biddoc.pdf
PDF 292 KB Posted
- Attached to
- 2026 Pedestrian Bridge Repairs
- Solicitation number
- 120.26
- Issued by
- Pitkin County, Colorado
About this file
This Request for Proposal (RFP) document is issued by Pitkin County, Colorado, seeking a qualified contractor to complete repairs to three pedestrian bridges: Stein Bridge over the Roaring Fork River, Hunter Creek Trail #1 (Hirsch) over Hunter Creek, and Hunter Creek #4 (Benedict Bridge). The work encompasses structural, timber, railing, deck, and protective coating repairs as detailed in the accompanying exhibits and engineered plans. Specific work includes installing truss diagonal wire rope repair systems and timber railing repairs at Stein Bridge; removing and replacing bolts and cross bracing at Hunter Creek Trail #1; and installing pier column bracket repairs, lateral restraint brackets, and timber work at Hunter Creek #4, along with surface preparation and staining of glulam stringers. An optional pre-proposal meeting is scheduled for October 6, 2026, from 1:00-2:00 PM via Google Meet. Questions and clarification requests must be submitted by 4:00 PM MT on October 8, 2026, via email to procurement@pitkincounty.com. Proposals must be uploaded to BidNet Direct by 2:00 PM MT on October 15, 2026. The Selection Committee will meet on October 16, 2026, with the Notice of Award issued October 19, 2026, and unsuccessful proposers notified October 20, 2026. The anticipated contract start date is October 21, 2026, with project completion targeted for November 30, 2026.
Proposals will be evaluated based on approach to project (30%), list of similar work (10%), availability (25%), estimated cost of services including reimbursable expenses (25%), and references (10%). Proposers must submit complete proposals in PDF format including a detailed approach statement, qualifications of the proposer and any subcontractors, references particularly from local governments, a completed proposal form acknowledging all addenda, and a fee schedule for any work not included in the scope. The County reserves the right to reject any and all proposals, conduct investigations into proposer qualifications and financial ability, and waive any irregularities or informalities. No reimbursement will be made for costs incurred in proposal preparation, site inspections, or conference attendance. Proposals must remain valid for a minimum of 60 days following the proposal opening date. The contract will be executed on standard Pitkin County Construction Contract documents, with any requested modifications from the standard form subject to County Attorney review and potentially causing delays in issuing the Notice to Proceed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 120.26 Rev. 2024.11.25 CDD
PUBLIC NOTICE
Pitkin County is accepting proposals to provide 2026 Pedestrian Bridge Repairs for the
Open Space and Trails Department.
More information is available online at www.BidNetDirect.com/Colorado.
Any and all questions, or requests for clarification, must be submitted by 4:00 PM MT on
October 8, 2026. Questions and requests for clarification will only be accepted via email at procurement@pitkincounty.com.
Proposal documents must be uploaded to the BidNet Direct website no later than 2:00
PM MT on October 15, 2026.
Published in the Aspen Daily News: September 28, 2026, and October 5, 2026.
PITKIN COUNTY
2026 PEDESTRIAN BRIDGE REPAIRS
Table of Contents
REQUEST FOR PROPOSAL
I. INTRODUCTION 3
II. COUNTY BACKGROUND 3
III. SCOPE OF WORK 4
A. SPECIFICATIONS AND DRAWINGS 4
B. CONTRACT TIME AND LIQUIDATED DAMAGES 4
C. ADDITIONAL INFORMATION 5
IV. SELECTION PROCESS 5
A. SUBMITTALS 5
B. TIME SCHEDULE 7
C. EVALUATION CRITERIA AND WEIGHING 8
D. SELECTION COMMITTEE 9
E. CONTRACT 9
PROPOSAL FORM 11
INSTRUCTIONS TO PROPOSERS 13
REQUEST FOR PROPOSALS
2026 PEDESTRIAN BRIDGE REPAIRS
GENERAL INFORMATION TO PROPOSERS
ISSUED: 9-24-2026
DUE: 10-15-2026 by no later than 2:00 PM MT
I. INTRODUCTION
Pitkin County (hereinafter called the “County”) is seeking a qualified Contractor to complete repairs to three pedestrian bridges: Stein Bridge over the Roaring Fork
River, Hunter Creek Trail #1 (Hirsch) over Hunter Creek, and Hunter Creek #4
(Benedict Bridge). The work includes structural, timber, railing, deck, and protective coating repairs as summarized below and further detailed in the project exhibits and plans.
