRASTRUCTURE
REQUEST FOR PROPOSAL
CONSTRUCTION MANAGER/GENERAL
CONTRACTOR (CM/GC) SERVICES
FOR
BOETTCHER CONCERT HALL RENOVATION
SOLICITATION NO. 202686467
DATE OF ISSUANCE: OCTOBER 22, 2026
Table of Contents
NOTICE OF INVITATION FOR PROPOSALS
SECTION 1 – INTRODUCTION
SECTION 2 – TENTATIVE SELECTION SCHEDULE
SECTION 3 – DESCRIPTION OF SERVICES
A. Project Background and Overview
B. Project Goals
C. Project Budget
D. Project Scope
E. Project Specific Requirements
F. Anticipated Project Schedule
G. Project Management Platform Requirements
SECTION 4 – WORK DESCRIPTION FOR CM/GC SERVICES
A. CM/GC Preconstruction Services
B. CM/GC Preconstruction Deliverables
C. CM/GC Construction Services
D. Subcontracting and Self-Performed Work
E. Required Availability of Key Personnel
F. Organizational Conflicts and Ineligible Firms
G. Compensation for CM/GC Preconstruction Services
H. Explanation of Guaranteed Maximum Price (GMP)
I. Cost Savings
SECTION 5 - GENERAL REQUIREMENTS
A. RFP Administration
B. Colorado Open Records Act
C. No Discrimination in Employment
D. Applicable Laws
E. Verification of Information
F. Submission Ownership – Use and Rights
G. Addenda
H. Contract Review
I. Insurance and Indemnification
J. Wage Rate Requirements
K. Minimum Wage Ordinance
L. Liquidated Damages
SECTION 6 – MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISE (MWBE)
PROGRAM
SECTION 7 – WORKFORCE REQUIREMENTS
SECTION 8 – SELECTION PROCESS
City Selection Committee
SECTION 9 – PHASE 1 PROPOSAL REQUIREMENTS
Phase 1 Selection Criteria – Utilized solely to shortlist proposers for Phase 2
Phase 1 Proposal Tabs
Tab 1 – Letter of Transmittal and Required Documents
Tab 2 – Team Qualifications/Experience (Limit to 5 pages)
Tab 3 – Project Understanding and Approach (Limit to 5 pages)
Tab 4 – Innovative CM/GC Delivery Method Solutions and Project Risks (Limit to 4 pages)
Tab 5 – Project Schedule (Limit to 4 pages)
Tab 6 – Comments to Sample Agreements
Tab 7 – MWBE Responsiveness Requirements
Tab 8 – Workforce Requirements
***PHASE 2***
SECTION 10 – SHORTLIST FIRMS ONLY – PHASE 2 – INTRODUCTION
ATTACHMENTS
Notice of Invitation
DENVER BOND OFFICE AND
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
NOTICE OF INVITATION FOR PROPOSALS
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) SERVICES FOR
BOETTCHER CONCERT HALL RENOVATION
Solicitation No. 202686467
The Denver Bond Office (“DBO”) and the Department of Transportation & Infrastructure (“DOTI”), City and County of Denver (“City”), has issued a Request for Proposals (the “RFP”) for Construction Manager/General Contractor (“CM/GC”) services for the project named above. RFP documents will be available for download at www.bidnetdirect.com//cityandcountyofdenverdoti, reference 202686467.
Phase 1 Proposals will only be received via the online electronic bid service through www.bidnetdirect.com//cityandcountyofdenverdoti. Phase 1 Proposals are due at 2:00 p.m. on December 2, 2026.
Late submissions will not be accepted.
Vibrant Denver Bond Program Approved by voters in 2025, the $950 million Vibrant Denver Bond Program is delivering 58 major projects across Denver, including libraries, parks and recreation centers, cultural facilities, affordable housing, improved streets and bridges, a family health clinic, a children’s advocacy center, and much more – without adding any new taxes.
This bond program was informed by direct community input from thousands of Denverites and community leaders.
The City will build the projects in this bond over six years from 2026 to 2031. Learn more at Vibrant Denver Bond.
General Statement of Work This project will renovate and rehabilitate the existing Boettcher Concert Hall in the Denver Performing Arts Complex at 1000 14th St, Denver, CO 80202. The renovation will include critical repairs, system upgrades, and address program needs. The Boettcher Concert Hall Project will address building systems and finishes that have exceeded their useful life. The project scope includes upgrades to HVAC, fire protection, life safety, data, technology, stage lighting, and audiovisual systems, along with new interior finishes, seating, and acoustic improvements. Floor plan modifications will improve circulation, operational functionality, ADA compliance, and integrate an education component. Exterior improvements, including roofing and façade repairs or replacement, will be included as required. The project will also evaluate a pavilion expansion for patron use, along with a west-side addition intended to activate the adjacent sculpture park.
A Pre-Proposal Meeting will be held on October 28, 2026, at 11:00 a.m. via teleconference. Details to access the meeting can be found on the project page at Do Business with DOTI. Interested firms are encouraged to attend.
Contractors are responsible for any information conveyed at this meeting.
Optional Site Visit: An optional site visit will be held on November 2, 2026, 10:00 a.m. – 12:00 p.m., local time.
