biddoc.pdf
PDF 4 MB Posted
- Attached to
- North Delta Waterline Replacement
- Solicitation number
- 2026-11
- Issued by
- Eagle County, Denver City, Colorado
About this file
This is an Invitation for Bids (IFB) issued by the City of Delta, Colorado Administration Department for the North Delta Waterline Replacement project (Bid #2026-11). The project consists of excavation and installation of a new 12-inch diameter PVC water main extending approximately 740 linear feet north from Ute Street to an existing junction along the northbound side of Highway 50, south of the Gunnison River bridge crossing. The scope includes all labor, materials, equipment, traffic control, and incidentals necessary for installation in accordance with City of Delta standards, CDOT requirements, and applicable federal, state, and local regulations. The contractor must also abandon the existing water main in place upon successful completion and activation of the new line. A mandatory pre-bid meeting is scheduled for July 13, 2026, at 10:00 a.m. MST at City Hall (360 Main Street, Delta, CO 81416), with virtual attendance available via Google Meet. The question deadline is July 15, 2026, at 4:00 p.m. MST, with written responses posted as addenda by July 16, 2026. Sealed bids must be submitted electronically to lindsay@cityofdelta.net by July 22, 2026, at 11:00 a.m. MST, with public bid opening occurring at the same date and time in the City Hall conference room. The project completion deadline is December 15, 2026, weather permitting.
Bids exceeding $50,000 require bid security equal to at least 5 percent of the bid amount via certified check or bid bond, forfeitable if the bidder fails to execute a contract within 15 days of acceptance. The award will be made to the lowest responsible bidder based on evaluation criteria including pricing (1-10 points), experience and qualifications (1-10 points), understanding of the project (1-10 points), and references (1-10 points), for a maximum of 50 points. The City offers a local contractor preference of 5 percent for vendors with principal places of business within the City of Delta and 2.5 percent for those within Delta County, provided quality, delivery, and service are judged essentially equal. The successful contractor must furnish performance and payment bonds equal to the full bid amount and provide proof of general liability and workers' compensation insurance. All pricing must be lump sum and include permits, insurance, supervision, equipment, mobilization, materials testing, and site restoration. The City of Delta is exempt from Colorado State Sales and Use Taxes, and bidders should not include such taxes in their proposals. Davis-Bacon prevailing wage requirements apply to the project, with specific wage rates established for various classifications in Delta County and surrounding Colorado counties.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Delta Administration Department 360 Main Street Delta, CO 81416
INVITATION FOR BIDS
NORTH DELTA WATERLINE REPLACEMENT - BID #2026-11
Issue Date: July 2, 2026 Agent/Contact: Justin Parker, justinp@cityofdelta.net Submissions must be received by: July 22, 2026 at 11:00 am (MST)
Introduction:
The City of Delta is accepting sealed bids for the replacement of the North Delta waterline.
Administrative Instructions:
Bids shall be submitted electronically to lindsay@cityofdelta.net. All electronic submissions must be ADA-compliant and are subject to the Colorado Open Records Act. All bids are to be submitted on a single PDF document and include only the bid form and supporting documents.
Bids will be publicly opened at 11:00 am (MST) on July 22, 2026, in the City of Delta Conference Room located on the ground floor of City Hall. LATE BIDS WILL NOT BE ACCEPTED AND IT
IS THE RESPONSIBILITY OF THE RESPONDENT TO ENSURE THAT BIDS (INCLUDING
SIGNED ADDENDA IF ISSUED) ARRIVE BY 11:00 AM (MST) ON July 22, 2026.
Complete bid packets can be downloaded from the City webpage at City of Delta RFP. ADDENDA
WILL BE POSTED TO THE WEBSITE, AND IT IS THE BIDDER’S RESPONSIBILITY TO
DOWNLOAD, REVIEW, SIGN, AND INCLUDE ADDENDA WITH THEIR BID.
The City reserves the right to amend this IFB by an addendum at any time prior to the date set for receipt of bids. Addenda will be posted on the City website under the “Bids and RFP” tab at City of Delta RFP.
Refer to the 2026 RFP Contracts to review the contract applicable to this bid.
The City reserves the right to reject any or all bids without disclosing the reason, to waive any informalities in the bids received, and to accept the bid deemed most advantageous and in the best interest of the City.
mailto:justinp@cityofdelta.net mailto:lindsay@cityofdelta.net https://www.cityofdelta.net/rfps https://www.cityofdelta.net/rfps https://drive.google.com/drive/u/0/folders/1ZNzZ3muhccFgBVQNTX2hT58yd-m6_shr
SCOPE OF WORK
This project consists of the excavation and installation of a new 12-inch water main beginning at Ute Street and extending approximately 740 linear feet north to the existing junction located along the northbound side of Highway 50, south of the Gunnison River bridge crossing, in accordance with the provided construction plans and City of Delta standards. Work shall include all labor, materials, equipment, and appurtenances necessary to complete the installation. The existing water main shall be abandoned in place upon successful completion and activation of the new line.
The selected contractor shall furnish all labor, materials, equipment, traffic control, and incidentals necessary to complete the project in accordance with the City of Delta Specifications and Standards, applicable CDOT requirements, and all governing federal, state, and local regulations
GENERAL TERMS AND CONDITIONS
These General Terms and Conditions apply to all offers made to the City of Delta (hereafter “City”) by all prospective vendors (hereinafter referred to as “Bidder”) regarding City solicitations, including but not limited to Invitations to Bid, Requests for Proposals, Requests for Quotes, and Requests for Qualifications. The following "Project Special Conditions" shall govern in case of any discrepancies in any or all of the following specifications, and the intent, either expressed or implied in these General Terms and Conditions, shall govern in the interpretation of the plans and specifications.
Contents of Bid
It is the responsibility of each Bidder before submitting a Bid to: (a) Examine the Contract Documents thoroughly, (b) Visit the site(s) to become familiar with local conditions that may affect the cost, progress, performance, or furnishing of the Work, (c) Consider federal, state, and local Laws and Regulations that may affect cost, progress, performance, or furnishing of the Work, (d) Study and carefully correlate Bidder's Observations with the Contract Documents, and (e) Notify City Engineer/Project Manager of all conflicts, errors, or discrepancies in the Contract Documents.
Bidders are responsible for confirming and verifying all project lines, grades, dimensions, specifications, plans, and project areas prior to submitting a bid.
