biddoc.pdf

PDF 1 MB Posted

Attached to
Galeton Drainage Project
Solicitation number
B2600095
Issued by
Weld County, Colorado

About this file

This is a Request for Proposal (RFP) document issued by Weld County, Colorado, through its Purchasing Division for construction services on the Galeton Drainage Project (Solicitation Number B2600095). The project involves removing the existing storm drain system and constructing an improved storm drain system along WCR 74 through Galeton, including roadway reconstruction and hot mix asphalt paving. Work encompasses clearing and grubbing, tree removal, structure removal, excavation, embankment placement, erosion control installation, dewatering, hydraulic seeding, geogrid installation, aggregate base course placement, asphalt paving, riprap installation, drainage structure installation, culvert and inlet installation, sanitary sewer conduit installation, signage and striping installation, and traffic control coordination. A mandatory pre-proposal meeting is scheduled for October 21, 2026, at 10:00 a.m. at the Weld County Public Works Facility (1111 H Street, Greeley, Colorado). Technical questions are due by October 28, 2026, at 7:00 a.m., with responses provided via addendum by October 30, 2026. Proposals are due November 5, 2026, by 10:00 a.m., with optional interviews anticipated for November 20, 2026. The Notice of Award is anticipated November 30, 2026, with contract execution anticipated December 16, 2026.

Evaluation uses a best value selection process combining technical score (50 points maximum), schedule score (20 points maximum), cost score (30 points maximum), and optional interview score (50 points maximum). The lowest responsible cost proposal receives 30 points, with other proposals scored based on their ratio to the lowest cost. Contractors must submit completed bid tabulation forms with unit prices, as cost proposals are sealed until after technical and schedule scores are determined. Bidders must be registered in the System for Award Management (SAM) database and provide a Dun & Bradstreet (DUNS) number. A 5% bid bond is required at proposal submission. Contractors must maintain comprehensive insurance including workers' compensation (statutory limits), commercial general liability ($2,000,000 per occurrence/$4,000,000 aggregate), automobile liability ($1,000,000 per accident), professional liability ($2,000,000 per loss/$4,000,000 aggregate), umbrella/excess liability ($1,000,000), and pollution liability ($1,000,000 per loss and aggregate). Performance and payment bonds (100% of contract value) are required at contract execution. All proposals must be submitted in PDF format with a maximum length of 15 pages, addressing scope of work, critical issues, project control, cost management, regulatory compliance, quality control, pending claims or OSHA citations, location impact, familiarity with Weld County specifications, employee count and budget information, facilities and equipment inventory, preliminary construction schedules, and references from three similar projects. This is not a CDOT contract and will not have CDOT oversight.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Weld County Finance Department Purchasing Division

1301 North 17th Avenue Greeley, Colorado 80631

Public Works Construction – Request for Proposal (RFP)

Solicitation Number: B2600095

Title: Galeton Drainage Project

Issue Date: October 7, 2026

Pre-Proposal Meeting: October 21, 2026, at 10:00 a.m.

(Mandatory)

Pre-Proposal Location: 1111 H Street, Greeley, CO 80632

Questions Due: October 28, 2026, by 7:00 a.m.

Questions email: tanderson@weld.gov with copy to bids@weld.gov

Proposal Due Date: November 5, 2026, by 10:00 a.m., Purchasing’s Clock

Proposal Delivery: Preferred email to bids@weld.gov or option to hand delivery to 1301

North 17th Avenue, Greeley, CO 80631

For additional information: bids@weld.gov

Documents Included in this Solicitation Package

RFP Schedules

Schedule A: Solicitation Instructions Schedule B: Scope of Work Schedule C: Procurement Schedule Schedule D: RFP Response - Criteria Schedule E: Proposal Form Schedule F: Insurance & Bonds Schedule G: Weld County Contract Schedule H: Forms Due with Proposal

RFP Attachments

Attachment 1 – Selected Bidder Forms Attachment 2 – Project Special Provisions Attachment 3 – Galeton Drainage Project Plans Attachment 4 – Galeton Geotechnical Report

Form Revision 6-2025 mailto:bids@weld.gov mailto:bids@weld.gov

Table of Contents

Public Works Construction – Request for Proposal (RFP) 1 Documents Included in this Solicitation Package 1

RFP Schedules 1 RFP Attachments 1

Table of Contents 2 Schedule A - Solicitation Instructions 4

Purpose/Background 4 Proposal Advertisement 4 Proposal Submission 4 Introductory Information 5 Cooperative Purchasing 6

Schedule B - Scope of Work 7 Project Overview 7 Method of Procurement 7 Delivery Method 7 Pricing Method 7 Specific Requirements and Responsibilities 7

Schedule C - Procurement Schedule 9 Schedule D – RFP Response Criteria 10

RFP Response Submittal 10 Response Format 11 Best Value Selection Process Summary Description 11

Technical Score 11 Schedule Score 11 Cost Score 12 Interview Score (optional) 12

Scoring Criteria 12 Schedule E - Proposal Response Form 18

Proposal Submittal Instructions 18 System for Award Management (SAM) Database 18 Fees - Proposal Schedule 18 Fees – Cost Adjustments 25

Schedule F – Insurance and Bonds 27

Solicitation # B2600095 Page 2

Insurance 27 Bonds 30 Insurance Mailing Information 30

Schedule G - Weld County Contract 32 Contractual Obligations 32 Weld County Standard Contract 32

Schedule H – Forms Due with Proposal 47 Bid Bond 48 IRS Form W-9 50 Title 49, CFR, Part 29 Debarment and Suspension Certification 51 Certification of Compliance with Equal Opportunity Clause Requirements 52 Contractors Performance Capability Statement (Form #605) 53 Anti-Collusion Affidavit (CDOT Form #606) 54 Assignment of Antitrust Claims (Form #621) 55 Bidders List (CDOT Form #1413) 56

Solicitation # B2600095 Page 3

Schedule A - Solicitation Instructions

Purpose/Background The Board of County Commissioners of Weld County, Colorado, by and through its Purchasing Office (collectively referred to herein as, “Weld County”), wishes to purchase the following:

Galeton Drainage Project

A Mandatory Pre-Proposal conference will be held on October 21, 2026 at 10:00a.m. at the Weld County Public Works Facility located at 1111 H Street, Greeley, CO 80631. Proposers must participate and record their presence at the pre-proposal conference to be eligible to submit Proposals.