Please R.S.V.P. to DOTI.Procurement@denvergov.org to receive the site visit details via email.
Deadline to submit questions: November 17, 2026, at 2:00 p.m. local time.
Minority and Women Business Enterprise Participation Pursuant to Article III of Chapter 28 of the Revised Municipal Code (D.R.M.C.) the Division of Small Business Opportunity (DSBO) has established the following participation requirement for this project:
Preconstruction Phase: No Program Construction Phase: 17% Minority and Women-Owned Business Enterprise (MWBE) https://urldefense.com/v3/__http:/www.bidnetdirect.com/cityandcountyofdenverdoti__;!!M87Ej6RJKlw!FKf8WYJAIVfOQ-QjzGDWHLUYU9d-n6-cJFDuAX4dH4IdKensM8GfnU2_gLbK1pVSbUbmW954$ https://urldefense.com/v3/__http:/www.bidnetdirect.com/cityandcountyofdenverdoti__;!!M87Ej6RJKlw!FKf8WYJAIVfOQ-QjzGDWHLUYU9d-n6-cJFDuAX4dH4IdKensM8GfnU2_gLbK1pVSbUbmW954$ https://www.denvergov.org/Government/Citywide-Programs-and-Initiatives/GO-Bonds/2025-Vibrant-Denver-Bond http://www.denvergov.org/dobusinesswithdoti
Notice of Invitation
The participation requirement must be met with certified firms, §§ 28-62, 28-66, D.R.M.C., found in the Small Business Certification and Contract Management System, or through the demonstration of a sufficient good faith effort. §§ 28-60, 28-64, D.R.M.C. The project is subject to additional requirements pursuant to the D.R.M.C.
Workforce Requirements This CM/GC project is subject to the requirements of Article XI, of Chapter 28 of the Denver Revised Municipal Code (the “Workforce Ordinance”) and its implementing rules and regulations. The goal of the Workforce Ordinance is to increase the availability of a skilled construction workforce by increasing the availability of apprenticeships and other approved training programs and requiring the utilization of workers living in economically disadvantaged areas and workers experiencing economic disadvantage on large city construction projects.
Prequalification Requirements Each contractor must be prequalified in category 2B General Building - Occupied Buildings at the $50,000,000.00 monetary level and request and receive project-specific permission to bid in accordance with the City’s Rules and Regulations Governing Prequalification of Contractors. Each contractor must have submitted a prequalification application a minimum of ten (10) calendar days prior to the Proposal due date. Applications must be submitted via B2Gnow. To view the Rules and information on how to apply, please visit our website at www.denvergov.org/prequalification.
Prevailing Wage and Minimum Wage Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, DRMC. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 DRMC.
General As the City’s best interests may appear, the City Engineer reserves the right to waive informalities in, and to reject any or all, proposals.
Publication Dates: October 22, 2026 Published In: Do Business with DOTI and BidNet https://denver.mwdbe.com/FrontEnd/SearchCertifiedDirectory.asp?tn=denver https://denver.mwdbe.com/FrontEnd/SearchCertifiedDirectory.asp?tn=denver https://denver.mwdbe.com/?TN=denver http://www.denvergov.org/prequalification
RFP Boettcher Concert Hall Renovation CM/GC Page 3
DENVER BOND OFFICE AND
DEPARTMENT OF TRANSPORTATION AND INFRASTRUCTURE
REQUEST FOR PROPOSALS
CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) SERVICES FOR
BOETTCHER CONCERT HALL RENOVATION
Solicitation No. 202686467
SECTION 1 – INTRODUCTION
By issuance of this Request for Proposals (“RFP”), the City and County of Denver, acting through the Denver Bond Office and the Department of Transportation and Infrastructure (“DOTI”) encourages all qualified Contractors to submit Proposals for CM/GC services for the construction of the Boettcher Concert Hall Renovation Project (the “Project”).
Proposals will be reviewed, and interviews conducted with all short-listed firms. Upon completion of the interviews, a Contractor will be selected to provide Preconstruction Services. The City may, in its sole discretion, elect to contract with the selected Contractor to provide comprehensive construction services to complete the Project for a Guaranteed Maximum Price (“GMP”) for the agreed upon package. Multiple packages may be necessary to complete the Project. The City reserves the right to procure construction services via alternate methods, or from another Contractor, if negotiations are unsuccessful or if the City Engineer determines, in their sole discretion, that it is in the City’s best interest not to contract with the Contractor selected as a result of this RFP.
The Selection Committee will focus on the experience and qualifications of the Contractor, the specific qualifications of key individuals to be assigned to this Project, prior history of similar performance of each submitting company, and the proposal.
As provided for in the City Charter and Section 20-56, of the Denver Revised Municipal Code (“DRMC”), the City Engineer reserves the right to terminate, suspend or modify this selection process at any time; reject any and all Proposals at any time; and waive any informalities, irregularities or omissions in Proposals at any time, all as the best interests of the City may appear.
