This bid tabulation report details the bids received for Solicitation Number 69056723B000022, the Mitchell Street and Black Rock Road Reconstruction project. The project involves reconstruction of Mitchell Street and Black Rock Road in Polk County, Oregon, including roadway excavation, asphalt paving, drainage improvements, retaining walls, signage, and erosion control measures. The report lists the bids from four contractors for the base Schedule B and alternate Schedule A, along with the engineer's estimates. For Schedule B, Conway Construction provided the lowest responsive bid at $7,528,512, while North Santiam Paving's bid was deemed non-responsive. For Schedule A, Conway Construction again submitted the lowest responsive bid at $6,275,457.10. The contract is anticipated to be awarded by December 4, 2023 to Conway Construction for their submitted Schedule A pricing.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 11/13/23
1 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Contractor Responsive?
Engineer's Estimate
Conway Construction, Inc.
JAL CONSTRUCTION, INC.
North Santiam Paving Co. no
STG Pacific, LLC
Alternate Schedule B
$8,106,946.50
$7,528,512.00
$7,703,261.00
$10,488,223.75
$8,871,569.00
Alternate Schedule A
$6,257,831.00
$6,275,457.10
$6,388,946.00
$8,817,912.40
$7,337,273.50
2 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Solcitation No: 69056723B000022
Division: Western Federal Lands
State: OR County: Polk
Federal Land: Opened at: FHWA Vancouver, WA Office
Opened by: Marino Chea
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Conway Construction, Inc. $7,528,512.00 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665
JAL CONSTRUCTION, INC. $7,703,261.00
PO Box 6269 Bend, OR 97708
STG Pacific, LLC $8,871,569.00 3700 Centerpoint Drive, Suite 8155 Anchorage, AK 99503
North Santiam Paving Co. ( $10,488,223.75 ) no
PO BOX 516
Stayton, OR 97383
Engineer's Estimate $8,106,946.50
DEAN ALAN
UMATHUM
Digitally signed by
DEAN ALAN UMATHUM
Date: 2023.11.16 13:04:55 -08'00'
Conway Construction Company 12/04/2023
3 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0020 15101-0000 MOBILIZATION
Conway Construction, Inc. Lump Sum $1,114,643.00 JAL CONSTRUCTION, INC. Lump Sum $600,000.00 STG Pacific, LLC Lump Sum $375,000.00 North Santiam Paving Co. Lump Sum $1,385,000.00 Engineer's Estimate ALL LPSM Lump Sum $950,000.00
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Conway Construction, Inc. Lump Sum $125,000.00 JAL CONSTRUCTION, INC. Lump Sum $140,000.00 STG Pacific, LLC Lump Sum $155,000.00 North Santiam Paving Co. Lump Sum $196,000.00 Engineer's Estimate ALL LPSM Lump Sum $180,000.00
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Conway Construction, Inc. Lump Sum $205,000.00 JAL CONSTRUCTION, INC. Lump Sum $200,000.00 STG Pacific, LLC Lump Sum $490,000.00 North Santiam Paving Co. Lump Sum $280,000.00 Engineer's Estimate ALL LPSM Lump Sum $203,000.00
B0080 15401-0000 CONTRACTOR TESTING
Conway Construction, Inc. Lump Sum $90,000.00 JAL CONSTRUCTION, INC. Lump Sum $50,000.00 STG Pacific, LLC Lump Sum $130,000.00 North Santiam Paving Co. Lump Sum $87,000.00 Engineer's Estimate ALL LPSM Lump Sum $140,000.00
B0100 15501-0000 CONSTRUCTION SCHEDULE
Conway Construction, Inc. Lump Sum $5,000.00 JAL CONSTRUCTION, INC. Lump Sum $55,000.00 STG Pacific, LLC Lump Sum $50,000.00 North Santiam Paving Co. Lump Sum $13,000.00 Engineer's Estimate ALL LPSM Lump Sum $35,000.00
B0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Conway Construction, Inc. $4.00 $1,000.00
JAL CONSTRUCTION, INC. $5.00 $1,250.00
STG Pacific, LLC $5.00 $1,250.00 North Santiam Paving Co. $8.75 $2,187.50 Engineer's Estimate 250 LNFT $9.00 $2,250.00
4 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Conway Construction, Inc. $4.00 $16,520.00
JAL CONSTRUCTION, INC. $5.00 $20,650.00
STG Pacific, LLC $5.00 $20,650.00 North Santiam Paving Co. $5.05 $20,856.50 Engineer's Estimate 4,130 LNFT $6.20 $25,606.00
B0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
Conway Construction, Inc. $275.00 $277,750.00
JAL CONSTRUCTION, INC. $125.00 $126,250.00
STG Pacific, LLC $470.00 $474,700.00 North Santiam Paving Co. $365.00 $368,650.00 Engineer's Estimate 1,010 LNFT $130.00 $131,300.00
B0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM
Conway Construction, Inc. $95.00 $5,320.00
JAL CONSTRUCTION, INC. $110.00 $6,160.00
STG Pacific, LLC $75.00 $4,200.00 North Santiam Paving Co. $200.00 $11,200.00 Engineer's Estimate 56 EACH $290.00 $16,240.00
B0200 20101-0000 CLEARING AND GRUBBING
Conway Construction, Inc. $15,300.00 $91,800.00
JAL CONSTRUCTION, INC. $40,000.00 $240,000.00
STG Pacific, LLC $35,000.00 $210,000.00 North Santiam Paving Co. $44,000.00 $264,000.00 Engineer's Estimate 6.0 ACRE $28,200.00 $169,200.00
B0220 20301-1600 REMOVAL OF MAILBOX
Conway Construction, Inc. $100.00 $300.00
JAL CONSTRUCTION, INC. $100.00 $300.00
STG Pacific, LLC $1,500.00 $4,500.00 North Santiam Paving Co. $600.00 $1,800.00 Engineer's Estimate 3 EACH $135.00 $405.00
B0240 20301-1900 REMOVAL OF PIPE CULVERT