II. COUNTY BACKGROUND
Covering 975 square miles, Pitkin County is located in the heart of the White River
National Forest, surrounded by the spectacular peaks of the central Rocky
Mountains. Pitkin County is located in Colorado with the county seat of Aspen.
Pitkin County includes the communities of Aspen, Snowmass, Woody Creek, Old
Snowmass, Meredith, Thomasville, Redstone and portions of the town of Basalt.
As public servants, we work in the public trust to ensure quality of life and experience in Pitkin County for present and future generations.
Organizational Values: Pitkin County embraces the following values to promote public trust and confidence in County Government.
Stewardship: We strive to leave our natural environment, community, public assets, and organization in better condition than we found them for current and future generations.
Ethics: We hold ourselves to high standards of honesty and dependability in the conduct of County business.
Excellence: We are committed to providing quality services that are accessible, accurate and innovative to meet our community’s needs.
Collaboration: We work together as employees and with citizens and other government, non-profit and private sector organizations helping each other succeed in promoting and achieving the public’s goals.
Open Communication: We are committed to listening to our citizens and partners and to giving accurate and timely information.
Positive Work Environment: We appreciate dedicated and knowledgeable employees and support their professional and personal growth.
Additional information about the County may be found on the County’s website at: https://pitkincounty.com/DocumentCenter/View/21997/PC_brochure_2020_FFO_digital
III. SCOPE OF WORK
A. SPECIFICATIONS
The work is generally summarized below. Proposers shall refer to the following accompanying exhibits for detailed quantities, dimensions, materials, installation requirements, drawings and other technical requirements:
• Exhibit A: “2026 OST Bridge Repairs Bid Schedule” for the project’s bid schedule
• Exhibit B: “Bridge Locations”
• Exhibit C: “2026 OST Bridge Repairs Plans and General Notes” for the project’s engineered plan set
• Exhibit D: Sample of the Pitkin County Construction Contract
Stein Bridge
• Install truss diagonal wire rope repair systems, including required steel plates, wire rope, hardware, connections, and related installation work shown in the plans.
• Repair the existing timber railing by tightening connections, replacing missing nuts and bolts, replacing one timber railing post, and removing and reattaching the west approach railing with new blocking and hardware.
• Remove and replace five identified timber deck planks, including required hardware and attachment to the existing stringers.
Hunter Creek Trail #1 (Hirsch)
• Remove and replace bolts at the midspan steel joist splice where nuts are missing, including new nuts, washers, and required installation and tensioning.
• Provide temporary shoring if required to safely unload the bridge members during bolt replacement. Any required shoring procedure shall be submitted to the Engineer for review.
• Complete the associated cross bracing repair work shown in the plans, including replacement of the bent cross bracing and connection hardware.
Hunter Creek Trail #4 (Benedict Bridge)
• Install the new pier column bracket repair shown in the plans.
• Tighten bolts at the existing mid-span pier connection plates and install timber shims at the connection gaps as shown in the plans.
• Install new lateral restraint brackets at both abutments on the exterior side of the glulam stringers.
• Remove and replace the existing timber jump span and curbs at the east bridge approach; remove and reattach the existing railing; and tie the new structure into existing grade.
• Prepare and stain the exterior upstream and downstream faces of the glulam stringers, including surface preparation, color and test samples, and containment necessary to prevent stain or preparation material from entering the creek or ground below.