SECTION 2 – TENTATIVE SELECTION SCHEDULE
Advertise and Issue RFP .............................................................................................. October 22, 2026 Pre-Proposal Meeting 11:00 AM ................................................................................. October 28, 2026 Optional Site Visit 10:00 AM .................................................................................... November 2, 2026 Deadline to Submit Questions 2:00 PM ................................................................... November 17, 2026 Phase 1 Submittal Due 2:00 PM .................................................................................. December 2, 2026
Shortlist Phase 2 Shortlist Notification ................................................................................................. December 18, 2026 Phase 2 Submittal Due ........................................................................................................ January 2027 Interviews ............................................................................................................................ January 2027 Notice of Selection .............................................................................................................. January 2027 Preconstruction Notice to Proceed (“NTP”) .......................................................................... March 2027 **Note: All dates are tentative and subject to change.
RFP Boettcher Concert Hall Renovation CM/GC Page 4
SECTION 3 – DESCRIPTION OF SERVICES
A. Project Background and Overview The City and County of Denver (City) is soliciting proposals from qualified contractors to provide Construction Manager/General Contractor (CM/GC) services for the Boettcher Concert Hall Renovation project on the Denver Performing Arts Complex at 1000 14th St, Denver, CO 80202. The Successful Proposer will provide CM/GC services for the preconstruction phase and will have the opportunity to negotiate a CM/GC Construction Project Contract with the General Contractor (GC) and the City to fulfill the Project’s construction phase. The CM/GC Construction Project Contract award to the CM/GC firm is not guaranteed but is contingent on a successful Guaranteed Maximum Price (GMP) negotiation with the City.
The Boettcher Concert Hall was the first “in the round” symphony hall in the United States. It was last renovated in 1993. The Concert Hall is over 45 years old and is not up to current building standards.
The building will require necessary capital improvements to bring the building up to current functionality, code and energy standards. Many critical building systems (i.e. electrical, lighting, telecommunications, security and card access systems, mechanical, heating, ventilation and air-conditioning systems) are outdated and require upgrades.
The primary focus of Boettcher Concert Hall Renovation Project includes renovation of the existing building to upgrade HVAC systems, upgrade fire and other life safety building system upgrades, new interior finishes, data and technology upgrades, stage lighting, audio visual, seating, and acoustic improvements. This project will include exterior work on the roofing and associated accessories. All improvements must meet current code and ordinance requirements, including Denver amendments, as well as LEED Gold, per Executive Order 123.
B. Project Goals The primary project goal is to maximize the CM/GC project delivery method to design and construct all improvements at the highest level with schedule certainty, budget control, constructability input, minimizing downtime to the facility, safety, and sustainability. Additionally, a successful project will:
Use best practices in planning, design, and construction to create a modern facility that meets operational and venue needs.
Enhance the patron, performer and staff experience through improved functionality, accessibility and technology integration.
Implement an effective plan and delivery approach to complete the project improvements within the project budget.
Minimize project delivery time.
Identify an optimal phasing and sequencing plan.
Facilitate and foster collaboration, communication, and partnership with all members of the project team and stakeholders.
Effectively coordinate and communicate with stakeholders to ensure they are receiving relevant information.
Ensure workers and public safety.
Construct an environmentally responsible Project. This includes the recycling of construction debris, following the Universal Recycling and Composting Ordinance (URCO), following
RFP Boettcher Concert Hall Renovation CM/GC Page 5 through on the commitments made in the Materials Management Plan (as required), and compliance with City processes and procedures.
Potential expansion of the pavilion and/or a west addition at the sculpture park depending on budget, design intent from stakeholders and end users.
C. Project Budget The project is funded by the Vibrant Denver Bond with an anticipated overall budget of $120,000,000.00. The anticipated preconstruction and construction budget estimate is $100,000,000.00.
D. Project Scope The Boettcher Concert Hall Project will renovate the existing facility to address building systems and finishes that have exceeded their useful life. The project scope includes:
upgrades to HVAC fire protection life safety data & technology stage lighting audiovisual systems new interior finishes seating improvements acoustic improvements floor plan modifications to improve circulation, operational functionality, ADA compliance, and integration of an educational component Exterior improvements, including roofing and façade repairs or replacement, will be included as required Associated landscaping and site work (as required) ADA accessibility Any other project requirements deemed necessary to support the required program
The project will also evaluate and design a pavilion expansion for patron use, along with a west-side addition intended to activate the adjacent sculpture park.
E. Project Specific Requirements The project is schedule driven and is a priority of the City’s to be designed and constructed in the most efficient manner possible. The construction window has been predetermined and must be met by the selected contractor.
The project will be required to be logically phased/sequenced to allow construction completion to occur on an accelerated schedule. Procurement can be phased with multiple packages for long lead items to shorten the overall construction window. The facility is expected to be closed during construction to maximize production and minimize construction duration.
Under the CMGC delivery method, the 50% CD package will be utilized for GMP negotiations and contract approval for early procurement and construction to start depending on when the GMP is executed. The assumption is that the overall project team works collaboratively and effectively to maintain the project cost and schedule.
Per the City’s Executive Order No. 123, the Boettcher Concert Hall Renovation project is required to achieve LEED Gold certification. Reference CCD Executive Order Number 123 for all requirements pertaining to LEED and sustainability. The Contractor shall coordinate
RFP Boettcher Concert Hall Renovation CM/GC Page 6 with the project’s Energy Consultant to track and document targeted LEED construction credits through on-site activity, procurement, and documentation to assist in achieving LEED Gold.