Conway Construction, Inc. $1,500.00 $3,000.00
JAL CONSTRUCTION, INC. $100.00 $200.00
STG Pacific, LLC $1,600.00 $3,200.00 North Santiam Paving Co. $6,350.00 $12,700.00 Engineer's Estimate 2 EACH $2,300.00 $4,600.00
5 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0260 20301-2400 REMOVAL OF SIGN
Conway Construction, Inc. $100.00 $800.00
JAL CONSTRUCTION, INC. $100.00 $800.00
STG Pacific, LLC $260.00 $2,080.00 North Santiam Paving Co. $165.00 $1,320.00 Engineer's Estimate 8 EACH $280.00 $2,240.00
B0280 20302-0700 REMOVAL OF FENCE
Conway Construction, Inc. $4.00 $3,840.00
JAL CONSTRUCTION, INC. $6.00 $5,760.00
STG Pacific, LLC $50.00 $48,000.00 North Santiam Paving Co. $31.00 $29,760.00 Engineer's Estimate 960 LNFT $8.00 $7,680.00
B0300 20304-2000 REMOVAL OF BRIDGE
Conway Construction, Inc. Lump Sum $150,000.00 JAL CONSTRUCTION, INC. Lump Sum $100,000.00 STG Pacific, LLC Lump Sum $110,000.00 North Santiam Paving Co. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
B0320 20401-0000 ROADWAY EXCAVATION
Conway Construction, Inc. $25.00 $300,000.00
JAL CONSTRUCTION, INC. $38.00 $456,000.00
STG Pacific, LLC $53.00 $636,000.00 North Santiam Paving Co. $50.00 $600,000.00 Engineer's Estimate 12,000 CUYD $60.00 $720,000.00
B0340 20421-0000 ROCK EXCAVATION
Conway Construction, Inc. $260.00 $8,320.00
JAL CONSTRUCTION, INC. $150.00 $4,800.00
STG Pacific, LLC $495.00 $15,840.00 North Santiam Paving Co. $355.00 $11,360.00 Engineer's Estimate 32 CUYD $300.00 $9,600.00
B0360 20702-0300 GEOTEXTILE FILTER, CLASS 1, TYPE C
Conway Construction, Inc. $3.00 $3,600.00
JAL CONSTRUCTION, INC. $3.50 $4,200.00
STG Pacific, LLC $5.00 $6,000.00 North Santiam Paving Co. $4.60 $5,520.00 Engineer's Estimate 1,200 SQYD $9.50 $11,400.00
6 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0380 20801-0000 STRUCTURE EXCAVATION
Conway Construction, Inc. $250.00 $142,500.00
JAL CONSTRUCTION, INC. $230.00 $131,100.00
STG Pacific, LLC $110.00 $62,700.00 North Santiam Paving Co. $361.00 $205,770.00 Engineer's Estimate 570 CUYD $110.00 $62,700.00
B0400 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
Conway Construction, Inc. $130.00 $6,240.00
JAL CONSTRUCTION, INC. $150.00 $7,200.00
STG Pacific, LLC $300.00 $14,400.00 North Santiam Paving Co. $290.00 $13,920.00 Engineer's Estimate 48 CUYD $255.00 $12,240.00
B0420 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Conway Construction, Inc. $155.00 $28,675.00
JAL CONSTRUCTION, INC. $160.00 $29,600.00
STG Pacific, LLC $300.00 $55,500.00 North Santiam Paving Co. $250.00 $46,250.00 Engineer's Estimate 185 CUYD $240.00 $44,400.00
B0440 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 (BANK STONE)
Conway Construction, Inc. $80.00 $61,280.00
JAL CONSTRUCTION, INC. $200.00 $153,200.00
STG Pacific, LLC $230.00 $176,180.00 North Santiam Paving Co. $260.00 $199,160.00 Engineer's Estimate 766 CUYD $215.00 $164,690.00
B0460 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
Conway Construction, Inc. $100.00 $58,000.00
JAL CONSTRUCTION, INC. $180.00 $104,400.00
STG Pacific, LLC $340.00 $197,200.00 North Santiam Paving Co. $235.00 $136,300.00 Engineer's Estimate 580 CUYD $195.00 $113,100.00
B0480 25110-2400 GROUTED RIPRAP, METHOD B, CLASS 4
Conway Construction, Inc. $1,200.00 $78,000.00
JAL CONSTRUCTION, INC. $300.00 $19,500.00
STG Pacific, LLC $500.00 $32,500.00 North Santiam Paving Co. $545.00 $35,425.00 Engineer's Estimate 65 CUYD $375.00 $24,375.00
7 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0500 25126-0000 REMOVE AND RESET BOULDER
Conway Construction, Inc. $100.00 $200.00
JAL CONSTRUCTION, INC. $200.00 $400.00
STG Pacific, LLC $1,650.00 $3,300.00 North Santiam Paving Co. $900.00 $1,800.00 Engineer's Estimate 2 EACH $285.00 $570.00
B0520 25210-1000 ROCKERY, IN-STREAM
Conway Construction, Inc. $80.00 $724,000.00
JAL CONSTRUCTION, INC. $152.00 $1,375,600.00
STG Pacific, LLC $90.00 $814,500.00 North Santiam Paving Co. $160.00 $1,448,000.00 Engineer's Estimate 9,050 SQFT $95.00 $859,750.00
B0540 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL
Conway Construction, Inc. $60.00 $135,120.00
JAL CONSTRUCTION, INC. $105.00 $236,460.00
STG Pacific, LLC $180.00 $405,360.00 North Santiam Paving Co. $105.00 $236,460.00 Engineer's Estimate 2,252 SQFT $90.00 $202,680.00
B0560 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (PRECAST CONCRETE BLOCK RETAINING WALL)
Conway Construction, Inc. Lump Sum $20,000.00 JAL CONSTRUCTION, INC. Lump Sum $5,000.00 STG Pacific, LLC Lump Sum $6,500.00 North Santiam Paving Co. Lump Sum $5,000.00 Engineer's Estimate ALL LPSM Lump Sum $10,000.00
B0580 30201-2000 ROADWAY AGGREGATE, METHOD 2
Conway Construction, Inc. $60.00 $340,500.00
JAL CONSTRUCTION, INC. $63.00 $357,525.00
STG Pacific, LLC $95.00 $539,125.00 North Santiam Paving Co. $66.00 $374,550.00 Engineer's Estimate 5,675 CUYD $120.00 $681,000.00
B0600 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Conway Construction, Inc. $130.00 $482,300.00
JAL CONSTRUCTION, INC. $156.00 $578,760.00
STG Pacific, LLC $155.00 $575,050.00 North Santiam Paving Co. $115.00 $426,650.00 Engineer's Estimate 3,710 TON $180.00 $667,800.00