Complete sets of Bidding Documents must be used in preparing Bids. The Owner does not assume any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
Clarification and Modification of Bid Solicitation
Interpretations or clarifications considered necessary by the Engineer in response to such questions will be issued by Addenda and posted to the City webpage. Questions must be submitted in writing to Justin Parker (justinp@cityofdelta.net) Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Addenda may also be issued to modify the Bidding Documents as deemed advisable by the City. The City reserves the right to amend this IFB by an addendum at any time prior to the date set for receipt of bids. ADDENDA WILL BE POSTED ON THE CITY WEBSITE UNDER
THE NEWS “RFP” TAB AT CITY OF DELTA RFP.
Pricing Collusion and Taxes
All lump sum, alternate, and unit prices must include all required General Conditions line items necessary to complete the Work, including but not limited to the following (as required): all permits, insurance, supervision; layout and survey as needed; equipment and personnel; off-site management and administrative assistance; trash removal/demo material disposal/haul off to a separate dumpster or off-site location; miscellaneous equipment; mobilization; as-built drawings;
mailto:justinp@cityofdelta.net fuel, watchmen, flagmen, and site security; scheduling; small tools; drawings and printing expenses, and mailing costs.
The City is exempt from Colorado State Sales and Use Taxes on materials and equipment to be incorporated in the work. Said taxes shall not be included in the bid price.
Preparation and Submission of Bid
The Bid Form is included with the Bidding Documents; additional copies may be obtained on the City of Delta website at City of Delta RFP.
Bids by corporations must be executed in the corporate name by the president or a vice president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
Bids by partnerships must be executed in the partnership name and signed by a partner whose title must appear under the signature and the official address of the partnership must be shown below the signature. All names must be typed or printed below the signature.
The Bid shall contain an acknowledgment of receipt of all Addenda, if applicable, on the Bid Form.
The address and telephone number for communications regarding the Bid must be shown.
Bid Security
All bid submissions for more than $50,000 shall include bid security in an amount equal to at least five percent (5%) of the amount of the bid. Bid security shall be accompanied by a certified check or bid bond equal to five percent (5%) of the bid amount, which shall also be enclosed within a sealed envelope, to be forfeited to the City if a bid is accepted and the bidder fails to sign a contract within fifteen (15) days of acceptance; provided, however, that this deadline may be extended by the Purchasing Agent in their discretion. All bids submitted without the necessary bid security will be rejected as nonresponsive
Modification of Withdrawal of Legitimate Offers
Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the Opening of Bids.
If within twenty-four (24) hours after Bids are opened any Bidder files a duly signed written notice with City and Engineer and promptly thereafter demonstrates to the reasonable satisfaction of City and Engineer that there was a material and substantial mistake in the presentation of its Bid, that Bidder may withdraw its Bid.
No bids may be withdrawn after the opening of bids without consent of the City of Delta for a period of sixty (60) days after the scheduled time of opening of bids. The successful bidder or bidders will be required to furnish satisfactory performance and payment bonds equal to the full amount of each bid or proposal
Evaluation of Offers and Criteria
City reserves the right to reject any and all Bids, to waive any and all informalities not involving price, time, or changes in the work, and the right to disregard all nonconforming, nonresponsive, unbalanced, or conditional Bids. Also, City reserves the right to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by City. Discrepancies in the multiplication of units of Work and unit prices will be resolved in favor of the unit prices.
Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
In evaluating Bids, City will consider the qualifications of the Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data as may be requested herein and/or in the Bid Form or prior to the Notice of Award.
City will consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations through the request of written documentation of relevant experience with reference to a minimum of three (3) projects of similar scope and size. The statement shall include equipment and manpower available for utilization on the project. City also may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.
The City reserves the right to reject any or all proposals without disclosing the reason, to waive any information in the proposals received, and to accept the proposal deemed most advantageous and in the best interest of the City. The City will refer to the Evaluation Guide below in evaluating each Bidder. The criteria below will be weighted in the evaluation of the bids accordingly. Although some of the elements listed below will be weighted more heavily than others, all requirements are considered necessary for evaluation.
City of Delta Request for Proposals Evaluation Guide
Assessment Criteria
Pricing (1-10 points)
Experience and Qualifications (1-10 points)
Understanding of the Project (1-10 points)
Reference (1-10 points)
Total Maximum Points (Total Points - 50)
Award of Contract
When the City gives a Notice of Award to the successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within ten business days thereafter, Contractor shall sign and deliver the required number of counterparts of the Agreement and attached documents to the Owner with the required Bonds. The City shall deliver one fully signed counterpart to the Contractor after approval by City Council at the next regularly scheduled meeting.
If the contract is to be awarded, it will be awarded to the lowest Bidder whose evaluation by City indicates that the award will be in the best interests of the Project.
Local Contractor Preference
Whenever competitive bidding is required by law for any contract involving materials, services, and/or labor furnished to the City for which appropriation or expenditure may be reasonably expected not to exceed five hundred thousand dollars ($500,000) in the aggregate for any fiscal year, preference shall be given to each qualified local business in the manner more particularly described in this Section.
A qualified local business means an individual or entity who, at the time of submitting a bid for a contract relating to a City of Delta purchase or work project, maintains a principal place of business located within the City for primary preference or within Delta County for secondary preference. Businesses which maintain satellite offices within the City shall not be considered local for purposes of this definition.
Notwithstanding other provisions of this Chapter, in the course of evaluating bids or proposals pertaining to any contract for the purchase or lease of supplies, materials, equipment, or other personal property, and/or any contract for labor to be performed on a public works project, and/or any professional services contract, the City shall provide the following percentage preferences for local goods and services provided by local vendors when quality, delivery time, and services are judged by the Purchasing Agent to be essentially equal: five percent (5%) primary preference for goods/services in the City and two point five percent (2.5%) secondary preference for goods/services in Delta County.
Each otherwise eligible contract bidder must sufficiently demonstrate ownership of a qualified local business in the related bid proposal documents.
When applying this provision to specific contract settings, the City will continue to give appropriate consideration and weight to all other relevant information and factors customarily used for comparison of bids in the process of selecting the lowest responsible bidder, including but not limited to the following:
● The relative quality of any proposed material items and their conformity with pertinent contract specifications.
● The relative benefit to the City of proposed delivery and discount terms and conditions, and proposed terms of warranty and repair for material items.
● The overall experience, qualification, and reputation of the bidder for performance of similar contracts.
SPECIAL TERMS AND CONDITIONS
IFB Package: Available July 2, 2026, online at the City of Delta RFP web page City of Delta RFP.
Mandatory Meeting: There will be a mandatory meeting on July 13, 2026, at 10:00 am (MST).
The mandatory meeting will be held at City Hall located at 360 Main Street, Delta, CO 81416.
