biddoc.pdf
PDF 42 MB Posted
- Attached to
- LS1 to Cattail Crossing Pipeline
- Solicitation number
- IFB-2026-WA-2603 LS1
- Issued by
- Pueblo County, Colorado
About this file
This is a bidding document for the LS1 to Cattail Crossing Pipeline project issued by Pueblo West, Colorado. The project involves furnishing all labor, materials, equipment, supervision, permits, testing, and incidentals necessary to replace approximately 9,300 linear feet of existing 10-inch water transmission main located between Lift Station No. 1 (LS1) and Cattail Crossing Pond. The new pipeline will follow the Cyclone Trail corridor and adjacent portions of McCulloch Boulevard within existing easements and rights-of-way, utilizing a combination of open-cut trench construction and horizontal directional drilling (HDD) methods. The work includes installation of a new 10-inch HDPE DR11 waterline with all associated appurtenances required to provide a complete and operational water transmission system. The bidding document establishes the specifications, requirements, and evaluation criteria that prospective contractors must follow when submitting their proposals for this water infrastructure replacement project.
The document establishes the contractual framework and technical specifications governing bidder qualifications, project execution standards, and submission requirements. Bidders are expected to demonstrate experience with similar pipeline construction projects, particularly those involving HDD technology and water transmission infrastructure. The project scope encompasses all permitting requirements, testing protocols, and final system commissioning to ensure the completed pipeline meets applicable water quality and safety standards. Contract terms, pricing structures, and payment conditions are detailed within the bidding document to establish clear expectations for project delivery, timeline adherence, and performance obligations.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION FOR BID (IFB)
AND
CONTRACT DOCUMENTS
FOR
IFB-2026-WA-2603
LS1 to Cattail Crossing Pipeline
PUEBLO WEST METROPOLITAN DISTRICT
P.O. Box 7005
Pueblo West, Colorado 81007
SEPTEMBER 2026
AGREEMENT
THIS AGREEMENT made and entered into this _______ day of _______________, 20___, by and between Pueblo West Metropolitan District, hereinafter referred to as “District” or “Owner”, and __________________ hereinafter referred to as “Contractor”.
RECITALS
1. In accordance with Colorado Statutes, the District has prepared plans, specifications, and other contract documents for the work described herein, has approved and adopted these contract documents and has invited proposals for furnishing materials, labor and equipment for the construction of improvements in accordance with the terms of this contract.
2. The Contractor, in response to the invitation, has submitted to the District in the manner at the time specified, a proposal in accordance with the terms of the contract and the bid proposal.
3. The District has opened, examined and canvassed the proposal submitted, and as a result of such canvas, has determined and declared the Contractor to be the lowest reliable and responsible bidder to perform Project No.IFB-2026-WA-2603 LS1 to Cattail Crossing Pond Pipeline has duly awarded said contract to the Contractor for the amount specified in Contractor's bid proposal.
NOW THEREFORE, in consideration of the compensation to be paid Contractor, and of the mutual agreements herein contained, Contractor and District agree as follows:
4. Contractor will furnish at its own cost and expense, all labor, tools, equipment and materials required to perform the “Work” which is more fully identified in the contract documents incorporated and made a part of this Agreement herein. Contractor shall construct and complete the Work in a good workmanlike manner and as described and required by the plans, specifications, contract documents and proposal for construction of the Work. All Work shall be done under the direct supervision of and to the entire satisfaction of the District. Contractor shall be compensated in the amount not to exceed
5. The work specified in this contract shall begin within ten (10) days after receipt by Contractor of the fully executed contract from the District. The work shall be completed within One Hundred Twenty (120) calendar days from date of commencement. The completion deadline will be extended if delays are caused by inclement weather for a period of time equal to that weather delay. Liquidated damages in the amount of $4,500.00 per working day shall be deducted from Contractor's estimate if the work is not completed prior to the expiration of the time limits specified above or of all extensions granted by District. The aforementioned sum is agreed upon as the proper measure of liquidated damages District will sustain per diem by the failure of Contractor to complete the work in the time stipulated, and this sum is not to be construed in any sense as a penalty.
6. Enforcement of the terms and conditions of this Agreement, and all rights of action relating to such enforcement, shall be strictly reserved to the District and the Contractor, and nothing contained in this Agreement shall give or allow any claim or right of action by any other or third person under this Agreement. It is the express intention of the District and the Contractor that any person other than the District or the Contractor receiving services or benefits under this Agreement shall be deemed to be an incidental beneficiary only.
7. Notwithstanding anything herein to the contrary, the parties understand and agree that all terms and conditions of this Agreement and the exhibits and attachments hereto which may require continued performance or compliance beyond the termination date of the Agreement shall survive such termination date and shall be enforceable by the District as provided herein in the event of such failure to perform or comply by the Contractor or by its subcontractors.
8. The Contractor agrees to indemnify and to hold the District and its agents harmless from any and all claims, suits, expenses, damages or other liabilities, including reasonable attorney fees and court costs arising out of damage or injury to persons or property caused or sustained by any person, persons, or entities as a result of any intentional or negligent act or omission by Contractor or failure of Contractor to perform this Agreement according to its terms. By requiring this right to indemnification, the District in no way waives or intends to waive the immunity protections provided to the District and its employees under the Colorado Governmental Immunity Act, C.R.S. § 24- 10-101, et seq.