8 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0620 41201-0000 TACK COAT
Conway Construction, Inc. $1.00 $6.00
JAL CONSTRUCTION, INC. $1.00 $6.00
STG Pacific, LLC $1.50 $9.00 North Santiam Paving Co. $1,100.00 $6,600.00 Engineer's Estimate 6 TON $1,300.00 $7,800.00
B0640 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Conway Construction, Inc. $2,050.00 $473,550.00
JAL CONSTRUCTION, INC. $1,330.00 $307,230.00
STG Pacific, LLC $2,400.00 $554,400.00 North Santiam Paving Co. $1,735.00 $400,785.00 Engineer's Estimate 231 CUYD $1,550.00 $358,050.00
B0660 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER (60-INCH)
Conway Construction, Inc. $1,200.00 $669,600.00
JAL CONSTRUCTION, INC. $1,200.00 $669,600.00
STG Pacific, LLC $1,785.00 $996,030.00 North Santiam Paving Co. $1,350.00 $753,300.00 Engineer's Estimate 558 LNFT $1,250.00 $697,500.00
B0680 55401-1000 REINFORCING STEEL
Conway Construction, Inc. $1.95 $26,715.00
JAL CONSTRUCTION, INC. $2.10 $28,770.00
STG Pacific, LLC $2.75 $37,675.00 North Santiam Paving Co. $2.00 $27,400.00 Engineer's Estimate 13,700 LB $3.50 $47,950.00
B0700 55401-2000 REINFORCING STEEL, EPOXY COATED
Conway Construction, Inc. $2.15 $28,380.00
JAL CONSTRUCTION, INC. $2.60 $34,320.00
STG Pacific, LLC $3.50 $46,200.00 North Santiam Paving Co. $2.00 $26,400.00 Engineer's Estimate 13,200 LB $5.00 $66,000.00
B0720 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
Conway Construction, Inc. $400.00 $114,400.00
JAL CONSTRUCTION, INC. $350.00 $100,100.00
STG Pacific, LLC $225.00 $64,350.00 North Santiam Paving Co. $275.00 $78,650.00 Engineer's Estimate 286 LNFT $275.00 $78,650.00
9 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0740 56202-0000 TEMPORARY SUPPORT STRUCTURE (TEMPORARY BRIDGE)
Conway Construction, Inc. Lump Sum $650,000.00 JAL CONSTRUCTION, INC. Lump Sum $390,000.00 STG Pacific, LLC Lump Sum $320,000.00 North Santiam Paving Co. Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00
B0760 56401-1000 BEARING DEVICE, ELASTOMERIC
Conway Construction, Inc. $1,000.00 $10,000.00
JAL CONSTRUCTION, INC. $1,500.00 $15,000.00
STG Pacific, LLC $1,540.00 $15,400.00 North Santiam Paving Co. $665.00 $6,650.00 Engineer's Estimate 10 EACH $1,750.00 $17,500.00
B0780 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE
Conway Construction, Inc. $15,000.00 $105,000.00
JAL CONSTRUCTION, INC. $11,000.00 $77,000.00
STG Pacific, LLC $21,000.00 $147,000.00 North Santiam Paving Co. $11,000.00 $77,000.00 Engineer's Estimate 7 CUYD $15,000.00 $105,000.00
B0800 60101-0000 CONCRETE
Conway Construction, Inc. $800.00 $32,800.00
JAL CONSTRUCTION, INC. $730.00 $29,930.00
STG Pacific, LLC $925.00 $37,925.00 North Santiam Paving Co. $900.00 $36,900.00 Engineer's Estimate 41 CUYD $750.00 $30,750.00
B0820 60201-0600 18-INCH PIPE CULVERT
Conway Construction, Inc. $125.00 $11,000.00
JAL CONSTRUCTION, INC. $160.00 $14,080.00
STG Pacific, LLC $280.00 $24,640.00 North Santiam Paving Co. $180.00 $15,840.00 Engineer's Estimate 88 LNFT $195.00 $17,160.00
B0840 60201-0800 24-INCH PIPE CULVERT
Conway Construction, Inc. $150.00 $58,500.00
JAL CONSTRUCTION, INC. $180.00 $70,200.00
STG Pacific, LLC $190.00 $74,100.00 North Santiam Paving Co. $335.00 $130,650.00 Engineer's Estimate 390 LNFT $250.00 $97,500.00
10 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0860 60201-1000 36-INCH PIPE CULVERT
Conway Construction, Inc. $550.00 $49,500.00
JAL CONSTRUCTION, INC. $1,550.00 $139,500.00
STG Pacific, LLC $275.00 $24,750.00 North Santiam Paving Co. $1,190.00 $107,100.00 Engineer's Estimate 90 LNFT $305.00 $27,450.00
B0880 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Conway Construction, Inc. $32.00 $30,720.00
JAL CONSTRUCTION, INC. $35.00 $33,600.00
STG Pacific, LLC $37.00 $35,520.00 North Santiam Paving Co. $15.00 $14,400.00 Engineer's Estimate 960 LNFT $30.00 $28,800.00
B0900 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Conway Construction, Inc. $36.00 $60,300.00
JAL CONSTRUCTION, INC. $44.00 $73,700.00
STG Pacific, LLC $43.00 $72,025.00 North Santiam Paving Co. $35.25 $59,043.75 Engineer's Estimate 1,675.0 LNFT $80.00 $134,000.00
B0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Conway Construction, Inc. $3,500.00 $28,000.00
JAL CONSTRUCTION, INC. $4,250.00 $34,000.00
STG Pacific, LLC $4,300.00 $34,400.00 North Santiam Paving Co. $3,400.00 $27,200.00 Engineer's Estimate 8 EACH $5,700.00 $45,600.00
B0940 61707-0000 STRUCTURE TRANSITION RAILING
Conway Construction, Inc. $225.00 $16,650.00
JAL CONSTRUCTION, INC. $270.00 $19,980.00
STG Pacific, LLC $265.00 $19,610.00 North Santiam Paving Co. $214.00 $15,836.00 Engineer's Estimate 74 LNFT $300.00 $22,200.00
B0960 61901-0900 FENCE, BARBED WIRE, 4 STRAND
Conway Construction, Inc. $30.00 $28,200.00
JAL CONSTRUCTION, INC. $20.00 $18,800.00
STG Pacific, LLC $95.00 $89,300.00 North Santiam Paving Co. $50.00 $47,000.00 Engineer's Estimate 940 LNFT $10.20 $9,588.00
11 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B0980 61920-2000 REMOVE AND RESET GATE
Conway Construction, Inc. $2,000.00 $4,000.00