Google Meet joining info Video call link: https://meet.google.com/frv-vntt-ewd Or dial: 2805-462-(US) +1 440 PIN: 561 359 463#
Question Deadline: July 15th, 2026, at 4:00 pm (MST). All questions regarding this IFB are to be emailed to justinp@cityofdelta.net. Any questions received after the deadline will not be addressed. Written responses to questions will be posted on the City webpage via addendum no later than July 16th, 2026, at 4:00 pm (MST).
Bid Submission Cut-Off: July 22, 2026, at 11:00 am (MST). All bids shall be submitted electronically via email to lindsay@cityofdelta.net. The subject line must state “BID ENCLOSED
– NORTH DELTA WATERLINE”. Do not include any bid information in the body of the email. All bids to be submitted in a single PDF document.
Public Bid Opening: Bids will be opened publicly on July 22, 2026, at 11:00 am (MST) in the downstairs conference room of Delta City Hall at 360 Main Street, Delta, CO 81416.
Rejection of Bids: The City of Delta reserves the right to reject any or all bids without disclosing the reason.
Late Bids: Bids not received by the Bid Submission deadline of July 22, 2026, at 11:00 am (MST) are late and will not be accepted. The City Council reserves the right to reject any or all bids, waive any informalities in bids, and accept the bid that is in the best interest of the City of Delta, Colorado.
Compliance with OSHA
Bidder agrees that all item(s) offered comply with all applicable Federal and State Occupational Safety and Health Act laws, standards, and regulations, and that Bidder will indemnify and hold the City of Delta harmless for any failure to so conform.
https://meet.google.com/frv-vntt-ewd mailto:justinp@cityofdelta.net mailto:lindsay@cityofdelta.net
BID FORM
PROJECT IDENTIFICATION: North Delta Waterline Project
Bid Submission Cut-Off: July 22, 2026, at 11:00 am (MST). All bids shall be submitted electronically via email to lindsay@cityofdelta.net, must be ADA-compliant, and are subject to the Colorado Open Records Act and must be submitted as one single PDF document.
Public Bid Opening: July 22, 2026, at 11:00 am (MST) at the City of Delta City Hall, 360 Main Street, Delta, CO 81416.
Name of Vendor: __________________________________________________________
Total Bid Amount: $ ________________________________________________________
Total Written Bid Amount: ____________________________________________________
Estimated Start Date: _______________________________________________________
SUBMITTED on: _______________________________________________________ 2026
End Bid Form
BID REQUIREMENTS:
BID SECURITY: All bid submissions for more than $50,000 shall include bid security in an amount equal to at least five percent (5%) of the amount of the bid.
SUBCONTRACTOR LIST: The bid must include a list of all subcontractors who will be performing work on the project, along with their qualifications and experience.
REFERENCES: The bid must include 3 references of equal type and scope within the past 3 years.
PROJECT SCHEDULE: The bid must include a proposed project schedule, detailing the timeline for completion of the work.
REQUIREMENTS AFTER CONTRACT AWARD:
PERFORMANCE AND PAYMENT BONDS: The successful bidder must furnish satisfactory performance and payment bonds equal to the full amount of each bid or proposal.
INSURANCE REQUIREMENTS: The successful bidder must provide proof of insurance coverage, including general liability and worker's compensation, as specified in the procurement code.
mailto:lindsay@cityofdelta.net
Reference Sheet
North Delta Water Line Replacement 2026
Scope of Work:
This project consists of the excavation and installation of a new 12-inch water main beginning at Ute
Street and extending approximately 740 linear feet north to the existing junction located along the northbound side of Highway 50, south of the Gunnison River bridge crossing, in accordance with the provided construction plans and City of Delta standards. Work shall include all labor, materials, equipment, and appurtenances necessary to complete the installation, including:
The existing water main shall be abandoned in place upon successful completion and activation of the new line.
The selected contractor shall furnish all labor, materials, equipment, traffic control, and incidentals necessary to complete the project in accordance with the City of Delta Specifications and Standards, applicable CDOT requirements, and all governing federal, state, and local regulations.
** The design plans provided in the RFP are subject to change.
Contractor is responsible for providing the following:
Attend pre-construction meeting – project manager and site superintendent must be present
Provide written Project Work Plan
Excavating and installation of approximately 740’ of new 12” C900 DR-18 PVC with tracer wire
Provide minimal disruption to water service
Connection of one (1) existing 3/4-inch residential service line.
Installation of one (1) Cross fitting 3 pack at Ute Street with necessary fittings
Installation of five (5) 12-inch water valves
Trenches excavated involving asphalt cuts shall be saw cut with uniform edges.
Additional material items may be needed to complete the project as determined in the field.
Disinfection and pressure testing
Contractor is responsible for identifying all utility conflicts
Contractor to provide Compaction Testing per City Standards every 100’ (where required)
Provide Stormwater plan
Provide Dewatering if needed
Must maintain road patch until project is complete - Dust control and sweeping during project
Must provide continued access to 650 N Main St. VM West through the project and schedule disruptions. Contractor must also provide a climate-controlled restroom trailer for this location.
Confirm pipe material on the north tee tie-in
All landscaping, fencing, and concrete shall be restored to their original condition.
Installed hydrants must be Kennedy hydrants.
Contractor shall one (1) Tee fitting 3 pack at north end of project with necessary angled fittings to connect to existing water lines as determined in the field
Tracer wire to be installed the length of the installation, including valve boxes and fire hydrants
Pressure testing, disinfection, and commissioning of the new water main as required by City of
Delta standards.
Work will be conducted Monday through Friday, with all streets being reopened to local or residential traffic by 5:00 pm on the days of closures
It will be the Contractor’s responsibility to prepare a daily report of the work accomplished to the City’s Project Manager on a weekly basis.
Project map and bid tab are located in the bid package.
Project shall be completed by December 15, 2026 (subject to change, weather permitting)
Work within CDOT right-of-way shall comply with all applicable CDOT standards, including requirements for backfill, compaction, traffic control, and roadway surfacing.