ADA compliance is a significant concern for all new construction and renovations. A construction Quality Control procedure to confirm compliance with ADA requirements is required.
There will be public art on this project. The selected firm will be expected to coordinate with the artist(s) as necessary for the installation of the art.
Public Information & Outreach – See Attachment 1 for specific scope of work for Public information and outreach.
F. Anticipated Project Schedule Design Start – December 2026
Construction Documents – Q2 2028
Preconstruction Services NTP – March 2027
Target Construction NTP – June 1, 2028
Target Substantial Completion – July 31, 2029
G. Project Management Platform Requirements The City and County of Denver has adopted a City-designated electronic project management and collaboration platform (the "City Platform") to be used for the administration of City bond-funded capital projects. As a condition of submitting a Statement of Qualifications and, if selected, performing services under any resulting contract, Proposers shall acknowledge and agree to comply with the City Platform requirements described herein.
Effective upon issuance of the Notice to Proceed (NTP), and unless expressly stated otherwise in the Contract or through written direction issued by the City, the selected Designer and/or Contractor shall fully utilize the City Platform as directed by the City for all project-related communications, workflows, and documentation. This includes, but is not limited to, submittals, requests for information (RFIs), inspections, photos, reviews, approvals, correspondence, meeting records, schedules, reports, and other project management functions identified by the City. Use of alternative platforms or parallel systems for City-directed project management functions is not permitted without prior written authorization from the City.
Failure to comply with the City Platform requirements following NTP issuance shall be considered non performance under the Contract and may be subject to the remedies available to the City pursuant to the Contract and applicable law.
Proposers shall ensure that their project teams, including subconsultants and subcontractors at all tiers, have the capability and willingness to use the City Platform in accordance with City standards, procedures, and timelines. Access to, use of, and required training for the City Platform shall be provided by the City at no cost to project team users.
This requirement is intended to support transparency, consistency, and efficient project delivery, and shall be implemented in a manner consistent with applicable State of Colorado procurement statutes and the City and County of Denver’s procurement requirements for bond-funded projects.
RFP Boettcher Concert Hall Renovation CM/GC Page 7
SECTION 4 – WORK DESCRIPTION FOR CM/GC SERVICES
A. CM/GC Preconstruction Services The selected Contractor shall participate in the continuing design process as an integral member of the Project Team and shall perform preconstruction services in accordance with the CM/GC Preconstruction Services Agreement.
The Contractor’s tasks during the preconstruction phase include, but are not limited to:
1. Design Constructability Review
a. It is anticipated that the Schematic Design documents will be complete in Q2 2027.
b. Review all plans, specifications, reports, site conditions, and all other necessary Project documentation to provide design validation from a construction expertise perspective.
c. Recommend early construction work packages and long-lead procurement packages when they may benefit cost, schedule, construction sequencing, quality, or risk.
d. Provide value engineering to identify and evaluate alternatives that may reduce cost, improve schedule, improve quality, reduce risk, or improve long-term value without compromising the City’s project goals.
2. Cost Estimating and Cost Model
a. Provide construction cost estimates at all design milestones.
b. Validate and reconcile design quantities as part of the milestone cost estimates.
c. Develop and refine a cost model throughout the design process to include bid items, quantities, assumptions, risk items, subcontractor and supplier quotes, labor, equipment, materials, escalation, and any other factors that will affect the project cost.
d. Continually compare and validate cost estimates with the Independent Cost Estimator
(ICE).
e. Prepare and submit GMP proposals to the City. GMP proposals may include early work packages, long-lead items, phased construction, or for the full project. GMP proposals shall include a clearly defined scope, assumptions, clarifications, exclusions, risk allowances, self-performed work, subcontractor pricing, and other required supporting documentation.
3. Schedule
a. Develop an initial construction schedule for the project and provide updates throughout the design process and as packages are developed in a format approved by the City.
b. Identify the critical path, long-lead items, schedule risks and mitigations, decision dates, and concurrent work impacts.
c. Identify a clear approach to project phasing/sequencing that achieves the project milestones.
4. Risk Management
a. Collaborate with the Project team to develop a Risk Management Plan.
b. Lead quantitative and qualitative risk management discussions with the Project team to create a Project Risk Register to identify risks, develop mitigation strategies, and assign risk owner responsibility.
RFP Boettcher Concert Hall Renovation CM/GC Page 8
c. Update the Risk Register no less than monthly throughout the project lifecycle.
5. Meetings
a. Attend all necessary meeting sessions with the City and Consultant team to gather and distribute information on the Project as required. As a part of this activity, the Contractor will be responsible for maintaining a log of action items and discussing the status of each item at the meetings.
b. Participate in Project Workshops, Project Milestone Meetings, GMP negotiations, recurring Project level and Program level status meetings, and any other meetings throughout preconstruction phase to effectively provide the preconstruction services requested in this RFP.
c. Attend partnering workshops as required by the project to maintain team member partnership and cooperation.
B. CM/GC Preconstruction Deliverables The Contractor will develop and produce the following preconstruction deliverables:
GMP (Guaranteed Maximum Price) Proposal(s) – As requested by the City for the Project, early work packages, or long-lead time procurement packages.