9. To the extent that an Agreement may be executed and performance of the obligations of the parties may be accomplished within the intent of the Agreement, the terms of this Agreement are severable, and should any term or provision hereof be declared invalid or become inoperative for any reason, such invalidity or failure shall not affect the validity of any other term or provision hereof. The waiver of any breach of a term hereof shall not be construed as waiver of any other term.
10. This contract also consists of the following contract documents, all of which are incorporated by reference as if set out in full herein:
A) Agreement (3 pages) J) Labor & Materials Payment Bond (2 pages)
B) Invitation for Bid K) Notice To Proceed
C) Instructions to Bidders (7 pages) L) Application & Certificate for Payment
D) Bid Form (7 pages) M) Change Order Form
E) Bid Bond (2 pages) N) Notice of Final Settlement
F) Statement of Qualifications and O) Specifications (216 pages)
Subcontractors (4 pages) P) Plan Sheets, Maps, Exhibits, etc
G) General Conditions (18 pages) (26 pages)
H) Notice of Award
I) Performance Bond (2 pages)
11. All the terms and conditions of this Contract and attached contract documents shall be binding upon the County and the Contractor, and their respective heirs, legal and personal representatives, successors, and assigns.
IN WITNESS WHEREOF the parties have executed this Agreement at Pueblo, Colorado, the day and year first written above.
PUEBLO WEST METROPOLITAN DISTRICT
By: __________________________________
Title: Board President
CONTRACTOR:
By: __________________________________
Title: _________________________________
INVITATION FOR BID
The Pueblo West Metropolitan District (PWMD) is seeking competitive bids for the following work:
LS1 to Cattail Crossing Pipeline
SCOPE OF WORK – – The work consists of furnishing all labor, materials, equipment, supervision, permits, testing, and incidentals necessary to replace approximately 9,300 linear feet of existing 10-inch water transmission main between Lift Station No. 1 (LS1) and Cattail Crossing Pond in Pueblo West, Colorado.
The new pipeline will generally follow the Cyclone Trail corridor and adjacent portions of McCulloch Boulevard within existing easements and rights-of-way. The project includes installation of a new 10-inch HDPE DR11 waterline utilizing a combination of open-cut trench construction and horizontal directional drilling (HDD) methods, along with all associated appurtenances required to provide a complete and operational water transmission system.
Contract time: 120 Calendar Days
A non-mandatory pre-bid meeting will take place on September 10, 2026 at 10:00 a.m. MT. This meeting will be held at the Boardroom at 356 S. McCulloch Blvd, Suite 103 Pueblo West Co 81007.
Electronic bids will be received by the Pueblo West Metropolitan District via Rocky Mountain E-Purchasing website until 2:00 p.m. MT on October 1, 2026. E-mailed bids will NOT be accepted. The bids will be opened, read aloud and tabulated at a virtual meeting held on October 1, 2026 at 2:01 p.m. MT. Those wishing to attend the virtual bid opening may do so by calling 240-813-4984 and entering PIN 749-748-666.
A 5% Bid Bond must accompany each bid received. A Performance Bond, Labor and Materials Payment Bond and Certificates of Insurance (coverage in accordance with the contract documents) will be required of the successful bidder.
Bid documents and specifications can be obtained from the Rocky Mountain E-Purchasing website at https://www.bidnetdirect.com/colorado/pueblo-west-metropolitan-district. If you need help registering, please call the Rock Mountain E-Purchasing Support Department toll free at 1-800-835-4605. Addenda will be posted only on the RMEPS websites. It is the bidder’s responsibility to verify whether addenda were issued. Bids which are received after the time and date stated above will not be considered. Bids that arrive late due to the fault of any technology issue are still considered late and will not be considered by the District. Pueblo West Metropolitan District is an Equal Opportunity Employer. Minority, small, disadvantaged & women owned enterprises are encouraged to submit competitive bids.
If assistance under the Americans with Disabilities Act Amendments Act (ADAAA) is needed to complete any portion of the IFB Process, please contact the District Clerk’s Office at (719) 251-8723.
PUEBLO WEST METROPOLITAN DISTRICT
Mike Winters, Procurement Manager
Publication Date: September 2, 2026 Bid No.: IFB-2026-WA-2603 https://www.bidnetdirect.com/colorado/pueblo-west-metropolitan-district
Instructions to Bidders
INSTRUCTIONS TO BIDDERS
To be considered, all bids for this project shall be made in accordance with these instructions.
DEFINITIONS:
BIDDING DOCUMENTS include the Advertisement for Bids, Instructions to Bidders, Bid Forms, Contract and General Conditions for Pueblo West Metropolitan District Projects, including any Addenda issued prior to receipt of bids.
ADDENDA are written or graphic instructions issued by the District prior to the execution of the contract, which modify or interpret the Bidding documents by additions, deletions, clarifications or corrections. Addenda will become part of the contract Documents when the Contract is executed.
A BID is a complete and properly signed proposal to do the work, or designated portion thereof, for the sum stipulated therein, supported by data called for by the Bidding documents.
AN ALTERNATE BID (OR ALTERNATE) is an amount stated in the Bid to be added to or deducted from the amount of the Bids if the corresponding change in project scope or materials described in the Bidding Documents is accepted.
A BIDDER is one who submits a Bid or Proposal for a prime contract with the District for the work described in the proposed Contract Documents.
A SUB-BIDDER is one who submits a Bid to a Bidder for materials or labor for a portion of the work.
