Bid Submission Instructions.pdf

PDF 61 KB Posted

Attached to
DOTD Agg Contract, Basecourse, Stone
Solicitation number
3000026950
Issued by
Louisiana

About this file

This is a Bid Submission Instructions document issued by the Louisiana Department of Transportation and Development (DOTD) Procurement Section that establishes procedures for submitting bids to state contract opportunities. The document outlines three delivery methods for bid submission: hand delivery, courier service, or U.S. Postal Service mail. All bids must be received and time-stamped by the DOTD Procurement Section before the specified bid opening date and time, which is designated in Central Standard Time. Bidders are responsible for ensuring proper delivery to the correct location, including noting the floor and room number on courier deliveries to prevent delays or rejection. Failure to meet the bid opening deadline will result in automatic bid rejection.

The instructions specify two distinct delivery addresses depending on the submission method: for hand or courier delivery, bids must be sent to the DOTD Procurement Section at 1201 Capitol Access Road, Headquarters Administration, 4th Floor East Wing, Room S-447, Baton Rouge, LA 70802; for U.S. Postal Service delivery, bids must be addressed to P.O. Box 94245, Baton Rouge, LA 70804-9245. The document emphasizes that DOTD is not responsible for delays caused by bidders' selected delivery methods and that bidders bear sole responsibility for timely bid delivery. All bid envelopes must clearly display the complete address, RFx number, and bid opening date.

View the file

Other files

File Type Posted
US Preference Form.pdf PDF
AML for Aggregates 10.PDF PDF
3000026950.pdf PDF
LA Preference Form.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SUBMISSION INSTRUCTIONS

Bid documents may be delivered to the Procurement Section located at the Department of Transportation and Development Headquarters in Baton Rouge, LA by either hand, courier service or through the US Postal Service. Bids MUST be received and time-stamped in the Procurement Section before the date and time set for receiving bid submissions as noted on the RFx hereof.

NOTE: The time set for receiving bids is Central Standard Time (CST).

HAND OR COURIER SERVICE DELIVERY:

For delivery by HAND or COURIER SERVICE to our physical location please clearly note, on the outside of the bid envelope, the complete address, RFx number and bid opening date as shown below. Bidders are hereby advised that most courier services will not deliver to the Procurement Section without a floor and room number noted on the envelope. Omission of this information could delay delivery of your bid and/or rejection if the bid is received after the opening deadline.

DOTD Procurement Section Headquarters Administration 4th Floor East Wing S-447

1201 Capitol Access Road Baton Rouge, LA 70802 RFx No.: ______________________ Bid Opening Date: ______________

Bidders are solely responsible for ensuring that the courier service provider makes inside deliveries to our physical location. The DOTD Procurement Office is NOT responsible for any delays caused by the bidder’s chosen means of delivery. Bidder is solely responsible for the timely delivery of bids. Failure to meet the bid opening date and time shall result in rejection of the bid.

U.S. POSTAL SERVICE DELIVERY:

For delivery by US POSTAL SERVICE to our P.O. Box please clearly note, on the outside of the bid envelope, the complete address, RFx number and bid opening date as shown below. Bidders are hereby advised that the U.S. Postal Service does not make deliveries to our physical location.

DOTD Procurement Section Headquarters Administration 4th Floor East Wing S-447 P.O. Box 94245 Baton Rouge, LA 70804-9245

RFx No.: ______________________ Bid Opening Date: ______________

Bids mailed through the U.S. Postal Service to our Post Office Box are received at the Baton Rouge Main Post Office and are then picked up the Division of Administration and then routed to the DOTD and then to the Procurement Section; therefore, extra delivery time is needed in order for bids to be received and time-stamped in our office before the bid opening deadline. The DOTD Procurement Section is NOT responsible for any delays caused by the bidders chosen means of delivery. Bidder is solely responsible for the timely delivery of bids. Failure to meet the bid opening date and time shall result in rejection of the bid.