OPCC (Opinion of Probable Construction Cost) Estimates – Initial and reconciled estimates at all required design milestones. Documented reports showing reconciled variances from design estimates and the ICE.
Schedule – Initial construction schedule and monthly updates identifying the critical path, milestones, phasing/sequencing, decision points, and long-lead items in a format approved by the City.
Risk Management Plan and Risk Register – Develop a project specific Risk Management Plan and Risk Register. Risk register should describe each risk, cause of the risk, and risk consequence. Quantitative analysis to include likelihood, impact, and risk level.
Construction Packaging – A report outlining recommendations for construction packages and the sequencing of work.
Subcontractor Selection Plan – Recommended approach to subcontractor procurement, competition, outreach, and compliance.
Quality Control Management Plan – Roles, responsibilities, standards, procedures, inspections, documentation, and integration into the project schedule.
Safety Management Plan – Approach to worker safety, public safety, site control, and regulatory compliance.
Monthly Invoices and Project Progress Reports – Documentation sufficient to support payment for preconstruction services.
C. CM/GC Construction Services If negotiations for the Guaranteed Maximum Price and the schedule for the approved package are not successful, the City reserves the right to place the construction package for open bid, and the Contractor shall not be eligible to submit a bid.
If the City elects to proceed with the selected Contractor for construction, the Contractor shall furnish all construction management, general contracting, supervision, coordination, labor, tools, supplies, RFP Boettcher Concert Hall Renovation CM/GC Page 9 manufactured components, equipment, materials, and everything else necessary and required to complete the Project safely, on time, within budget, and in conformance with the Contract Documents.
The Contractor shall construct the Project in conformance with the construction contract documents, implement controls for risks identified during preconstruction, manage subcontractors and suppliers, coordinate required permits, comply with environmental and safety commitments, and maintain project controls with appropriate access by the City.
D. Subcontracting and Self-Performed Work Subcontractor contracts shall be publicly advertised and competitively bid. When circumstances warrant, the CM/GC may be allowed to self-perform work. Any proposed self-performed work shall be disclosed in the proposal and documented in the GMP proposal with a detailed, quantified, unit-price cost estimate. The CM/GC shall competitively bid its self-performed scope against other contractors performing the same scope, and the CM/GC’s bid shall be submitted to the City PM no later than 24 hours prior to the receipt of other bids, unless otherwise approved by the City.
E. Required Availability of Key Personnel Listed Key Personnel in the Proposal constitutes an agreement by the Contractor to make the personnel available to complete work on the contract at whatever level the Project requires.
Modifications to the Contractor’s Team or Key Personnel and other personnel listed in the Contractor’s Project Management Team shall be approved by the City. If a Key Person is to leave the team, resumes for a minimum of three replacement candidates must be provided to the City PM for review and selection. The City reserves the right to interview the replacement candidate(s).
In order to secure the City’s approval prior to the award of the contract, a written request shall be forwarded to the City PM. The request shall include a) the nature of the desired change, b) the reason for the desired change, and c) a statement of how the desired change will meet the required qualifications for the position/responsibility. No such modification will be made without prior written City approval from the City PM.
F. Organizational Conflicts and Ineligible Firms The Contractor will include a full disclosure of all potential organizational conflicts of interest in the Proposal. By submitting its Proposal, each Contractor agrees that, if an organizational conflict of interest is thereafter discovered, the Contractor will make an immediate and full written disclosure to the City that includes a description of the action that the Contractor has taken or proposes to take to avoid or mitigate such conflicts. If an organizational conflict of interest is determined to exist, the City may at its discretion, cancel the contract. If the Contractor was aware of an organizational conflict of interest prior to the award of the contract and did not disclose the conflict to the City, the contract may be terminated for default. No firm that is ineligible for City contracts may be part of any Contractor’s team. Each Contractor is responsible for determining eligibility of its team members.
G. Compensation for CM/GC Preconstruction Services Monthly payments will be paid per invoice as work progresses based on preconstruction services completion with agreement of the City PM. Scope for these services is outlined in this RFP and includes, but is not limited to deliverables, innovations, meetings, scheduling, cost estimating and risk registers. If additional services are requested by the City PM, additional fee could be negotiated to minimize Contractor and Owner risk, including but not limited to geotechnical investigations, survey, test sections, potholing, etc.
RFP Boettcher Concert Hall Renovation CM/GC Page 10
H. Explanation of Guaranteed Maximum Price (GMP) The Guaranteed Maximum Price (GMP) is the amount that will be incorporated into the standard CM/GC Construction Contract. The GMP is defined in the attached sample contract. It is the sum of the Cost of the Work and the Fee. The GMP proposal may include negotiated allowances and a negotiated GMP Contingency. The selected Contractor shall prepare the GMP proposal in conformance with the attached sample CM/GC contract. The City and the selected Contractor will refine the Cost Model, consisting of bid items, quantities, risks and assumptions for the construction package, through a series of workshops. The selected Contractor will propose a GMP and if necessary, the City and the selected Contractor will negotiate the direct Cost of Construction for that package to agree on a final GMP. Payment for the construction of the project will be paid through a Schedule of Values as per the Standard Specifications for Construction General Contract Conditions (Yellow Book) Section 903.
