biddoc.pdf
PDF 6 MB Posted
- Attached to
- Speaker Cabling Installation
- Solicitation number
- 2021B - RRHS
- Issued by
- Adams County, Colorado
About this file
This is a Request for Proposal (RFP) issued by School District 27J, located in Brighton, Colorado, for speaker cabling installation services at Riverdale Ridge High School in Thornton, Colorado. The project scope involves replacing the existing classroom speaker daisy-chain wiring configuration with dedicated home-run cabling, with each classroom speaker individually wired back to the nearest designated MDF/IDF location. The contractor must provide all labor, materials, installation, termination, labeling, testing, and documentation for 18/2 shielded speaker cable throughout the building's multiple wings (F, G, E, A, D, and additional areas on Levels 1 and 2). The project encompasses approximately 49-59 classrooms across the affected building areas. The RFP was issued on October 14, 2026, with a deadline for submitting questions by October 23, 2026, at 3:00 PM. Proposals must be submitted via email to Elizabeth Morales at emorales@sd27j.net by October 28, 2026, at 10:00 AM Local Time, with an estimated contract award date of November 2, 2026. No bid opening will be held. Installation work is to be phased by building wing and scheduled primarily on Mondays to minimize disruption to instructional activities.
The proposal pricing template requires contractors to separately itemize labor costs, material costs, and total project cost for the speaker cabling installation. Contractors must furnish all materials, equipment, cable support infrastructure, fasteners, firestopping materials, labels, and other incidental items necessary for completion. Proposals must include the proposed 18/2 shielded speaker cable manufacturer and part number, description of cable support infrastructure, proposed installation schedule with estimated number of Monday installation dates required, material lead times, warranty information, and identification of any proposed deviations from the Scope of Work. The District is exempt from paying most sales taxes, but the contractor must bear all applicable state and local sales taxes on purchased materials. Exclusions explicitly stated include connection to the Bogen PA system head-end equipment, system programming or configuration, replacement of existing Bogen CSD 1X2 classroom speakers or head-end equipment, and PA system commissioning beyond cable testing and verification. Proposals will be evaluated based primarily on qualifications, compliance with scope of work, timeline, and cost, with the highest-scoring vendor receiving the award. All proposal costs must remain valid for a minimum of ninety (90) days from the proposal due date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR PROPOSAL (RFP)
Project:
Contractor Services:
Speaker Cabling Installation Riverdale Ridge High School
Closing Date:
October 28, 2026 10:00 AM Local Time
Issued by:
School District 27J
1850 Egbert St., Suite 140 Brighton, CO 80601
October 14, 2026
Date of RFP: October 14, 2026
Subject: Request for Proposal, Speaker Cabling Installation for Riverdale Ridge High School
Enclosures:
1) Vendor Acknowledgement
2) Instruction to Proposers
3) Scope of Work/Specifications
4) Pricing Template
5) Exhibit A-Project Drawings Identifying Classroom Locations, Number of Classrooms, and MDF/IDF
Locations
6) Exhibit B -Bogen CSD 1X2 speaker specifications sheet
7) Exhibit C -Bogen CSD 1X2 speaker installation manual
To: All prospective proposers:
Enclosed, please find a Request for Proposal (RFP) to provide School District 27J with speaker cabling installation as further described in the Scope of Work/Specifications and the Contract Agreement (the “Agreement”) Unless otherwise noted, Proposers must provide a proposal on all of the requirements stated within this request. Proposers must be able to commit the resources necessary to provide the design and engineering services requested in a timely manner and conform to all material aspects of the Scope of Work/Specification enclosed.
To be considered valid in the selection process, all proposals must follow the critical dates, as set forth below:
Critical Dates:
1) RFP Issue Date- October 14, 2026
2) Questions Due Date- October 23rd at 3:00 PM, Local Time. Responses to questions will be provided in writing to all prospective proposers, by October 26th at 3:00, Local Time. All questions are to be emailed to Elizabeth Morales at emorales@sd27j.net. Only emailed questions will be responded to.
3) Proposal Due Date- Proposals must be sent or delivered as directed in this solicitation and received on or before, October 28, 2026 at 10:00 AM, Local Time. Proposals received after this time will not be considered and individual extensions to the due date will not be granted. The District will only accept an e-mail response to this Request for Proposal. You are responsible to address the email to emorales@sd27j.net. Attn: Elizabeth Morales
NOTE: THERE WILL NOT BE A BID OPENING ON THE PROJECT.
4) Proposal Expiration date- Proposers must indicate an expiration date for the proposal and pricing. Any expiration date shall not be less than ninety (90) days from the proposal due date as indicated herein.
Please be advised that the award of any agreement is based upon the content of the proposal. Organized, succinct and straight forward submissions are appreciated. There is no need to go to excessive costs in preparing elaborate packaging. Prior to a formal award, all contract terms and conditions must be agreed upon by all parties. Please address any inquiries to the following: emorales@sd27j.net mailto:emorales@sd27j.net.
mailto:emorales@sd27j.net.
mailto:emorales@sd27j.net
VENDOR ACKNOWLEDGEMENT
Purpose: The purpose of this RFP is to provide School District 27J a proposal for mobilization services described in the Scope of Work and the Agreement.
Date: October 14, 2026
Proposal title: Speaker Cabling
Riverdale Ridge High School 13380 Yosemite Street, Thornton, CO 80602
Proposals will be received until: October 28, 2026 @ 10:00 A.M. Local Time
For additional information please contact: Elizabeth Morales
Construction Specialist emorales@sd27j.net
Documents included in this package: Vendor Acknowledgement Instruction to Proposers Scope of Work/Specifications Pricing Template
The undersigned hereby affirms that (1) he/she is a duly authorized agent of the Vendor, (2) he/she has read all terms and conditions, technical specifications and all other Contract Documents which were made available in conjunction with this Solicitation and fully understands and accepts them, (3) that the offer is being submitted on behalf of the Vendor in accordance with any terms and conditions set forth in this document, and (4) that the Vendor will accept any awards made to it as a result of the offer submitted herein for a minimum of ninety (90) calendar days following the date of submission.
VENDOR PRINT OR TYPE YOUR INFORMATION
(Include this form in your proposal)
Name of Company: Fax:
Address: City/State: Zip:
Contact Person: Title: Phone:
Authorized Representative’s Signature: Phone:
Printed Name: Title: Date:
Email Address: Approved by: Date:
mailto:emorales@sd27j.net
INSTRUCTIONS TO PROPOSERS
1. APPLICABILITY:
These Instruction to proposers applies, but are not limited, to all bids, proposals, qualifications and quotations (hereinafter referred to as “Offers” or “Responses”) made to the School District 27J (hereinafter referred to as "District") by all prospective product and/or service suppliers (hereinafter referred to as "Vendors") in response, but not limited, to Invitations to Bid, Requests for Proposals, Requests for Qualifications, and Requests for Quotations (hereinafter referred to as “Solicitations”).
2. BACKGROUND:
School District 27J, or 27J Schools is a Colorado Public School District that encompasses serval jurisdictions including; Aurora, Brighton, Broomfield, Commerce City, Thornton, and Lochbuie covering approximately 215 sq. miles northeast of Denver, CO. The District continues to grow and currently serves the following schools:
• 1 K-8 Magnet School
• 14 Elementary Schools
• 5 Middle Schools
• 3 High Schools
• 1 Alternative School
• 6 Charter Schools
27J Schools educates over 20,000 students with the mission to empower every student today to take control of their future tomorrow.
