This is a bid document for a road construction project administered by the State of Michigan for a Local Agency in St. Clair County. The project involves 1.14 miles of roundabout construction on Krafft Road from State Road to Parker Road, including hot mix asphalt base crushing, shaping, and resurfacing, trenching, drainage improvements, concrete paving, curb and gutter installation, and pavement markings. The project was advertised on August 7, 2026, with a letting scheduled for 10:30 AM local time at 425 W. Ottawa Street, Lansing, Michigan 48933. The estimated project completion date is May 28, 2027, and bid documents include approximately 48 pages of plans available for online examination.
The project carries a required Disadvantaged Business Enterprise (DBE) participation goal of 6.00% and no Small Business Program (SBP) participation requirement. Prime contractors must be prequalified in classification 1358 Cb or 1358 Ea, and if not prequalified in subclassifications Cb, Ea, and K, they must designate prequalified subcontractors prior to contract award. The call number is 025, the contract ID is 77000-214601, the project number is 26A0826 with federal project number 215207ACRU, and an alternate control section number 77000 26A0810 is referenced. Bidders are required to provide guaranty information as specified in the proposal documentation.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Letting of: 260904
10:30 AM, Local Time 425 W. OTTAWA ST., LANSING, MI 48933
Call Number Contract ID Control Section Project Number Federal Project Number
025 77000-214601 214601ASTUL 77000 26A0826
215207ACRU 77000 26A0810
Description: 1.14 mi of construction of a roundabout including hot mix asphalt base crushing, shaping, and resurfacing, trenching, drainage improvements, concrete paving, curb and gutter, and pavement markings on Krafft Road from State Road to Parker Road, St. Clair County. This is a Local Agency project.
Required DBE Participation: 6.00%
Required SBP Participation: 0.00%
Net Classification Required For This Project: ** 1358 Cb or 1358 Ea **
Estimated Pages For Plans: 48
Completion Date: 5/28/2027
12:00:00 AM
In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Cb, Ea and K. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder.
Date Advertised: 8/7/2026
See proposal for bidder guaranty information.
Proposal and plans, if applicable, are available for examination online at <http://mdotcf.state.mi.us/public/eprop/login/index.cfm>
Notice of Advertisement Report v1
AASHTOWare Project™ Version 5.04.04 Revision 047
File details come from the government source that posted it. Updated .