This document is a Bid Worksheet for the Robbs Fording Road Project, PGC-440-21-01, issued by the Commonwealth of Pennsylvania Pennsylvania Game Commission. The project involves maintenance work on 0.39 miles of road at Crooked Creek Lake in Burrell Township, Armstrong County. The principal items of work include clearing, earthwork, pipe installation, drainage ditch work, and road base and surface material. The bid is due on March 2, 2022 at 2:00 P.M.

The estimated quantities for the various work items are provided, including the lengths and diameters of corrugated plastic pipes, volumes of bedding and backfill material, and areas of geogrid, geotextile, and seeding. Contractors are required to furnish all necessary materials, labor, and equipment to complete the project in a timely and workmanlike manner.

View the file

Other files

File Type Posted
Drawing 3.pdf PDF
BOP-2201 EO 2021-06 Worker Protection Form BOP 02072022 FINAL.pdf PDF
Electronic Bid Notice.pdf PDF
Drawing 1.pdf PDF
Specifications.pdf PDF
Drawing 2.pdf PDF
Terms_and_Conditions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMMONWEALTH OF PENNSYLVANIA

PENNSYLVANIA GAME COMMISSION

DESCRIPTION: Robbs Fording Road Project

PROJECT NO.: PGC-440-21-01

LOCATION OF WORK: SGL #440, Burrell Township, Armstrong County

DATE DUE: March 2, 2022 TIME: 2:00 P.M.

This project shall be known as PGC-440-21-01

The contractor agrees to furnish, deliver to the site, and use materials, water, tools, equipment, light, power, and to perform all labor, superintendence, and all means of demolition necessary to execute, construct and finish in an expeditious, substantial and workmanlike manner all the work necessary for maintenance of 0.39-miles of road at Crooked Creek Lake in

Burrell Township, Armstrong County. The principal items of work under this contract and estimated quantities are as follows:

1. Contract Bonds – Job

2. Clearing - Job

3. Earthwork – 1,233 Sy

4. Remove Existing Pipes – 6 Each

5. 18-inch Corrugated Plastic Pipe – 20 LF

6. 24-inch Corrugated Plastic Pipe – 160 LF

7. 30-inch Corrugated Plastic Pipe – 60 LF

8. Pipe Bedding and Backfill – 158 CY

9. 18” Precast Concrete Headwalls – 2 Each

10. 24” Precast Concrete Headwalls – 10 Each

11. 30” Precast Concrete Headwalls – 4 Each

12. Drainage Ditch – 129 LF

13. Geogrid – 358 SY

14. Geotextile 358 SY

15. AASHTO #1 Stone – 96 CY

16. Road Base Material – 911 CY

17. #2A Coarse Aggregate – 596 CY

18. Seeding - Job