3. CONTENTS OF OFFER:
A. General Conditions. Vendors are required to submit their Offers in accordance with the following expressed conditions:
1. Vendors shall make all investigations necessary to thoroughly inform themselves regarding the project. No plea of ignorance by the Vendor of conditions that exist or that may hereafter exist as a result of failure to fulfill the requirements of the contract documents will be accepted as the basis for varying the requirements of the District or the compensation to the Vendor.
2. Vendors are advised that all District contracts are subject to all legal requirements contained in the District Board policies, the District policy and procedures and state and federal statutes. When conflicts between the Solicitation and these legal documents occur, the highest authority will prevail.
3. Vendors are required to state exactly what they intend to furnish to the District via this Solicitation and must indicate any variances to the terms, conditions, and specifications of this Solicitation no matter how slight. If variations are not stated in the Vendor’s Offer, it shall be construed that the Vendor’s Offer fully complies with all conditions identified in this Solicitation.
4. All Offers and other materials submitted in response to this Solicitation shall become the property of School District 27J.
5. Open Records. The Vendor understands that proposals shall become the exclusive property of the District upon District receipt and shall be subject to public inspection and copying in accordance with the Colorado Open Records Act, C.R.S. §§ 24-72-200.1 et seq. In issuing this RFP, the District is not seeking, and advises Offerors not to submit, trade secrets or confidential commercial or financial information. The District shall have no obligation to withhold all or any part of a proposal in response to an open records request.
B. Clarification and Modifications in Terms and Conditions
1. If any Vendor contemplating submitting an Offer under this Solicitation is in doubt as to the true meaning of the specifications, the Vendor must submit a written request for clarification to the District's specified contact person. The Vendor submitting the request shall be responsible for ensuring that the request is received by the District in accordance with the Solicitation Schedule.
Any official interpretation of this Solicitation must be made, in writing, by an agent of the District's Construction Services Department who is authorized to act on behalf of the District.
The District shall not be responsible for interpretations offered by employees of the District who are not agents of the District's Construction Services Department.
The District shall issue a written addendum for substantial changes which impact the technical submission of Offers. Such addenda shall be emailed to all Vendors that have notified the District of their intent to bid on this project. The Vendor shall certify its acknowledgment of the addendum by noting the receipt of it on the Vendor Acknowledgment Form on page 3. In the event of conflict with the original contract documents, addenda shall govern over all Contract Documents to the extent specified. Subsequent addenda shall govern over prior addenda only to the extent specified.
C. Prices Contained in Offer
1. The District is exempt from paying taxes in most municipalities. Notwithstanding, Vendors should be aware of the fact that all materials and supplies which are purchased directly by the Vendor in conjunction with this contract will be subject to applicable state and local sales taxes and these taxes shall be borne by the Vendor.
2. The Vendor, by affixing its signature to this Solicitation, certifies that its Offer is made without previous understanding, agreement, or connection either with any persons, firms or corporations making an Offer for the same items, or with the District. The Vendor also certifies that its Offer is in all respects fair, without outside control, collusion, fraud, or otherwise illegal action. To ensure integrity of the District's public procurement process, all Vendors are hereby placed on notice that any and all Vendors who falsify the certifications required in conjunction with this section will be prosecuted to the fullest extent of the law.
D. Qualification of Vendor. Vendor shall be prepared, if so, requested by 27J, to present evidence of his experience, qualifications and financial ability to carry out the Contract Documents.
4. SOLICITATION: The following activities outline the process to be used to solicit vendor responses and to evaluate each vendor proposal.
Solicitation Schedule:
Distribute Request for Proposal October 14, 2026 Deadline for Submitting Questions October 23, 2026 at 3:00 PM Proposal Due Date Deadline October 28, 2026 at 10:00 AM Estimated Award Contract November 2, 2026
5. SUBMISSION
A. Preparation
1. All Offers will refer to and contain the information requested in the Scope of Work/Specifications document (included) as well as follow the format as described therein.
2. The Offer must be typed or legibly printed in ink. The use of erasable ink is not permitted. All corrections made by the Vendor must be initialed by the authorized agent of the Vendor.
3. Offers must contain, a signature of an authorized agent of the Vendor in the space provided on the Vendor Acknowledgement. The original Vendor Acknowledgement of this Solicitation must be included in all Offers.
4. The accuracy of the Offer is the sole responsibility of the Vendor. No changes in the Offer shall be allowed after the date and time that the Offers are due.
B. Proposal Requirements
1. All Offers will refer to and contain the information requested in the Scope of Work/Specifications document (included) as well as follow the format as described therein.
2. The Offer must be typed or legibly printed in ink.
All proposals must contain the following information:
• Vendor Acknowledgement Form
• Pricing Template
• Detailed Quote
6. AWARD OF CONTRACT. The District shall award a contract to a Vendor through the issuance of an Intent to Award. All of the documents included and/or referred to in this Solicitation (the “Contract Documents”) are collectively an integral part of the agreement between the School District 27J and the successful Vendor.
Accordingly, all Vendors must be thoroughly familiar with these documents and the terms and conditions governing the project. Upon issuance of a Notice of Award, the Vendor must execute, in substantially the same form, the Contract Documents.
The Districts intent is to award each project separately within this solicitation. However, the District reserves the right to award more than one project within a given bundle to a vendor if it is in the best interest of the District.
7. CONTRACTUAL OBLIGATIONS. The terms and conditions for the design services requested for in this RFP are contained in the Contract Documents, including, but not limited to, the Agreement.
8. EVALUATION CRITERIA. An evaluation committee composed of representatives selected by District will perform the evaluation of proposals. The committee shall evaluate technical proposals submitted by the Vendor and may conduct interviews based upon evaluation factors listed in the proposal requirements. Proposals will be evaluated and scored by the committee based primarily on qualifications, compliance with scope of work, timeline and dates, and cost. The highest scoring vendor will be awarded the project.
PRICING TEMPLATE
Speaker Cabling Labor for Riverdale Ridge High School $
Speaker Cabling Materials for Riverdale Ridge High School $
Total Project Cost Speaker Cabling for Riverdale Ridge High School $
SCOPE OF PROPOSAL
Speaker Cabling Riverdale Ridge High School
1. Project Overview
School District 27J is soliciting proposals from qualified low-voltage cabling contractors to provide labor, materials, installation, termination, labeling, testing, and documentation for new speaker cabling within an existing District 27J school building, Riverdale Ridge High School.
The purpose of this project is to replace the existing classroom speaker daisy-chain wiring configuration with a dedicated home-run cabling configuration. Each classroom speaker shall be individually wired back to the nearest designated MDF/IDF location.
The existing classroom speakers will remain in place. The current speaker model is Bogen CSD 1X2. The speaker specification sheet and installation manual are included with this RFP and shall be reviewed by the contractor prior to submitting a proposal.
2. Project Scope
The contractor shall provide all labor, materials, equipment, supervision, and incidental work necessary to complete the speaker cabling installation described in this Scope of Work and the associated drawings.
The work shall include:
• Installation of new 18/2 shielded speaker cable from each designated classroom to the nearest MDF/IDF location identified on the project drawings.
• Installation of one individual cable run for each classroom.
• Removal, abandonment, or modification of existing daisy-chain cabling as directed by the District.
• Routing of cabling through existing building pathways where available and appropriate.
• Installation of all required dedicated cable support infrastructure.
• Proper termination of all speaker cable conductors at the designated termination points.
• Labeling of each cable with the corresponding classroom/room number.
• Testing and verification of installed cabling.
• Cleanup and restoration of work areas following each installation phase.