JAL CONSTRUCTION, INC. $2,500.00 $5,000.00
STG Pacific, LLC $1,500.00 $3,000.00 North Santiam Paving Co. $2,000.00 $4,000.00 Engineer's Estimate 2 EACH $4,515.00 $9,030.00
B1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Conway Construction, Inc. $250.00 $5,000.00
JAL CONSTRUCTION, INC. $240.00 $4,800.00
STG Pacific, LLC $200.00 $4,000.00 North Santiam Paving Co. $143.00 $2,860.00 Engineer's Estimate 20 HOUR $165.00 $3,300.00
B1020 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL
Conway Construction, Inc. $185.00 $3,700.00
JAL CONSTRUCTION, INC. $260.00 $5,200.00
STG Pacific, LLC $150.00 $3,000.00 North Santiam Paving Co. $72.00 $1,440.00 Engineer's Estimate 20 HOUR $210.00 $4,200.00
B1040 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Conway Construction, Inc. $235.00 $4,700.00
JAL CONSTRUCTION, INC. $300.00 $6,000.00
STG Pacific, LLC $160.00 $3,200.00 North Santiam Paving Co. $143.00 $2,860.00 Engineer's Estimate 20 HOUR $305.00 $6,100.00
B1060 62301-0000 GENERAL LABOR
Conway Construction, Inc. $90.00 $7,200.00
JAL CONSTRUCTION, INC. $105.00 $8,400.00
STG Pacific, LLC $195.00 $15,600.00 North Santiam Paving Co. $73.00 $5,840.00 Engineer's Estimate 80 HOUR $95.00 $7,600.00
12 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B1080 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
Conway Construction, Inc. $31,500.00 $78,750.00
JAL CONSTRUCTION, INC. $35,000.00 $87,500.00
STG Pacific, LLC $35,000.00 $87,500.00 North Santiam Paving Co. $49,500.00 $123,750.00 Engineer's Estimate 2.5 ACRE $18,200.00 $45,500.00
B1100 62501-0000 TURF ESTABLISHMENT
Conway Construction, Inc. $5,000.00 $12,500.00
JAL CONSTRUCTION, INC. $6,000.00 $15,000.00
STG Pacific, LLC $6,000.00 $15,000.00 North Santiam Paving Co. $3,400.00 $8,500.00 Engineer's Estimate 2.5 ACRE $6,525.00 $16,312.50
B1120 62635-3000 CUTTINGS, WILLOW POLE (SINGLE GROUP METHOD)
Conway Construction, Inc. $35.00 $33,600.00
JAL CONSTRUCTION, INC. $35.00 $33,600.00
STG Pacific, LLC $35.00 $33,600.00 North Santiam Paving Co. $29.00 $27,840.00 Engineer's Estimate 960 EACH $55.00 $52,800.00
B1140 63302-0000 SIGN SYSTEM
Conway Construction, Inc. $200.00 $8,000.00
JAL CONSTRUCTION, INC. $100.00 $4,000.00
STG Pacific, LLC $20.00 $800.00 North Santiam Paving Co. $128.00 $5,120.00 Engineer's Estimate 40 SQFT $210.00 $8,400.00
B1160 63309-0900 DELINEATOR, TYPE FLEXIBLE (TYPE 4, ALT 1)
Conway Construction, Inc. $85.00 $1,700.00
JAL CONSTRUCTION, INC. $55.00 $1,100.00
STG Pacific, LLC $32.00 $640.00 North Santiam Paving Co. $85.00 $1,700.00 Engineer's Estimate 20 EACH $170.00 $3,400.00
B1180 63309-0900 DELINEATOR, TYPE FLEXIBLE (TYPE 2)
Conway Construction, Inc. $100.00 $5,500.00
JAL CONSTRUCTION, INC. $80.00 $4,400.00
STG Pacific, LLC $68.00 $3,740.00 North Santiam Paving Co. $85.00 $4,675.00 Engineer's Estimate 55 EACH $170.00 $9,350.00
13 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B1200 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
Conway Construction, Inc. $0.23 $4,841.50
JAL CONSTRUCTION, INC. $0.30 $6,315.00
STG Pacific, LLC $0.50 $10,525.00 North Santiam Paving Co. $0.22 $4,631.00 Engineer's Estimate 21,050 LNFT $1.05 $22,102.50
B1220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
Conway Construction, Inc. $0.23 $4,818.50
JAL CONSTRUCTION, INC. $0.30 $6,285.00
STG Pacific, LLC $0.50 $10,475.00 North Santiam Paving Co. $0.22 $4,609.00 Engineer's Estimate 20,950 LNFT $1.05 $21,997.50
B1240 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
Conway Construction, Inc. $21.00 $1,848.00
JAL CONSTRUCTION, INC. $35.00 $3,080.00
STG Pacific, LLC $40.00 $3,520.00 North Santiam Paving Co. $30.00 $2,640.00 Engineer's Estimate 88 EACH $45.00 $3,960.00
B1260 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
Conway Construction, Inc. $58.00 $1,740.00
JAL CONSTRUCTION, INC. $60.00 $1,800.00
STG Pacific, LLC $150.00 $4,500.00 North Santiam Paving Co. $63.00 $1,890.00 Engineer's Estimate 30 EACH $80.00 $2,400.00
B1280 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Conway Construction, Inc. $15,000.00 $15,000.00
JAL CONSTRUCTION, INC. $10,000.00 $10,000.00
STG Pacific, LLC $17,000.00 $17,000.00 North Santiam Paving Co. $17,500.00 $17,500.00 Engineer's Estimate 1 EACH $17,000.00 $17,000.00
B1300 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
Conway Construction, Inc. $30,000.00 $120,000.00
JAL CONSTRUCTION, INC. $10,000.00 $40,000.00
STG Pacific, LLC $18,000.00 $72,000.00 North Santiam Paving Co. $18,000.00 $72,000.00 Engineer's Estimate 4 EACH $38,575.00 $154,300.00
14 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: B
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
B1320 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Conway Construction, Inc. $27.00 $6,885.00
JAL CONSTRUCTION, INC. $30.00 $7,650.00
STG Pacific, LLC $50.00 $12,750.00 North Santiam Paving Co. $35.00 $8,925.00 Engineer's Estimate 255 SQFT $35.00 $8,925.00
B1340 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Conway Construction, Inc. $140.00 $61,600.00
JAL CONSTRUCTION, INC. $80.00 $35,200.00