"General Decision Number: CO20260003 05/18/2026
State: Colorado
Construction Types: Heavy
Counties: Colorado Counties of Alamosa, Archuleta, Baca, Bent, Chaffee, Cheyenne, Clear Creek, Conejos, Costilla, Crowley, Custer, Delta, Dolores, Eagle, Elbert, Fremont, Garfield, Gilpin, Grand, Gunnison, Hinsdale, Huerfano, Jackson, Kiowa, Kit Carson, La Plata, Lake, Las Animas, Lincoln, Logan, Mineral, Moffat, Montezuma, Montrose, Morgan, Otero, Ouray, Park, Phillips, Pitkin, Prowers, Rio Blanco, Rio Grande, Routt, Saguache, San Juan, San Miguel, Sedgwick, Summit, Teller, Washington and Yuma
Modification Number Publication Date 0 01/02/2026 1 05/18/2026
ELEC0012-006 09/01/2025
Rates Fringes
ELECTRICIANS (ALAMOSA, ARCHULETA, BACA, BENT,
CHAFFEE, CONEJOS, COSTILLA, CROWLEY, CUSTER,
FREMONT, HUERFANO, KIOWA, LAS ANIMAS, MINERAL,
OTERO, PROWERS, PUEBLO, RIO GRANDE, SAGUACHE
COUNTIES)...........................................$ 35.40 16.06
ELEC0068-011 06/01/2025
Rates Fringes
ELECTRICIAN (CLEAR CREEK, EAGLE, GILPIN, GRAND,
JACKSON, LAKE, LOGAN, MORGAN, PHILLIPS, SEDGWICK,
SUMMIT, WASHINGTON AND YUMA COUNTIES)...............$ 46.80 19.53
ELEC0111-002 09/01/2025
Rates Fringes
LINE CONSTRUCTION: LINEMAN AND WELDER...............$ 61.36 14.88
LINE CONSTRUCTION: LINE EQUIPMENT OPERATOR..........$ 44.27 9.41
LINE CONSTRUCTION: GROUNDMEN........................$ 27.39 5.82
ELEC0111-008 01/01/2025
Rates Fringes
ELECTRICIAN (DELTA, GARFIELD, MONTROSE, AND RIO
BLANCO COUNTIES IN COLORADO.).......................$ 31.75 13.25
ELEC0111-010 01/01/2025
Rates Fringes
ELECTRICIAN (DOLORES, GUNNISON, HINSDALE, LA PLATA,
MOFFAT, MONTEZUMA, OURAY, PITKIN, ROUTT, SAN JUAN
AND SAN MIGUEL COUNTIES IN COLORADO.)..............$ 36.95 14.41
ELEC0113-004 06/01/2025
Rates Fringes
ELECTRICIAN (CHEYENNE, ELBERT, KIT CARSON, LINCOLN,
PARK AND TELLER COUNTIES)...........................$ 40.70 18.47
ENGI0009-004 05/01/2024
Rates Fringes
POWER EQUIPMENT OPERATORS: TRACKHOE.................$ 35.20 15.20
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED,
RUBBER TIRES UNDER 5 TONS...........................$ 34.58 15.20
POWER EQUIPMENT OPERATORS: ROLLER: SELF-PROPELLED,
ALL TYPES OVER 5 TONS...............................$ 35.03 15.20
POWER EQUIPMENT OPERATORS: MOTOR GRADER:
BLADE-ROUGH.........................................$ 35.03 15.20
POWER EQUIPMENT OPERATORS: MOTOR GRADER:
BLADE-FINISH........................................$ 35.58 15.20
POWER EQUIPMENT OPERATORS: MECHANIC.................$ 35.58 15.20
PLUM0003-003 06/01/2024
Rates Fringes
PLUMBER (CLEAR CREEK, GILPIN, GRAND, JACKSON, LAKE,
LOGAN, MORGAN, PHILLIPS, SEDGWICK, SUMMIT,
WASHINGTON, AND YUMA. PARTS OF ELBERT, EAGLE, KIT
CARSON, LINCOLN, AND PARK COUNTIES).................$ 50.68 20.15
PLUM0058-010 07/01/2024
Rates Fringes
PLUMBER (ALAMOSA, BACA, BENT, CHAFFEE, CHEYENNE,
CONEJOS, COSTILLA, CROWLEY, CUSTER, ELBERT
(SOUTHERN PORTION INCLUDING TOWNS OF ELBERT,
MATHERSON AND SIMLA), FREMONT, HUERFANO, KIOWA, KIT
CARSON (INCLUDING TOWNS OF DFALGLER, SIEBERT, VONA,
STRATTON AND BETHUNE), LAS ANIMAS, LINCOLN
(INCLUDING TOWNS OF GEONA AND ARRIBA IN THE
SOUTHERN PORTION OF THE COUNTY), MINERAL, OTERO,
PARK (INCLUDING TOWNS OF FAUPLAY, HARTSEL AND LAKE
GEORGE), PROWERS, PUEBLO, RIO GRANDE, AND SAGUACHE
COUNTIES)...........................................$ 45.90 17.17
PLUM0058-012 07/01/2024
Rates Fringes
PLUMBER: INCLUDES HVAC WORK (TELLER COUNTY).........$ 45.90 17.17
PLUM0145-004 07/01/2025
Rates Fringes
PLUMBER (ARCHULETA, DELTA, DOLORES, EAGLE (EAGLE
COUNTY IS DIVIDED FROM WHERE PITKIN AND LAKE
COUNTIES JOIN ON THE NORTH, AND IN A STRAIGHT LINE
TO AND INCLUDING THE TOWN OF EDWARDS AND NORTHERLY
TO THE SOUTH EAST CORNER OF ROUTT COUNTY),
GARFIELD, GUNNISON, HINSDALE, LA PLATA, MOFFAT,
MONTEZUMA, MONTROSE, OURAY, PITKIN, RIO BLANCO,
ROUTT, SAN JUAN AND SAN MIGUEL COUNTIES)............$ 41.32 16.01
SUCO2001-005 12/20/2001
Rates Fringes
POWER EQUIPMENT OPERATORS: FRONT END LOADER.........$ 15.86 3.59
POWER EQUIPMENT OPERATORS: BULLDOZER................$ 15.08 4.44
POWER EQUIPMENT OPERATORS: BOBCAT/SKID LOADER.......$ 20.22 4.41
POWER EQUIPMENT OPERATORS: (EXCAVATOR)..............$ 15.39 0.00
POWER EQUIPMENT OPERATORS: (BACKHOE)................$ 15.93 3.58
PIPEFITTER..........................................$ 18.13 1.84
LABORER, COMMON.....................................$ 11.11 3.80
CEMENT MASON/CONCRETE FINISHER......................$ 14.76 2.28
CARPENTERS: FORM BUILDING AND SETTING...............$ 16.16 0.82