• Coordination with District personnel and other contractors as required to complete the work.
3. Cable Requirements
Unless otherwise noted, all new classroom speaker cabling shall meet the following requirements:
• 18/2 shielded speaker cable.
• Cable shall be suitable for the intended public address/speaker application.
• Cable shall be installed in accordance with the cable manufacturer's requirements and applicable codes.
• Cable shall be installed as a continuous run from the classroom speaker location to the designated
MDF/IDF termination location.
• Cable shall not be spliced.
• Cable shall not contain unterminated conductors or elements.
• Conductors shall be terminated only at designated outlets, terminals, or equipment termination points.
• Cable shall be installed without excessive tension and within the manufacturer's specified bending radius.
• Cable shall not be bruised, kinked, scored, deformed, crushed, or abraded.
• Any cable damaged during installation shall be removed and replaced with new cable at the contractor's expense.
4. Cable Support and Pathways
All cabling shall be supported using dedicated cable support infrastructure.
The contractor shall furnish and install all support infrastructure required for a complete and code-compliant installation, including, but not limited to:
• J-hooks
• Cable slings
• Cable straps
• Cable tray
• Conduit
• Manufactured sleeves
• Other approved cable support systems
Cabling shall not be supported by other trade's equipment or architectural elements.
Under no circumstances shall speaker cabling be supported by:
• HVAC ducts
• HVAC piping
• Plumbing piping
• Electrical conduit
• Electrical equipment
• Existing unrelated cabling
• Ceiling tile
• Ceiling grid
• Light fixtures
• Sprinkler piping
• Structural elements not specifically approved for cable support
• Other building systems or architectural elements
The contractor shall provide sufficient dedicated support infrastructure to maintain the cable installation in a neat, secure, and code-compliant manner.
5. Cable Routing and Installation
Cables shall be neatly routed and trained to their respective termination points.
The contractor shall:
• Bundle, lace, and train conductors as appropriate.
• Install lacing bars and distribution spools where required.
• Maintain manufacturer's minimum bend radius requirements.
• Avoid excessive tension on cable.
• Maintain separation from sources of electrical interference as required.
• Protect cable where passing through walls, floors, sleeves, raceways, or other penetrations.
• Provide appropriate fire-rated sleeves and sealing where required.
• Maintain the integrity of existing fire-rated assemblies.
• Coordinate penetrations and pathway requirements with the District prior to installation.
Any penetrations created by the contractor shall be properly sleeved, sealed, and fire stopped as required by applicable codes.
6. Speaker Equipment
The existing classroom speakers shall remain in place.
The existing speaker model is: Bogen CSD 1X2
The contractor shall review the Bogen CSD 1X2 specification sheet and installation documentation included with this RFP to ensure that the proposed cabling installation is compatible with the existing speaker equipment.
Unless specifically identified as an alternate or change by the District, the contractor shall not replace the existing classroom speakers.
7. MDF/IDF Termination
Each classroom speaker cable shall be routed to the MDF/IDF identified on the associated drawings.
• Route each cable to the designated MDF/IDF.
• Maintain organized cable routing within the MDF/IDF.
• Provide appropriate cable management.
• Label each cable at the MDF/IDF termination point.
• Leave sufficient cable for proper termination and future service.
• Maintain appropriate bend radius and cable management within the MDF/IDF.
This RFP does not include connection of the new speaker cabling to the Bogen PA system head-end equipment.
The District or its designated PA contractor will be responsible for connecting the new speaker cabling to the Bogen PA system and completing associated system configuration/programming.
8. Cable Labeling
Each speaker cable shall be clearly and permanently identified.
The contractor shall label the cable with the corresponding classroom/room number at both ends of the cable:
1. At the classroom speaker termination point.
2. At the MDF/IDF termination point.
Labels shall consist of vinyl wraparound labels or self-adhesive labels suitable for telecommunications/low-voltage cabling applications.
Labels shall be legible, securely attached, and resistant to normal environmental conditions.
Room identification shall correspond exactly with the room numbers shown on the project drawings.
9. Phasing and Installation Schedule
The project shall be completed in phases by building wing.
Installation work will be scheduled across multiple Monday installation dates. The building does not have regularly scheduled classes on Mondays, and Mondays will be utilized as the primary installation period to minimize disruption to instructional activities.
The contractor shall coordinate the installation schedule with District 27J prior to beginning work.
• Coordinate installation dates with the District.
• Complete work by wing or designated installation area.
• Maintain safe access through the building during installation.
• Coordinate access to classrooms, MDFs, and IDFs.
• Notify the District of any conditions that may affect the installation schedule.
• Maintain a clean and safe work environment at the conclusion of each Monday installation period.
The District reserves the right to establish the sequence and timing of individual installation phases.
10. Coordination with District
The successful contractor shall coordinate all work with the District's designated project representative.
Prior to beginning work in each wing, the contractor shall verify:
• Classroom locations.
• MDF/IDF serving each classroom.
• Cable pathways.
• Existing conditions.
• Access requirements.
• Any conflicts with other building systems.
• Required penetrations and pathway infrastructure.
Any discrepancy between the drawings and field conditions shall be brought to the District's attention before proceeding with affected work.
11. Existing Conditions
The building is an existing occupied school facility. Contractors shall account for existing construction, building systems, and conditions when developing their proposal.
The contractor shall verify field conditions prior to installation.
The contractor shall take appropriate precautions to protect:
• Existing PA equipment.
• Existing speaker equipment.
• Network equipment.
• Telecommunications equipment.
• Electrical equipment.
• Building finishes.
• Ceiling systems.
• HVAC systems.
• Other building systems.
The contractor shall be responsible for repairing damage caused by its work.
12. Cleanup
The contractor shall maintain a clean and orderly work area throughout the project.
At the conclusion of each installation period, the contractor shall:
• Remove cable scraps and installation debris.
• Remove unused materials and packaging.
• Clean work areas.
• Replace ceiling tiles and other temporarily displaced building components.
• Leave classrooms, hallways, MDFs, IDFs, and other work areas in the same or better condition than they were found.
13. Codes, Standards, and Workmanship
All work shall comply with applicable federal, state, and local codes, ordinances, regulations, and industry standards.
The contractor shall perform all work in a professional manner consistent with generally accepted low-voltage cabling practices.
The completed installation shall be neat, organized, properly supported, properly labeled, and suitable for long-term maintenance and service.
14. Contractor-Furnished Materials
Unless specifically identified otherwise in the proposal documents, the contractor shall furnish all labor, materials, tools, equipment, lifts, ladders, cable support hardware, pathway materials, fasteners, sleeves, firestopping materials, labels, termination hardware, and other incidental materials necessary to complete the work.
15. Proposal Requirements
Proposals shall clearly identify all costs associated with completing the work described in this Scope of Work.
At a minimum, proposals shall include:
• Total project cost.
• Labor costs.
• Material costs.
• Proposed 18/2 shielded speaker cable manufacturer and part number.
• Description of proposed cable support infrastructure.
• Proposed installation schedule.
• Estimated number of Monday installation dates required.
• Lead time for materials.
• Warranty information.
• Any exclusions or assumptions.
• Identification of any proposed deviations from this Scope of Work.
The District may request clarification of any proposed exclusions, assumptions, or deviations prior to contract award.
16. Exclusions
The following items are specifically excluded from this RFP unless identified as an approved alternate:
• Connection to the Bogen PA system head-end equipment.
• Programming or configuration of the Bogen PA system.
• Replacement of existing Bogen CSD 1X2 classroom speakers.