STG Pacific, LLC $85.00 $37,400.00 North Santiam Paving Co. $75.00 $33,000.00 Engineer's Estimate 440 HOUR $85.00 $37,400.00
B1360 64603-0200 FIXTURE, MAILBOX
Conway Construction, Inc. $500.00 $1,500.00
JAL CONSTRUCTION, INC. $1,000.00 $3,000.00
STG Pacific, LLC $750.00 $2,250.00 North Santiam Paving Co. $1,300.00 $3,900.00 Engineer's Estimate 3 EACH $315.00 $945.00
B1380 64631-0000 ROADSIDE DEVELOPMENT (TREATMENT DITCH)
Conway Construction, Inc. $40.00 $23,600.00
JAL CONSTRUCTION, INC. $100.00 $59,000.00
STG Pacific, LLC $100.00 $59,000.00 North Santiam Paving Co. $85.00 $50,150.00 Engineer's Estimate 590 LNFT $70.00 $41,300.00
B1400 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION
Conway Construction, Inc. Lump Sum $250,000.00 JAL CONSTRUCTION, INC. Lump Sum $290,000.00 STG Pacific, LLC Lump Sum $260,000.00 North Santiam Paving Co. Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $137,300.00
Total Schedule - All Items
Conway Construction, Inc. $7,528,512.00
JAL CONSTRUCTION, INC. $7,703,261.00
STG Pacific, LLC $8,871,569.00 North Santiam Paving Co. $10,488,223.75 Engineer's Estimate $8,106,946.50
15 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Solcitation No: 69056723B000022
Division: Western Federal Lands
State: OR County: Polk
Federal Land: Opened at: FHWA Vancouver, WA Office
Opened by: Marino Chea
Date: 11/07/23
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Conway Construction, Inc. $6,275,457.10 6620 NW Whitney Rd. Suite 100 Vancouver, WA 98665
JAL CONSTRUCTION, INC. $6,388,946.00
PO Box 6269 Bend, OR 97708
STG Pacific, LLC $7,337,273.50 3700 Centerpoint Drive, Suite 8155 Anchorage, AK 99503
North Santiam Paving Co. ( $8,817,912.40 ) no
PO BOX 516
Stayton, OR 97383
Engineer's Estimate $6,257,831.00
16 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Conway Construction, Inc. Lump Sum $829,608.00 JAL CONSTRUCTION, INC. Lump Sum $585,000.00 STG Pacific, LLC Lump Sum $375,500.00 North Santiam Paving Co. Lump Sum $1,135,000.00 Engineer's Estimate ALL LPSM Lump Sum $740,000.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Conway Construction, Inc. Lump Sum $95,000.00 JAL CONSTRUCTION, INC. Lump Sum $120,000.00 STG Pacific, LLC Lump Sum $100,000.00 North Santiam Paving Co. Lump Sum $176,000.00 Engineer's Estimate ALL LPSM Lump Sum $140,000.00
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Conway Construction, Inc. Lump Sum $175,000.00 JAL CONSTRUCTION, INC. Lump Sum $140,000.00 STG Pacific, LLC Lump Sum $480,000.00 North Santiam Paving Co. Lump Sum $250,000.00 Engineer's Estimate ALL LPSM Lump Sum $156,000.00
A0080 15401-0000 CONTRACTOR TESTING
Conway Construction, Inc. Lump Sum $70,000.00 JAL CONSTRUCTION, INC. Lump Sum $40,000.00 STG Pacific, LLC Lump Sum $120,000.00 North Santiam Paving Co. Lump Sum $60,000.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00
A0100 15501-0000 CONSTRUCTION SCHEDULE
Conway Construction, Inc. Lump Sum $5,000.00 JAL CONSTRUCTION, INC. Lump Sum $45,000.00 STG Pacific, LLC Lump Sum $50,000.00 North Santiam Paving Co. Lump Sum $12,500.00 Engineer's Estimate ALL LPSM Lump Sum $26,000.00
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Conway Construction, Inc. $4.00 $1,000.00
JAL CONSTRUCTION, INC. $5.00 $1,250.00
STG Pacific, LLC $5.00 $1,250.00 North Santiam Paving Co. $8.75 $2,187.50 Engineer's Estimate 250 LNFT $9.00 $2,250.00
17 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Conway Construction, Inc. $4.00 $7,840.00
JAL CONSTRUCTION, INC. $5.00 $9,800.00
STG Pacific, LLC $5.00 $9,800.00 North Santiam Paving Co. $5.05 $9,898.00 Engineer's Estimate 1,960 LNFT $6.20 $12,152.00
A0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
Conway Construction, Inc. $275.00 $277,750.00
JAL CONSTRUCTION, INC. $125.00 $126,250.00
STG Pacific, LLC $470.00 $474,700.00 North Santiam Paving Co. $365.00 $368,650.00 Engineer's Estimate 1,010 LNFT $130.00 $131,300.00
A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM
Conway Construction, Inc. $95.00 $2,660.00
JAL CONSTRUCTION, INC. $110.00 $3,080.00
STG Pacific, LLC $110.00 $3,080.00 North Santiam Paving Co. $200.00 $5,600.00 Engineer's Estimate 28 EACH $290.00 $8,120.00
A0200 20101-0000 CLEARING AND GRUBBING
Conway Construction, Inc. $15,300.00 $58,140.00
JAL CONSTRUCTION, INC. $40,000.00 $152,000.00
STG Pacific, LLC $40,000.00 $152,000.00 North Santiam Paving Co. $42,000.00 $159,600.00 Engineer's Estimate 3.8 ACRE $28,200.00 $107,160.00
A0220 20301-1600 REMOVAL OF MAILBOX
Conway Construction, Inc. $100.00 $100.00
JAL CONSTRUCTION, INC. $100.00 $100.00
STG Pacific, LLC $1,600.00 $1,600.00 North Santiam Paving Co. $600.00 $600.00 Engineer's Estimate 1 EACH $135.00 $135.00
A0240 20301-1900 REMOVAL OF PIPE CULVERT
Conway Construction, Inc. $1,500.00 $3,000.00
JAL CONSTRUCTION, INC. $100.00 $200.00
STG Pacific, LLC $5,000.00 $10,000.00 North Santiam Paving Co. $6,350.00 $12,700.00 Engineer's Estimate 2 EACH $2,300.00 $4,600.00
18 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 20301-2400 REMOVAL OF SIGN
Conway Construction, Inc. $100.00 $600.00
JAL CONSTRUCTION, INC. $100.00 $600.00