ENGINEER – when reference is made to either “Engineer,” “Architect,” or “Landscape Architect,” this should be taken to mean District’s Representative, and may include an employee of the District.
BIDDING DOCUMENT:
Bidders may obtain complete bidding documents from the Rocky Mountain E-Purchasing System website at https://www.bidnetdirect.com/colorado/pueblo-west-metropolitan-district or by email request to purchasing@pueblowestmetro.us.
Complete sets of Bidding Documents shall be used in preparing bids. The District does not assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
The District, in making copies of the Bidding Documents available on the above terms, does so only for the purpose of obtaining bids on the work and does not confer a license or grant any other use. Bidder shall return all Bidding Documents to the County with submission of bid.
https://www.bidnetdirect.com/colorado/pueblo-west-metropolitan-district mailto:purchasing@pueblowestmetro.us
EXAMINATION OF BIDDING DOCUMENTS AND PROJECT SITE:
Each bidder, by submitting their Bid, represents that they have read and understands the Bidding Documents and that they have visited the site to obtain first-hand knowledge of existing local conditions under which the work is to be performed. Contractors will not be given extra payments for conditions which can be determined by examination of the documents and the site.
IFB SCHEDULE:
September 2, 2026 IFB Posted September 10, 2026 Pre-bid meeting at 10:00 a.m. MT
September 22, 2026 Deadline for receipt of written questions, by 12:00 p.m. MT
September 24, 2026 Final Posting of applicable Addenda, 5:00 p.m. MT
October 1, 2026 Responses due at 2:00 p.m. MT – Electronically submitted only through Pueblo West Metropolitan District – Bid Opportunities and RFPs | BidNet Direct
October 1, 2026 Virtual Bid Opening, 2:01 p.m.
October 12, 2026 Tentative Board Approval obtained October 26, 2026 Tentative Award actions completed
SUBSTITUTIONS:
The materials, products and equipment described in the Bidding Documents established a standard of required function, dimension, appearance and quality to be met by any proposed substitution. No substitution will be considered unless a written request for approval has been submitted by the Bidder and has been received by the District at least seven (07) working days prior to the date and hour for receipt of bids. Requests received after this time may not be considered. Each such request shall include the name of the material for which it is to be substituted and a complete description of the proposed substitute including catalog cuts, performance and test data, and any other data or other information necessary for a complete evaluation of the submittal. The District’s decision of approval or disapproval of a proposed substitute shall be final. If the District approves any proposed substitution, such approval will be set forth in an Addendum. Bidders shall not rely upon approvals made in any other manner.
Written requests shall be submitted in accordance to the Submission of Questions listed below.
INTERPRETATION OR CORRECTION OF BIDDING DOCUMENTS:
Bidders shall promptly notify the District of ambiguity, inconsistency or error which they may discover upon examination of the Bidding Documents or of the site and local conditions. Bidders requiring a clarification or interpretation of the Bidding Documents shall make a written request to reach the District no later than Seven (07) calendar days prior to the date and time for receipt of bids.
Any interpretation, correction or change of the Bidding Documents will be made by Addendum. Interpretations, corrections or changes of the Bidding Documents made in any other manner will not be binding, and bidders shall not rely upon such interpretations, corrections and changes.
Written requests shall be submitted in accordance to the Submission of Questions listed below.
ADDENDA:
The District reserves the right to amend the Bidding Documents by written addenda. No addenda will be issued later than five (05) working days prior to the date for receipt of bids, except an Addendum, if necessary, to postpone the date for receipt of bids or for withdrawing the invitations for bids. Addenda will be posted on the Rocky Mountain E- Purchasing System website, unless otherwise stated in the Invitation for Bid, and it is the responsibility of the contractor to obtain all addenda. Contractor registered for the paid notification service on the Rocky Mountain E-Purchasing System will be notified of addenda either by fax or by email depending on the service that they have subscribed
to. It is the responsibility of contractors registered for the no charge, no notification service on the Rocky Mountain E-Purchasing System to monitor the Rocky Mountain E- Purchasing System for any addenda. If revisions are of such magnitude to warrant, in the District’s opinion, the postponement of the date for receipt of bids, an addendum will be issued announcing the new date.
PREPARATION OF BIDS:
Submit Bids on Bid Forms if provided in the Bidding Documents. Fill all blank spaces on the Bid Form by typewriter or manually in ink. Where so indicates by makeup of the Bid Form express sums in both words and figures; in case of discrepancy between the two, the written amount shall govern. Include all requested alternate sums on the Bid Form;
failure to comply may be cause for rejection. Segregated bids or assignments also may be cause for rejection.
Any interlineation, alternation or erasure must be initialed by the signer of the Bid. Bidder shall make no additional stipulations on the Bid Form nor qualify their Bid in any other manner. Each copy of Bid shall include the legal name of Bidder and a statement whether Bidder is a corporation, partnership, individual, or any other legal entity, and each copy shall be signed by the person or person legally authorized to bind the bidder to a Contract.
A bid by a corporation shall further give the state of incorporation and have the corporate seal affixed. A Bid submitted by an agent shall have a current power of attorney attached certifying agent’s authority to bind Bidder.
BID SECURITY:
If required in the Invitation to Bid, each Bid shall be accompanied by a Bid Security, made payable to the District named on the Bid Form, in the amount of 5% of the Base Bid sum, pledging that the Bidder will enter into a contract with the District on the terms stated in their Bid and will, if required, furnish bonds as described hereafter. Should the bidder refuse to enter into such Contract or fail to furnish such bonds, if required, the amount of the Bid Security shall be forfeited to the District as liquidated damages, not as a penalty.