CARPENTERS: ALL OTHER WORK..........................$ 15.72 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.65 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract from May 11, 2026, through December 31, 2026. The applicable Executive Order minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than �SU�, �UAVG�, �SA�, or �SC� denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The �SU� identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
�SU� wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The �SA� identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the �SA� identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
W
WW
W
W
DELTA, COLORADO
PROJECT LOCATION
VICINITY MAP
NO SCALE
KLJ PROJECT NO. 2304-00573
NORTH DELTA WATER LINE EXTENSION
CITY OF DELTA
DELTA, COLORADO
FEBRUARY 2025
100% BID SET
OWNER
CITY OF DELTA
360 MAIN STREET
DELTA, COLORADO 81416
PH: 970.874.7566
FAX: 970.874.8776 N
O R
TH
D
EL
TA
W
AT
ER
L
IN
E
EX
TE
N
SI
O N
INDEX OF SHEETS
1 COVER
2 - 4 GENERAL NOTES
5 LEGEND AND ABBREVIATIONS
6 PROJECT CONTROL LAYOUT
7 PLAN AND PROFILE - STA 1+00 TO STA 4+50
8 PLAN AND PROFILE - STA 4+50 TO STA 7+98.53
9 ENGINEERING GEOLOGY
10 DETAILS - THRUST BLOCKS
11 DETAILS - RESTRAINTS
12 DETAILS - VALVES
13 SWMP AND ACCESS PLAN
FOR BID - NOT FOR CONSTRUCTION © KLJ ENGINEERING LLC 2025 Feb 20, 2025 - 10:07am - K:\Projects\City\CO\Delta\2304-00573_NDeltaWLExt\CAD\Design\Plans\2023_2304-00573_Cover.dwg (Cover)
STATE OF COLORADO
PROJECT LOCATION
UTILITY CONTACTS
UTILITY
COMPANY UTILITY CONTACT INFORMATION
CITY OF DELTA JUSTIN PARKER - PUBLIC WORKS MANAGER
PHONE: 970-874-7913 EMAIL: JUSTINP@CITYOFDELTA.NET
DELTA MONTROSE
ELEC & FIBER
UTILITIES
SHELBY BEAR P.E. - SYSTEM DESIGN SUPERVISOR
PHONE: 970-240-1238 EMAIL: SHELBY.BEAR@DMEA.COM
BLACK HILL ENERGY
DISTRIBUTION
PAUL FICKLIN- UTILITY CONSTRUCTION MANAGER
PHONE: 720-596-1122 EMAIL: PAUL.FICKLIN@BLACKHILLSCORP.COM
PHONE: 720-808-5042
CENTURYLINK /
LUMEN
AL PEREZ - LUMEN ENGINEER EMAIL: AL.PEREZ1@LUMEN.COM
KENNETH MILLER EMAIL: KENNETH.MILLER@LUMEN.COM
CLEARNETWORX DAVID SNEESBY - OSP GIS SPECIALIST
PHONE: 970-576-4554 EMAIL: DAVIDS@DEEPLYDIGITAL.COM
ENGINEER
KLJ ENGINEERING LLC
1601 RIVERFRONT DRIVE, SUITE 204
GRAND JUNCTION, CO 81501
PH: 970.450.7474
www.kljeng.com
US
-H
W Y
CO-H
WY 92
GUNNISON
RIVER DR.
UTE ST.
02/20/2025
PROJECT CONTACTS:
OWNER: CITY OF DELTA
OWNER PM: DAVE HOOD, PE
PHONE: 970-874-7903 ext 222
EMAIL: DAVIDHOOD@CITYOFDELTA.NET
ENGINEER: KLJ ENGINEERING
ENGINEER OF RECORD: KATIE RADAVICH, PE
PHONE: 970-450-7488
EMAIL: KATIE.RADAVICH@KLJENG.COM
PROJECT STANDARDS AND SPECIFICATIONS:
1. THE INTENT OF THIS PROJECT IS TO REPLACE 12-INCH DIAMETER CAST IRON
WATER LINE WITH NEW PVC WATER LINE (12-INCH DIAMETER).
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CITY OF DELTA
STANDARDS AND SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF
PUBLIC IMPROVEMENTS (“OWNER STANDARDS”), DATED MAY 2010, AND AS
SUBSEQUENTLY REVISED AND IN ACCORDANCE WITH THE DRAWINGS AND
SPECIFICATIONS INCLUDED HEREIN.
3. IN SOME INSTANCES, REFERENCES ARE MADE TO COLORADO DEPARTMENT OF
TRANSPORTATION (CDOT) STANDARDS AND MATERIALS BOTH ON THESE
DRAWINGS AND WITHIN THE OWNER STANDARDS. THIS REFERENCE IS TO THE
CURRENT EDITION OF THE CDOT STANDARD SPECIFICATIONS FOR ROAD AND
BRIDGE CONSTRUCTION AND M&S STANDARD DRAWINGS.
4. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE CDOT STANDARD
CONSTRUCTION SPECIFICATIONS, DATED 2023, AND CDOT 2019 M&S STANDARD
DRAWINGS AS SUBSEQUENTLY REVISED AND IN ACCORDANCE WITH THE
DRAWINGS AND SPECIFICATIONS INCLUDED HEREIN.
5. THE CONTRACTOR SHALL HAVE IN THEIR POSSESSION AT ALL TIMES HARD
COPIES OF THE PROJECT DRAWINGS AND ALL REFERENCE DESIGN STANDARDS
AND SPECIFICATIONS
6. ORDER OF PRECEDENCE IN CASE OF CONFLICT BETWEEN THE DRAWINGS,
SPECIFICATIONS, OR OTHER DOCUMENTS SHALL BE (1) PROJECT DRAWINGS; (2)
PROJECT TECHNICAL SPECIFICATIONS; (3) OWNER STANDARDS; AND (4) CDOT
STANDARD SPECIFICATIONS AND DRAWINGS.
7. ALL ITEMS NOTED AS "INCIDENTAL" OR “NO SEPARATE PAY” WILL NOT BE
MEASURED AND PAID SEPARATELY. ALL COSTS FOR ITEMS NOTED AS
"INCIDENTAL" OR “NO SEPARATE PAY” SHALL BE INCLUDED IN OTHER RELATED
ITEMS OF WORK.
8. OWNER AND ENGINEER HAVE DONE THEIR BEST TO QUANTIFY ITEMS AND
PROVIDE BID ITEMS ACCORDING TO THE WORK. IF THERE ARE ITEMS NOT
IDENTIFIED IN THE BID FORM AND ARE RELATED TO OTHER ITEMS OF WORK,
CONTRACTOR SHALL ASSUME THESE COSTS ARE INCLUDED IN RELATED ITEMS
OF WORK AND WILL NOT BE PAID FOR SEPARATELY, EVEN IF THEY ARE NOT
IDENTIFIED AS "INCIDENTAL" OR "NO SEPARATE PAY". IF THERE ARE ITEMS THE
CONTRACTOR THINKS SHOULD BE INCLUDED IN THE BID FORM, HE/SHE SHALL
NOTIFY THE OWNER AND ENGINEER IN WRITING PRIOR TO THE BID OPENING
FOR CLARIFICATION AND POTENTIAL INCLUSION IN THE BID FORM. THIS
PROJECT HAS AN ALTERNATE BID FOR HDPE PIPE. THE CITY OF DELTA DOES NOT
HAVE A SPEC FOR THIS. THE SPEC FOR HDPE PIPE IS BELOW.