STG Pacific, LLC $300.00 $1,800.00 North Santiam Paving Co. $165.00 $990.00 Engineer's Estimate 6 EACH $280.00 $1,680.00
A0280 20302-0700 REMOVAL OF FENCE
Conway Construction, Inc. $4.00 $640.00
JAL CONSTRUCTION, INC. $6.00 $960.00
STG Pacific, LLC $20.00 $3,200.00 North Santiam Paving Co. $31.00 $4,960.00 Engineer's Estimate 160 LNFT $8.00 $1,280.00
A0300 20304-2000 REMOVAL OF BRIDGE
Conway Construction, Inc. Lump Sum $150,000.00 JAL CONSTRUCTION, INC. Lump Sum $100,000.00 STG Pacific, LLC Lump Sum $110,000.00 North Santiam Paving Co. Lump Sum $350,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00
A0320 20401-0000 ROADWAY EXCAVATION
Conway Construction, Inc. $20.00 $66,000.00
JAL CONSTRUCTION, INC. $38.00 $125,400.00
STG Pacific, LLC $56.00 $184,800.00 North Santiam Paving Co. $60.00 $198,000.00 Engineer's Estimate 3,300 CUYD $60.00 $198,000.00
A0340 20421-0000 ROCK EXCAVATION
Conway Construction, Inc. $260.00 $8,320.00
JAL CONSTRUCTION, INC. $150.00 $4,800.00
STG Pacific, LLC $495.00 $15,840.00 North Santiam Paving Co. $355.00 $11,360.00 Engineer's Estimate 32 CUYD $300.00 $9,600.00
A0360 20702-0300 GEOTEXTILE FILTER, CLASS 1, TYPE C
Conway Construction, Inc. $3.00 $3,600.00
JAL CONSTRUCTION, INC. $3.50 $4,200.00
STG Pacific, LLC $5.00 $6,000.00 North Santiam Paving Co. $4.60 $5,520.00 Engineer's Estimate 1,200 SQYD $9.50 $11,400.00
19 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0380 20801-0000 STRUCTURE EXCAVATION
Conway Construction, Inc. $250.00 $142,500.00
JAL CONSTRUCTION, INC. $230.00 $131,100.00
STG Pacific, LLC $110.00 $62,700.00 North Santiam Paving Co. $361.00 $205,770.00 Engineer's Estimate 570 CUYD $110.00 $62,700.00
A0400 25101-0100 PLACED RIPRAP, METHOD A, CLASS 1
Conway Construction, Inc. $130.00 $6,240.00
JAL CONSTRUCTION, INC. $150.00 $7,200.00
STG Pacific, LLC $300.00 $14,400.00 North Santiam Paving Co. $290.00 $13,920.00 Engineer's Estimate 48 CUYD $255.00 $12,240.00
A0420 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Conway Construction, Inc. $155.00 $28,675.00
JAL CONSTRUCTION, INC. $160.00 $29,600.00
STG Pacific, LLC $300.00 $55,500.00 North Santiam Paving Co. $250.00 $46,250.00 Engineer's Estimate 185 CUYD $240.00 $44,400.00
A0440 25101-0500 PLACED RIPRAP, METHOD A, CLASS 5 (BANK STONE)
Conway Construction, Inc. $80.00 $61,280.00
JAL CONSTRUCTION, INC. $200.00 $153,200.00
STG Pacific, LLC $250.00 $191,500.00 North Santiam Paving Co. $260.00 $199,160.00 Engineer's Estimate 766 CUYD $215.00 $164,690.00
A0460 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4
Conway Construction, Inc. $100.00 $58,000.00
JAL CONSTRUCTION, INC. $180.00 $104,400.00
STG Pacific, LLC $380.00 $220,400.00 North Santiam Paving Co. $235.00 $136,300.00 Engineer's Estimate 580 CUYD $195.00 $113,100.00
A0480 25110-2400 GROUTED RIPRAP, METHOD B, CLASS 4
Conway Construction, Inc. $1,200.00 $78,000.00
JAL CONSTRUCTION, INC. $300.00 $19,500.00
STG Pacific, LLC $500.00 $32,500.00 North Santiam Paving Co. $545.00 $35,425.00 Engineer's Estimate 65 CUYD $375.00 $24,375.00
20 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 25126-0000 REMOVE AND RESET BOULDER
Conway Construction, Inc. $100.00 $200.00
JAL CONSTRUCTION, INC. $200.00 $400.00
STG Pacific, LLC $1,650.00 $3,300.00 North Santiam Paving Co. $900.00 $1,800.00 Engineer's Estimate 2 EACH $285.00 $570.00
A0520 25210-1000 ROCKERY, IN-STREAM
Conway Construction, Inc. $80.00 $724,000.00
JAL CONSTRUCTION, INC. $152.00 $1,375,600.00
STG Pacific, LLC $96.00 $868,800.00 North Santiam Paving Co. $160.00 $1,448,000.00 Engineer's Estimate 9,050 SQFT $95.00 $859,750.00
A0540 30201-2000 ROADWAY AGGREGATE, METHOD 2
Conway Construction, Inc. $60.00 $216,000.00
JAL CONSTRUCTION, INC. $63.00 $226,800.00
STG Pacific, LLC $105.00 $378,000.00 North Santiam Paving Co. $64.00 $230,400.00 Engineer's Estimate 3,600 CUYD $120.00 $432,000.00
A0560 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1
Conway Construction, Inc. $130.00 $302,250.00
JAL CONSTRUCTION, INC. $156.00 $362,700.00
STG Pacific, LLC $155.00 $360,375.00 North Santiam Paving Co. $115.00 $267,375.00 Engineer's Estimate 2,325 TON $180.00 $418,500.00
A0580 41201-0000 TACK COAT
Conway Construction, Inc. $1.00 $5.00
JAL CONSTRUCTION, INC. $1.00 $5.00
STG Pacific, LLC $1.50 $7.50 North Santiam Paving Co. $1,100.00 $5,500.00 Engineer's Estimate 5 TON $1,300.00 $6,500.00
A0600 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE)
Conway Construction, Inc. $2,050.00 $473,550.00
JAL CONSTRUCTION, INC. $1,330.00 $307,230.00
STG Pacific, LLC $2,400.00 $554,400.00 North Santiam Paving Co. $1,735.00 $400,785.00 Engineer's Estimate 231 CUYD $1,550.00 $358,050.00
21 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0620 55302-3700 PRECAST, PRESTRESSED CONCRETE DECKED BULB TEE GIRDER (60-INCH)
Conway Construction, Inc. $1,200.00 $669,600.00
JAL CONSTRUCTION, INC. $1,200.00 $669,600.00
STG Pacific, LLC $1,785.00 $996,030.00 North Santiam Paving Co. $1,350.00 $753,300.00 Engineer's Estimate 558 LNFT $1,250.00 $697,500.00
A0640 55401-1000 REINFORCING STEEL
Conway Construction, Inc. $1.95 $26,715.00