• Replacement of Bogen head-end equipment.
• PA system commissioning beyond cable testing and verification.
• Changes to PA system programming or software.
• Repair or replacement of unrelated existing PA system components.
Any work outside of the defined scope must receive written approval from District 27J prior to commencement.
17. Drawings and Reference Documents
The following documents are incorporated into this RFP and shall be considered part of the project requirements:
• Project drawings identifying classroom quantities and MDF/IDF locations by wing.
• Bogen CSD 1X2 speaker specification sheet.
• Bogen CSD 1X2 speaker installation manual.
Contractors shall review all provided documentation prior to submitting a proposal.
18. Acceptance of Work
The District will inspect completed work for compliance with this Scope of Work.
Acceptance will be based on, at minimum:
• Correct cable routing.
• Individual home-run cabling for each classroom.
• Proper cable support.
• Proper terminations.
• Proper labeling.
• Compliance with applicable codes and installation requirements.
• Successful cable testing.
• Completion of required documentation.
• Acceptable workmanship and cleanup.
Any deficiencies identified by the District shall be corrected by the contractor at no additional cost to the District.
s s
R 2
Exhibit A Project Drawings Identifying Classroom Locations, Number of Classrooms, and MDF/IDF Locations
F Wing Level 1 11 Classrooms
1 1.2 2 3 4 5 5. 6
H P 144"
IDF1.1 BOUNDARY
144" P H
2 2 2
2 2 2 2
C
2 2 2 2
IF IF
A IF IF A
WAP
1 P
A T4.1
T4.1 A
P
E A T4.1
T4.1 A
P 1
CLASSROOM
F1
F1 6
F1 5
F1 4
F1 3 p
2 AC
SC01
CORRI0OR
AC
SC02
1 E
S
D12
M
0.1
P 1 P
F12 s s P P
SC01
SC01 1
P
COUNSEL
OFFICE
p IF IF
SCIENCE
p IF IF
SC01
E
E.1
AC
2 E 2
CLASSROOM
F1 2
CLASSROOM
F1 E 2
STAIR ENTRY
A P A
E 2
P AC
PREP
F1 1
D12%
AC TS03 1
2 p
D12&
COUNSEL
OFFICE
IF IF CORRI0OR C 2 2
F13 AC AC
PREP
CORRI0OR
013A HALL:AY
2 IF IF
FFSSDD
F111 ,')1.1
I0F CLOSET
IF
STOR
ELEC CLOSET
2 F11
F
F11
F111
R
T .1
N
STAFF
F113
T4.2
F113A
F113%
F113C
CUST
A E
E A
A CLASSROOM
F115
:OMEN
F116
F11
2 RESOURCE
CENTER
FF 2
RECEPTION
2 OFFICE
ELE9 MACHINE
ROOM
C 01314
T1.2
144"
H P 2
E 1
SC02
TS04
F13 MEN
F112
1 IF
V F114 p p
TS04 F11
D132
T1.3
*.1
P P
1 COMMUNICATIONS FLOOR PLAN, FIRST LEVEL - AREA 1
T1.1
8' 4' 0 8' 1/8" = 1'-0"
KEY PLAN
3 5
NORTH
WORK NOTES
E E E E E
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
.r vt
9/
/2
:3 4:
PM
ID
1.
B O
U N
D A
Y
E
1.
B O
U N
D A
1.
B O
U N
D A
T1 .3 s
0%
CO
NS
TR
UC
TI
ON
DO
CU
M
EN
TS
.1
-1
9-
Re vis ion s
O
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, F
IR
ST
L
E
VE
L
- A
R
EA
SD
7J H ig h
Sc ho ol rc hi te ct ur e
E ng in ee rin g
P la nn in g In te rio rs
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
RV
ED
G wing Level 1
11 classrooms
2 3 4 5 5 9 6 9
E 1 p
F13
MEN
F112
1 IF
V
C8ST
F114
TS04 F11
T1.1
'132
T1.3
IDF ROOM
D135
F1 $
M SC01
P 1 P
CORRIDOR
E11
STORAGE
E11B
E S
G110
*13
G112
*113
G113
IF 1
G114
G113C
CLASSROOM A A
G115
G116
*11
H p 2
TS04
A P A
E 2
STAFF
G113B
P
T4.1 A E
2 P N 2 P
G113A IF
A A
IF P
IF ELEC CLOSET
SENSORY
E10
G13 G111
2 G11 2 2 p p
2 1
E12
A P A P R TS04
G109
G102
IF IF 2
G101
G100
G11
- 5
UP
K p AC 2
AC 2
p p AC 2
SC01
G12
K 5
1 2
G10
CLASSROOM A
G10
G106
CLASSROOM A
G105
G104
G103
L
P E A T4.1 T4.1 A E P P E A T4.1 T4.1 A E P P E A T4.1 T4.1 A E P
2 2 2 2
2 2
2 2
H IDF1.1 BOUNDARY
2 5
3 4
4 5
5 6 5 N
1 COMMUNICATIONS FLOOR PLAN, FIRST LEVEL - AREA 2
9 9
R
P
G 1
P
T1.1
WORK NOTES
TS04 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
RELEASES DOOR HOLDERS. THE DOORS WILL CLOSE AND REMAIN LOCKED UNTIL
THE LOCKDOWN IS RESET. THE DOOR HOLDERS INTERFACE WITH THE SECURITY
SYSTEM ONLY AND ARE NOT TIED INTO THE FIRE ALARM SYSTEM.
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3 4:
1.
B O
U N
D A
1.
B O
U N
D A
1.
B O
U N
D A
1.
B O
U N
D A
1.
B O
U N
D A
FF
SS
DD
TR
UC
M
.2
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, F
IR
ST
L
E
VE
L
- A
R
7J H ig h
Sc ho hi te ct ur e
E ng in ee rin g
P la nn in g In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
.1 s s
G116
No wiring needed 9 10
IDF1.2 BOUNDARY
P +144"
12 12.3
D11
D11A
14.3 14.6 14.7
W25. 12T(S
TS03 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
RELEASES DOOR HOLDERS. THE DOORS WILL CLOSE AND REMAIN LOCKED UNTIL
THE LOCKDOWN IS RESET. IN THE EVENT OF A FIRE, THE FIRE ALARM SYSTEM SHALL
OVERRIDE THE ACCESS CONTROL SYSTEM TO RELEASE THE DOOR HOLDERS AND
TO KEEP THE DOORS UNLOCKED IN FAIL SAFE FOR EMERGENCY EGRESS.
2 COUNSEL
AP OFFICE
AP OFFICE 2
AP OFFICE
L D
PRINCIPAL SEC
0EAN OFFICE 1 SC01
0101 2
SECURE ENTR<
0.1
TS04 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
RELEASES DOOR HOLDERS. THE DOORS WILL CLOSE AND REMAIN LOCKED UNTIL
THE LOCKDOWN IS RESET. THE DOOR HOLDERS INTERFACE WITH THE SECURITY
SYSTEM ONLY AND ARE NOT TIED INTO THE FIRE ALARM SYSTEM.
TS10 PROVIDE 40" FLAT PANEL DISPLAY FOR SECURITY CAMERA VIDEO. SECURITY
OFFICE
2 2
2 2 2 2 2
TS14 S S 3
TS12 TS13
PRINCIPAL
C CV
D11&
CONTRACTOR TO FURNISH AND INSTALL.
TS11 PROVIDE 27" FLAT PANEL DISPLAY FOR SECURITY CAMERA VIDEO. DISPLAY WILL SIT
E ON DESKTOP. SECURITY CONTRACTOR TO FURNISH AND INSTALL.