Security shall be either a Certified Check, Cashier’s Check, or Bid Bond. A Bid Bond shall be written on the District form, if provided, and the attorney in fact who executes the bond on behalf of surety shall affix to the bond a certified and current copy of their power of attorney.
The successful Bidder’s security will be retained until they have signed the contract and furnished the required performance and payment bonds. The District reserves the right to retain the security of the three (03) lowest responsible bidders until the lowest responsible bidder enters into a Contract, or until thirty (30) days after the bid opening, whichever is the shorter. All other bid security will be returned upon request as soon as practicable.
SALES AND USE TAXES:
The Bidder and all Sub-Bidders shall include in their bid all City of Pueblo Sales and Use Tax if applicable. State of Colorado and Pueblo County tax shall not be included.
The Bidder and all Sub-Bidders shall make application to the Department of Revenue, State of Colorado, for a certificate or certificates of exemption, indicating that the Bidder’s or Sub-Bidder’s purchase of construction building materials is for the purpose of erection, alteration, or repair of structures owned and used by the Pueblo West Metropolitan District and is therefore exempt from paying State of Colorado Sales Tax per C.R.S. §39-26-708.
The Department of Revenue shall provide forms to the applicant or applicants for certificates, which shall be verified by the Owner’s Representative that the Bidder or Sub- Bidder is in fact entitled to the issuance of such certificate prior to issuance.
The Bidder shall exclude the amount of any applicable federal excise or manufacturer’s taxes from Bidder’s bid.
SUBCONTRACTOR LISTING/COMPLIANCE:
Within seven (07) calendar days of notification of selection for award of a Contract for the work, Bidder shall submit a complete list of subcontractors or other persons or organizations proposed for the work. The list shall include all information required thereon. Include in the list all portions of the work to be performed by Bidder with his/her own forces, and proprietary names and suppliers of principle items or systems of material and equipment.
The Contractor shall make all necessary requirements of its subcontractor for this project to ensure Contractor’s compliance with the terms and conditions of this Agreement.
QUESTIONS:
All written questions, clarifications or requests regarding this IFB shall be submitted by e-mail to Michael Winters, Procurement Manager at Purchasing@pueblowestmetro.us no later than Seven (07) calendar days prior to the date and time for receipt of bids. The District will not respond to questions submitted after the date and time noted above. The answers to all written questions, clarifications or requests received will be posted on the Rocky Mountain E-Purchasing System website as an addendum no later than five (05) working days prior to the date for receipt of bids.
CONTACT DURING THE SOLICITATION PROCESS:
ALL COMMUNICATION REGARDING THIS INVITATION FOR BID SHALL BE
DIRECTED TO MICHAEL WINTERS, PROCUREMENT MANAGER. NO OTHER
CONTACT SHALL BE MADE REGARDING THIS INVITATION FOR BID WITH ANY
OTHER DISTRICT STAFF, BOARD MEMBERS, AGENTS, CONSULTANTS, ETC.
DURING THE IFB PROCESS. FAILURE TO COMPLY WITH THIS REQUIREMENT
MAY RESULT IN THE OFFENDING CONTRACTOR BEING REMOVED FROM
CONSIDERATION.
SUBMISSION OF BIDS:
Submit all copies of the Bid and any other documents required in accord with these Instructions to Bidders electronically through the Rocky Mountain E-Purchasing System website, unless otherwise stated in the Invitation for Bid, prior to the time and date for receipt of bids as specified. Bidder shall assume full responsibility for timely delivery of their bid. Bids received after the time and date for receipt of Bids will not be accepted.
MODIFICATION OR WITHDRAWAL OF BIDS:
Bids may be modified or withdrawn by written correspondence to the Finance Department
– Purchasing Division prior to the date/time set for bid opening.
The bidder, prior to the specified bid opening date/time, may withdraw a bid if the bidder’s representative appears at the Finance Department or Procurement Specialist receives a written request for withdrawal at the Finance Department – Purchasing Division. At the bid opening, but prior to the actual advertised date and time of the opening of the bids, a bidder may withdraw a bid to correct a mathematical error, to sign a document or to correct clerical errors and resubmit to the Finance Department – Purchasing Division.
Bids may not be modified, withdrawn or canceled by Bidder for thirty (30) days after bid opening or until Bidder has entered into a Contract with the District. Bids may be withdrawn after bid opening without forfeiture of Bid Security only if the District refuses in writing to accept any person or organization listed on the Bidder’s Subcontractor Listing.
mailto:Purchasing@pueblowestmetro.us
BID OPENING:
Bids will be opened, read aloud and tabulated at a virtual meeting, unless otherwise stated in the Invitation for Bid, held at the time and place stated in the Invitation for Bid.
AWARD OF CONTRACT:
It is the intent of the District to award the Contract to the lowest conforming, reliable and responsible Bidder or Bidders provided the Bids are judged to be reasonable and do not exceed the amount of funds determined by the District to be available. If the District accepts any alternates, it shall have the right to accept alternates in any order or combination, and to determine the low bidders on the basis of the Base Bids and the alternates accepted.
The District reserves the right to reject any or all Bids, to accept other than the lowest Bid and to waive any informality or irregularity in any Bid received. The District also reserves the right to reject a Bid if the Bidder fails to submit the data required by these Instructions to Bidders, or if the Bid is in any way incomplete or irregular.
