This is a preliminary bid results tabulation for Oregon project S-73000-00002648, OR18 Enhanced Ped Crossing in Grand Ronde, involving three bidding contractors: Elk Mountain Construction, Brown Contracting Inc, and HP Civil Inc. The project encompasses comprehensive pedestrian crossing improvements including mobilization, traffic control, temporary protection devices, erosion and pollution control measures, contaminated soil handling, construction survey work, pavement removal and replacement, concrete work, signage, and installation of lighting infrastructure with flashing beacons. The scope of work includes 45 distinct line items ranging from temporary barricades and flagging services to permanent surface-mounted markers, thermoplastic pavement markings, and electrical work for illumination systems.
The bid tabulation presents total project costs of $521,722.00 for Elk Mountain Construction, $538,888.00 for Brown Contracting Inc, and $541,045.55 for HP Civil Inc. Pricing variations among bidders are notable across multiple line items, with significant differences in high-cost categories such as flashing beacon installation ($110,000 to $123,000), lighting poles and arms ($18,000 to $32,500), temporary protection and direction of traffic ($40,000 to $102,500), and pole foundations ($5,000 to $25,000). The bid results indicate competitive pricing strategies with Elk Mountain Construction submitting the lowest overall proposal. No information regarding set-asides, contract term, funding sources, or award determination criteria is provided in this preliminary bid results document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Notice_of_Intent_to_Participate_NASPO_Construction_Equipment_OK-SW-192_Final.pdf | ||
| SAMPLE_Participating_Addendum_Ref.No._2646_Final~1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| S-73000-00002648 OR18 Enhanced Ped Crossing Grand Ronde | ||||||
| PRELIMINARY BID RESULTS | Elk Mountain Construction | Brown Contracting Inc | HP Civil Inc | |||
| Bid Item # | Description | Est | ||||
| QTY | UNIT | UNIT | ||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL | |||||
| PRICE | UNIT | |||||
| PRICE | TOTAL |
PRICE
| 1 | MOBILIZATION | 1 | LS | $ 55,000.000 | $ 55,000.00 | $ 60,587.000 | $ 60,587.00 | $ 54,104.550 | $ 54,104.55 |
| 2 | TEMPORARY PROTECTION AND DIRECTION OF TRAFFIC | 1 | LS | $ 40,000.000 | $ 40,000.00 | $ 49,321.000 | $ 49,321.00 | $ 102,500.000 | $ 102,500.00 |
| 3 | TEMPORARY SIGNS | 500 | SQFT | $ 10.000 | $ 5,000.00 | $ 40.000 | $ 20,000.00 | $ 31.000 | $ 15,500.00 |