Proposers are responsible for reviewing the complete exhibits and incorporating the requirements shown therein into their proposed approach, schedule, and pricing.
The summary above is intended to provide a clear description of the work within the RFP and does not replace the detailed technical requirements contained in the exhibits.
B. ADDITIONAL INFORMATION
It is the Contractors responsibility to provide any and all safety equipment and/or managerial oversight necessary to perform all work in a safe and workman-like manner. Pitkin County reserves the right to enter the working site for periodic checks of safe working environments, as applicable.
Pitkin County expects that any Contractor providing goods or services will do so in compliance with Pitkin County policies, including, but not limited to, tobacco use policies, public health orders, permitting requirements, construction ordinances, building access and safety requirements, and Pitkin County standards of conduct.
Pitkin County’s elected Board of County Commissioners have identified climate action and carbon footprint reduction as a priority for County projects. Pitkin
County encourages all proposers to be environmentally conscious when preparing their proposal documents, making travel plans, printing materials, selecting fleet vehicles, designing/updating facilities systems, qualifying subcontractors, investing, and/or any other business activities wherever a less environmentally impactful solution may or could exist.
IV. SELECTION PROCESS
The County is required by the terms of the Pitkin County Procurement Code to conduct a competitive selection process to select a Contractor for the above-described proposal. This process shall be through formal proposals submitted in response to this Request for Proposals.
A. SUBMITTALS
1. Proposer shall submit proposals for this Service as outlined in the Request for Proposals and Scope of Services, or an alternately developed plan as developed by Proposer in response to and in accordance with this Request for Proposals and
Information to Proposers attached hereto.
Proposal Format: Each response shall be 8½” X 11” in size. Font, Times New
Roman, size shall be no smaller than 12 point. A sample contract has been included for review and Template Contract revisions, if any, must be uploaded as a separate file with any changes clearly highlighted. Template Contract change requests will not be reviewed until scoring has been completed and, as such, any information that could be considered material to your proposed response to the solicitation should not be included in the sample Contract. Proposals may include pages up to 11”x17” size, as needed.
a. The proposal must contain name, address, daytime phone number(s), and e-mail address for person(s) to whom additional selection process requests should be communicated;
b. A proposed approach (basic description of how Proposer will proceed with this Service), timetable for the Service, and proposed method of compensation for services rendered;
c. A statement of Qualifications of the Proposer and any subcontractors anticipated to perform under the awarded contract;
d. References, especially those for significantly similar projects with local governments;
e. A completed Proposal Form (may indicate “In Attached
Documents” for Approach and Qualifications/References sections of the provided Proposal Form, if desired. The Proposal Form, however, will not be considered complete if any and all addenda are not acknowledged and the form has not been signed);
f. List of all subcontractors (including qualifications);
g. Fee schedule of standard rates for any work that may not be included in provided Scope of Work, as applicable
2. Proposer may be required to supply additional information upon request, or to make additional submissions under secondary selection criteria, if necessary.
3. Any and all questions or comments shall be submitted via email to procurement@pitkincounty.com no later than 4:00 PM MT on October 8, 2026. All requests must have the email subject line, “RFP 120.26 2026
Pedestrian Bridge Repairs Request for Clarification and Questions.” All questions, comments and answers provided shall be shared with all
Proposers via addendum posted on BidNet Direct. Addendum(s) will include the requests for clarification and questions, as written by the
Proposer.
4. All Proposals must be uploaded to the BidNet Direct website. Proposals will not be accepted in any other form or manner.
5. During the Request for Proposal selection process, all proposals shall remain confidential. The entire selection process (procurement) file shall be available to the public (which includes all Proposers) after an agreement is approved by the County, except those items for which confidentiality has been requested in writing by the Proposer, and providing that the County
Attorney has reviewed and determined this to be the properly confidential under the State Open Records Act and other relevant statutes and regulations.