Proposals will be received until: November 5, 2026 at 10:00 a.m. (Weld County Purchasing Time Clock). The submitted Proposals will be read over a Microsoft Teams Conference Call November 5, 2026 at 10:30 a.m. To join, call the phone number and enter the Conference ID provided below or you are invited to attend the Proposal opening in person at the Weld County Purchasing Conference Room, 1301 N. 17th Avenue, Greeley, CO 80631.

Proposal Advertisement You can find information concerning this request on the BidNet Direct website at https:// www.bidnetdirect.com/ Weld County Government is a member of BidNet Direct. BidNet Direct is an on-line notification system which is being utilized by multiple non-profit and governmental entities.

Participating entities post their Proposals, quotes, proposals, addendums, and awards on this one centralized system.

Proposal Submission

1. PREFERRED: email Proposals to bids@weld.gov If your Proposal exceeds 25MB please upload your Proposal to https://www.bidnetdirect.com. The maximum file size to upload to BidNet Direct is 500 MB. If vendor does not desire email submission, sealed Proposals will be received at the Office of the Weld County Purchasing in the Weld County Building located at 1301 North 17th Avenue, Greeley, CO 80631 by the Proposal due date and time.

2. PDF format is required. Emailed Proposals must include the following statement on the email:

“I hereby waive my right to a sealed Proposal”. An email confirmation will be sent when your

Microsoft Teams By Phone

Join: Teams Meeting Meeting ID: 224 776 245 150 102

Passcode: Ko3545d

+1 720-439-5261,,237639792# United States, Denver

Phone conference ID: 237 639 792#

Solicitation # B2600095 Page 4 https://www.bidnetdirect.com/ https://www.bidnetdirect.com/ mailto:bids@weld.gov https://www.bidnetdirect.com/ https://teams.microsoft.com/meet/224776245150102?p=I6qwXozRgf57sXG1mb

Proposal has been received. Please call Purchasing at 970-400-4222 or 4223 with any questions.

Introductory Information

1. Proposals shall be typewritten or written in ink on forms prepared by the Weld County

Purchasing Division. Each Proposal must give the full business address of Proposer and be signed by authorized person. Bids by partnerships must furnish the full names of all partners and must be signed with the partnership name by one of the members of the partnership or by an authorized representative, followed by the signature and title of the person signing.

Proposals by corporations must be signed with the legal name of the corporation, followed by the name of the state of the incorporation and by the signature and title of the president, secretary, or other person authorized to bind it in the matter. The name of each person signing shall also be typed or printed below the signature. A Proposal by a person who affixes to his signature the word "president," "secretary," "agent," or other title without disclosing his principal, may be held to be the Proposal of the individual signing. When requested by the Weld County Procurement Manager satisfactory evidence of the authority of the officer signing on behalf of a corporation shall be furnished. A power of attorney must accompany the signature of anyone not otherwise authorized to bind the Proposer. All corrections or erasures shall be initialed by the person signing the Proposal. All Proposers shall agree to comply with all of the conditions, requirements, specifications, and/or instructions of this solicitation as stated or implied herein. All designations and prices shall be fully and clearly set forth. All blank spaces in the solicitation forms shall be suitably filled in. Proposers are required to use the solicitation forms which are included in this package and on the basis indicated in the Solicitation Forms. The submitted proposal must be filled out completely, in detail, and signed by the Proposer.

2. Late or unsigned Proposals shall not be accepted or considered. It is the responsibility of the Proposer to ensure that the proposal arrives in the Weld County Purchasing Division on or prior to the time indicated in Schedule A. Hard copy Proposals received prior to the time of opening will be kept unopened in a secure place. No responsibility will attach to the Weld County Purchasing Division for the premature opening of a Proposal not properly addressed and identified. Proposals may be withdrawn upon written request to and approval of the Weld County Procurement Manager; said request being received from the withdrawing Proposer prior to the time fixed for award. Negligence on the part of a proposer in preparing the Proposal confers no right for the withdrawal of the Proposal after it has been awarded.

Proposers are expected to examine the conditions, specifications, and all instructions contained herein, failure to do so will be at the Proposer’s risk.

3. In accordance with Section 14-9(3) of the Weld County Home Rule Charter, Weld County will give preference to resident Weld County bidders (proposers) in all cases where said bids are competitive in price and quality. It is also understood that Weld County will give preference to suppliers from the State of Colorado, in accordance with C.R.S. § 30-11-110 (when it is accepting bids (proposals) for the purchase of any books, stationery, records, printing, lithographing or other supplies for any officer of Weld County). Weld County reserves the right to reject any and all bids (proposals), to waive any informality in the bids (proposals), to award the bid (proposal) to multiple vendors, and to accept the bid (proposal) that, in the opinion of the Board of County Commissioners, is to the best interests of Weld County. The bid(s) (proposal) may be awarded to more than one vendor.

Solicitation # B2600095 Page 5

Cooperative Purchasing Weld County encourages cooperative purchasing in an effort to assist other agencies to reduce their cost of seeking solicitations and to make better use of taxpayer dollars through volume purchasing.

Vendor(s) may, at their discretion, agree to extend the prices and/or terms of the resulting award to other state or local government agencies, school districts, or political subdivisions in the event they would have a need for the same product/service. Usage by any entity shall not have a negative impact on Weld County in the current term or in any future terms.

Solicitation # B2600095 Page 6

Schedule B - Scope of Work

Project Overview Weld County is seeking Proposals for a contractor to provide construction services for the Galeton Drainage Project.

Method of Procurement

Best Value: Best Value refers to a project procurement method where price and other key factors, such as quality and expertise, are considered in the evaluation and selection process. Best Value is typically achieved through a two-step process using a Request for Qualifications (RFQ) and Request for Proposal (RFP) to evaluate proposers.