PERFORMANCE BOND AND LABOR AND MATERIALS PAYMENTS BOND:
If the contract price is in excess of fifty thousand dollars ($50,000.00), for the construction, erection, repair, maintenance, or improvement of any building, road, bridge viaduct, tunnel, excavation or other such public work included in said contract, the contractor to whom the work is awarded will be required to furnish both a Labor and Materials Payment Bond and a Performance Bond to Pueblo West Metropolitan District in an amount equal to one-hundred percent (100%) of the contract price. Each bond shall be executed in three counterparts on the form hereto attached, signed by a surety company authorized to do business in the State of Colorado, and acceptable to the District. Each copy of the bond filed with the District shall be accompanied by a “power of attorney” certified to include the date of the bond. Bonds shall be executed on the forms provided as part of these documents. If bonds are submitted on any other form than what is provided in the contract documents, Pueblo West Metropolitan District must first approve the forms prior to acceptance.
EXECUTION OF CONTRACT:
Notwithstanding any delay in the preparation and execution of the formal Contract Agreement, each Bidder shall be prepared, upon written Notice of Award, to commence work as specified in the Contract following receipt of official written Notice to Proceed.
The accepted Bidder shall assist and cooperate with the District in preparing the formal Contract Agreement, and within ten (10) calendar days following its presentation shall execute same and return it to the District.
OPEN RECORDS:
The parties agree that the District will be free under this contract to make any disclosure of information required by the Colorado Open Records Act. (C.R.S. § 24-72-101, et seq.)
NONDISCLOSURE:
The Contractor must identify under separate cover the information that it considers confidential or proprietary. This is a continuing obligation. Confidential or proprietary information for the purpose of this paragraph is information relating to Contractor’s research, development, trade secrets, business affairs, internal operations and management procedures and those of its customers, clients or affiliates, but does not include information lawfully obtained by third parties, information which is in the public domain, or information which is or could have been acquired/developed independently by the District or a third party. Notwithstanding the foregoing the District shall not be in violation of its obligations under this section should it disclose confidential information if such disclosure is, in the sole opinion of the District’s legal counsel, required by applicable law and/or legal process (including, but not limited to, disclosures required pursuant to the Colorado Open Records Act, C.R.S. § 24-72-201, et seq., as now or hereafter amended). The District shall endeavor to provide notice to the Contractor as promptly as practicable under the circumstances, of any demand, request, subpoena, court order or other action requiring such disclosure, in order to afford Contractor the opportunity to take such lawful action as it deems appropriate to oppose, prevent or limit the disclosure, solely at its own instance and expense; but nothing herein shall be construed to require the District to refuse or delay compliance with any such law, order or demand.
Bid Form
BID FORM
CONTRACT IDENTIFICATION NO.:IFB-2026-WA-2603
THIS BID IS SUBMITTED TO: Pueblo West Metropolitan District c/o Pueblo West Metropolitan District Finance Department – Purchasing Division
P. O. Box 7005 Pueblo West, CO 81007
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with the District in the form included in the Contract Documents to complete all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Instructions to Bidders. This
Bid will remain open for thirty (30) days after the day of Bid opening. BIDDER will sign the Agreement and submit the contract Security and other documents required by the Contract Documents within ten (10) days after the date of the District’s Notice of Award.
3. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that:
a. BIDDER has examined copies of all the Contract Documents and of the following addenda:
DATE NUMBER
(receipt of all of which is hereby acknowledged) and also copies of the Invitation to Bid and the Instruction to Bidders.
b. BIDDER has examined the site and locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules and regulations) and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as BIDDER deems necessary;
c. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation;
BIDDER has not directly or indirectly induced any person, firm or a corporation to refrain from himself any advantage over any other Bidder or over District.
4. The BID SCHEDULE has been filled in and completed as required. The number of units contained in the Schedule is approximate only, and final payment will be made for the actual number of units which are incorporated in or made necessary by the work included in this contract. In the event that work and/or materials or equipment are required to be furnished to a greater or lesser extent than is contemplated by the Drawings and Specifications, such work and/or materials or equipment will be furnished additionally or omitted in accordance with the unit prices stated in the Bid Schedule.
5. BIDDER shall complete the Work within One Hundred Twenty (120) calendar days after issuance of the Notice of Proceed.
6. Communications concerning this Bid shall be addressed to:
The name and address of BIDDER indicated below.
To the following address:
7. Is your company a Small, Minority or Woman Owned Company? __________
If yes, please explain:
SUBMITTED ON , 20 .
BID SCHEDULE
The Bidder shall complete the following Bid Schedule completely and it shall remain attached to the Contract Documents. Bid prices shall include sales tax (if applicable), license fees and all other applicable fees.
The quantities shown are approximate only and are for the purpose of bid comparison.
Payment shall be based on the final measured quantities completed in place (EXCEPT those items designated as “lump sum”) at the unit price quoted herein.