REQUIRED NOTIFICATIONS AND SUBMITTALS:
9. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY UTILITY SERVICE
OUTAGE(S) AT LEAST 48 HOURS PRIOR TO DISRUPTION OF SERVICE. ALL SERVICE
OUTAGES MUST BE APPROVED BY THE OWNER PRIOR TO DISRUPTION OF
SERVICE AND MAY REQUIRE WORKING ATYPICAL HOURS IN ORDER TO AVOID
DISRUPTING SERVICE DURING DAYTIME HOURS.
10. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ALL ROAD CLOSURES AND FIRE
HYDRANTS TO BE TAKEN OUT OF SERVICE AT LEAST 48 HOURS PRIOR TO THE
CLOSURE'S IMPLEMENTATION.
11. THE CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND ELEVATIONS PRIOR
TO START OF DEMOLITION OF EXISTING FACILITIES.
12. CONTRACTOR SHALL SUBMIT ANY CHANGE OR DEVIATION FROM THE PROJECT
DRAWINGS TO THE ENGINEER FOR APPROVAL PRIOR TO STARTING THE WORK.
13. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS AND/OR MANUFACTURER'S
TECHNICAL LITERATURE FOR ALL PROPOSED MATERIALS TO BE INCORPORATED
INTO THE PROJECT. THESE SHALL BE APPROVED IN WRITING BY THE OWNER OR
ENGINEER PRIOR TO ORDERING AND PLACEMENT/CONSTRUCTION.
14. THE CONTRACTOR SHALL RECORD PRECISE LOCATIONS AND ELEVATIONS OF ANY
VARIATIONS FROM THE DESIGN ON "AS-BUILT" DRAWINGS SHOWING THE
LOCATIONS AND DIMENSIONS OF ANY ELEMENT OF THE PROJECT THAT IS NOT
INSTALLED AS DESIGNED AND SHALL PROVIDE THAT INFORMATION TO THE
OWNER PRIOR TO RELEASE OF FINAL PAYMENT.
15. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL IDENTIFY DISPOSAL SITES
FOR ANY MATERIALS LEAVING THE PROJECT AREA. IF MATERIALS ARE BEING
TAKEN TO ANYWHERE BESIDES A REGISTERED LANDFILL OR GREEN WASTE
FACILITY, CONTRACTOR SHALL PROVIDE WRITTEN AGREEMENTS FROM
RECEIVING PROPERTY OWNER INDICATING THEIR ACCEPTANCE OF THE
MATERIAL AND ANY CONDITIONS FOR USE OF THEIR SITE. FOLLOWING PROJECT
COMPLETION, THE OWNER WILL ALSO REQUIRE WRITTEN VERIFICATION FROM
THE PROPERTY OWNER THAT THESE CONDITIONS WERE MET BEFORE
RETAINAGE IS RELEASED.
16. SHOULD HAZARDOUS MATERIALS BE ENCOUNTERED ON THE SITE, THE
CONTRACTOR SHALL LEAVE SUCH MATERIALS UNDISTURBED AND SHALL
CONTACT THE OWNER FOR DIRECTION REGARDING HANDLING AND DISPOSAL
OF THE MATERIALS.
17. ONCE MOBILIZED, THE CONTRACTOR SHALL ATTEND WEEKLY PROGRESS
MEETINGS WITH THE OWNER AND ENGINEER TO DISCUSS THE WORK PROGRESS
AND ANY OUTSTANDING ISSUES. AT A MINIMUM, THE CONTRACTOR'S SITE
SUPERINTENDENT AND REPRESENTATIVES FROM ANY SUBCONTRACTORS
PERFORMING WORK THAT WEEK SHALL ATTEND THIS MEETING.
18. A CHANGE ORDER SIGNED BY THE OWNER IS REQUIRED TO QUALIFY ANY EXTRA
WORK FOR EXTRA PAYMENT. THE CONTRACTOR SHALL NOTIFY THE OWNER IN
WRITING PRIOR TO STARTING ANY WORK THAT MAY QUALIFY AS A CHANGE
ORDER TO ALLOW THE OWNER/ENGINEER TO PROVIDE GUIDANCE. ANY EXTRA
WORK COMPLETED BY THE CONTRACTOR WITHOUT A SIGNED CHANGE ORDER
SHALL BE DEEMED TO HAVE BEEN COMPLETED FOR THE CONTRACTOR'S
CONVENIENCE AND SHALL NOT BE ELIGIBLE FOR EXTRA COMPENSATION.
SPECIAL INSPECTIONS AND TESTING:
19. SPECIAL INSPECTIONS SHALL BE PROVIDED BY THE OWNER AND/OR ENGINEER.
SPECIAL INSPECTIONS ARE REQUIRED FOR THE FOLLOWING WORK:
19.1. BOTTOM OF EXCAVATIONS FOR LINE, GRADE, AND CONDITION PRIOR TO
PLACEMENT OF BACKFILL
19.2. UTILITY INSTALLATIONS FOR LINE, GRADE, AND CONDITION PRIOR TO
PLACEMENT OF BACKFILL
19.3. THRUST BLOCKING, UTILITY CONNECTIONS/FITTINGS, AND HYDRANTS
19.4. PREPARED BASE COURSE AND SUBGRADE FOR LINE, GRADE, AND CONDITION
PRIOR TO PLACEMENT OF PAVEMENT OR CONSTRUCTION OF CURB AND
GUTTER, SIDEWALKS, OR DRIVEWAYS
19.5. ALL CONCRETE, FORMWORK, AND REINFORCING STEEL
19.6. THESE INSPECTIONS ARE PROVIDED FOR THE OWNER'S BENEFIT WITH THE
INTENT OF IDENTIFYING ANY PROBLEMS PRIOR TO CONSTRUCTION OF
PROJECT COMPONENTS. THE INSPECTIONS DO NOT RELIEVE THE
CONTRACTOR OF ANY LIABILITY FOR PROJECT QUALITY OR CONFORMANCE
WITH THE DRAWINGS.
20. MATERIALS TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE OWNER
STANDARDS BY AN INDEPENDENT COMPANY SUBCONTRACTED TO THE
CONTRACTOR. ALL MATERIALS TESTING SHALL BE PAID FOR BY THE
CONTRACTOR.