Delivery Method

Design-Bid-Build (DBB): Design-Bid-Build (DBB) is the traditional project delivery method in which County either designs or retains a designer to furnish complete design services. Then solicits bids or proposals (advertises) and awards a separate construction contract based on the designer's completed construction documents. In DBB, the agency "owns" the details/risks of design during construction and as a result, is responsible for the cost of any errors or omissions encountered in construction.

Pricing Method

Unit Pricing: Unit pricing is where the contractor simply sets a price for each unit of type of work, or category of cost.

Specific Requirements and Responsibilities

The project in general consists of removing the existing storm drain system and constructing an improved storm drain system along WCR 74 through the town of Galeton. The existing WCR 74 roadway and intersecting roadways will be reconstructed and paved with hot mix asphalt to improve roadway drainage. The work to be performed will include but not be limited to:

• Clearing and grubbing

• Removal of trees

• Removal of structures

• Removal of storm pipe

• Removal of asphalt mat

• Unclassified excavation

• Placement of embankment material

• Stripping and stockpiling of topsoil

• Installing and maintaining erosion control items

• Dewatering

• Hydraulic seeding and mulching

• Installation of geogrid

• Placement of aggregate base course

• Hot mix asphalt paving

Solicitation # B2600095 Page 7

• Installing riprap

• Installing drainage structures

• Installing culverts, inlets, curb/gutters

• Installing sanitary sewer conduit

• Adjusting sanitary sewer structures

• Installation of permanent signage and striping

• Work site traffic control and coordination to ensure safe access through the project.

• Contractor provided process control testing

• Other miscellaneous items

This is not a CDOT contract and will not have CDOT oversight.

Weld County will review all proposals and rank the proposals using the County’s best value process (outlined in Schedule D – RFP Response Criteria) to select the proposer representing the best value bid for the contract. The bid tabulation provided in Schedule E, Table 1 must be submitted as part of the proposal or the bid will be rejected.

Solicitation # B2600095 Page 8

Schedule C - Procurement Schedule

Below is the anticipated schedule for procurement of this solicitation:

Advertisement Date October 7, 2026

Pre-Proposal Meeting (Mandatory) October 21, 2026, at 10:00 a.m.

1111 H Street, Greeley, CO 80632

Technical Questions Due October 28, 2026, by 7:00 a.m.

Technical Questions email tanderson@weld.gov with copy to bids@weld.gov

Questions Answered via Addendum October 30, 2026

Proposals Are Due November 5, 2026, by 10:00 a.m.

Purchasing’s Clock

Interviews (Optional) November 20, 2026

Solicitation Notice of Award (Anticipated) November 30, 2026

Contract Execution (Anticipated) December 16, 2026

Solicitation # B2600095 Page 9

Schedule D – RFP Response Criteria

RFP Response Submittal

Weld County is seeking the proposer with the best value for the County. To aid in the determination, contractor shall address the following items in the RFP response submittal, The RFP Response should be arranged in order of the evaluation criteria shown in the RFP Review Scoring Table below.

The response items include:

1. The RFP Response shall include a completed Statement of Qualifications and Subcontractors showing the proposer understands the scope of the project and its objectives.

2. The RFP Response shall include a description of critical issues that the proposer considers to be of importance for the project and how those issues will be solved.

3. The RFP Response shall include a description of how the proposer will time and phase segments of construction to minimize road closure durations, maintain drainage, accommodate local residents / businesses, and maintain safe local access within the project limits at all times.

4. The RFP Response shall include a description of how the project costs will be controlled for both the prime contractor and their sub-contractors.

5. Describe how the proposer will ensure that all Federal, State, and Local laws, rules, and regulations will be followed.

6. Describe how the proposer will handle the quality control for the entire project.

7. Describe any judgements, claims, or suits pending or outstanding against proposer’s company.

8. Describe any citations by OSHA for violations within the last 5 years.

9. The RFP Response shall include a description of the proposer’s location and explain how it will not affect the project coordination with the County.

10. Explain how the proposer is familiar with Weld County’s project specifications and policies.

11. Include a list of the number of employees and the annual operating budget.

12. Explain the proposer’s knowledge about Weld County in general.

13. Include a list of your company’s facilities and major equipment leased or owned (excavators with bucket sizes, blades, dozers, scrapers, tractor trailers, etc.)

14. The RFP Response shall include a preliminary construction schedule showing major construction items associated with the project that is included in this RFP, and how the proposer would complete the project within the contract time.

15. References from at least three other projects with similar requirements that have involved the staff proposed to work on this project. The County may choose to visit one or more of the listed projects and/or request a copy of the plans and documentation completed.

Solicitation # B2600095 Page 10

Response Format

The following defines the response format:

1. Limit the total length of RFP Response to a maximum of 15 pages.

a. The County will reject RFP responses received that are longer than 15 pages in length.

b. The front and back cover will not count as pages.

c. Section dividers also do not count as pages unless they have photos or text on them, then they will be included in the pages count.

d. The proposal document forms included in this request which are mandatory to submit with your Proposal will not be included in the page count for your proposal.

2. RFP Responses shall be mainly made up of 8 ½” x 11” paper.

a. 11” x 17” paper can only be used for presenting construction schedules.

b. Text sizes shall be 12 point or larger.

3. Failure to follow these instructions may result in the RFP Response being rejected.

Best Value Selection Process Summary Description

The following simple equation is utilized to determine the selection process scoring of the contractors which submit proposals. A selection committee consisting of multiple staff members will review the proposals.

BV = TS + SS + CS + IS

BV = Best Value Total Score (150 points maximum) TS = Technical Score (50 points maximum) SS = Schedule Score (20 points maximum) CS = Cost Score (30 points maximum) IS* = Interview Score (50 points maximum) (this criterion is optional to the County)

*Interviews are only used to make final determinations between short-listed contractors. A short-list of contractors will be created for the interview process if there is a clear and definite separation of a group of contractor proposals above the others based on proposal scores. If a single proposal score shows a clear and definite separation from all the others submitted, the entire interview process may be omitted.

Technical Score Based upon 4 separate evaluation criteria, each with their own weighting factors. Evaluation criteria are as follows:

• Scope of proposal and team.