BASE BID
ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
1 GENERAL CONDITION LS 1
2 CONSTRUCTION SURVEYING LS 1
3 CLEAR and GRUB LS 1
4 TRAFFIC CONTROL LS 1
5 EROSION CONTROL LS 1
6 SEEDING and RESTORATION AC 2.6
7 WATER PIPE 10_INCH HDPE (OPEN CUT) LF 5190
8 WATER PIPE 10_INCH HDPE
(HORIZONTAL DIRECTIONAL DRILLING)
LF 4060
9 GATE VALVE 10_INCH with BOX EA 3
10 TIE IN WEST SIDE NEAR LS1 CONNECTION POINT LS 1
11 TIE IN EAST SIDE at CATTAIL CROSSING POND
CONNECTION POINT
LS 1
12 BEND 10_INCH EA 15
13 AIR REALEASE VACCUM VALVE with MANHOLE and
VENT (CIP)
EA 6
14 GROUND WATER BARRIER EA 13
TOTAL BASE BID PRICE
TOTAL BASE BID IN WRITING:
____________________________________________________________________DOLLARS
AND _____________________________ CENTS.
BID ALTERNATE NO. 1
ITEM NO. DESCRIPTION UNIT QUANTITY UNIT PRICE TOTAL
BA1-1 TRAFFIC CONTROL LS 1
BA1-2 WATER PIPE 10_INCH HDPE (OPEN CUT) LF 55
BA1-3 WATER PIPE 10_INCH HDPE
(HORIZONTAL DIRECTIONAL DRILLING)
LF 120
BA1-4 TIE IN EXISTING TP 1 WELL LINE LS 1
BA1-5 POND CONNECTION and ELASTOMERIC CHECK
VALVE
LS 1
BA1 -6 TEMPORARY COFFER DAM
DEWATERING and POND WATER CONTROL
LS 1
BA1-7 POND CLAY LINER RESORATION CY 5
BA1-8 TYPE M RIP RAP PROTECTION CY 24
TOTAL BID ALTERNET No. 1 BID PRICE
TOTAL BID ALTERNATE NO. 1 IN WRITING:
_____________________________________________________________DOLLARS
TOTAL BASE BID AND ADD ALTERNATE NO. 1
_____________________________________________________________DOLLARS
SIGNATURES
AN INDIVIDUAL:
By: __________________________________________________________ (SEAL) (Individual’s Name) – Please Print
By: __________________________________________________________ (Individual’s Signature)
Doing business as: _______________________________________________
Business address: ________________________________________________
Phone No.: ______________________ Fax No.: _______________________
E-Mail Address: _________________________________________________
A PARTNERSHIP:
By: ____________________________________________________________ (SEAL) (Firm Name) (General Partner)
Business address: __________________________________________________
Phone No.: ______________________ Fax No.: _________________________
E-Mail Address: ___________________________________________________
A CORPORATION:
By: ___________________________________________________________ (Corporation Name)
(State of Incorporation)
By: ____________________________________________________________ (Name of Person Authorized to Sign) – Please Print
(Title)
By: ____________________________________________________________ (Signature of Personal Authorized to Sign)
(Corporate Seal)
Attest: __________________________________________________________ (Secretary)
Business address: _________________________________________________
A JOINT VENTURE:
By: ______________________________________________________________ (Name) (Address)
By: _______________________________________________________________ (Name)
(Address)
Phone No.: ______________________ Fax No.: __________________________
E-Mail Address: ____________________________________________________
(Each joint venture must sign. The manner for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above).
(Rest of Page Intentionally Left Blank)
Bid Bond
BID BOND
KNOW ALL MEN BY THESE PRESENTS, that ______________________________ as Principal, and ________________________________________________ as Surety, are hereby held and firmly bound unto Pueblo West Metropolitan District (hereinafter called the “Owner”) in the penal sum of __________________________________ Dollars ($______________), lawful money of the United States of America, for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors administrators, successors and assigns, jointly and severally, firmly to these presents.
THE CONDITION OF THIS OBLIGATION IS SUCH, that whereas the Principal has submitted the accompanying Bid dated ______________________, 20____ for the IFB-2026-WA-2603 LS1 to Cattail Crossing Pipeline as set out in the accompanying Bid; and
WHEREAS, the Owner has required as a condition for receiving said Bid that the principal deposit with the Owner either a certified check equivalent to not less than five percent (5%) of the amount of said Bid or in lieu thereof furnish a Bid Bond for said amount conditioned such that in the event of failure to execute the proposed Contract for such construction if the Contract is to be awarded to him, that said sum be paid immediately to the Owner as liquidated damages and not as a penalty for the principal’s failure to perform.
NOW THEREFORE, if the principal shall, within the period specified therefore:
A. On the attached prescribed forms presented to him for signature, enter into a written Contract with the Owner in accordance with his Bid as accepted, and give a Performance Bond with good and sufficient sureties, as may be required upon the forms prescribed by the Owner for the faithful performance and the proper fulfillment of said Contract, or
B. Withdraw said Bid within the time specified, or
C. Pay to the Owner the sum determined upon herein as liquidated damages, and not as a penalty, the n this obligation shall be void and of no effect, otherwise to remain in full force and effect.
IN WITNESS WHEREOF, the above parties have executed this instrument under their several seals this ________________ day of _______________, 20____ the name and corporate seal of each corporate party being hereto affixed and these presents duly signed by its undersigned representative pursuant to authority of its governing board.
Principal ________________________________
Address ________________________________
Bid Bond
ATTEST:
By: ______________________________ By: ____________________________
Surety: _________________________
Address: ________________________
ATTEST: _________________________
By: ______________________________
INSTRUCTIONS:
1. The full firm name and residence of each individual party to the bond must be inserted in the first paragraph.
2. If the principal is a partnership, the full name of all partners must be inserted in the first paragraph which must recite that they are partners composing that partnership (to be named), and all partners must execute the bond as individuals.