1 1
1 1
P s s
SC01 SC01
0103 2
P WAP P
FBF
E.1
TS12 PROVIDE WIRELESS PENDANT FOR BOTH LOCKDOWN AND DURESS BUTTONS; ONE
PENDANT WITH TWO BUTTONS.
TS13 WHEN EITHER THE LOCKDOWN OR DURESS BUTTONS ARE PRESSED, AN AUTOMATED
MESSAGE SHALL BE SENT TO THE CENTRAL STATION MONITORING COMPANY WITH
INSTRUCTIONS TO DISPATCH POLICE.
D12&
COUNSEL 2
OFFICE
2 2
COUNSEL
OFFICE
COUNSEL 2
015P
:OMENS
MENS
:ORKROOM
CONFERENCE
2 P
TOILET
0120C
E;AM
0120B
NURSE
TS14 S S TS13
L D
F
S S W TS11
MV VSS
TS14 WHEN THE LOCKDOWN BUTTON IS PRESSED, AN AUTOMATED MESSAGE SHALL BE
BROADCAST OVER PUBLIC ADDRESS SYSTEM TO ALL =ONES ALERTING PEOPLE
INSIDE AND OUTSIDE OF BUILDING.
PREP
CORRI0OR
013A HALL:A<
P
2 2
TEST
MATERIALS
AC
0120A
S CV
C D100
2 F
2 OFFICE
P
RECOR0S
0130 2
CONFERENCE
T4.2
P
P 016
2 2 s s P
0EAN OFFICE 0117 2
ATTEN0ANCE 2
D11 A
F.9
D132
ELEV MACHINE
01314
ELEV SUMP
I0F ROOM 1
S (
ACS
,')1.
D13
ELECTRICAL
D1
BOOKKEEPING
A0 SECRETAR<
A0 OFFICE
A0 STORAGE
D1
TS10
SRO
-- 2
G
G.1
0135 T3.
SC01
TS03
E11A
E wing Level 1
6 classrooms
*11
3 2
E106A
E11A
3 3
PULL OUT
E104
E0
CLASSROOM T4.1
E100
H.2
N 2 P
P SENSOR<
CLASSROOM 2
E107
CHANGING
ROOM
E106B
A P
LIFE SKILLS
E106
IF A
E105
E103
QUIET ROOM
E100A
2 OFFICE
E100B
E 2
P 2 B15
SC01 1
ELECTRICAL 2
CLOSET
E103A
P s
B100
-.5
G11
UP
STAIR S5
E13
CLA< STORAGE
3 AC
1 R
SC01
B111 C
WAP
E102A
E102B
A E A
CERAMICS
E102
P A
E101
STU0ENT
STORE
B111
POS
B11 B
K.5
E13
IF
T4.1 P
TS10
C B110
G103
KILN
E102C
E102B 2
PUG
E1020
OFFICE
E102E
A S W S W
2 VSS ACS
2 S S S 1
MV L D POS
TS14 TS13
L
KE< PLAN
A M SC02 P +144"
H
CAMPUS
SECURIT<
B110
1 COMMUNICATIONS FLOOR PLAN, FIRST LEVEL - AREA 3
T1.3 4 1/8" = 1'-0" 1
L.9
M 2
.9
VESTIBULE
B11
+120"
N.1
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3 5:
.2
.2
1.
B O
U N
D A
1.
B O
U N
D A
B1
ID
F 1.
B
O U
N D
A
1.
B O
U N
D A
.4
T1 .4
ID
F
1.
B O
U N
D A
1A
.5
TR
UC
M
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, F
IR
ST
L
E
VE
L
- A
R
7J H ig h
Sc ho hi te ct ur e
E ng in ee rin g
P la nn in g In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
8'
A wing Level 1
TE03 PROVIDE 1-INCH CONDUIT UNDERGROUND. STUB TO MILLWORK FROM ACCESSIBLE
CEILING LOCATION.
14.3 14.6 14. 15 16 16. 16. 1 1 . 18 1 20 21 H
22 TS04 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
RELEASES DOOR HOLDERS. THE DOORS WILL CLOSE AND REMAIN LOCKED UNTIL
13 classrooms
A125A
S E TS30
THE LOCKDOWN IS RESET. THE DOOR HOLDERS INTERFACE WITH THE SECURITY
SYSTEM ONLY AND ARE NOT TIED INTO THE FIRE ALARM SYSTEM.
A
TS30 ENCLOSURE AND E;TERIOR CAMERA ARE LOCATED ON DIFFERENT LEVELS FROM
EACH OTHER. COORDINATE FINAL LOCATION OF BOTH WITH OWNER PRIOR TO
ROUGH-IN. SEE DETAIL TS-CD.
TE03
HEALTH
SCIENCES
A125
A16
IDF1.3 BOUNDARY
H P +144"
A122A
M SC01
CTE
A124
2 1 E
B
B.2
P WAP
AC E 2
WAP 2
FABRICATION
P LAB
A124A
A124A
ME= SS
P H
A101/
STAGE CRAFT 1
A122
A123
A16
1 T4.1
IF IF p
2 B.6
9ESTIB8LE
A11
S A101B
STAGE ACCESS
A101K p PIANO A121C
HALL
A16A
A120
2 A 2
E 2
A P A
P
+144"
SC01 A101A
A101%
9EST
WAP
+144"
,')1.
ACS
S E
A11
CTE P P
A11 C
A101C
R TS04
A100
IDF CLOSET
A120
T .
PROP
A116
1 SC01
A118C
MAN8FACT8RING
LAB
+144"
A11 D
CONTROL
A100
A8DITORI8M
A101
STAGE
A121
P N
A115
S8PPL<
A118A
TOOL ROOM
A118B
A118
1 E TS30
WOMEN
P N A114
CTE P P
A112
D
D.1
A101D
A100A
9EST
ELEC CLOSET
A113
2 A 2
M A11 E
A101D
A10
1 +144"
OFFICE
A121A
A121B
IF IF p
S CV
MAIN
A12
S TICKET BOOTH
D A101E
ME== ACCESS
A101F
8NIFORM
RISER ROBE WAP
COST8ME
STAGE ACCESS
A101G
MAKE 8P
A10 A P
2 A
DRAMA
E 2 2
P A
P FABRICATION
LAB
A111
A111%
D100
D119A
A102
A105 1 A101H
HALL
A101-
P
DRESSING
A10 B
P
DRESSING
A10 C p
2 IF IF
A
T4.1
1 1
CTE
CLASSROOM
A110 2
KE< PLAN
s CORRIDOR P
A13
A1
R P P
A14
P s s s
P P SC01
F.
1 T1.5 G
1 COMMUNICATIONS FLOOR PLAN, FIRST LEVEL - AREA 4
T1.4
NORTH \\c in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3 5:
ID
F
1.
B O
U N
D A
1.
B O
U N
D A
T1 .3
T1
TR
UC
M
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, F
IR
ST
L
E
VE
L
- A
R
7J H ig h
Sc ho hi te ct ur e
E ng in ee rin g
P la nn in g In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
S
F
1.
B O
U N
D A
A wing Level 1
14.3 14. 14.7 15
CORRIDOR p
T1.4
17.7 18 s s p
SC01
p p SC01
T1.4
TA02 ROUGH-IN FOR FUTURE OFOI E4UIpMENT. RUN ALL CONDUIT TO RACK LOCATION IN
CONCESSIONS STAND.