• Critical issues and similar projects.

• Project control and approach.

• Work location/familiarity.

Schedule Score County discloses to Proposers the maximum allowable contract time acceptable, for example 150

Solicitation # B2600095 Page 11 calendar days. The earliest responsible proposed schedule scores 20 points. Other proposed schedules score based upon a ratio to the earliest. This Schedule Score is calculated by the Project Manager and provided to the selection committee members after the Technical Scores have been determined. The schedule of the successful Proposer shall form the basis for establishing the contract time, and liquidated damages would be applied after this contract time has expired.

The Schedule Score for each proposer will be calculated as follows:

1. Find the shortest responsible calendar day duration among all proposers.

2. Calculate each proposer’s Schedule Score Factor:

Proposer Schedule Score Factor = (Minimum Proposer Calendar Days) ÷ (Proposer Calendar Days). Round result to two (2) decimal places.

3. Calculate each proposer’s Schedule Score:

Proposer Schedule Score = (Proposer Schedule Score Factor) x (20). Round result to two (2) decimal places.

Cost Score The lowest responsible cost proposal scores 30 points. Other proposed costs score based upon a ratio to the lowest cost. The County will request Proposers to submit their cost proposal separately from their main proposal document. The Project Manager will not share the cost proposals with the other selection committee members until after the technical and schedule scores have been prior determined.

The Cost Score for each proposer will be calculated as follows:

1. Find the lowest responsible cost among all proposers.

2. Calculate each proposer’s Cost Score Factor:

Proposer Cost Score Factor = (Minimum Proposer Cost) ÷ (Proposer Cost). Round result to two decimal places.

3. Calculate each proposer’s Cost Score:

Proposer Cost Score = (Proposer Cost Score Factor) x (30). Round result to two (2) decimal places.

Interview Score (optional) If the County decides to incorporate this criterion into the selection process, they will select the three Proposers with the highest scores to participate. In such case, these short-listed Proposers interview scores shall be added into the equation which determines the Best Value Total Score (BV).

Scoring Criteria

The RFP Responses will be evaluated using the criteria listed in each Table. 1 through 3. NOTE:

Each RFP Response will be individually evaluated by a team of reviewers. Each reviewer will score using a rating scale from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. After the individual reviewers have scored each area, the individual reviewer scores will be totaled.

The two to three highest cumulative scored RFP Responses will be invited to participate in interviews (if required) to help the reviewers determine the final overall score and which represents the best value to the County. If interviews are determined to be necessary for the selection process, Contractors will be evaluated on the criteria shown below in Table 4.

Solicitation # B2600095 Page 12

After all scores have been determined from the RFP Response and the interview (if required), each score will be totaled for each RFP. The highest score will be considered the top ranked proposal and best value for the County. NOTE: The highest score proposal may not be the lowest proposed cost.

Solicitation # B2600095 Page 13

Table 1 - Technical Scoring Form

Evaluation Criteria Evaluation Standard Scoring Weighting

Factor Score Range

Scope of Proposal and Team

• The proposal clearly shows an understanding of the project objectives.

• The proposed methodology meets the desired goals of the County.

• Qualifications and relevant experience of key team members (including subcontractors).

• Evidence that the team has worked together successfully on past similar projects.

1 to 5 3.0 3.0 – 15.0

Critical Issues and

Similar Projects

• The proposal demonstrates that the Contractor clearly understands the major issues associated with the project.

• The proposal offers realistic solutions to the critical issues.

• Contractor has demonstrated its ability to produce successful projects, meet project schedules, and meet project budgets.

• The team has successfully completed projects for Weld County in the past.

1 to 5 3.0 3.0 – 15.0

Project Control and Approach

• The Contractor has described how they will control construction costs.

• The proposal describes clearly how their major subcontractor’s costs will be controlled.

• The Contractor has demonstrated their ability to ensure that State and Federal regulations and specifications are met.

• The Contractor has demonstrated a quality control (QA/QC) process in place to manage the quality of the materials and final product.

• The approach is described in a logical manner.

1 to 5 3.0 3.0 – 15.0

Work Location/ Familiarity

• The Contractor’s office location does not adversely affect coordination with the County.

• The Contractor is familiar with Weld County policies and construction criteria.

• The Contractor demonstrated knowledge of Weld County in general.

1 to 5 1.0 1.0 – 5.0

Proposal Technical Review Score

10.0 to 50.0

Solicitation # B2600095 Page 15

Table 2 - Schedule Scoring Form

Table 3 - Cost Scoring Form

Evaluation Criteria Evaluation Standard Scoring Weighting

Factor Score Range

Schedule and Contract

Time

• The Contractor’s schedule contains sufficient detail to ensure project schedule goals are met.

• Weld County will supply the initial project schedule goals, and Contractors will be encouraged to meet or exceed those goals.

• The schedule and resultant Contract Time proposed by the successful Proposer will become the basis for the official Contract Time allowed.

1 to 20 1.0 1.0 – 20.0

Proposal Schedule Review Score

1.0 to 20.0

Evaluation Criteria Evaluation Standard Scoring Weighting

Factor Score Range

Cost

• The costs were presented in a way that is reasonable and consistent with the project goals.

• The Contractor’s cost proposal will remain sealed until after their Technical Score and Schedule Score have been first established.

• The lowest responsible Proposal cost will receive 30 points, and all other Contractor’s Proposal costs will be scored based upon their ratio to the lowest cost.

1 to 30 1.0 1.0 – 30.0

Proposal Cost

Review Score

1.0 to 30.0

Solicitation # B2600095 Page 16

Table 4 - Interview Scoring Form

Evaluation Criteria Evaluation Standard Scoring Weighting

Factor Score Range

Work Approach

• Contractor proposed and clearly described their approach for completing the project.

• The Contractor offered innovative ideas for the project.

1 to 5 2 2.0 – 10.0

Project Manager Qualifications

• The Contractor’s project manager has adequate qualifications and a proven track record to complete projects of this scope.

• The Contractor’s proposed project manager demonstrates effective communication skills.

