This is a Bidder Questions and Answers document for Michigan Department of Natural Resources RFP #250000002704 concerning tree and shrub control services at eight state parks. The solicitation involves invasive woody species removal across multiple treatment zones at Waterloo Recreation Area, Island Lake Recreation Area, Algonac State Park, Highland Recreation Area, and Watkins Lake State Park. Work includes various treatment techniques such as foliar herbicide applications, cut stump treatments, basal bark treatments, hand swiping, and forestry mowing. The document clarifies that contractors may propose multi-season treatment strategies, with DNR preferring foliar work completion by September 30, 2025, particularly at Waterloo and Island Lake, while other zones may extend to September 15, 2026, or March 1, 2026, depending on phenology and project phases. Specific target species include black locust, buckthorn, autumn olive, multiflora rose, honeysuckle, Siberian elm, and various other non-native invasive species, with zone acreages and species compositions detailed for each location.

The document establishes that herbicide selection should be specified by vendors in their proposals, with Garlon 4 Ultra designated for black locust foliar treatments and Milestone added or substituted in most zones at vendor discretion. Access and operational constraints include restrictions on UTV use in certain no-slop zones with high native plant diversity, requirements for hand-swiping or cone nozzle applications in sensitive areas, and protection protocols for planted native trees. Partial payments are permitted for quantifiable work completed during interim phases. The Q&A format indicates that prebid meetings were held at each location to discuss zone-specific completion deadlines, treatment preferences, and site conditions. DNR reserves flexibility regarding treatment seasonality and expects bidders to clearly identify pricing differences for work completed in different seasons or under different treatment sequences in their bid responses.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Michigan.gov/MiProcurement

BIDDER QUESTIONS & ANSWERS

RFP#250000002704

Tree and Shrub Control at 8 State Parks Bidders who have questions for the above Solicitation must fill the sections below and attach the document in an email to the Solicitation Manager, as described in the Instruction to Bidders.

Addendum

All Parks Section C

2. Techniques Pgs. 7-9 If contractor would like to include forestry mowing of a zone (or multiple zones) as part of their treatment in conjunction with foliar herbicide treatments and thus span multiple seasons, please provide this intent and proposed timeline in your proposal and it will be considered. Please note that foliar treatment before mowing is preferred in most cases. Including prices for different sequences of treatments is acceptable. Mowing and herbicide treatments should be separated for proper bid comparisons.

All Parks Section C

5. Results Pgs. 12-17 The deadline for work completion in any one treatment area is separate from and need not be the same as the other zones in the same bid line item (treatment zone groups).

All Parks Section C

3. Herbicides 3.d. For all black locust stems that are treated Pg. 10 Section 3.d. Garlon 4 Ultra is specified as the herbicide to be used when performing foliar treatments on black locust. In most zones, milestone should be added or substituted. Venders should put their preferred chemical mix in their proposal.

Section C

1. Park/Species /Treatment Waterloo Recreation Area Pg. 6 Treatment Zone A (site 52) All non-native invasive woody species are added as target species. In addition to those listed in the work statement Siberian elm and upright juniper are known to occur at the site. The boundary of this zone was modified to end at the tree line on the southwest edge. The polygon has been updated on the Web map. The new acreage is 14.25.

Treatment Zone 24-2 All non-native invasive woody species are added as target species. The most common species in this zone are black locust, juniper and autumn olive.

Section C

1. Park/Species /Treatment Island Lake Recreation Area

Pg. 5 All poplar and cherry trees under 20 feet were added as target species in treatment zones F, 8, 10, 14, 15, and 16.

All Parks (Q/A 1-3)

Q #
Document and Section
Page #
Bidder Question
Answer (to be completed by the State)
1
Section 5

Results

12
How do we know if a zone must be completed by September 30, 2025 or September 15, 2026?
A1: Bidder should make note on the bid response form in the Willing/Preferred Treatment Season column when they are willing and when they prefer to do the work each bid line item (i.e. by Sept 30; winter work; growing season 2026). Bidders should note in the discounts section if there is a price difference between the seasons they list. Further details can be written in the minimum/maximum section of their bid response form how many zones and/or what specific zones they are willing/able to complete by September 30, 2025 and what zones they and what zones they prefer to complete by September 15, 2026. Price discounts for doing work the following year (dormant season, growing season or some combination of the two) should be noted.

A2: It was explained at each prebid meeting that DNR expects to award some work to be completed by September 30, 2025. Our preferred zones/park were noted at each prebid meeting. It was also noted that DNR has flexibility of season with most parks and zones. Cut stump, frill, basil bark zones were noted at each location and can be done during dormant season. Island Lake numbered zones (follow up to land clearing) were noted as preferred to be treated in the current growing season. Likewise, all locust treatments at Waterloo were also noted that 2025 foliar treatments were preferred.

2
N/A
N/A
Will partial payments be made for work completed in 2025?
Yes, if significant and quantifiable work is completed by September 30 or during the winter but a bid line item is not 100% complete until growing season 2026 partial payments can be made.