TE01 (1) 1-1/4" TELECOM CONDUIT UNDERGROUND TO IDF1.4.
TS02 pROVIDE pROTECTIVE CAGE OVER CAMERA ENCLOSURE TO pREVENT DAMAGE.
TS03 WHEN THE LOCKDOWN BUTTON IS pRESSED, THE ACCESS CONTROL SYSTEM
G THE LOCKDOWN IS RESET. IN THE EVENT OF A FIRE, THE FIRE ALARM SYSTEM SHALL
OVERRIDE THE ACCESS CONTROL SYSTEM TO RELEASE THE DOOR HOLDERS AND
WAp
SPLAY
A12A
A103
A104 p 2
N
ENSEMBLE
VOCALS
A107
PRACTI2CE
A107B
PRACTICE
A107D
A107C
MUSIC OFFICE
A107A
A108B
A108A
BAND
A108
A10 C
A108C
G.1
TO KEEp THE DOORS UNLOCKED IN FAIL SAFE FOR EMERGENCY EGRESS.
TS04 WHEN THE LOCKDOWN BUTTON IS pRESSED, THE ACCESS CONTROL SYSTEM
THE LOCKDOWN IS RESET. THE DOOR HOLDERS INTERFACE WITH THE SECURITY
SYSTEM ONLY AND ARE NOT TIED INTO THE FIRE ALARM SYSTEM.
TS05 INTERCOM AT DOOR B105F SHALL BE SET Up TO TRIGGER STROBE LIGHT TO NOTIFY
KITCHEN pERSONNEL.
CONCESSIONS
B102
IDF1.3 BOUNDARY
IDF1.4 BOUNDARY
LOCKER
B103A
B103B
CUSTODIAL
1 E SC02
1 E SC02
H.2
B101 (F)
TA02
S (F) M (F)
B105C
2 ELECTRICAL 2
B105D
FB2
B103E
B105F
B105E
2 DIRTY LINEN CLEAN LINEN RECEIVING
C
B103C B103D STORAGE
B105
S CV
TE01 MV
B105*
WAp 1
FB2
TA02 WAp
TS05 1
TS05
S S DRY STORAGE
B103F SC01
WAp
(F) A S (F)
C B103F
STUDENT
COMMONS 2
B100
TA02
TE01
KITCHEN 1
SERVERY
B103
FB2 p
MECHANICAL
B105B
COOLER
B103G p
TE01 +144"
T3.4
FREEZER
B103H
C L
2 p
B105H
WAp 1
WAp
SC01
STORAGE
B104
IT ROOM
B104A
IDF1.4
B12
B12A
B105A
B12
VESTIBULE
B11
R R
R 1 E
S SC02
SC02 E 1 FAMILY TOILET
TS02
C100 C100A C100B C100C WAp +144"
B12B TS03 1 E
M C11 A
S V R C
S IF
CV
B107
STAFF TOILET
AV CLOSET
C100A
+144" 1
4 1 SC01
SC01 1
p
C120 p H
STAFF DINING
B10
STAFF TOILET
B107A
B107B
E4UIPMENT
C120 p N p N p N B108 p N
B106 C
B13
H p
ROOF ACCESS
C121 C121
GIRLS
ATHLETICS
LOCKERS
C119
GIRLS TOILET
C118A WAp 1
P
GIRLS
SHO:ERS
C118B
KEY PLAN
WAp 1 MEN B109
SC01 1
WAp 4
T1.6
TS03 B13
2 R
1 .2
MAIN
GYMNASIUM
C100
1 COMMUNICATIONS FLOOR pLAN, FIRST LEVEL - AREA 5
T1.5
19.5
20 20.1
REFEREE
C117 p N p N
T1.6
\\c in \d at a\
_p ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3 6:
pM
ID
F
1.
B O
U N
D A
1.
B O
U N
D A
1.
B
O U
N D
A
T1
TR
UC
M
9-
M M
U N
IC
AT
IO
N
S
FL
O O
R p
LA
N
, F
IR
ST
L
EV
EL
A
R
7J H ig h
Sc ho hi te ct ur e
E ng in ee rin g pl an ni ng
I nt er io
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
s s
14 3
14 7
16 16 2
19 5
20 20 1 23
2 R MAIN
C100
C117
C116
P N P N
CUSTODIAL
C122
GIRLS 3E
LOC.ERS
C118
H P
GIRLS COACH
OFFICE P
C115
+144" 2
WEIGHT /
FITNESS ROOM
C102
ELECTRICAL
CLOSET
C113
C114
COACH TOILET
C112A
COACH TOILET
C115A
IDF1.4 BOUNDARY V R
IDF1.5 BOUNDARY 2
BOYS COACH
C112
1 E TS30
IDF1.4 BOUNDARY
IDF1.5 BOUNDARY
C11
2 1 TS02
BOYS 3E N
WAP +144"
E4UI3MENT
1 STORAGE
C111
P
LOC.ER
C110
WAP 1
M C111
C13
BOYS TOILETS
C110A
T
BOYS
SHOWERS
C110B
C103A
H P
WRESTLING
C103
AU;ILIARY
C101
TRAINING
C108
U
1 TS02
WAP +144"
TS02
BOYS
ATHLETICS
LOC.ERS
C109P N
W
SC01
P P
WAP
CORRIDOR
C12
WAP C1
C1
2 P P
+144" +144"
1 C
E4UI3MENT
C107
IDF CLOSET
C106
IDF1.5
VEST
C15
C1
M C1 C
1 E ;
DANCE / CHEER
2 1
P T .
TS30 E 1
VEST C
C14
E 1 C1
C104
TS30
TEAM ROOM
C105
IDF1.5 BOUNDARY
C105B
STORAGE H
C105A
.EY 3LAN
z
1 COMMUNICATIONS FLOOR PLAN, FIRST LEVEL - AREA 6
T1. 6 8' 4' 0 8'
TS02 PROVIDE PROTECTIVE CAGE OVER CAMERA ENCLOSURE TO PREVENT DAMAGE.
TS30 ENCLOSURE AND EXTERIOR CAMERA ARE LOCATED ON DIFFERENT LEVELS FROM
ROUGH-IN. SEE DETAIL TS-CD.
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3
1.
B O
U N
D A
1.
B
O U
N D
A
F
1.
B O
U N
D A
TR
UC
M
.6
M
M U
N
IC
AT
IO
N S
F
LO
O R
P
LA
N , F
IR
ST
L E
VE
L
- A R
7J H ig h
Sc ho
9-hi te ct ur e E ng in ee rin g P la nn in g
In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
F wing Level 2 13 classrooms
1 1.2 2 3 4 5 5. 6
IDF2.2 BOUNDARY
MDF2.1 BOUNDARY
&LASSROO0
F2
A
F2 6
&ORRI'OR
F22
F2 5
F2 4
F2 3 A
SC01 1
2 AC 3
TE&H OFFI&E
'2 E
'.1
2 3
3 IF IF
S E S E
ACS VSS
F2 AC
2 E
F2 1
F21
D22$
DN
STAIR S1
'22
D200F
0') ..1
3 E
0'F
TS30 E S
P 2
F23 C
S&IEN&E
F2 2
S&IEN&E
AC WAP
P 1
TS03
4 4
TC01
D22% s SC01
M
'2 F
2 IF IF
I'F &LOSET
F211
0EN
F212
F213
F213A
F213%
F213&
ESL
A F215
ESL
F216 A
ELE& &LOSET
:O0EN
PT6
A 4
2 E
STORA*E
F21 A
T1.8
3 TS04
F2 V
&8ST
F214 2 2
3 3
F2
R
IF IF 2
T1.9
T1.8
D20
*.1
1 COMMUNICATIONS FLOOR PLAN, SECOND LEVEL - AREA 1
T1.7 s
A
P P
E E E s
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3
2.