B. TIME SCHEDULE
The County will endeavor to use the following timetable:
September 24, 2026 Request for Proposals publicly advertised, posted on website
(www.bidnetdirect.com/colorado)
October 6, 2026 Optional, but recommended virtual pre-proposal meeting will be held via Google Meet from 1:00-2:00 PM. Please submit your RSVP with planned attendee list via email to procurement@pitkincounty.com by no later than 24-hours prior to the scheduled meeting to receive meeting credentials.
October 8, 2026 Proposer’s request for clarification and questions due via email to procurement@pitkincounty.com by 4:00 PM MT
October 12, 2026 County’s response to request for clarification and questions posted on BidNet Direct via addendum
October 15, 2026 PROPOSALS MUST BE UPLOADED TO BIDNET
DIRECT BY 2:00 PM MT
October 16 , 2026 Meeting of Selection Committee; checking of references as necessary; requests for additional information or clarifications, if necessary; scheduling of interviews, if necessary
October 19, 2026 Issuance of Notice of Award to top-ranked proposer
October 20, 2026 Notices sent to unsuccessful proposers
October 21, 2026 Anticipated Contract Start Date
November 30, 2026 Anticipated Project Completion Date
C. EVALUATION CRITERIA AND WEIGHING
Selection of the "short-listed" Proposers to be interviewed and/or the selection of the top-ranked Proposer will be based upon the following criteria and relative importance (or as the same may be amended or supplemented by published secondary selection criteria, if any):
1. Approach to Project 30%
The Proposer shall prepare a brief statement as to how they intend to address:
A. The Project Scope of Work
B. The Project Schedule
C. The Personnel assignments, including:
i. Statements of the qualifications and experience of those personnel
ii. The time estimates of personnel assigned to the Project
iii. Other pertinent facts
2. List of Similar Work 10%
The Proposer shall submit examples of work with governmental agencies and work of similar size and type.
3. Availability 25%
The Proposer shall affirmatively state and demonstrate that all necessary staff is available to complete the Project within the time indicated on the proposed schedule.
4. Estimated Cost of Services, including Reimbursable Expenses 25%
A. The Proposer shall list all costs assumed necessary to successfully complete and/or deliver the provided scope of work, services, and/or goods, including but not necessarily limited to:
i. Labor and material expenses
ii. Reimbursable expenses for mileage and administrative services
iii. Miscellaneous expenses
B. The Proposer shall provide a list of standard fees/rates and material markup rates to include with the Contract for any additional services or goods that may not be covered in the awarded Contract; billable only as incurred and as agreed upon in advance by mutual signing of a change order.
5. References 10%
The Proposer shall provide a list, including contact name and information, of references/prior clients, especially local, state and federal government.
D. SELECTION COMMITTEE
Communications between Proposer and any member of the selection committee during the selection process, except when and in the manner expressly authorized by the Request for Proposals, is prohibited. Violation of this restriction is grounds for disqualification from the process.
Voting Members of the
Selection Committee:
Nonvoting counsel to the
Selection Committee:
-Jeff Werner, OST Resource and
Stewardship Manager
Mark Frymoyer, SGM Civil
Engineer
Marijean Frymoyer, SGM Civil
Engineer
Ted O’Brien, Resource & Trails
Manager
-County Attorney
-County Procurement
E. SAMPLE CONTRACT
A sample of the Pitkin County Construction Contract is included as Exhibit D.
The Proposer must present any exceptions to the standard contract language, if any, with their proposal, included as a separate document. If changes are not requested at the time of proposal submission, the County shall consider that terms and conditions are accepted by proposer. Requests for Contract alterations, modifications, additions, or deletions will not be entertained following proposal submission. Submittal of contract change requests is for County’s information only and will not be reviewed until selection committee scoring and vendor selection has been completed; contract language change requests will not disqualify any proposer or be evaluated for partiality. This opportunity is offered so proposers may familiarize themselves with standard County terms and requirements, and change requests that are submitted at the time of proposal allow the County to expedite the consideration of such requests during the award process so as to avoid delays in contracting.