| 4 | TEMPORARY BARRICADES, TYPE II | 9 | EACH | $ 100.000 | $ 900.00 | $ 180.000 | $ 1,620.00 | $ 65.000 | $ 585.00 |
| 5 | TEMPORARY BARRICADES, TYPE III | 5 | EACH | $ 200.000 | $ 1,000.00 | $ 220.000 | $ 1,100.00 | $ 160.000 | $ 800.00 |
| 6 | PEDESTRIAN CHANNELIZING DEVICES | 112 | FOOT | $ 30.000 | $ 3,360.00 | $ 25.000 | $ 2,800.00 | $ 26.000 | $ 2,912.00 |
| 7 | TEMPORARY PLASTIC DRUMS | 67 | EACH | $ 50.000 | $ 3,350.00 | $ 80.000 | $ 5,360.00 | $ 45.000 | $ 3,015.00 |
| 8 | PORTABLE CHANGEABLE MESSAGE SIGNS | 2 | EACH | $ 2,000.000 | $ 4,000.00 | $ 2,500.000 | $ 5,000.00 | $ 4,000.000 | $ 8,000.00 |
| 9 | TEMPORARY CURB RAMP | 1 | EACH | $ 2,200.000 | $ 2,200.00 | $ 2,700.000 | $ 2,700.00 | $ 1,200.000 | $ 1,200.00 |
| 10 | FLAGGERS | 150 | HOUR | $ 100.000 | $ 15,000.00 | $ 80.000 | $ 12,000.00 | $ 60.000 | $ 9,000.00 |
| 11 | FLAGGER STATION LIGHTING | 4 | EACH | $ 2,000.000 | $ 8,000.00 | $ 1,200.000 | $ 4,800.00 | $ 750.000 | $ 3,000.00 |
| 12 | EROSION CONTROL | 1 | LS | $ 4,000.000 | $ 4,000.00 | $ 2,000.000 | $ 2,000.00 | $ 2,500.000 | $ 2,500.00 |
| 13 | INLET PROTECTION, TYPE 11 | 1 | EACH | $ 1,000.000 | $ 1,000.00 | $ 500.000 | $ 500.00 | $ 175.000 | $ 175.00 |
| 14 | SEDIMENT BARRIER, TYPE 3 | 42 | FOOT | $ 30.000 | $ 1,260.00 | $ 90.000 | $ 3,780.00 | $ 8.500 | $ 357.00 |
| 15 | POLLUTION CONTROL PLAN | 1 | LS | $ 10,000.000 | $ 10,000.00 | $ 1,200.000 | $ 1,200.00 | $ 2,500.000 | $ 2,500.00 |
| 16 | HEALTH AND SAFETY PLAN | 1 | LS | $ 10,000.000 | $ 10,000.00 | $ 1,500.000 | $ 1,500.00 | $ 2,500.000 | $ 2,500.00 |
| 17 | CONTAMINATED SOIL DISPOSAL | 38 | TON | $ 280.000 | $ 10,640.00 | $ 200.000 | $ 7,600.00 | $ 170.000 | $ 6,460.00 |
| 18 | SEGREGATE AND STOCKPILE CONTAMINATED SOIL | 1 | LS | $ 6,000.000 | $ 6,000.00 | $ 7,500.000 | $ 7,500.00 | $ 3,000.000 | $ 3,000.00 |
| 19 | CONSTRUCTION SURVEY WORK | 1 | LS | $ 8,000.000 | $ 8,000.00 | $ 15,000.000 | $ 15,000.00 | $ 15,000.000 | $ 15,000.00 |
| 20 | REMOVAL OF SURFACINGS | 90 | SQYD | $ 80.000 | $ 7,200.00 | $ 88.000 | $ 7,920.00 | $ 65.000 | $ 5,850.00 |
| 21 | REMOVAL OF STRUCTURES AND OBSTRUCTIONS | 1 | LS | $ 15,000.000 | $ 15,000.00 | $ 5,000.000 | $ 5,000.00 | $ 500.000 | $ 500.00 |
| 22 | GENERAL EXCAVATION | 25 | CUYD | $ 800.000 | $ 20,000.00 | $ 320.000 | $ 8,000.00 | $ 170.000 | $ 4,250.00 |
| 23 | SUBGRADE GEOTEXTILE | 15 | SQYD | $ 40.000 | $ 600.00 | $ 30.000 | $ 450.00 | $ 6.000 | $ 90.00 |
| 24 | ADJUSTING INLETS | 1 | EACH | $ 1,000.000 | $ 1,000.00 | $ 2,200.000 | $ 2,200.00 | $ 1,800.000 | $ 1,800.00 |
| 25 | COLD PLANE PAVEMENT REMOVAL, 3 INCHES DEEP | 135 | SQYD | $ 60.000 | $ 8,100.00 | $ 80.000 | $ 10,800.00 | $ 35.000 | $ 4,725.00 |