B O
U N
D A
2.
B
O U
N D
A
F2 .1
B O
U N
D A
TR
UC
M
.7
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, S E
C O
N D
L
EV
E L
- A R
7J
H ig h Sc ho hi te ct ur e E ng in ee rin g P la nn in g
In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
G wing Level 2
12 classrooms
2 3 4
4 5 5
5 6 p TS04
)23
)213
&86T )214 2 2
)21
'2 3
T1.7 R
SC01 P
SC01 SC01
T1.7 T1.9
&ORR,'OR
E21
&LA66ROO0
G21
G23
6TA))
6TOR
G214
6TA))
,NTER9ENT,ON
A :O0EN
TS04 G21
(2
0EN
AC G212
P N
G213
G213& G215
,NTER9ENT,ON
G216
P N IF
6TORAGE
6TA))
G213%
6TOR
G213A
P E A
T4.1 2
A E
A
ELE& &LO6ET
G211
2 2 2 2 G21
G23
(22
6&,EN&E A
G2 2
G2 1
6&,EN&E
G2
R P
- 5
G2 T4.1 T4.1
2 MDF2.1 BOUNDARY
p K
1 &ORR,'OR
P P G22 P
5 5
SC01 P
p AC 2 p p AC 2
IDF2.3 BOUNDARY
AC 2 p
&LA66ROO0 A
G2 6
P 2
G2 5
G2 4
P 2
&LA66ROO0
G2 3
P L
P E A T4.1 T4.1 A E P E A T4.1 T4.1 A E E A T4.1 T4.1 A E
IF IF
A
A 2 2
A 2 2
2 2 2
S
2 2
2 2 2
E 1
TS30
IDF2.2 BOUNDARY IDF2.3 BOUNDARY
1 E S 0
3 4
5 6 5
1 COMMUNICATIONS FLOOR PLAN, SECOND LEVEL - AREA 2
T1.8
5 5 5
G 1
A
WAP P
WORK NOTES
TS04 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
RELEASES DOOR HOLDERS. THE DOORS WILL CLOSE AND REMAIN LOCKED UNTIL
THE LOCKDOWN IS RESET. THE DOOR HOLDERS INTERFACE WITH THE SECURITY
SYSTEM ONLY AND ARE NOT TIED INTO THE FIRE ALARM SYSTEM.
TS30 ENCLOSURE AND EXTERIOR CAMERA ARE LOCATED ON DIFFERENT LEVELS FROM
ROUGH-IN. SEE DETAIL TS-CD.
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3
2.
B O
U N
D A
2.
B O
U N
D A
2.
B O
U N
D A
.9
T1 .9
TR
UC
M
.8
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, S E
C O
N D
L
EV
E L
- A R
7J
H ig h Sc ho hi te ct ur e E ng in ee rin g P la nn in g
In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
.7
AC
S
D wing Level 2 3 classrooms 2
TECH OFFICE
D200E
12.3
13 14
14.3 14.6 14.
:25. N2TES
TC01 FOR COMPUTER CLASSROOMS, BUSINESS CLASSROOM, VIDEO PRODUCTION, AND
CADD LAB: PROVIDE CHATSWORTH THINLINE II WALL MOUNTED CABINET, 36" HIGH,
26" WIDE, 12" DEEP, NOMINAL, 6U RACK SPACE. TERMINATE ALL LOCAL DATA CABLES
FOR SEATING LOCATIONS IN THIS ROOM AT PATCH PANEL WITHIN CABINET. CONFIRM
SEATING CAPACITY AND TERMINATION METHODOLOGY WITH DISTRICT I.T.
REPRESENTATIVE AND ARCHITECT.
TS01 PROVIDE MEDIA CENTER RFID ANTI-THEFT DETECTION GATE WITH MONITORING
SOFTWARE. COORDINATE INSTALLATION/INTEGRATION INTO MEDIA CENTER
BORROWING MANAGEMENT SYSTEM WITH OWNER.
TS03 WHEN THE LOCKDOWN BUTTON IS PRESSED, THE ACCESS CONTROL SYSTEM
THE LOCKDOWN IS RESET. IN THE EVENT OF A FIRE, THE FIRE ALARM SYSTEM SHALL
OVERRIDE THE ACCESS CONTROL SYSTEM TO RELEASE THE DOOR HOLDERS AND
S E S E
ACS VSS
0') ..1
A 2
T6.1
TO KEEP THE DOORS UNLOCKED IN FAIL SAFE FOR EMERGENCY EGRESS.
$ S
IF WAP
WAP P P
WAP P
OFFICE
D200D
P
3 E 1
1 MDF
PT6
PT6
PT6
PT6
TC01
D22% M
SC01
IF 5
5 IF
MEDIA CENTER
READING
D200
WORK ROOM
D200C 2
P
MEZZ ACCESS
A101F
F
STORAGE
F219A TE;TBOOK
STORAGE
D203
COMP8TER
D202
COMP8TER
D201
D200B
2 D203
D202
M
D20 SC01
TS01
D200
SC01
COPY CENTER
D200A
F.9
G
IF 3
T1.8
WAP
P
CORRIDOR
E21
2 BOOK DROP
B105F C
P N N
D200A
E2
E2 A
SC02 1
DISPLAY
A12A
G.1
STORAGE
E11A
E wing Levle 2 E20
2 2
E22%
TS03 3
2 2
H
H.2
5 classrooms
E204
E20 A
9IDEO
E203A
E203B
E203A
A 2
E203
CORR DOR
E22
E203
E200
A E 2
1 A
E200
P P P P P s
-.5
K.5
STAIR S5
E23
DN
ART
E202
IF IF 3
WORKROOM
E201A
E202B
E201B
ART
E201
E20 &
IT
E201C
1 ,') .
L KEY PLAN
1 COMMUNICATIONS FLOOR PLAN, SECOND LEVEL - AREA 3
T1.9 4
IDF2.3 BOUNDARY
8.9
D.1 s
\\c um in \d at a\
_P ro je ct s\
D
LR
-2
0- D is tri ct j_ H ig hS ch oo l3 \0
-C
A D
\1 0-
M as te rs
\2
J
H ig h S ch oo l
C om m
_R
.rv t
C
U se rs \jm itt er er \D oc um e nt s\ Lo ca l R ev it
F ile s\
J H ig h
S ch oo l 3
C om m
R
_j oh n.
m itt er er
/2
:3
.8
T1 .8 s
E2
A
M D
F2 .1
B O
U N
D A
2.
B
O U
N D
A
TR
UC
M
9-
M M
U N
IC
AT
IO
N
S F
LO
O
R P
LA
N
, S E
C O
N D
L
EV
E L
- A R
7J
H ig h Sc ho hi te ct ur e E ng in ee rin g P la nn in g
In te
, D
LR
G ro up i nc a
Co lo ra do c or po ra tio n, A
LL
R
IG
HT
S
RE
SE
Exhibit B
Bogen CSD 1X2 Speaker Specifications Sheet
Drop-In Ceiling Speaker CSD1X2 & Variations with Back Can Bogen’s CSD1X2 Drop-In Ceiling Speakers are 1' X 2' speakers that allow for fast and easy installation.
Just make one simple cut to the ceiling tile, lay the support rail crossbar (included) across the ceiling grid, and drop the speaker into place.