The GMP will not be increased. The Contractor assumes all risk with performance of the bid items, including management of its subcontractors, suppliers, and any associated cost impacts over and above a GMP not agreed to as risk pool items in the executed Risk Register. If negotiations fail, the City reserves the right to prepare the plans, specifications, and estimate package for advertisement. The CM/GC Services Contractor will not be allowed to bid.
I. Cost Savings To the extent the actual cost of the work may be reduced through the course of the design refinement, procurement, and construction, the reduction in cost shall revert entirely to the benefit of the City. There shall be no “shared savings” compensation to the CM/GC.
SECTION 5 - GENERAL REQUIREMENTS
A. RFP Administration The Denver Bond Office and the Department of Transportation and Infrastructure hereby designates Michele Foust, Department of Transportation and Infrastructure Contract Administration, to serve in the capacity of administrator for this selection process and will be responsible for coordination of the procedures and rules specified in this RFP, managing this process and all other matters related to this process. In conducting the process in a fair and equitable manner, the administrator will serve as the primary intermediary between the design professionals, the City, and the members of the Selection Committee.
All inquiries and questions regarding this RFP shall be directed to Michele Foust in the Department of Transportation and Infrastructure in writing via email at doti.procurement@denvergov.org. Any contractor that contacts any member of the Selection Committee, other than the designated contact, from the date of issuance of the RFP and prior to the completion of the selection process may be disqualified from further participation in the selection process, at the City’s sole discretion.
B. Colorado Open Records Act Documents submitted pursuant to this RFP will be subject to the Colorado Open Records Act, C.R.S.
§§ 24-72-201, et seq. Information clearly marked as confidential and proprietary will be kept confidential by City, unless otherwise provided by law. City will attempt to notify the Contractor if a request is made for pages of documents clearly marked as confidential and proprietary so that the Contractor may take any action it deems necessary to defend the request. The Contractor, not the City, shall be the entity responsible for defending against Colorado Open Records Act disclosures for any records claimed by the Contractor to be confidential and proprietary.
mailto:doti.procurement@denvergov.org
RFP Boettcher Concert Hall Renovation CM/GC Page 11
C. No Discrimination in Employment In connection with the performance of work under the Agreement, the Contractor may not refuse to hire, discharge, promote, demote, or discriminate in matters of compensation against any person otherwise qualified, solely because of race, color, religion, national origin, ethnicity, citizenship, immigration status, gender, age, sexual orientation, gender identity, gender expression, marital status, source of income, military status, protective hairstyle, or disability. The Contractor shall insert the foregoing provision in all subcontracts.
D. Applicable Laws This selection process and the performance of any selected Contractor shall be subject to, governed by, and construed in accordance with the laws of the State of Colorado and the Charter, Revised Municipal Code, Rules, Regulations, written policies and Executive Orders of the City and County of Denver, as the same may be amended from time to time. Specifically, this process shall be governed by the provisions of the Charter and the provisions Section 20-56, DRMC.
E. Verification of Information Contractors are hereby notified that the City will rely on the accuracy and completeness of all information provided in making its selection. As such, are urged to carefully review all information provided to ensure the clarity, accuracy and completeness of such information. As the City deems necessary and appropriate in its sole discretion, the City reserves the right to make any inquiries or other follow up required to verify the information provided.
F. Submission Ownership – Use and Rights The City reserves the option of retaining any or all of the materials submitted in response to this RFP.
G. Addenda As the City may require, addenda may be issued to supplement this RFP. Any Proposer/Contractor who downloads the RFP from BidNet shall receive automated notification of addenda. It shall be conclusively presumed that the Proposer/Contractor, before submitting a written response, register and download the RFP documents from BidNet, read all addenda, posted decisions, and other items relevant to the
RFP.
H. Contract Review Contractors shall undertake a detailed review of both of the Sample Agreements (CM/GC Preconstruction and CM/GC Construction) (Attachments 6 and 7, respectively) and provide with their Proposal a list of all questions, issues, or requested modifications which they would like the City to review and address. A thorough review of the sample agreements with legal counsel should be performed prior to submission of the list of issues. The Contractor waives, and the City reserves the right to deny, any concern or request for modification to the Sample Agreements (CM/GC Preconstruction Services and CM/GC Construction) not submitted in writing with proposals.
I. Insurance and Indemnification The selected Contractor for this Project shall be required to strictly comply with the insurance and indemnification requirements set forth in the Sample Agreement and all Exhibits. The selected Contractor, and all subcontractors performing work or providing services for the Project will be required to obtain insurance coverage in the amounts and under the terms and conditions specified therein. As such, each prime Contractor shall submit within the Letter of Transmittal a statement indicating their intention to comply with these requirements, without exception.
http://www.bidnetdirect.com/cityandcountyofdenverdoti
RFP Boettcher Concert Hall Renovation CM/GC Page 12
J. Wage Rate Requirements In performance of all Work hereunder, the Contractor agrees to comply with and be bound by all requirements and conditions of the City’s Payment of Prevailing Wages Ordinance, Sections 20-76 through 20-79, DRMC and any determinations made by the City pursuant thereto as well as the City’s Minimum Wage Protections Sections 20-82 through 20-84 DRMC, in addition to the U.S. Department of Labor rates, and the Contractor shall pay whichever is greatest of the three rates.