3. The state of incorporation of each corporate party to the bond must be inserted in the first paragraph and the bond must be executed under the corporate seal of said party attested by its secretary or other authorized officer.
4. Power of Attorney must accompany this bond when signed by other than an officer of either the principal; or surety.
5. A standard printed bond form may be used in lieu of the foregoing form provided that the security stipulations protecting the Owner are not in any way reduced by use of such standard printed bond form.
Statement of Qualifications
STATEMENT OF QUALIFICATIONS AND SUBCONTRACTORS
All questions herein must be answered by all bidders and the information given must be legible, clear in meaning and comprehensive. The bidder will not be given the opportunity to further explain or defend any answers beyond the time that this statement is submitted with the bid. This statement must be notarized. Questions may be answered on separate attached sheets if necessary. The Bidder may attach and submit any additional information which is believed to be pertinent to this bid. Failure to complete this form pursuant to the directions herein may be cause for rejection of the bid. All bidders are reminded that a contract for work described in the Contract Documents will be awarded to the lowest, reliable, responsible and qualified bidder as determined by the District. The District reserves the right to waive informalities and/or irregularities and to reject any or all bids.
DATE SUBMITTED __________________________
All questions must be answered by all bidders and the data given must be clear and comprehensive. This statement must be notarized. If necessary, questions may be answered on separate attached sheets. The bidder may submit any additional information. Failure to complete this form may be cause for rejection of the bid.
1. Name of Bidder ___________________________________________________
2. Permanent main office address _______________________________________ and phone number _______________________________________
3. When organized ___________________________________________________
4. How many years have you been engaged in this type of construction? Under what firm or trade names and how long under each? How long has each company been bonding work?
5. Major Contract on hand that parallel the proposed project (schedule these showing gross amount of each Contract and appropriate anticipated dates of completion).
6. Are you licensed as a municipal Contractor or any other title?
If “yes”, in what city, county, and state?
What class license and number?
7. General type of work performed by you?
8. Have you in the past two years, or are you at the present time, late in the completion of any projects?
Yes ______ No _______ If “yes”, where and why (please list all applicable projects).
9. Liquidated damages and/or disputes: List all projects in the last two years where liquidated damages were or may be assessed, where substantial disputes or protests occurred or are currently occurring. Attach a detailed explanation.
10. Has your bonding company been contacted in the past two years concerning the late completion of a project?
Yes _______ No _______ If “yes” please explain the circumstances.
11. Have you ever failed to complete any work awarded you?
Yes _______ No ________ If “yes”, where and why?
12. Have you ever defaulted or been terminated on a Contract?
Yes _______ No _______ If “yes”, when, where, why and was the Contact bonded?
13. List your major equipment anticipated for this Contract and whether you own or intend to Lease this equipment.
14. Experience in construction work similar to this project. List project name, location, project superintendent, date completed, contract value.
15. Do you anticipate Subcontracting work under this Contract?
Yes _______ No _______ If “yes”, what percent of total Contract? _________ and to whom?
16. Background and experience of the principal members of your organization who will be involved with this project.
Name Title Experience (give years)
17. Are any lawsuits pending against you, your firm or the officers of the firm at this time?
Yes _______ No _______ if “yes”, give details:
18. The undersigned hereby authorized and requests any person, firm or corporation to furnish any information requested by the Owner in verification of the recitals comprising this Statement of Bidder’s Qualifications.
Dated this ____________ day of ____________________, 20 ______.
Bidder: ____________________
By: _____________________
Title: _____________________
NOTARY
County of _________________) ) ss, State of __________________)
__________________________ being duly sworn, deposes and says that he/she is _________________ of _______________________________, and that the answers to the foregoing questions and all statements therein contained are true and correct.
Subscribed and sworn before me this ______ day of _________________, 20 _____.
Commission Expires Notary Public
General Conditions
GENERAL CONDITIONS
The following general conditions are acknowledged by the District and the Contractor as being incorporated into the attached Contract as if set out in full therein.
DEFINITIONS:
ARCHITECT/ENGINEER – The Principal architect or engineer under contract with or in the employ of the District who prepared the working drawings and/or specifications of the work and who, depending on the terms of his engagement, might or might not be responsible for the supervision of the Contractor’s performance of the work.
CONTRACT – The written agreement between the District and the Contractor to perform the work specified in the attached contract.
CONTRACTOR – The sole proprietorship, partnership, or corporation to which the purchase order is addressed.
DISTRICT – Pueblo West Metropolitan District, acting by and through the chairperson of the Board of Directors or his/her designee.
INSPECTOR – An employee of the District or District’s representative assigned to inspect the Contractor’s performance of the work.
SUBCONTRACTOR – A sole proprietorship, partnership, or corporation which has a contract with the Contractor of the performance of labor at the site of the work regardless of whether supplying of material is a part of such contract, but without contractual relationship to the purchaser.
SUPPLIER – A sole proprietorship, partnership, or corporation which over-the-counter or under contract furnishes the Contractor material or equipment incorporated in the work or otherwise incident to the Contractor’s performance, but which performs no labor at the work site.
WORK – The material and/or labor the Contractor is to furnish to the District by completion of the contract.
CONTRACTOR SHALL PREPARE WORK SCHEDULE:
The Contractor, prior to commencing any part of the work covered by this Contract, shall submit to the Engineer for his approval, a time schedule for each unit of the work. The time schedule as submitted will be used as a guide by the Engineer to determine the suitable progress of the work by the Contractor.