1 to 5 2 2.0 – 10.0

Quality of Presentation

• The Contractor’s presentation was clear and easy to understand.

• The people being interviewed displayed effective communication skills.

1 to 5 2 2.0 – 10.0

Question/Answer Session

• The Contractor provided good answers to the questions asked by the selection committee.

• The answers provided by the Contractor demonstrated a clear understanding of the project and the project goals.

1 to 5 4 4.0 – 20.0

Proposal Interview

Score

10.0 to 50.0

Solicitation # B2600095 Page 17

Schedule E - Proposal Response Form

Proposal Submittal Instructions The following items must be completed and submitted with your proposal on or before the proposal opening deadline. November 5, 2026 @10:00am

1) Vendor’s Proposal – Outlined in Schedule D

2) Schedule E: Proposal Response Form

3) Schedule H: Forms Due with Proposal

4) Any issued Addenda must be completed/acknowledged.

5) All other items as requested in the Bid Specifications and/or Scope of Work.

Failure to include any of the above items upon submittal of your Proposal may result in your Proposal being incomplete, non-responsive, and your Proposal being rejected. If there are any exclusions or contingencies submitted with your Proposal, it may be disqualified.

System for Award Management (SAM) Database

Proposers must be registered in the System for Award Management (SAM) database. In space below, provide the company’s Dun & Bradstreet (DUNS) number. Weld County will use the SAM database to verify the company’s registration and status.

DUNS/UEI #: ____________

Fees - Proposal Schedule

The submitted bid unit prices, along with the TOTAL cost for the bid tabulation provided in Schedule E, Table 1, will be used by Weld County to assign a Cost Score based on Table 3 of the Scoring Criteria. The bid tabulation provided in Schedule E, Table 1 must be submitted with the bid schedule below and must utilize the same unit prices, or the bid will be rejected. It is expressly stated that for the initial contract period and for potential future renewal periods, each item may be utilized in quantities greater or lesser than shown or may not be utilized at all, which will be at Weld County’s sole discretion.

Solicitation # B2600095 Page 18

Table 1 – Galeton Drainage Project Bid Tabulation

Item No. Item Description Uni t

Quantit y Unit Cost Total Cost

210-00000 Clearing and Grubbing LS 1

202-00008 Tree Trimming HR 10

202-00010 Removal of Tree EA 6

202-00012 Removal of Tree Stump EA 2

202-00015 Removal of Headwall EA 4

202-00019 Removal of Inlet EA 4

202-00021 Removal of Manhole EA 1

202-00035 Removal of Pipe LF 2,532

202-00220 Removal of Asphalt Mat (Planing) (Full Depth Removal) SY 7,057

202-00240 Removal of Asphalt Mat (Planing) (2 Inch Mill) SY 325

202-00250 Removal of Pavement Marking SF 132

202-00810 Removal of Ground Sign EA 13

202-01000 Removal of Fence LF 12

202-08000 Removal of Water Line (PVC) (Contingency) LF 550

202-08001 Expose Water Line (PVC) (Contingency) LF 550

202-08002 Removal of Water Line (AC) (Contingency) LF 610

202-08003 Expose Water Line (AC) (Contingency) LF 610

202-08004 Removal of Water Line Valve (Contingency) EA 1

203-00000 Unclassified Excavation CY 6,714

203-00050 Unsuitable Material (Muck) (Contingency) CY 2,500

Item No. Item Description Unit Quantit y Unit Cost Total Cost

203-00067 Embankment CY 635

203-00068 Embankment Material (R-40 Import) CY 3,880

203-00500 Rock Fill (57-67) (Contingency) CY 2,500

203-01100 Proof Rolling HR 30

203-01597 Utility Potholing HR 80

203-01622 Sweeping (With Pickup Broom) HR 30

207-00205 Topsoil (Redistribute) CY 321

Solicitation # B2600095 Page 19

207-00210 Stockpile Topsoil CY 321

208-00002 Erosion Log Type 1 (12 Inch) LF 430

208-00011 Erosion Bales (Weed Free) EA 13

208-00018 Filtrexx Siltsoxx (or Approved Equal) LF 660

208-00020 Silt Fence LF 664

208-00035 Aggregate Bag LF 510

208-00045 Concrete Washout Structure (Lined) EA 1

208-00075 Pre-fabricated Vehicle Tracking Pad EA 4

208-00103 Removal and Disposal of Sediment (Labor) HR 20

208-00105 Removal and Disposal of Sediment (Equipment) HR 20

208-00207 Erosion Control Management DAY 114

208-00300 Temporary Berm LF 30

209-00600 Dust Palliative (Magnesium Chloride) GAL 35,250

210-00010 Reset Mailbox Structure EA 5

211-03006 Dewatering DAY 45

Item No. Item Description Unit Quantit y Unit Cost Total Cost

212-00702 Biotic Soil Amendments (Hydraulically Applied) LB 3,125

212-00707 Seeding (Native) Hydraulic AC 0.69

212-00711 Seeding (Wetland) Broadcast AC 0.01

213-00011 Mulching (Hydraulic) AC 0.69

240-00020 Netting SY 150

304-06000 Aggregate Base Course (Class 6) (Recycled Concrete)

TO

N 3,108

304-08000 Aggregate Base Course (Class 6) (Shouldering)

TO

N 182

Item No. Item Description Unit Quantit y Unit Cost Total Cost

203-00067 Embankment CY 635

203-00068 Embankment Material (R-40 Import) CY 3,880

203-00500 Rock Fill (57-67) (Contingency) CY 2,500

203-01100 Proof Rolling HR 30

Solicitation # B2600095 Page 20

304-09101 Aggregate Base Course (Screened RAP) TO N 162

304-09014 Aggregate Base Course (Special) (Contingency)

TO

N 71

403-33841 Hot Mix Asphalt (Grading S) (100) (PG 64-22)

TO

N 2,546

403-34851 Hot Mix Asphalt (Grading SX) (100) (PG 64-28)