At the time of the preparation of this RFP, the then-current prevailing wage rates applicable to this Project shall be included in the RFP package. In any event, the Contractor will be held, at the actual due date of the Proposal, to those prevailing wage rates incorporated into the RFP documents.
K. Minimum Wage Ordinance The services being requested in this solicitation may involve services that are covered pursuant to Division 3.75 of Article IV of Chapter 20 of the DRMC, which is designed to address the issue of wage equity and cost of living affordability in the City and County of Denver. Contractor agrees that any contract with the City shall include a requirement that they will comply with the provisions of DRMC, Sections 20-82 through 20-84, including, but not limited to, paying all covered workers no less than the City Minimum Wage for all covered services rendered in connection with the Contract. Additionally, the Contractor agrees that the contract shall require compliance with all current and future federal and state laws and City ordinances.
L. Liquidated Damages A reasonable estimate of the total detriment that the City would suffer in the event that the Contractor so defaults and the Project is not Substantially Complete within the Construction Time, as extended as permitted herein, is and shall be, in the event of said default and failure, as the sole and exclusive remedy (whether at law or in equity) of the City for this delay, and not as a penalty, the amount per day stated below that the Work shall remain not Substantially Complete after the Construction Time, as applicable, including extensions, has elapsed. It is understood and agreed that the City reserves all of its other rights and remedies for any other or different breach or default of this Construction Contract by Contractor, or for any other cause of action.
Amount per Calendar Day Substantial Completion $5,000.00
Refer to the Sample Agreement CM/GC Construction (Attachment 7) for full Liquidated Damages parameters.
SECTION 6 – MINORITY AND WOMEN-OWNED BUSINESS ENTERPRISE (MWBE)
PROGRAM
MWBE Responsiveness Requirements
The below-listed DSBO proposal requirements are all conditions of responsiveness. Failure to submit a responsive proposal constitutes cause for rejection thereof.
1. Non-Competition Submitter shall not restrict an MWBE from providing subcontracting/subconsulting quotations to other Submitters. Any Submitter who does so shall cause their submittal to be rejected. §§ 28-59(f), 28-63(f), D.R.M.C
2. Joint Ventures If submitter is participating in a joint venture with a certified MWBE firm, submitter must submit the firm’s Joint Venture Agreement to DSBO at least 10 business days prior to the response to Request for Proposals (RFP) response submission. The Joint Venture must be approved by DSBO.
RFP Boettcher Concert Hall Renovation CM/GC Page 13
A Joint Venture is an association of an MWBE firm and one or more other firms to carry out a single, for-profit business enterprise, for which the parties combine their property, capital efforts, skills and knowledge, and in which the MWBE is responsible for a distinct, clearly defined portion of the work of the contract and whose share in the capital contribution, control, management, risks, and profits of the joint venture are commensurate with its ownership interest.
DSBO will count a portion of the total dollar value of the joint venture contract toward the MWBE requirement equal to the distinct, clearly defined portion of the work that the MWBE performs with its own forces in a NAICS code in which the firm is MWBE certified. The joint venture agreement MUST specify the services, dollar value, reporting structure, and details of the MWBE’s performance requirements associated with their percent of the joint venture ownership.
3. Commitment to MWBE Participation Submitter shall include with their submittal a completed DSBO form, entitled “Commitment to MWBE Participation,” stating their committed MWBE participation percent on this project. The committed participation level will be inserted into any resulting contract and the Contractor/Consultant must comply with that committed participation amount during the term of the contract.
4. Good Faith Effort If Submitter cannot meet the MWBE requirement established by DSBO or is able to only meet part of the requirement, they shall include with their submittal a completed DSBO Good Faith Effort form, available on the DSBO website and linked here.
Unless otherwise indicated on the form, Submitter must complete each field of the Good Faith Effort form, the purpose of which is to furnish to DSBO a comprehensive statement of their good faith efforts to meet the requirement. This means that Submitter must show that they took all necessary and reasonable steps to achieve the MWBE requirement which, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to obtain sufficient MWBE participation, even if they were not fully successful.
The statement of good faith efforts should address each of the categories outlined in the DSBO Ordinance, §§ 28-60, 28-64, D.R.M.C., and any additional criteria established by rule or regulation.
As part of their good faith efforts, Submitters are encouraged to solicit the support and assistance of DSBO by contacting the procuring agency’s Contract Administrator (CA)/Buyer with specific questions; the CA/Buyer will coordinate with DSBO to reply thereto. All good faith efforts information must be complete, accurate, adequately documented, and submitted with the submittal.
Good faith efforts must be demonstrated to be substantive and not merely for formalistic compliance with the DSBO Ordinance.
To award a contract to a submitter that has failed to meet the MWBE requirement, DSBO will determine whether Submitter made good faith efforts to actively, effectively, and aggressively seek MWBEs to meet the MWBE requirement prior to submittal submission, which determination shall include consideration of Proposer’s MWBE Utilization Plan strategies to meet their MWBE participation commitment. Failure of Submitter to show good faith efforts shall render their submittal ineligible for further consideration with the City.