All Parks (Continue Q/A 1-3)

Q#
Document and Section
Page #
Bidder Question
Answer (to be completed by the State)
3
Section 5

Results

12
Q. Completion dates - we assume zones can be completed when DNR think phenology will be best for kill rates, but did notice a general statement for completing certain zones "For some zones all treatments must be completed by September 30, 2025. For some zones treatments must be completed by March 1, 2026. Other zones may have the option to complete by September 15, 2026. Deadlines will be discussed at the respective prebid meetings." Vendor A didn't hear specific dates today, so if there are specific deadlines for sites in southeast MI, please let us know

DNR-PRD would like as much of the foliar work completed by sept 30, 2025, particularly at Waterloo and Island Lake so the next phase of work can be done over the winter. Bidders should submit their preferred strategy and seasonality of work in their bid. If there are cost differences between options you propose due to timing or strategies, they should be made clear in your bid response.

Questions regarding zone boundaries were asked and answered during each meeting.

Algonac State Park Q/A 1-3

Q #

Document and Section
Page #
Bidder Question

Answer (to be completed by the State)

Section 11

Creating brush piles versus scattering brush shall be as determined in section 3.iii.

Do we have to remove buckthorn biomass from the zones?

No, for foliar sprayed trees will be left standing dead. For cut stump treatments trees will either be left scattered on the ground or piled. See section 11 of the work statement for details on creating brush piles.

Section C

PARK / SPECIES / TREATMENT

Section 2 Techniques

7-9

Is foliar spray preferred for most treatment zones?

Yes. Zones 7 and 31 are most suitable for winter basal bark treatment.

Section 2 Techniques

v. Hand swiping

vi. Foliar Spray

Section 4 Adjuvants

Section 7

7-9

12-13

What are no slop areas?

No slop zones indicate areas of high native plant diversity where collateral damage is not acceptable. In these areas plants should be treated by hand swiping or cone nozzles on handheld/backpack sprayers. Areas within no slop areas that are monocultures of non- native species can be sprayed. Outside of no slop areas collateral damage should be kept to a minimum when most of the vegetation is native (see section 7 of the work statement).

Highland Recreation Area Q/A 1-5

Q #

Document and Section
Page #
Bidder Question

Answer (to be completed by the State)

Section C 3.Herbicides

Is it acceptable to use milestone within the dripline of an oak?
Yes
2
Section C

1.

Park/Species/Treatment

Can zones 8 and 9 be forestry mowed?

Yes but oak, hickory and fragrant sumac need to be avoided.

3
Section C

1.

Park/Species/Treatment

Is it expected that every stem of target species are found and treated in areas of dense native prairie plants (question asked in reference to bittersweet)?
No. Patches of target species should be found and treated but it is not expected for every individual stem.
4
Section C

1.

Park/Species/Treatment

What other species are expected in this zones?

Black locust and bittersweet are the two most common target species. Autumn olive, multiflora rose, honey suckle, and Siberian elm are also likely to occur.

5
Section C

1.

Park/Species/Treatment

Are all woody invasive species treatment targets in zone 9?
Yes

Island Lake Recreation Area Q/A 1-3

Q #

Document and Section
Page #
Bidder Question

Answer (to be completed by the State)

Section D. Description of treatment area DNR PRD Woody Contract hyper link

18
Why is zone G yellow on the map?

Zone G is a no-slop area. No-slop zones indicate areas of high native plant diversity where collateral damage is not acceptable. In these areas plants should be treated by hand swiping or cone nozzles on handheld/backpack sprayers. Areas within no slop areas that are monocultures of non- native species can be sprayed. Outside of no slop areas collateral damage should be kept to a minimum when most of the vegetation is native.

2
Section C.

2.Techniques

7-9
How should the locust in zone G be treated?

Due to the high density of native plants, much of the zone locust trees where this occurs may be cut stump treated as needed.

Can we use UTV’s within any/all zones?

UTV’s are allowed on designated trails for access and moving equipment/personal to and from zones. Additionally, if doing broad herbicide treatments UTV’s may be used within most zones (i.e. land clearing zones. UTV’s are not allowed in zones G, H or D.

Waterloo Recreation Area Q/A 1-4

Q #

Document and Section
Page #
Bidder Question

Answer (to be completed by the State)

Section C.

2.Techniques

Can drone spraying be used in zones with dense stands of locust even in tree planted zones?

Yes, drone spraying will be allowed in most zones. In zones where native trees have been planted hand spraying will be required where young trees are identified.

Are lingering black locust trees treatment targets?

Yes, any black locust trees that are lingering (showing any signs of resprouting and/or re-growth) need to be treated as well as resprouts.

Is there ATV access to the zones at the mine site?
Yes. ATVs will be allowed within the site to access most zones. Entrance points and routes will be decided by DNR project manager. No ATVs are allowed on slopes.
Are there any tree species that are desired at the mine site?
Yes, young native trees have been planted and need to be protected from drift. Poplar stands should also be avoided.

Watkins Lake State Park Q/A 1

Q #

Document and Section
Page #
Bidder Question

Answer (to be completed by the State)

Can brush hogging be used in place of cut stump treatment in Watkins Lake zone K?
No, due to the sensitive nature of the habitat work should be preformed by cut stumping.