TO

N 1,033

420-00520 Geogrid (Reinforcement) SY 11,510

506-00030 Grouted Riprap (9 Inch) CY 34

601-03000 Concrete Class D CY 50

602-00020 Reinforcing Steel (Epoxy Coated) LB 1,643

603-01150 15 Inch Reinforced Concrete Pipe LF 176

603-01180 18 Inch Reinforced Concrete Pipe LF 8

603-01240 24 Inch Reinforced Concrete Pipe LF 24

603-01300 30 Inch Reinforced Concrete Pipe LF 567

603-01360 36 Inch Reinforced Concrete Pipe LF 863

603-02360 45x29 Inch Reinforced Concrete Pipe Elliptical LF 336

603-05018 18 Inch Reinforced Concrete End Section EA 1

Item No. Item Description Unit Quantit y Unit Cost Total Cost

603-05024 24 Inch Reinforced Concrete End Section EA 1

603-83006 6 Inch Sewer Pipe (Special) LS 1

604-00510 Inlet Type D (10 Foot) EA 1

604-03405 Inlet (Double) (5 Foot) (Special) EA 1

604-19951 Inlet (Single) (V5636) (Special) EA 1

604-19952 Inlet (Double) (V5636) (Special) EA 2

604-19961 Inlet (Single) (575231B01) (Special) EA 2

Item No. Item Description Unit Quantit y Unit Cost Total Cost

203-00067 Embankment CY 635

203-00068 Embankment Material (R-40 Import) CY 3,880

203-00500 Rock Fill (57-67) (Contingency) CY 2,500

Solicitation # B2600095 Page 21

604-19962 Inlet (Double) (575231B01) (Special) EA 1

604-30006 Manhole Slab Base – 6’-Dia (5 Foot) EA 1

604-30008 Manhole Slab Base – 8’-Dia (5 Foot) EA 1

604-30016 Manhole Slab Base – 6’-Dia (10 Foot) EA 2

604-30018 Manhole Slab Base – 8’-Dia (10 Foot) EA 1

604-50902 Sewer Manhole Ring and Cover EA 2

604-50904 4’-Dia Eccentric Flat Slab Top EA 2

607-11525 Fence (Plastic) LF 80

609-20010 Curb Type 2 (Section B) LF 79

609-21020 Curb and Gutter Type 2 (Section II-B) LF 413

609-24008 Gutter Type 2 (8 Foot) (8 Inch) LF 1,541

614-00011 Sign Panel (Class I) SF 71

614-00012 Sign Panel (Class II) SF 29

614-00216 Steel Signpost (2x2 Inch Square Tubing) LF 168

614-80311 Barricade (Type 3 F-A) EA 1

Item No. Item Description Unit Quantit y Unit Cost Total Cost

620-00002 Field Office (Class 2) EA 1

620-00020 Sanitary Facility EA 1

625-00000 Construction Surveying LS 1

626-00000 Mobilization LS 1

627-00002 Thermoplastic Pavement Marking SF 243

627-00008 Modified Epoxy Pavement Marking GAL 38

629-01031 Survey Monument (Type 3A) EA 1

630-00000 Flagging HR 500

630-00016 Traffic Control (Special) LS 1

630-10122 Variable Message Board EA 6

Item No. Item Description Unit Quantit y Unit Cost Total Cost

203-00067 Embankment CY 635

203-00068 Embankment Material (R-40 Import) CY 3,880

203-00500 Rock Fill (57-67) (Contingency) CY 2,500

Solicitation # B2600095 Page 22

630-80310 Automated Flagging Assistance Device EA 2

630-90408 1 Inch x 4 Foot x 10 Foot Steel Road Crossing Plate EA 10

Note: Include all Force Account (F/A) items and amounts below in the total Proposal amount.

700-70010 F/A Minor Contract Revisions F/A 1 $500,000.0

$500,000.0

700-70016 F/A Fuel Cost Adjustments F/A 1 $40,000.00 $40,000.00

700-70019 F/A Asphalt Cement Cost Adjustment F/A 1 $15,000.00 $15,000.00

700-70380 F/A Erosion Control F/A 1 $50,000.00 $50,000.00

TOTAL PROPOSAL AMOUNT ($)

TOTAL PROPOSAL (WRITTEN WORDS):

Item No. Item Description Unit Quantit y Unit Cost Total Cost

203-00067 Embankment CY 635

203-00068 Embankment Material (R-40 Import) CY 3,880

203-00500 Rock Fill (57-67) (Contingency) CY 2,500

Solicitation # B2600095 Page 23

Solicitation # B2600095 Page 24

Fees – Cost Adjustments

Proposers have the option to accept Fuel and/or Asphalt Cement Cost Adjustments in accordance with CDOT Section 109 for Fuel and Asphalt Cement Cost Adjustments. To accept either of these standard special provisions, the Proposer must fill in an “X” next to the “YES” below. No Fuel or Asphalt Cement Cost Adjustments will be made due to fuel or asphalt cement cost changes for Proposers who answer “NO”. If neither line is marked, the Department will assume the Proposer has answered “NO”. After the Proposals are submitted, Proposer will not be given any other opportunity to accept or reject the Fuel and/or Asphalt Cement Cost adjustments.

Fuel Cost Adjustment

• YES, I choose to accept Fuel Cost Adjustments for this project.

• NO, I choose NOT to accept Fuel Cost Adjustments for this project.

Asphalt Cement Cost Adjustment

• YES, I choose to accept Asphalt Cement Cost Adjustments for this project.

• NO, I choose NOT to accept Asphalt Cement Cost Adjustments for this project.

NOTE: The following are items of work to be completed by Weld County:

1. Materials Quality Acceptance (QA) and Independent Assurance (IA) Testing.

2. Construction Inspection.

Attestation

The undersigned, by his or her signature, hereby acknowledges and represents that:

1. The Proposal herein meets all the conditions, specifications and special provisions set forth in the Request for Proposal B2600095

2. The quotations set forth herein are exclusive of any federal excise taxes and all other state and local taxes.

3. He or she is authorized to bind the below-named Proposer for the amount shown on the accompanying Proposal sheets.

4. Acknowledgement that bidder is required to submit a current IRS Form W9 upon award and prior to contracting.

5. Acknowledgement of Schedule F – Insurance and Bonds

6. Acknowledgment of Schedule G – Weld County Contract

7. By submitting a responsive proposal, the supplier agrees to be bound by all terms and conditions of the solicitation as established by Weld County.