As mentioned in Section IV.A, proposers should not include any information specific to their proposed approach, pricing, delivery schedule, etc. when submitting language change requests as this information will not be reviewed prior to final selection of a top-ranked proposer. Failure of proposer to review and abide by this guidance and any lack of conveyance of such information to the selection committee shall be construed as an error on the behalf of the proposer and not on behalf of the County or the selection committee.
PROPOSAL FORM
Proposal Time: 2:00 PM MT
Proposal Date: October 15, 2026
From:
Phone
E-mail Address:
To: THE PITKIN COUNTY BOARD OF COMMISSIONERS c/o Procurement
530 E Main Street, Suite #304
Aspen, CO 81611
For: RFP 120.26 2026 Pedestrian Bridge Repairs
Pursuant to a request by the Pitkin County Commissioners, the undersigned Proposer having examined this Request for Proposals (RFP), including familiarization of the site and/or the conditions of the proposed Service environment, including the availability of materials and labor hereby proposes to furnish all labor, materials, supplies, applicable permits, services, and supervision required to provide a completed product as detailed in this RFP and adjoining documentation for the sum of:
Fee Schedule(s) for this project and any applicable work that may not have been included in the Scope of Work but may be necessary for successful completion must be included in the proposal documents.
Approach, Qualifications, and References may be submitted on your own proposal form;
please indicate “In attached documents” for any items omitted herein. A completed proposal form including, at minimum, acknowledgement of all addenda and signature/corporate seal is required for proposals to be considered responsive.
Statement and Detailed Approach to Service:
Qualifications of Proposer:
Please insert names address, phone numbers and description of similar Service for
Reference Checks.
1.
2.
3.
It is further understood that the right is reserved by the County to reject any and all proposals and it is agreed that the proposals may not be withdrawn for a period of ten (10) days from specified time for receiving proposals.
The Proposer acknowledges receipt of Addenda Nos. .
The right is reserved to waive any informalities and to reject any Proposal.
(Type/Print name under all signatures)
Dated this day of , 2026
(Corporate seal) PROPOSER:
SIGNATURES: If the proposal is being submitted by a Corporation, the Proposal
Form should be signed by an officer, i.e. President or vice-president. The signature of the officer signing shall be attested to by the secretary and properly sealed. If the proposal is being submitted by an individual or a partnership, the proposal shall so indicate and be properly signed.
INSTRUCTIONS TO PROPOSERS
FOR PITKIN COUNTY CONTRACTS
1. a. A "Proposal" is a responsive, conforming, unconditional, complete, legible and properly executed offer on the Pitkin County Proposal Form to do the work called for in the Request for Proposals (“RFP”).
b. Proposals must be submitted electronically in PDF format and submitted at the time and place designated in the RFP. Electronic submissions must be clearly marked as a
"sealed proposal" with the Service name and the name, contact person, mailing address and telephone number of the Proposer. The County reserves the right to request verification of any original or electronic signature at any time before issuing a Notice of Award.
c. It shall be the responsibility of the Proposer to ensure that the Proposal is in proper form and in the County's possession by or before the scheduled time and date of public
Proposal opening. Proposals will not be accepted after the scheduled time and date of opening. Any Proposals received late will be returned to the Proposer unopened, if possible. In the event that it is impossible to determine who the late Proposer is unless the envelope is opened, the envelope will be opened, the address determined, and the envelope and Proposal returned immediately to the Proposer.
d. If specified in the Request for Proposals, parties who request packages of proposal documents will be required to pay a fee for the document package. All parties who request packages must provide the name of the potential Proposer, along with the name of a contact person, address, telephone number, and email address for the purpose of dissemination of Addenda or additional proposal information.
e. If a mistake is made or discovered at or after the public opening, the County reserves the right to determine which party made the mistake and whether the mistake is material and, after these determinations, the County, in its sole discretion, shall make the decision whether to accept or reject the Proposal. No advantage shall be taken by either party of manifest clerical errors or omissions in the Proposal documents or the
Request for Proposals (and plans and specifications). All Proposers are required to notify the County immediately of any errors of omissions that may be encountered.