21. THE OWNER SHALL BE NOTIFIED IMMEDIATELY VIA PHONE AND EMAIL OF ANY
FAILING TESTS, INCLUDING, BUT NOT LIMITED TO, COMPACTION, CONCRETE AIR
CONTENT, CONCRETE SLUMP, ETC.
22. CONTRACTOR SHALL SUBMIT FORMAL QUALITY CONTROL REPORTS ON A
MONTHLY BASIS SUMMARIZING ALL TESTING PERFORMED DURING THE PERIOD,
IDENTIFYING ANY FAILED TESTS AND WHAT WAS DONE TO ADDRESS ANY
FAILURES, AND SUMMARIZING QUANTITIES/AREAS REPRESENTED BY THE
TESTING
23. CONTRACTOR IS RESPONSIBLE FOR TRACKING PROJECT QUANTITIES/AREAS AND
TO MAKE SURE THAT ALL REQUIRED TESTING IS BEING PERFORMED ACCORDING
TO OWNER STANDARDS AND MEETS REQUIRED MINIMUM TESTING
FREQUENCIES.
24. CONTRACTOR SHALL PROVIDE THE OWNER A MINIMUM 24-HOUR ADVANCE
NOTICE FOR ALL SPECIAL INSPECTIONS. DELAYS INCURRED BY FAILURE TO
PROVIDE THE PROPER ADVANCE NOTICE SHALL NOT BE THE BASIS FOR
ADDITIONAL PAYMENT.
GENERAL NOTES:
25. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE
SCOPE OF WORK SHOWN ON THE DRAWINGS OR DESCRIBED IN THE
SPECIFICATIONS IN A MANNER SATISFACTORY TO THE OWNER. UNLESS STATED
OTHERWISE, THE CONTRACTOR SHALL FURNISH ALL MATERIALS, EQUIPMENT,
TOOLS, LABOR, AND INCIDENTALS NECESSARY TO COMPLETE THE WORK.
26. WATER USED FOR THE PROJECT WILL NOT BE PAID FOR SEPARATELY BUT SHALL
BE INCLUDED IN RELATED ITEMS OF WORK.
27. ALL MATERIAL GENERATED WITHIN THE PROJECT LIMITS SHALL BE REMOVED
FROM THE PROJECT SITE AT NO COST TO THE PROJECT, UNLESS SPECIFIED BY
THE CONTRACT DOCUMENTS.
28. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ENSURING SAFETY AT THE JOB
SITE AND IS REQUIRED TO CARRY OUT ALL TASKS IN STRICT COMPLIANCE WITH
ALL APPLICABLE SAFETY REGULATIONS SET FORTH BY FEDERAL, STATE, AND
LOCAL AUTHORITIES INCLUDING OSHA.
29. EXISTING FIELD CONDITIONS MAY VARY FROM THE CONTRACT DOCUMENTS.
THE CONTRACTOR SHALL VERIFY ACTUAL FIELD CONDITIONS PRIOR TO
SUBMITTING BIDS FOR THE PROJECT.
30. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LINES, LEVELS, MATERIALS,
ETC. PRIOR TO THE START OF CONSTRUCTION AND SHALL NOTIFY THE ENGINEER
OF ANY DISCREPANCIES IN WRITING.
31. IN SOME CASES, THERE ARE AREAS OF THE SITE DEPICTED ON MORE THAN ONE
PAGE OF THE DRAWINGS AND ALL IMPROVEMENTS ARE NOT DEPICTED ON
EVERY PAGE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL PLAN
SHEETS AND SHALL BE RESPONSIBLE FOR ANY COSTS ASSOCIATED WITH TO
FAILURE TO REVIEW ALL PLAN SHEETS.
32. PROJECT ACCESS AND STAGING SHALL BE RESTRICTED TO THE LIMITS OF
DISTURBANCE AND EASEMENT AREAS IDENTIFIED ON THE DRAWINGS. ALL
ACCESS SHALL BE FROM OWNER PROPERTY OR RIGHT-OF-WAY, UNLESS
SPECIFICALLY NOTED OR APPROVED OTHERWISE.
33. CONTRACTOR SHALL PLACE TEMPORARY ORANGE CONSTRUCTION OR RIBBON
FENCING ALONG WORK EXTENTS WHERE IDENTIFIED IN THE DRAWINGS IN
ORDER TO DELINEATE ALLOWABLE WORK AREAS AND AVOID TRESPASS ONTO
NEIGHBORING LAND. FENCING SHALL BE REMOVED UPON SUBSTANTIAL
COMPLETION OF THE WORK. NO SEPARATE PAY FOR CONSTRUCTION FENCING
AND SHALL BE CONSIDERED SUBSIDIARY TO RELATED ITEMS OF WORK.
34. REMAINING AREAS BEYOND THOSE IDENTIFIED ON THE DRAWINGS TO RECEIVE
TEMPORARY RIBBON FENCING DO NOT NEED TO BE FENCED ALONG
DISTURBANCE LIMITS UNLESS CONTRACTOR IS UNABLE TO AVOID DISTURBANCE
BEYOND THESE LINES. IF CONTRACTOR ROUTINELY DISTURBS BEYOND THESE
LINES, THE OWNER MAY REQUEST THE ADDITION OF RIBBON FENCING AT THE
CONTRACTOR'S COST.
35. WATER SHALL BE USED AS A DUST CONTROL, WHERE REQUIRED. LOCATIONS
SHALL BE AS DIRECTED BY THE ENGINEER. WATER FOR DUST CONTROL WILL NOT
BE PAID FOR SEPARATELY BUT INCLUDED IN THE WORK.
36. THE CONTRACTOR SHALL PROVIDE A CERTIFIED SCALE AND CERTIFIED WEIGHER
AT THE POINT OF LOADING FOR ALL AGGREGATES AND WATER DELIVERED TO
THE PROJECT.
37. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DRAINAGE DURING
THE WORK. ANY REWORK OF MATERIALS DUE TO LACK OF THE MAINTENANCE
SHALL BE REPAIRED AT THE CONTRACTOR'S EXPENSE.
38. SANITARY FACILITIES SHALL BE LOCATED ON SITE AND SHALL BE FULLY
OPERATIONAL BEFORE CONSTRUCTION CAN BEGIN. SANITARY FACILITY PAY
ITEM SHALL INCLUDE CLEANING A MINIMUM OF ONCE PER WEEK. THIS WILL BE
SUBSIDIARY TO THE PAY ITEM FOR THE SANITARY FACILITY AND WILL NOT BE
PAID FOR SEPARATELY.