8. Weld County reserves the right to reject any and all Proposals, to waive any informality in the Proposals, and to accept the Proposal that, in the opinion of the Board of County Commissioners, is to the best interests of Weld County.

The Proposal(s) may be awarded to more than one vendor.

Solicitation # B2600095 Page 25

CONTRACTOR:

By: ____________________________ ______________ Date of Signature

Name: __________________________

Title: ___________________________

Item Entry

Company Name:

Address:

Phone

Email:

FEIN/Federal Tax ID #:

Solicitation # B2600095 Page 26

Schedule F – Insurance and Bonds

Insurance

Contractor shall provide coverage with limits of liability no less than those stated below:

Required Types of Insurance.

1) Workers’ Compensation and Employer’s Liability Insurance covering all the Contractor’s employees acting within the course and scope of their employment.

The policy shall contain a waiver of subrogation against the County. This requirement shall not apply when a Contractor or subcontractor is exempt under Colorado Workers’ Compensation Act, AND when such Contractor or subcontractor executes the appropriate sole proprietor waiver form.

Minimum Limits:

Coverage A (Workers' Compensation) Statutory Coverage B (Employers' Liability) $ 100,000 $ 100,000 $ 500,000

2) Commercial General Liability Insurance including public liability and property damage covering all operations required by the Work. The policy shall be endorsed to include the following additional insured language: County, its subsidiary, parent, associated and/or affiliated entities, successors, or assigns, its elected officials, departments, employees, agents, and volunteers shall be named as additional insureds with respect to liability arising out of the activities performed by, or on behalf of the Contractor, including completed operations."

Such policy shall include minimum limits as follows:

Each Occurrence $ 2,000,000

General Aggregate $ 4,000,000

Products/Completed Operations Aggregate $ 4,000,000

Personal Advertising Injury $ 2,000,000

Fire Damage (Any One Fire) $ 100,000 Medical Payments (Any One Person) $ 10,000

Completed Operations coverage must be kept in effect for up to the statute of repose after project completion.

Solicitation # B2600095 Page 27

3) Automobile Liability:

Contractor's Automobile Insurance Policy shall include Minimum Limits as follows:

Bodily Injury/Property Damage (Each Accident) $ 1,000,000

Bodily injury and property damage for any owned, hired, and non-owned vehicles used in the performance of this contract. The County is to be endorsed as an additional insured on policy for Automobile Liability with respect to liability arising out of the activities performed by, or on behalf of the Contractor, including completed operations.

4) Professional Liability: Contractor shall maintain Professional Liability Insurance covering wrongful acts, errors and/or omissions, including design errors, if applicable, for damage sustained by reason of or in the course of operations under this Contract resulting from professional services provided by the Contractor as part of the Contract.

The policy/coverages shall be amended to include the following:

a. Coverage shall apply for three (3) years after project is complete.

b. Policy is to be on a primary basis, if other professional coverage is carried.

Per Loss $ 2,000,000

Aggregate $ 4,000,000

5) Umbrella or Excess Liability Insurance: Contractor shall maintain limits of $1,000,000 and shall become primary in the event the primary liability policy limits are impaired or exhausted. The policy shall be written on an Occurrence form and shall be following form of the primary.

6) Pollution Liability. Weld County requires this coverage whenever work at issue under this Contract involves potential pollution risk to the environment or losses caused by pollution conditions that may arise from the operations of the Contractor described in the Exhibits. The policy shall cover the Contractor’s completed operations.

Coverage shall apply to sudden and gradual pollution conditions resulting from the escape of release of smoke, vapors, fumes, acids, alkalis, toxic chemicals, liquids, or gases, natural gas, waste materials, or other irritants, contaminants, or pollutants (including asbestos). If the coverage is written on a claims-made basis, the Contractor warrants that any retroactive date applicable to coverage under the policy precedes the effective date of this Contract; and that continuous coverage will be maintained, or an extended discovery period will be exercised for a period of three

(3) years beginning from the time that work under this contract is completed.

Solicitation # B2600095 Page 28

Minimum Limits:

Per Loss $ 1,000,000

Aggregate $ 1,000,000

Additional Insurance Related Requirements

No limitation of Liability: The insurance coverages specified in this Agreement are the minimum requirements for this Contract and in no way limit the indemnity covenants contained in this Contract or decrease or limit any liability of Contractor.

The County in no way warrants that the minimum limits contained herein are sufficient to protect the Contractor from liabilities that might arise out of the performance of the Work under by the Contractor, its agents, representatives, employees, or subcontractors. The Contractor shall assess its own risks and if it deems appropriate and/or prudent, maintain higher limits and/or broader coverages.

The Contractor is not relieved of any liability or other obligations assumed or pursuant to the Contract by reason of its failure to obtain or maintain insurance in sufficient amounts, duration, or types. The Contractor shall maintain, at its own expense, any additional kinds or amounts of insurance that it may deem necessary to cover its obligations and liabilities under this Agreement.

Certification of Compliance with Insurance Requirements. The Contractor stipulates that it has met the insurance requirements identified herein.

All insurers must be licensed or approved to do business within the State of Colorado, and unless otherwise specified, all policies must be written on a per occurrence basis. The Contractor shall provide the County with a Certificate of Insurance evidencing all required coverages, before commencing work or entering the County premises. The Contractor shall furnish the County with certificates of insurance (ACCORD) form or equivalent approved by the County as required by this Contract. The certificates for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The Contractor shall name on the certificate, ”Weld County, its associated and/or affiliated entities, successors, or assigns; its elected officials, employees, agents, and volunteers as Additional Insureds” for Commercial General Liability and Auto Liability for work that is being performed by the Contractor.

On insurance policies where the County is named as an additional insured, the County shall be an additional insured to the full limits of liability purchased by the Contractor even if those limits of liability are in excess of those required by this Contract.

