The provided document is a Bid Tab Sheet (Unofficial) for the Georgia Veterans Memorial Cemetery Glennville Phase 2 project, which is being managed by the Georgia State Financing and Investment Commission (GSFIC) on behalf of the Georgia Department of Veterans Service (Owner). The project scope includes developing a new pre-placed crypts Burial Section D, extending the asphalt drive, replacing failed pre-cast columbarium unit caps with granite caps and end panels, replacing and adding new service emblems in the Ceremonial Area, as well as grading, drainage, sod, and irrigation work. The bid opening date is August 7, 2024, at 2:00 PM. The document shows the bid prices submitted by two contractors, Dabbs-Williams General Contractors, LLC and Strack, Inc., for the base bid and various additive alternates.

The base bid total for Dabbs-Williams General Contractors, LLC is $2,229,000, while the base bid total for Strack, Inc. is $3,121,300. The document also includes unit prices for various line items, such as concrete curb and gutter replacement, unsuitable soil excavation and removal, sod installation, and crushed stone base. Bidder qualification notes are provided, indicating that the GSFIC will use the e-Builder Project Management system to receive, review, and store contractor bids and supporting documents.

View the file

Other files

File Type Posted
Notice of Intent to Award.pdf PDF
eBuilder Registration _ Bid Submittal User Gu.pdf PDF
Pre_Bid Sign_In Sheet.pdf PDF
Invitation To Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project:

Bid Open Date:

Description Quantity UoM Unit Cost Total Cost Unit Cost Total Cost

1 Base Bid - GVMC Expansion 0.00 1,350,000.00 0.00 2,248,000.00 2 Crypt Material Cost w/Markup 0.00 835,000.00 0.00 829,300.00 3 Allowance - Unforeseen Conditions 0.00 20,000.00 0.00 20,000.00 4 Allowance - Tree Pruning 0.00 20,000.00 0.00 20,000.00 5 Allowance - Emblem Materials 0.00 4,000.00 0.00 4,000.00

2,229,000.00 3,121,300.00

1 Remove/replace the existing pre-cast concrete colum 0.00 345,000.00 0.00 360,000.00 2 Remove existing Service Emblems in Ceremonial Ar 0.00 12,000.00 0.00 2,600.00

357,000.00 362,600.00

1 Concrete curb & gutter replacement 10 LF 25.00 250.00 40.00 400.00 2 Unsuitable soils - excavate and remove off site and r 1 CY 60.00 60.00 100.00 100.00 3 Sod - material and installation 100 SF 1.25 125.00 1.30 130.00 4 Crushed stone base - material and installation 1 CY 75.00 75.00 220.00 220.00 5 80-100 sieve stone fill - material and installation 1 CY 125.00 125.00 250.00 250.00

635.00 1,100.00

2,229,000.00 3,121,300.00

Bidder Qualification Notes included

Bid Summary Base Bid Total

Unit Prices

Unit Prices Cost Total

Additive Alternates

Additive Alternates Cost Total

Base Bid

Base Bid Cost Total

Dabbs-Williams General Contractors, LLC Strack, Inc.

VSB-147-24-01, GVMC Glennville Phase 2 Brad Williams Christian Long

08.07.2024 2:00 PM bmw@dabbs-williams.com christianl@strackinc.com