(See 2.a. and 2.c., below).
f. The signer of the Proposal must initial any alteration or erasure. If provided on the required Proposal Form, the proposal price of each item must be stated in numerals and words; in case of a conflict, the words will control. In case of conflict between the indicated sum of any addition of figures and the correct sum, the correct sum will control.
g. No reimbursement will be made by the County for any costs incurred in the preparation of a statement of qualifications, Proposals, or attendance at a site inspection, pre-bid conference or interviews.
h. No person, firm, corporation or other entity shall be allowed to make, file or be interested in more than one Proposal for the same work, unless alternate proposals are called for. A person, firm, corporation or other entity who has submitted a sub-proposal to Proposer, or who has quoted prices on materials to a Proposer, is not hereby disqualified from submitting a sub-proposal or quoting prices to other
Proposers.
2. a. If any person contemplating submitting a Proposal is in doubt as to the true meaning of any part of the Drawings, Specifications or other Proposal or Contract Documents, or finds discrepancies, errors, ambiguities, inconsistencies, incompleteness or omissions in the Drawings or Specifications or the proposal process, he/she must submit to the Procurement Officer a written request for an amplification, clarification, explanation, interpretation or correction thereof. Failure to do so shall constitute: (1) acceptance by the Proposer of the Drawings, Specifications or other Proposal or
Contract Documents as is, and (2) a waiver by the Proposer of any and all claims arising, or that might arise, out of such discrepancies, errors, ambiguities, inconsistencies, incompleteness or omissions.
b. Proposers may propose substitute materials or techniques if such substitution is equal to or better than the materials or techniques described in the RFP and if the substitution has been submitted in writing at least ten (10) days prior to the public Proposal opening. The burden of proof of equality or superior quality is on the Proposer. If accepted as equal by the County in its discretion, the substitute will be designated as an alternative on a formal addendum available to all Proposers three (3) days prior to the deadline for Proposal submission, when possible. If approval of any substitute materials and/or processes has not been provided by County prior to the deadline for proposal submission, proposers may elect to submit an alternate bid with separate pricing and rationalization for the alternate materials and/or approach. County, at its sole discretion, will determine if the alternate meets the needs of the respective project.
c. Any amplification, clarification, explanation, interpretation or correction of the documents will be made only by written Addendum duly issued and a copy of the
Addendum will be mailed or delivered to each person receiving a set of the Proposal
Documents. Delivery, as used in these Instructions, shall include electronic delivery through e-mail, facsimile, web-posting or other electronic means. Neither the County nor the Procurement Officer will be responsible for any information, representations, explanations or interpretations of the Contract Documents not in written addenda.
d. The County reserves the right to call a pre-proposal conference; if called and conducted, a summary of the pre-proposal conference will be mailed or electronically delivered to all parties receiving a set of Proposal documents.
e. On request, the County will provide each Proposer access to the site to conduct, at
Proposer's sole cost, such inspections, tests and investigations as each Proposer deems necessary for submission of a Proposal. No information provided by County representatives at such a site inspection shall be deemed a waiver of the requirements of 2.a. and 2.c., above.
f. Any Addenda issued during the time of the Proposal process, or forming a part of the
Proposal Documents, shall be covered in the Proposal, and shall be considered a part of the RFP. Receipt of each Addendum shall be acknowledged in the Proposal.
g. If specified in the RFP, a request for qualifications may precede the RFP process.