Upon request by the County, Contractor must provide a copy of the actual insurance policy and/or required endorsements effecting coverage(s) required by the Contract for examination for evidence of required coverages. Copies are not kept as a record, are

Solicitation # B2600095 Page 29 deemed confidential, and are not subject to disclosure under Colorado's Open Records Act (CORA). All certificates and endorsements are to be received and approved by the County before work commences.

Each insurance policy required by this Agreement must be in effect at or prior to commencement of work under this Agreement and remain in effect for the duration of the project, and for a longer period of time if required by other provisions in this Agreement. Failure to maintain the insurance policies as required by this Agreement or to provide evidence of renewal is a material breach of contract.

Any modification or variation from the insurance requirements in this Agreement shall be made by the County Attorney’s Office, whose decision shall be final. Such action will not require a formal contract amendment but may be made by administrative action.

Bonds

1. For projects over $50,000 the following bonds are required:

a. A 5% Bid Bond is required at the time of Proposal submittal.

b. Performance Bond in the amount of 100% of the contract value, will be required at time of contract execution, or as otherwise defined in the Specifications/Scope of Work.

c. Payment Bond (Labor and Materials) in the amount of 100% of the contract value, will be required at time of contract execution, or as otherwise defined in the Specifications/Scope of Work.

2. Surety companies executing bonds must appear on the U.S. Treasury Department’s most current list (Circular 570) as amended and be authorized to transact business in the State of Colorado.

3. A 5% Retainage Fee will be held for Construction contracts over $150,000.

4. Bonds may be submitted on the Standard AIA form or Weld County Form.

Insurance Mailing Information

Certificates of Insurance, endorsements and bonds shall be provided to the County via electronic correspondence or mail using the information below:

Email:

Project Manager: Trace Anderson Email: tanderson@weld.gov Telephone: (970) 400-3714

Mail:

Solicitation # B2600095 Page 30

Weld County Public Works ATTN: Trace Anderson PO Box 758 Greeley, CO 80632

Solicitation # B2600095 Page 31

Schedule G - Weld County Contract

Contractual Obligations

1. The successful Contractor will be required to sign a contract substantially similar to the Weld County Standard Contract shown in Schedule G of this document.

The County reserves the right to add or delete provisions to the form prior to Agreement execution.

2. Issuance of this solicitation does not commit the County to award any agreement or to procure.

3. If a formal contract is required, the Contractor agrees and understands that a Notice of Award does not constitute a contract or create a property interest of any nature until a contract is signed by the Awardee and the Board of County Commissioners and/or their authorized designee.

4. Contractor is responsible for reviewing the Weld County Standard Contract and understanding the terms and conditions contained therein, including, but not limited to, insurance requirements, indemnification, illegal aliens, equal opportunity, non-appropriation, and termination.

5. Contractor’s Response to this solicitation is a willingness to enter into the Weld County Standard Contract or Contractor shall identify and include any proposed revisions they have for the Weld County Standard Contract. Any proposed revisions made by the Contractor after the County Notice of Intent to Award the Solicitation may be grounds for rescinding said Notice. The identification of willingness to enter into the standard Agreement is for general purposes at this time but is part of the evaluation process and must be included. There may be negotiations on a project-by-project basis that provide further clarification.

Weld County Standard Contract

Below is a sample of a standard Weld County Contract for Construction.

Agreement for Construction Services Between Weld County and [Contractor] for the Galeton Drainage Project

Solicitation # B2600095 Page 32

THIS AGREEMENT is made and entered into this ______ day of ____________, 2026, by and between the Board of Weld County Commissioners, on behalf of the Department of Public Works, hereinafter referred to as “County,” and [Contractor], hereinafter referred to as “Contractor”.

WHEREAS, County desires to retain Contractor to perform construction services as required by County and set forth in the attached Exhibits; and

WHEREAS, Contractor is willing to perform and has the specific ability, qualifications, and time to perform the required construction services to provide the services according to the terms of this Agreement; and

WHEREAS, Contractor is authorized to do business in the State of Colorado and has the time, skill, expertise, and experience necessary to provide the equipment, materials and services as set forth below;

NOW, THEREFORE, in consideration of the mutual promises and covenants contained herein, the parties hereto agree as follows:

1. Introduction. The terms of this Agreement are contained in the terms recited in this document and in the Exhibits, each of which forms an integral part of this Agreement and are incorporated herein. The parties each acknowledge and agree that this Agreement, including the attached Exhibits, define the performance obligations of Contractor and Contractor’s willingness and ability to meet those requirements (the “Work”). If a conflict occurs between this Agreement and any Exhibit or other attached document, the terms of this Agreement shall control, and the remaining order of precedence shall be based upon order of attachment.

Exhibit A consists of County’s Invitation for Bid (IFB) as set forth in Bid Package No.

B2600095.

Exhibit B consists of Contractor’s Response to County’s Request for Bid.

2. Service or Work. Contractor agrees to procure the materials, equipment and/or products necessary for the Work and agrees to diligently provide all services, labor, personnel and materials necessary to perform and complete the Work described in the attached Exhibits. Contractor shall faithfully perform the Work in accordance with the standards of professional care, skill, training, diligence and judgment provided by highly competent Contractors performing construction services of a similar nature to those described in this Agreement. Contractor shall further be responsible for the timely completion and acknowledges that a failure to comply with the standards and requirements of Work within the time limits prescribed by County may result in County’s decision to withhold payment or to terminate this Agreement.

Solicitation # B2600095 Page 33

3. Term. The term of this Agreement begins upon the date of the mutual execution of this Agreement and shall continue through and until Contractor’s completion of the responsibilities described in the attached Exhibits. Both of the parties to this Agreement understand and agree that the laws of the State of Colorado prohibit County from entering into Agreements which bind County for periods longer than one year. This Agreement may be extended upon mutual written agreement of the Parties.

In its sole discretion, the County, by the Director of the Department of Public Works or his or her designee, may extend the time for the Contractor to complete the service or work, by not more than thirty (30) days. Such extension shall not increase the compensation to be paid to the Contractor nor change any other term herein.

4. Termination; Breach; Cure. County may terminate this Agreement for its own convenience upon thirty (30) days written notice to Contractor.

This is the start of the file's text. The full file is on GovTribe.