Bid Specs.Street Crackfill.2025.pdf
PDF 99 KB Posted
- Attached to
- 2025 Street Crackfill
- Solicitation number
- DPW 2025-03
- Issued by
- Kalamazoo County, Blissfield Village, Michigan
About this file
The document is a Bid Specification for the Village of Blissfield's 2025 Street Crackfill project in Michigan. The project involves comprehensive street maintenance, specifically crack repair and filling, with work to be completed within 120 days from the Notice of Award. The specifications outline a detailed process for street crack repair, including cleaning cracks with compressed air, routing with a power wire brush, removing vegetative matter, filling cracks with hot rubberized crack filler, and spraying with water after filling. The contractor will be responsible for traffic control, warning signs, and must provide proof of property damage, liability, and workers' compensation insurance.
No specific pricing terms, funding sources, or financial details are provided in the bid specifications. The document is primarily a technical specification sheet with a signature section for potential bidders to complete, indicating the Village of Blissfield is seeking qualified contractors to perform the street maintenance work. The bid document serves as a formal invitation for contractors to submit proposals for the crack filling project, with clear expectations for the work to be performed and the required documentation for bidding.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Form.Street Crackfill.2025.pdf | ||
| Invitation to Bid.Street Crackfill.2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SPECIFICATIONS
Village of Blissfield: 2025 Street Crackfill
TERM
• Work shall be completed within 120 days from the Notice of Award.
SPECIFICATIONS
• Cracks in the streets to be crack filled shall be blown out with compressed air.
• Cracks shall be routed with a power wire brush as needed.
• No vegetative matter shall remain in the cracks after cleaning/routing.
• Cracks shall then be immediately filled with hot rubberized crack filler, in sufficient quantity to completely fill each crack.
• Cracks will be sprayed with water immediately after filling.
• The contractor shall be responsible for any traffic control and warning signs as may be needed.
• The contractor must provide a copy of adequate property damage, liability, and workers’ compensation insurance with bid documents.
Company Name: ___________________________ Phone: ___________________________
Email: _______________________________ Fax: ___________________________________
Signature: ______________________________ Printed Name: ________________________
Title: ____________________________________________
File details come from the government source that posted it. Updated .