• Finely perforated grille over the entire front of speaker
• Fully enclosed, industrial grade steel construction
• Enclosed Back Can
• 8'' main cone with secondary high-frequency cone
• 70V/25V, 4-watt transformer (4, 2, 1, 0.5, 0.25 watt) taps;
selected by rotary switch
• Seismic attachment point
• Available in off-white and bright white (“U” versions) grille finish
• ''VR'' versions have a Recessed Volume Control (front-mounted)
• Listed to UL Standard 1480 for U.S. use
• Support Rail Crossbar (included)
CEILING TILE
CSD1X2 CEILING GRID
SUPPORT RAIL CROSSBAR (included)
*Listed to UL Standard 1480 for U.S. use
Drop-In Ceiling Speaker CSD1X2 & Variations
(with Back Can)
FINELY PERFORATED
METAL FINISH GRILLE
SUPPORT RAIL
CROSSBAR
SPEAKER ENCLOSURE SEISMIC ATTACHMENT POINT
ROTARY TAP
SELECTOR
SWITCH
FRONT-MOUNTED
VOLUME CONTROL
(''VR'' VERSION)
ELECTRICAL BOX
WIRE NUTS FOR
CONNECTIONS
ELECTRICAL BOX COVER
S P E CIF IC A T I O N S
Frequency Response ...................... 110 Hz to 20 kHz SPL @ 1W / 1m ................................. 94 dB Power Taps ...................................... 4, 2, 1, 0.5, 0.25 W Dispersion @ 2 kHz (6 dB down) ..... 100° Cone Material & Surround ................. Treated paper Cones .............................................. 8" main cone with secondary high frequency cone Magnet Weight ............................... 10 oz.
Connection ....................................... Via wire nuts (included in electrical box)
Dimensions ................................... . .12-1/4" W x 5" H x 24" D Product Weight ................................ 10 lb.
70V and 25V Compatible.
Plenum-Rated and Listed to UL Standard 1480 for U.S. only.
Architect and Engineer Specifications The speaker shall be a Bogen Model CSD1X2. It shall be a 1 ft. x 2 ft. steel assembly with non-reflective, finished metal grille; damped high-compliance factory-mounted 8" loudspeaker with a treated paper cone; and 70V/25V transformer. The 8" main speaker cone shall have a 10 ounce magnet. A secondary high frequency cone speaker shall be included in the assembly. The back of the assembly shall have a back can enclosure. The speaker shall include a seismic attachment point. Output shall be 94 dB @ 1W/1m (min.). Frequency response shall be 110 Hz to 20 kHz (min.). Transformer shall have power taps of 4, 2, 1, 0.5, and 0.25 watts, selectable by rotary switch. A support rail cross-bar shall be included. The speaker shall measure 12-1/4" W x 5" H x 24" D. The speaker shall weigh 10 lb. Speaker listed to UL Standard 1480 for U.S. use.
For CSD1X2: Front grille shall be off-white in color.
For CSD1X2U: Front grille finish shall be bright white in color.
For CSD1X2VR: Front grille finish shall be off-white in color. An easily accessible, front-mounted recessed volume control shall be included.
For CSD1X2VRU: Front grille finish shall be bright white in color. An easily accessible, front-mount-ed recessed volume control shall be included.
50 Spring Street, Ramsey, NJ 07446, U.S.A.
Tel: 201 934-8500 • Fax: 201-934-9832 www.bogen.com
Lead Color 70V Red 25V Yellow COM Black
Model
Of f-w hi te
F in is h
Br ig ht W hi te
F in ish (U
Ba ck an ce ss ed
V ol um e
C on tr ol
(V R
CSD1X2 ● ●
CSD1X2U ● ●
CSD1X2VR ● ● ●
CSD1X2VRU ● ● ●
http://www.bogen.com/
Exhibit C
Bogen CSD 1X2 Speaker Installation Manual
Model CSD1X2 Drop-In Ceiling Speaker with Back Can 70V & 25V Speaker Systems
SEISMIC TETHER
POINT
Electrical Connection
1. Remove electrical box cover, then install cable clamp (if desired) and feed interconnecting cable into the electrical box.
2. Select speaker leads for desired system type:
70V - Red, 25V - Yellow, and COM - Black for both. Interconnect the speakers in the system, making sure that all leads of the same color are connected together. Avoid swapping colors.
3. Cut bare wire tip off of unused speaker lead. Secure all mechanical connections and re-install electrical box cover.
4. Set tap selector switch to proper tap setting.
NOTE: All wiring must comply with NFPA 70
Ceiling Installation
1. For 2 ft. x 4 ft. tile space, cut ceiling tile to 35-1/2'' long.
For 2 ft. x 2 ft. tile space, cut to 11-1/2"Iong.
2. Place speaker in ceiling opening.
KN
FEED
CABLE
3. Slide Tile Support Rail under speaker edge beside opening.
4. Drop in
CEILING
TILE SUPPORT RAIL
-- 2-YEAR WARRANTY --
The CSD1X2 is warranted to be free from defects in material or workmanship for two (2) years from the date of sale to the original purchaser. This warranty does not extend to any of our products that have been subjected to abuse, misuse, improper storage, neglect, accident, improper installation or have been modified or repaired or altered in any manner whatsoever, or where the serial number or date code has been removed or defaced.
lntertek xxxxxxx
CONFORMS TO
UL STD 60065
CERTIFIED TO
CAN/CSA STD C22.2
NO. 60065
ETL CLASSIFIED
@us lntertek xxxxxxx
CONFORMS TO
UL STD 1480
Spec fications subject to change without notice © 2004·2014 Bogen Communications, Inc. 53·2070-011 1412
BOGEN®
COMMUNICATIONS, INC.
www.bogen.com
70V Red 25V Yellow COM Black http://www.bogen.com/
| NOTE: THERE WILL NOT BE A BID OPENING ON THE PROJECT. |
| VENDOR ACKNOWLEDGEMENT |
| VENDOR PRINT OR TYPE YOUR INFORMATION |
| INSTRUCTIONS TO PROPOSERS |
| 1. APPLICABILITY: |
| 2. BACKGROUND: |
| 3. CONTENTS OF OFFER: |
| 5. SUBMISSION |
| PRICING TEMPLATE |
| SCOPE OF PROPOSAL |
| 1. Project Overview |
| 2. Project Scope |
| 3. Cable Requirements |
| 4. Cable Support and Pathways |
| 5. Cable Routing and Installation |
| 6. Speaker Equipment |
| 7. MDF/IDF Termination |
| 8. Cable Labeling |
| 9. Phasing and Installation Schedule |
| 10. Coordination with District |
| 11. Existing Conditions |
| 12. Cleanup |
| 13. Codes, Standards, and Workmanship |
| 14. Contractor-Furnished Materials |
| 15. Proposal Requirements |
| 16. Exclusions |
| 17. Drawings and Reference Documents |
| 18. Acceptance of Work |
| G wing Level 1 |
| No wiring needed |
| E wing Level 1 |
| 6 classrooms |
| A wing Level 1 |
| 13 classrooms |
| No wiring needed |
| A wing Level 1 |
| No wiring needed |
| No wiring needed |
| F wing Level 2 |
| G wing Level 2 |
| D wing Level 2 |
| E wing Levle 2 |
| 5 classrooms |
| Drop-In Ceiling Speaker |
| Drop-In Ceiling Speaker CSD1X2 & Variations (with Back Can) |
| Model CSD1X2 |
| with Back Can |
File details come from the government source that posted it. Updated .