| 26 | AGGREGATE BASE | 80 | TON | $ 100.000 | $ 8,000.00 | $ 250.000 | $ 20,000.00 | $ 100.000 | $ 8,000.00 |
| 27 | LEVEL 3, 1/2 INCH ACP MIXTURE | 27 | TON | $ 1,120.000 | $ 30,240.00 | $ 680.000 | $ 18,360.00 | $ 500.000 | $ 13,500.00 |
| 28 | CONCRETE CURBS, CURB AND GUTTER | 32 | FOOT | $ 465.000 | $ 14,880.00 | $ 155.000 | $ 4,960.00 | $ 80.000 | $ 2,560.00 |
| 29 | CONCRETE WALKS | 590 | SQFT | $ 26.000 | $ 15,340.00 | $ 30.000 | $ 17,700.00 | $ 19.000 | $ 11,210.00 |
| 30 | EXTRA FOR CURB RAMPS | 2 | EACH | $ 7,000.000 | $ 14,000.00 | $ 2,500.000 | $ 5,000.00 | $ 1,800.000 | $ 3,600.00 |
| 31 | TRUNCATED DOMES ON NEW SURFACES | 29 | SQFT | $ 100.000 | $ 2,900.00 | $ 100.000 | $ 2,900.00 | $ 50.000 | $ 1,450.00 |
| 32 | DELINEATORS, TYPE 2 | 16 | EACH | $ 200.000 | $ 3,200.00 | $ 555.000 | $ 8,880.00 | $ 175.000 | $ 2,800.00 |
| 33 | PAVEMENT LINE REMOVAL | 40 | FOOT | $ 30.000 | $ 1,200.00 | $ 80.000 | $ 3,200.00 | $ 18.000 | $ 720.00 |
| 34 | PAVEMENT BAR REMOVAL | 288 | SQFT | $ 22.000 | $ 6,336.00 | $ 30.000 | $ 8,640.00 | $ 18.000 | $ 5,184.00 |
| 35 | PERMANENT SURFACE MOUNTED TUBULAR MARKERS | 4 | EACH | $ 400.000 | $ 1,600.00 | $ 400.000 | $ 1,600.00 | $ 185.000 | $ 740.00 |
| 36 | THERMOPLASTIC, EXTRUDED, SURFACE, NON-PROFILED | 250 | FOOT | $ 10.000 | $ 2,500.00 | $ 35.000 | $ 8,750.00 | $ 6.500 | $ 1,625.00 |
| 37 | PAVEMENT BAR, TYPE B-HS | 216 | SQFT | $ 26.000 | $ 5,616.00 | $ 35.000 | $ 7,560.00 | $ 23.000 | $ 4,968.00 |
| 38 | REMOVE EXISTING SIGNS | 1 | LS | $ 4,000.000 | $ 4,000.00 | $ 4,000.000 | $ 4,000.00 | $ 1,600.000 | $ 1,600.00 |
| 39 | CROSSWALK CLOSURE BARRICADES | 2 | EACH | $ 1,000.000 | $ 2,000.00 | $ 1,500.000 | $ 3,000.00 | $ 900.000 | $ 1,800.00 |
| 40 | SIGNS, STANDARD SHEETING, SHEET ALUMINUM | 83 | SQFT | $ 40.000 | $ 3,300.00 | $ 80.000 | $ 6,600.00 | $ 42.000 | $ 3,465.00 |
| 41 | POLE FOUNDATIONS | 1 | LS | $ 5,000.000 | $ 5,000.00 | $ 6,500.000 | $ 6,500.00 | $ 25,000.000 | $ 25,000.00 |
| 42 | LUMINAIRES, LAMPS, AND BALLASTS | 1 | LS | $ 1,000.000 | $ 1,000.00 | $ 1,500.000 | $ 1,500.00 | $ 40,000.000 | $ 40,000.00 |
| 43 | SWITCHING, CONDUIT, AND WIRING | 1 | LS | $ 30,000.000 | $ 30,000.00 | $ 30,000.000 | $ 30,000.00 | $ 20,000.000 | $ 20,000.00 |
| 44 | LIGHTING POLES AND ARMS | 1 | LS | $ 20,000.000 | $ 20,000.00 | $ 18,000.000 | $ 18,000.00 | $ 32,500.000 | $ 32,500.00 |
| 45 | FLASHING BEACON INSTALLATION | 1 | LS | $ 110,000.000 | $ 110,000.00 | $ 123,000.000 | $ 123,000.00 | $ 110,000.000 | $ 110,000.00 |
| TOTAL | $ 521,722.00 | $ 538,888.00 | $ 541,045.55 |
File details come from the government source that posted it. Updated .