This is a Bid Tabulation and Recommendation for Contract Award document from the Michigan Department of Technology, Management & Budget (DTMB), State Facilities Administration, Design & Construction division for the Northern Region Administration. The project involves electrical upgrades at Kinross Correctional Facility, Phase 2, located at the Warehouse Complex, Building 600 in Lansing, Michigan. The bid opening occurred on November 1, 2026, at 2:00 p.m., with the file number 472/26238. Four contractors submitted bids for this electrical upgrade project.

Glen Construction, LLC submitted the lowest base bid of $1,920,400.00 and is recommended for award. The competing bids were as follows: J & B Associates, LLC at $2,797,621.00; J. Ranck Electric, Inc. at $3,436,402.00; and Amble Electric, LLC at $3,883,220.00. All bidders were required to submit bid bonds at 5.00% and met the qualification criteria, with three of the four bidders identified as either certified as awardable or qualified as disabled veterans. Adequate funds are available for this contract award from the designated budget allocation.

View the file

Other files

File Type Posted
Memo 260929 Award Glenn Construction, LLC Y26472.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Agency Name

9/2/2026

Bid Tabulation and Recommendation For Contract AwardDMB-412 (R 10/96)

DOC/Northern Region Administration NRA

Available Funds $

Bid opening date and time 11/1/2026Bid Expiration Date

RWG./ 26238File Number

Director SAB Architect

FUNDS:

Adequate

Revised W.O./M.O.P.

Addendum

Additional Funds $

RECOMMENDATION (Return to Facilities Administration)

REASON FOR PROJECT (Must be filled in)

BID SECURITY

NOT REQUIRED REQUIRED

BIDDERS BASE BIDCert. of Awardability? BID BOND

Bid Package # 1

Scope Kinross C.F. - Electrical Upgrades – Phase 2 Index Number

BOND %

Matrix Consulting Engineers

, 2:00 p.m.

Qualified Dis. Veteran?

DMB-402 (RPIMS revision date: 04/08) DTMB State Facilities Administration, Design & Construction

Warehouse Complex, Building 600

P.O. Box 30026

Lansing, Michigan 48909

AWARD:BIDDER:

Low

Second

Third

Glen Construction, LLC $1,920,400.00Bond

5092 W. Vienna Road, Suite K

Clio MI 48420

5.00%Yes

J & B Associates, LLC $2,797,621.00Bond

2340 W. M-61

Gladwin MI 48624

5.00%Yes

J. Ranck Electric, Inc. $3,436,402.00Bond

1993 Gover Parkway

Mt. Pleasant MI 48858

5.00%

Amble Electric, LLC $3,883,220.00Bond

P.O. Box 437

Lakeview, MI 48850 MI

5.00%Yes

Page 1 of 1472 26238/ . RWG