SHEET
ISSUE DATE
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - NOT FOR CONSTRUCTION © KLJ ENGINEERING LLC 2025 Feb 20, 2025 - 10:08am - K:\Projects\City\CO\Delta\2304-00573_NDeltaWLExt\CAD\Design\Plans\2023_2304-00573_GeneralNotes.dwg (2 GENERAL NOTES)
N O
R
TH
D
EL
TA
W
A
TE
R L
IN
E
EX
TE
N
SI
O N
C
IT
Y O
F D
EL
TA
D
EL
TA
, C
O
LO
R
AD
O
G
EN
ER
A
L N
O
TE
S
2304-00573
2/2025
KR
SAM
39. THE CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS
DESIGNATED TO REMAIN FROM DAMAGE DURING CONSTRUCTION
OPERATIONS. ANY MONUMENTS DISTURBED BY THE CONTRACTOR THAT ARE
NOT DESIGNATED FOR RELOCATION SHALL BE RESET AT THE CONTRACTOR'S
EXPENSE. THE CONTRACTOR SHALL NOTE THOSE MONUMENTS IN THE FIELD
PRIOR TO CONSTRUCTION.
40. THE CONTRACTOR SHALL REPAIR OR REPLACE AT THE CONTRACTOR'S EXPENSE
ANY EXISTING SIGNS DAMAGED BY CONTRACTOR.
41. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE QUALITY CONTROL
TESTING REQUIREMENTS OF THE OWNER. IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO CONTACT THE TESTING FIRM 24 HOURS IN ADVANCE OF
THE NEED FOR TESTING AND TO VERIFY THAT THE APPROPRIATE NUMBER OF
TESTS HAVE BEEN TAKEN. ALL FAILING TESTS SHALL BE PERFORMED UNTIL
PASSING RESULTS ARE OBTAINED. PAYMENT OF QUALITY CONTROL TESTING IS
THE CONTRACTOR'S RESPONSIBILITY AND SHALL NOT BE PAID FOR SEPARATELY
BUT SHALL BE INCIDENTAL TO THE WORK. THE OWNER WILL PROVIDE QUALITY
ASSURANCE TESTING, AS DEEMED NECESSARY BY THE OWNER.
42. MATERIALS FOR THE SUBBASE SHALL BE CDOT AGGREGATE BASE COURSE (ABC)
CLASS 6 AS SHOWN IN SUBSECTION 703.03 UNLESS SPECIFICALLY NOTED
OTHERWISE.
43. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE
OWNER OR THEIR ASSIGNED REPRESENTATIVE. THE OWNER AND THEIR
ASSIGNED REPRESENTATIVES RESERVE THE RIGHT TO ACCEPT OR REJECT ANY
SUCH MATERIALS AND WORKMANSHIP THAT DO NOT CONFORM TO THE
DRAWINGS AND SPECIFICATIONS LISTED HEREIN. REQUIRED QUALITY
CERTIFICATIONS AND DOCUMENTATION SHALL BE SUBMITTED TO THE OWNER
PRIOR TO PLACEMENT OR USE OF THE MATERIAL.
REMOVALS AND CLEARING
44. WHERE EXISTING ASPHALT PAVEMENT, CONCRETE PAVEMENT, OR CONCRETE
SIDEWALK IS TO BE REMOVED ADJACENT TO STRUCTURES. CONCRETE, OR
ASPHALT TO REMAIN, IT SHALL BE CUT FULL DEPTH TO A NEAT LINE. CONCRETE
REMOVALS SHALL BE TO THE NEAREST TOOL JOINT UNLESS NOTED OTHERWISE.
45. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF ALL MATERIALS
REMOVED FROM THE SITE IN ACCORDANCE WITH APPLICABLE WASTE
HANDLING AND DISPOSAL LAWS. THE COST FOR HAULING AND DISPOSAL OF
REMOVED MATERIAL SHALL BE INCLUDED IN THE UNIT PRICE FOR THE RELATED
BID ITEM UNLESS SPECIFICALLY NOTED OTHERWISE.
46. THE POTENTIAL EXISTS FOR BURIED RUBBLE (ASPHALT, CONCRETE, DEBRIS, ETC)
TO BE ENCOUNTERED WITHIN PROJECT EXCAVATIONS. IF ENCOUNTERED, THESE
MATERIALS SHALL BE SEGREGATED FROM EXCAVATED SOILS AND DISPOSED OF
AT THE LOCAL LANDFILL.
47. ALL PROJECT FOOTPRINT AND SPOIL FILL AREAS SHALL BE CLEARED AND
GRUBBED TO INCLUDE ALL SURFACE OBJECTS, TREES, ROOTS, STUMPS, AND
OTHER PROTRUDING OBSTRUCTIONS NOT DESIGNATED TO REMAIN. TOPSOIL
SHALL BE SEGREGATED, STOCKPILED, AND RESTORED FOLLOWING FINAL
GRADING PER RESTORATION SECTION. TREE STUMPS SHALL BE REMOVED OR
GRINDED TO AT LEAST TWO FEET BELOW EXISTING GROUND OR PROPOSED
SUBGRADE, WHICHEVER IS LOWER.
48. BURNING OF REMOVED MATERIAL WILL NOT BE ALLOWED WITHIN THE PROJECT
AREA. SHOULD BURNING BE UTILIZED FOR CLEARING AND GRUBBING
OPERATIONS OFF-SITE, THE BURN OPERATION SHALL BE PERMITTED WITH THE
LOCAL FIRE DISTRICT AND THE COLORADO DEPARTMENT OF PUBLIC HEALTH
AND ENVIRONMENT PRIOR TO IMPLEMENTATION. BURNING OPERATIONS
SHALL TAKE PLACE UNDER THE CONSTANT CARE OF THE CONTRACTOR AND
SHALL BE EXTINGUISHED DURING OFF-WORK HOURS.
EXCAVATION, BACKFILL, AND SPOILS
49. EXCAVATION SHALL BE UNCLASSIFIED EXCAVATION AND EMBANKMENTS WILL
BE PER THE DETAILS INCLUDED IN THE PLANS. EXCAVATION AND EMBANKMENT
SHALL BE CONSIDERED SUBSIDIARY TO RELATED ITEMS OF WORK AND NO
SEPARATE PAY.
50. CONTRACTOR SHALL USE VIBRATORY ROLLERS ON GRANULAR MATERIALS AND
SHEEPSFOOT ROLLERS ON COHESIVE SOILS. SHEEPSFOOT ROLLER SHALL BE OF
SIMILAR COMPACTIVE EFFORT TO A CAT CP74 OR LARGER.
51. MAXIMUM…