JAL CONSTRUCTION, INC. $2.10 $28,770.00
STG Pacific, LLC $2.75 $37,675.00 North Santiam Paving Co. $2.00 $27,400.00 Engineer's Estimate 13,700 LB $3.50 $47,950.00
A0660 55401-2000 REINFORCING STEEL, EPOXY COATED
Conway Construction, Inc. $2.15 $28,380.00
JAL CONSTRUCTION, INC. $2.60 $34,320.00
STG Pacific, LLC $3.50 $46,200.00 North Santiam Paving Co. $2.00 $26,400.00 Engineer's Estimate 13,200 LB $5.00 $66,000.00
A0680 55601-1100 BRIDGE RAILING, STEEL, TWO RAIL
Conway Construction, Inc. $400.00 $114,400.00
JAL CONSTRUCTION, INC. $350.00 $100,100.00
STG Pacific, LLC $225.00 $64,350.00 North Santiam Paving Co. $275.00 $78,650.00 Engineer's Estimate 286 LNFT $275.00 $78,650.00
A0700 56202-0000 TEMPORARY SUPPORT STRUCTURE (TEMPORARY BRIDGE)
Conway Construction, Inc. Lump Sum $650,000.00 JAL CONSTRUCTION, INC. Lump Sum $390,000.00 STG Pacific, LLC Lump Sum $320,000.00 North Santiam Paving Co. Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $150,000.00
A0720 56401-1000 BEARING DEVICE, ELASTOMERIC
Conway Construction, Inc. $1,000.00 $10,000.00
JAL CONSTRUCTION, INC. $1,500.00 $15,000.00
STG Pacific, LLC $1,540.00 $15,400.00 North Santiam Paving Co. $665.00 $6,650.00 Engineer's Estimate 10 EACH $1,750.00 $17,500.00
22 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0740 58501-0000 ULTRA HIGH PERFORMANCE CONCRETE
Conway Construction, Inc. $15,000.00 $105,000.00
JAL CONSTRUCTION, INC. $11,000.00 $77,000.00
STG Pacific, LLC $21,000.00 $147,000.00 North Santiam Paving Co. $11,000.00 $77,000.00 Engineer's Estimate 7 CUYD $15,000.00 $105,000.00
A0760 60101-0000 CONCRETE
Conway Construction, Inc. $800.00 $32,800.00
JAL CONSTRUCTION, INC. $730.00 $29,930.00
STG Pacific, LLC $925.00 $37,925.00 North Santiam Paving Co. $900.00 $36,900.00 Engineer's Estimate 41 CUYD $750.00 $30,750.00
A0780 60201-0600 18-INCH PIPE CULVERT
Conway Construction, Inc. $125.00 $11,000.00
JAL CONSTRUCTION, INC. $160.00 $14,080.00
STG Pacific, LLC $280.00 $24,640.00 North Santiam Paving Co. $180.00 $15,840.00 Engineer's Estimate 88 LNFT $195.00 $17,160.00
A0800 60201-0800 24-INCH PIPE CULVERT
Conway Construction, Inc. $150.00 $28,500.00
JAL CONSTRUCTION, INC. $180.00 $34,200.00
STG Pacific, LLC $205.00 $38,950.00 North Santiam Paving Co. $310.00 $58,900.00 Engineer's Estimate 190 LNFT $250.00 $47,500.00
A0820 60201-1000 36-INCH PIPE CULVERT
Conway Construction, Inc. $550.00 $49,500.00
JAL CONSTRUCTION, INC. $1,550.00 $139,500.00
STG Pacific, LLC $275.00 $24,750.00 North Santiam Paving Co. $1,190.00 $107,100.00 Engineer's Estimate 90 LNFT $305.00 $27,450.00
A0840 60901-2300 CURB, ASPHALT, 6-INCH DEPTH
Conway Construction, Inc. $32.00 $30,720.00
JAL CONSTRUCTION, INC. $35.00 $33,600.00
STG Pacific, LLC $37.00 $35,520.00 North Santiam Paving Co. $15.00 $14,400.00 Engineer's Estimate 960 LNFT $30.00 $28,800.00
23 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
Conway Construction, Inc. $36.00 $41,400.00
JAL CONSTRUCTION, INC. $44.00 $50,600.00
STG Pacific, LLC $45.00 $51,750.00 North Santiam Paving Co. $35.25 $40,537.50 Engineer's Estimate 1,150.0 LNFT $80.00 $92,000.00
A0880 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
Conway Construction, Inc. $3,500.00 $21,000.00
JAL CONSTRUCTION, INC. $4,250.00 $25,500.00
STG Pacific, LLC $4,300.00 $25,800.00 North Santiam Paving Co. $3,400.00 $20,400.00 Engineer's Estimate 6 EACH $5,700.00 $34,200.00
A0900 61707-0000 STRUCTURE TRANSITION RAILING
Conway Construction, Inc. $225.00 $16,650.00
JAL CONSTRUCTION, INC. $270.00 $19,980.00
STG Pacific, LLC $270.00 $19,980.00 North Santiam Paving Co. $214.00 $15,836.00 Engineer's Estimate 74 LNFT $300.00 $22,200.00
A0920 61901-0900 FENCE, BARBED WIRE, 4 STRAND
Conway Construction, Inc. $30.00 $4,200.00
JAL CONSTRUCTION, INC. $20.00 $2,800.00
STG Pacific, LLC $170.00 $23,800.00 North Santiam Paving Co. $50.00 $7,000.00 Engineer's Estimate 140 LNFT $10.20 $1,428.00
A0940 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Conway Construction, Inc. $250.00 $5,000.00
JAL CONSTRUCTION, INC. $240.00 $4,800.00
STG Pacific, LLC $200.00 $4,000.00 North Santiam Paving Co. $142.00 $2,840.00 Engineer's Estimate 20 HOUR $165.00 $3,300.00
A0960 62201-0700 BACKHOE LOADER, 1 CUBIC YARD MINIMUM CAPACITY FRONTEND BUCKET, 10 CUBIC FOOT MINIMUM
CAPACITY BACKHOE BUCKET, 90 HP MINIMUM FLYWHEEL
Conway Construction, Inc. $185.00 $3,700.00
JAL CONSTRUCTION, INC. $260.00 $5,200.00
STG Pacific, LLC $150.00 $3,000.00 North Santiam Paving Co. $72.00 $1,440.00 Engineer's Estimate 20 HOUR $210.00 $4,200.00
24 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0980 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY
Conway Construction, Inc. $235.00 $4,700.00
JAL CONSTRUCTION, INC. $300.00 $6,000.00
STG Pacific, LLC $160.00 $3,200.00 North Santiam Paving Co. $143.00 $2,860.00 Engineer's Estimate 20 HOUR $305.00 $6,100.00
A1000 62301-0000 GENERAL LABOR
Conway Construction, Inc. $90.00 $7,200.00
JAL CONSTRUCTION, INC. $105.00 $8,400.00
STG Pacific, LLC $95.00 $7,600.00 North Santiam Paving Co. $73.00 $5,840.00 Engineer's Estimate 80 HOUR $95.00 $7,600.00