PRECONSTRUCTION CONFERENCE:
Prior to the commencement of work at the site, a pre-construction conference will be held at a mutually agreed time and place. The conference shall be attended by:
• Contractor and his Superintendent
• Principal Subcontractors
• Owner’s Representative
• Others as requested by Contractor, District or Engineer
The purpose of the conference is to designate responsible personnel and establish a working relationship. Matters requiring coordination will be discussed and procedures for handling such matters established.
An agenda is to be provided which will include, but is not limited to, the following:
• Contractor’s tentative schedules
• Transmittal, review and distribution of Contractor’s submittals
• Processing applications for payment
• Maintaining record documents
• Critical Work sequencing
• Field decisions and Change Orders
• Use of premises, office and storage areas, security,
• Housekeeping and Owner’s Representative’s needs
• Contractor’s assignments for safety and first aid
The District will preside at the conference and will arrange for keeping the minutes and distributing the minutes to all persons in attendance.
PROGRESS MEETINGS:
Contractor shall schedule and hold regular progress meetings on a weekly basis and at other times as requested by the District or required by progress of the work. Contractor, District, and all Subcontractors active on the site shall request attendance by representatives of their suppliers, manufacturers, and other Subcontractors.
Contractor shall preside at the meetings and provide for keeping and distribution of the minutes. The purpose of the meetings will be to review the progress of the work, maintain coordination of efforts, discuss changes in scheduling, and resolve other problems, which may develop.
ROYALTIES AND PATENTS:
The Contractor shall pay all royalties and license fees. The Contractor shall defend all suits or claims for infringement of any patent rights and shall save the District harmless from loss on account thereof.
PERMITS, LICENSES AND REGULATIONS:
Permits and licenses required for prosecution of the work shall be procured and paid for by the Contractor. Contractor warrants that it has and will maintain all licenses and certifications required by federal or state law or regulation and agrees to abide by all the applicable laws, regulations and administrative rulings of the United States, State of Colorado, Pueblo West Metropolitan District, and any other applicable political subdivision, securing any necessary license and permits in connection with implementing the agreement. The Contractor shall notify the District, and the Agreement shall terminate if the Contractor loses any such license or certifications.
CODE COMPLIANCE:
The Contractor shall exercise usual and customary professional care in their efforts to comply with applicable law, codes and regulations in effect as of the date of this Agreement. Contractor will not be the final arbiters of code enforcement and interpretations. Contractor will not and do not warrant or guarantee in any manner whatsoever, that interpretations, rulings, and enforcements of the building officials will not add cost or time to the project. Design changes made necessary by newly enacted laws, codes and regulations after the date of this Agreement shall be considered additional services subject to an adjustment in compensation and schedule.
PROTECTION OF WORK AND PROPERTY:
The Contractor shall continuously maintain, at his expense, adequate protection of the work and the District’s or public property and shall take all practicable precautions in the interest of safety.
INSPECTION OF THE WORK:
The inspector assigned to the work and any other authorized representative of the District shall at all times have access to the site of the work for purpose of inspection. The Contractor shall provide safe, convenient and proper facilities for such access and inspection.
SUPERINTENDENT OF THE WORK:
The Contractor shall keep a competent and reliable superintendent on the job at all times that work is being performed. The superintendent, in the Contractor’s absence from the site, shall stand in the stead of the Contractor and any authoritative directions given to the superintendent shall be as binding as if given to the Contractor.
CHANGES IN THE WORK:
The District, without invalidating the contract, may order extra work, or make any other reasonably related changes by altering, adding to or deducting from the work. The contract price and time for completing of the work may then be adjusted accordingly by mutual agreement with a change order and purchase order issued by the District.
DEDUCTION FOR UNCORRECTED WORK:
If the District finds that work was not performed in accordance with the contract, equitable reduction of the contract price shall be made therefore.
INSURANCE:
The Contractor shall not commence work under this contract until Contractor has obtained all insurance required under this paragraph and such insurance has been approved by the District, nor shall the Contractor allow any subcontractor to commence work on a subcontract until all similar insurance required of the subcontractor has been obtained and approved. All insurance shall cover and protect the District against all claims arising as a result of the operation of Contractor. The Contractor’s liability insurance must establish the District as “Additional Insured”. Each such certificate shall provide that the District shall receive thirty (30) days prior written notice of cancellation of such insurance coverage.
Insurance of the following kind and minimum limits will be required to be carried by the Contractor throughout the lifetime of the project:
Workmen’s Compensation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Statutory Limits
General Liability:
General Aggregate Limit (Other than Products-completed Operations) . . . . . . . . . . . . $2,000,000 Products-completed Operations Aggregate Limit . . . . . . . . . . . . . . $2,000,000 Personal Injury and Advertising Limit * . . . . . . . . . . . . . . . . . $1,000,000 Per Occurrence Limit * . . . . . . . . . . . . . . . . . . . . . . . . . . . . . $1,000,000 Fire/Explosion/water Damage Limit ** . . . . . . . . . . . . . . . . . . $ 50,000 Medical Expense Limit ** . . . . . . . . . . . . . . . . . . . . . . . . . . . . $ 5,000
Comprehensive Automobile Liability Insurance:
Limits of Liability for and injury to one person in any single occurrence of not less than $350,000 and for any injury to two or more…