5. DSBO Program Requirements Handbook (DSBO Handbook) – Signature Statement Submitter must submit the completed and signed Signature Statement of the DSBO Program Requirements Handbook with their submittal documents to be found responsive. The signed Signature Statement page evidences Submitter’s review and agreement to comply with the requirements outlined in the DSBO Handbook.
https://www.denvergov.org/files/assets/public/v/1/economic-development/documents/dsbo/compliance/dsbo_commitment-to-mwbe-participation_march-2025-1.pdf https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Economic-Development-Opportunity/Business-Support/Navigate-City-Services-and-Requirements/Do-Business-With-the-City/Compliance https://www.denvergov.org/files/assets/public/v/1/economic-development/documents/dsbo/compliance/dsbo-good-faith-effort-form.pdf https://www.denvergov.org/files/assets/public/v/1/economic-development/documents/dsbo/compliance/dsbo-program-requirements-handbook-march-2025-version.pdf https://www.denvergov.org/files/assets/public/v/1/economic-development/documents/dsbo/compliance/signature-statement-dsbo-program-requirements-handbook.pdf
RFP Boettcher Concert Hall Renovation CM/GC Page 14
6. MWBE Utilization Plan Submitter shall include with their proposal a completed DSBO form, entitled “MWBE Utilization Plan,” stating their strategy for meeting the MWBE requirements, including certified small business utilization and expectations for their lower tiered MWBE-certified firms. To meet the MWBE Utilization Plan minimum responsiveness requirements, Submitter must meaningfully address each of the form’s sections; any section that is blank or has “N/A” as a response may deem the proposer non-responsive. Contract execution will be conditioned upon a DSBO-approved MWBE Utilization Plan, unless DSBO has determined that Proposer made a 0%-participation good faith effort.
Exception: if Submitter is submitting documentation of a good faith effort that states that they can only meet 0% of the MWBE requirement, they are exempt from this responsiveness requirement and need not submit a completed MWBE Utilization Plan form.
7. Authority The DSBO Ordinance and rules and regulations promulgated pursuant thereto apply to this project and are incorporated into these solicitation documents by reference. Compliance with those, and any additional requirement contained herein, are conditions of responsiveness. The DSBO Ordinance, its accompanying rules and regulations, and additional MWBE guidance are available here:
https://www.denvergov.org/dsbo. Submitter is encouraged to contact the procuring agency/Buyer with specific questions related to compliance therewith, who will coordinate with DSBO to reply to Submitter’s questions.
SECTION 7 – WORKFORCE REQUIREMENTS
This CM/GC agreement is subject to the requirements of Article XI, of Chapter 28 of the Denver Revised Municipal Code (the “Workforce Ordinance”) and its implementing rules and regulations.
The goal of the Workforce Ordinance is to increase the availability of a skilled construction workforce by increasing the availability of apprenticeships and other approved training programs and requiring the utilization of workers living in economically disadvantaged areas and workers experiencing economic disadvantage on large city construction projects. The Denver Construction Careers Program (the “DCCP”) is responsible for implementation and oversite of the Workforce Ordinance. Contractor is entitled to no additional compensation for activities associated with compliance with the Workforce Ordinance and all associated costs are included in Contractor’s pricing proposal.
In order to be considered responsive to this RFP, proposer shall complete and sign the attached Workforce Commitment Form (Attachment 5) and include with their Phase 1 proposal. The executed Workforce Commitment Form will become an exhibit in the awarded construction contract. Proposers are encouraged to engage with DCCP to understand program requirements before responding. Additional information and DCCP contact information can be found at:
https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices- Directory/Economic-Development-Opportunity/Employers-Jobseekers/Denver-Construction-Careers- Program
The DCCP, in consultation with the contracting agency, has determined that the vertical construction apprentice utilization requirements of Section 28-325 of the Workforce Ordinance apply to this CM/GC agreement. Contractor must also comply with the target hire and additional requirements of the Workforce Ordinance.
If Contractor is selected, it shall engage with the DCCP to develop a proposed Workforce Plan. Contractor shall submit a proposed Workforce Plan to the DCCP that meets or exceeds the requirements of the https://www.denvergov.org/files/assets/public/v/1/economic-development/documents/dsbo/compliance/mwbe_utilization-plan-final-3-6-2025.pdf https://www.denvergov.org/dsbo https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Economic-Development-Opportunity/Employers-Jobseekers/Denver-Construction-Careers-Program https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Economic-Development-Opportunity/Employers-Jobseekers/Denver-Construction-Careers-Program https://www.denvergov.org/Government/Agencies-Departments-Offices/Agencies-Departments-Offices-Directory/Economic-Development-Opportunity/Employers-Jobseekers/Denver-Construction-Careers-Program
RFP Boettcher Concert Hall Renovation CM/GC Page 15
Workforce Ordinance and implementing rules and regulations as soon as reasonably feasible. A final Workforce Plan, approved by the DCCP must be in place no later than 60 days after issuance of a notice to proceed with construction. Contractor is responsible for submitting its proposed plan and addressing DCCP concerns sufficiently in advance of this deadline to avoid project delay.