A1020 62402-0200 FURNISHING AND PLACING TOPSOIL, 3-INCH DEPTH
Conway Construction, Inc. $31,500.00 $40,950.00
JAL CONSTRUCTION, INC. $35,000.00 $45,500.00
STG Pacific, LLC $35,000.00 $45,500.00 North Santiam Paving Co. $42,000.00 $54,600.00 Engineer's Estimate 1.3 ACRE $18,200.00 $23,660.00
A1040 62501-0000 TURF ESTABLISHMENT
Conway Construction, Inc. $5,000.00 $6,500.00
JAL CONSTRUCTION, INC. $6,000.00 $7,800.00
STG Pacific, LLC $6,100.00 $7,930.00 North Santiam Paving Co. $3,400.00 $4,420.00 Engineer's Estimate 1.3 ACRE $6,525.00 $8,482.50
A1060 62635-3000 CUTTINGS, WILLOW POLE (SINGLE GROUP METHOD)
Conway Construction, Inc. $35.00 $33,600.00
JAL CONSTRUCTION, INC. $35.00 $33,600.00
STG Pacific, LLC $38.00 $36,480.00 North Santiam Paving Co. $29.00 $27,840.00 Engineer's Estimate 960 EACH $55.00 $52,800.00
A1080 63302-0000 SIGN SYSTEM
Conway Construction, Inc. $220.00 $4,400.00
JAL CONSTRUCTION, INC. $100.00 $2,000.00
STG Pacific, LLC $20.00 $400.00 North Santiam Paving Co. $125.00 $2,500.00 Engineer's Estimate 20 SQFT $210.00 $4,200.00
25 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1100 63309-0900 DELINEATOR, TYPE FLEXIBLE (TYPE 4, ALT 1)
Conway Construction, Inc. $85.00 $1,530.00
JAL CONSTRUCTION, INC. $55.00 $990.00
STG Pacific, LLC $22.00 $396.00 North Santiam Paving Co. $85.00 $1,530.00 Engineer's Estimate 18 EACH $170.00 $3,060.00
A1120 63309-0900 DELINEATOR, TYPE FLEXIBLE (TYPE 2)
Conway Construction, Inc. $100.00 $5,000.00
JAL CONSTRUCTION, INC. $80.00 $4,000.00
STG Pacific, LLC $62.00 $3,100.00 North Santiam Paving Co. $85.00 $4,250.00 Engineer's Estimate 50 EACH $170.00 $8,500.00
A1140 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (YELLOW)
Conway Construction, Inc. $0.23 $3,208.50
JAL CONSTRUCTION, INC. $0.30 $4,185.00
STG Pacific, LLC $0.50 $6,975.00 North Santiam Paving Co. $0.22 $3,069.00 Engineer's Estimate 13,950 LNFT $1.05 $14,647.50
A1160 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID (WHITE)
Conway Construction, Inc. $0.23 $3,224.60
JAL CONSTRUCTION, INC. $0.30 $4,206.00
STG Pacific, LLC $0.50 $7,010.00 North Santiam Paving Co. $0.22 $3,084.40 Engineer's Estimate 14,020 LNFT $1.05 $14,721.00
A1180 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
Conway Construction, Inc. $21.00 $1,176.00
JAL CONSTRUCTION, INC. $35.00 $1,960.00
STG Pacific, LLC $40.00 $2,240.00 North Santiam Paving Co. $30.00 $1,680.00 Engineer's Estimate 56 EACH $45.00 $2,520.00
A1200 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
Conway Construction, Inc. $58.00 $1,740.00
JAL CONSTRUCTION, INC. $60.00 $1,800.00
STG Pacific, LLC $150.00 $4,500.00 North Santiam Paving Co. $63.00 $1,890.00 Engineer's Estimate 30 EACH $80.00 $2,400.00
26 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1220 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Conway Construction, Inc. $15,000.00 $15,000.00
JAL CONSTRUCTION, INC. $6,500.00 $6,500.00
STG Pacific, LLC $17,100.00 $17,100.00 North Santiam Paving Co. $16,000.00 $16,000.00 Engineer's Estimate 1 EACH $17,000.00 $17,000.00
A1240 63502-3100 TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM
Conway Construction, Inc. $30,000.00 $120,000.00
JAL CONSTRUCTION, INC. $10,000.00 $40,000.00
STG Pacific, LLC $18,000.00 $72,000.00 North Santiam Paving Co. $17,250.00 $69,000.00 Engineer's Estimate 4 EACH $38,575.00 $154,300.00
A1260 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Conway Construction, Inc. $27.00 $6,885.00
JAL CONSTRUCTION, INC. $30.00 $7,650.00
STG Pacific, LLC $50.00 $12,750.00 North Santiam Paving Co. $35.00 $8,925.00 Engineer's Estimate 255 SQFT $35.00 $8,925.00
A1280 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Conway Construction, Inc. $140.00 $61,600.00
JAL CONSTRUCTION, INC. $80.00 $35,200.00
STG Pacific, LLC $85.00 $37,400.00 North Santiam Paving Co. $75.00 $33,000.00 Engineer's Estimate 440 HOUR $85.00 $37,400.00
A1300 64603-0200 FIXTURE, MAILBOX
Conway Construction, Inc. $500.00 $500.00
JAL CONSTRUCTION, INC. $1,000.00 $1,000.00
STG Pacific, LLC $830.00 $830.00 North Santiam Paving Co. $1,300.00 $1,300.00 Engineer's Estimate 1 EACH $315.00 $315.00
A1320 64631-0000 ROADSIDE DEVELOPMENT (TREATMENT DITCH)
Conway Construction, Inc. $40.00 $14,720.00
JAL CONSTRUCTION, INC. $100.00 $36,800.00
STG Pacific, LLC $105.00 $38,640.00 North Santiam Paving Co. $85.00 $31,280.00 Engineer's Estimate 368 LNFT $70.00 $25,760.00
27 out of 27 Project No: OR FLAP POLK MITCHELL(1)
Project Name: Mitchell Street and Black Rock Road Reconstruction
Schedule: A
Schedule Type: Alternate
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1340 65001-1000 CONSTRUCT AND MAINTAIN DIVERSION
Conway Construction, Inc. Lump Sum $250,000.00 JAL CONSTRUCTION, INC. Lump Sum $290,000.00 STG Pacific, LLC Lump Sum $275,000.00 North Santiam Paving Co. Lump Sum $750,000.00 Engineer's Estimate ALL LPSM Lump Sum $137,300.00
Total Schedule - All Items
Conway Construction, Inc. $6,275,457.10
JAL CONSTRUCTION, INC. $6,388,946.00
STG Pacific, LLC $7,337,273.50 North Santiam Paving Co. $8,817,912.40 Engineer's Estimate $6,257,831.00