3. a. Each Proposal, if required by the Proposal Documents, shall be accompanied by a certified check or bid bond in a form acceptable to the County Attorney, in an amount specified, payable without condition to the County as a guarantee that the Proposer, if awarded the Contract, will promptly execute the Agreement in accordance with the
Proposal, and will furnish, if required by the Proposal, good and sufficient bonds for the faithful performance of the Contract and for the payment to all persons supplying labor and material for the work (see 10.a., below). The Proposal guaranties of all parties except the three highest scoring Proposals will be returned promptly after the opening of Proposals. After execution of the Contract and issuance of a Notice to Proceed, the remaining two Proposers’ guaranties will be returned.
b. Proposer also, if required by the Proposal Documents, will fully complete and submit with the Proposal a Pitkin County Qualification Statement, or an updated Statement if one is already on file. Pitkin County reserves the right to pre-qualify Proposers based on said qualification statements.
c. Proposer also must submit with the Proposal a list of subcontractors, independent contractors and suppliers to be employed under the Contract. If the County has a reasonable objection to any such subcontractor, independent contractor or supplier, it shall notify the Proposer and the Proposer may then: (a) withdraw the Proposal; or (b) substitute an acceptable contractor or supplier. If required by the Contract Documents, subcontractors, independent contractors and/or suppliers may be required to submit a
Contractor's Qualification Statement.
d. Proposals by corporations must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown below the signature.
e. Proposals by partnerships or limited liability companies (“LLC”) must be executed in the partnership or LLC name and signed by a partner, authorized LLC officer, whose title must appear under the signature and the official address of the partnership or LLC must be shown below the signature. The state in which the entity was formed and whose law governs the entity shall be shown below the signature.
f. All names must be typed or printed below the signature.
4. a. Proposer acknowledges that this proposal is solicited and submitted subject to the requirements of the "Pitkin County Procurement Code," (Ordinance #009-2025, as previously amended by Ordinances #026-2005 & #03-2007 (copies available via the
PitkinCounty website at https://pitkincounty.com/DocumentCenter/View/27059/title-
03-revenue-and-finance or upon request for a nominal charge). As such, the Proposer agrees to comply with all applicable requirements of said Procurement Code relating to proposing, contract drafting, contract administration, and ethics. The requirements of the Procurement Code are incorporated herein by this reference.
b. The Proposer shall immediately notify the County Manager in writing of any violation of said Code by the County's employees or agents, which violation is known or should have been known by Proposer, and failure to so notify the County of violations within five (5) days of knowledge of such violations shall disqualify the Proposer from award https://pitkincounty.com/DocumentCenter/View/27059/title-03-revenue-and-finance https://pitkincounty.com/DocumentCenter/View/27059/title-03-revenue-and-finance of the Contract being proposed and shall be deemed as a waiver of any action or defense that the Proposer may have against the County by reason of such violation of the Procurement Code.
c. The submission of a Proposal shall be conclusive evidence and legal admission that the Proposer: (1) has no questions, complaints or objections in connection with the
Proposal process and/or documents, subject to any requests made by Proposer for amplification, clarification, explanation, interpretation or correction pursuant to
Paragraph 2.a. and 2.c., above; (2) has no questions, complaints or objections as to the completeness, sufficiency, scope or detail of the Proposal Documents; and (3) has full knowledge of the scope, nature, quality and quantity of work to be performed, the detailed requirements of the Proposal Documents including any and all contract documents, the plans and specifications, the site and conditions under which the work is to be performed, the Pitkin County Procurement Code and applicable Colorado law.
5. a. All Proposals will be opened and read in public by name of Proposer only. No
Proposals may be withdrawn after the beginning of the public opening. The County, in its sole discretion, may delay a Proposal opening for no longer than two (2) business days if weather or other circumstances beyond control of Proposers results in delay in receipt of Proposals. Proposals may be withdrawn at any time prior to the beginning of the public opening or modified by a document executed and delivered in a form substantially similar to the Proposal Form prior to opening.
b. All Proposals submitted must be valid for a minimum period of sixty (60) days after the date of the Proposal opening. During this time, Proposers are investigated, and
Proposals are evaluated.
6. a. Proposals will be awarded to the highest scoring Proposer complying with the terms, conditions, guidelines, selection criteria, plans and specifications presented in the
Request For Proposals. All rights are reserved by the County to determine, in the
County's sole reasonable discretion, whether the Proposal meets the needs or a purpose intended and is within the budget.
b. Although price may be a major consideration in the selection of a Proposal, the County does not award on price alone. The County may also consider the quality of product as judged by the County; past experience with Proposers, subcontractors, independent contractors, products or suppliers; qualifications of the Proposers and/or subcontractors, independent contractors or suppliers; services offered; warranties;
maintenance considerations; long-range costs; delivery; and similar considerations, all as specified in detail in the RFP.
c. The County reserves the absolute right to conduct such investigations as it deems necessary to assist in the evaluation of any Proposal and to establish the experience, responsibility, reliability, references, reputation, business ethics, history, qualifications and financial ability of the Proposers and proposed subcontractors, independent contractors and suppliers. The purpose of such investigation is to satisfy the County that the Proposer has the experience, resources and commercial reputation necessary to perform the work and support any warranties in accordance with the
Contract Documents in the prescribed manner and time.
d. The County, at its sole discretion, may require the apparent successful Proposer to demonstrate, at a place and time designated by the County, that the Proposal meets the performance criteria specified, or to otherwise provide documented proof from independent reliable sources acceptable to the County that said performance criteria will be met prior to final acceptance of the Proposal. The burden of proof of such a demonstration is on the Proposer. In the event that the apparent successful Proposer fails to demonstrate or provide acceptable proof of meeting required performance criteria, that proposal will be rejected and the next eligible Proposer in the selection ranking will be invited to participate in the same process until a proposal meeting performance criteria is found within the ranking of eligible Proposers. The County reserves the rights to reject any or all Proposals or to otherwise accept the Proposal which in the County's sole discretion is in the best interest of the County.
e. Pitkin County reserves the right, if it deems such action to be in the best interests of the County, to reject any and all Proposals or to waive any irregularities or informalities therein. Any incomplete, conclusory, false or misleading information provided by Proposer shall be grounds for rejection of the proposal. If proposals are rejected, the County further reserves the right to investigate and accept the next best proposal in order of ranking or to reject all proposals and re-solicit for additional pro-posals.
f. Any questions or disputes involving the documents or procedures not covered by these
Instructions or other Proposal Documents shall be resolved by the Procurement
Officer on the basis of fairness, custom in the industry, maximization of competition and best interests and convenience of the County.
7. Issuance of Notice of Award, execution of Contract Documents and issuance of a Notice to
Proceed shall be as specified in the Contract Documents and in accordance with the Pitkin
County Procurement Code. County standard practice is to first notice the top-ranked proposer and enter into a final contract agreement prior to notifying unsuccessful bidders.
Non-awarded bidders will be notified of the County’s decision and shall be offered an optional debrief conversation of the bidding and evaluation process; debrief conversations may be offered prior to contract signing but, in most cases, will not be scheduled until a contract has been finalized.
8. Contracts will be executed on standard Pitkin County Contract documents and/or by separate agreement with the Proposer. Copies of any applicable standard forms are included with the
Proposal Documents. The County reserves the right to negotiate with the Proposer for contract terms not specified in the Proposing Documents. Any changes from the Pitkin
County standard form contract may result in a delay in the issuance of a Notice to Proceed in order to obtain any necessary County Attorney review of changes from the standard form.
Proposer agrees that any such delays shall not be grounds for either additional compensation or an extension of time to complete the work that is the subject of the Proposal.
9. If any contract awarded as a result of a Proposal extends beyond the calendar year, nothing herein shall be construed as an obligation by the County beyond any amounts that may be, from time to time, appropriated by the County on an annual basis. It is understood that payment under any Contract is conditional upon annual or supplemental statutory appropriation of funds by said governing body and that before providing services, the
Proposer, if he/she so requests, will be advised as to the status of funds appropriated for services or materials and shall not be obligated to provide services or materials for which funds have not been appropriated.
File details come from the government source that posted it. Updated .