BID SPECS - Attachment 1.pdf
PDF 7 MB Posted
- Solicitation number
- B2500092
- Issued by
- Weld County, Colorado
About this file
The document is a comprehensive set of bid specifications and construction documents for the Weld County Human Resources Building B HVAC Upgrades project located at 315 N 11th Ave, Greeley, Colorado. The project involves a complete replacement of the existing HVAC systems, including seven rooftop units (RTUs), exhaust fans, VAV boxes with electric reheat, and associated building controls. The specifications cover detailed mechanical, electrical, and architectural requirements for the upgrade, with a focus on replacing the existing HVAC infrastructure while maintaining the building's current functionality.
The bid documents include detailed technical specifications, mechanical and electrical plans, demolition drawings, and equipment schedules that outline the scope of work. The project will involve removing existing HVAC equipment and installing new Trane Precedent rooftop units with gas heating, updating the building automation system with new DDC controls, and replacing VAV terminal units with electric reheat. The electrical documents indicate that the existing electrical service will remain unchanged, with new connections made to existing panels. The estimated project complexity suggests a comprehensive upgrade aimed at improving the building's energy efficiency and HVAC performance, with careful consideration of existing building systems and operational continuity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Specs - Human Services Building B HVAC Upgrade - 92.docx | DOCX document | |
| BID SPECS - Attachment 2.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP NOT TO SCALE
N O
T
FO
R
REG
U
LA
TO
RY
A
PPRO
V A L, PERM
IT
IN
G
O R
C O
N
ST
RU
C
TI
O N
DRAWN BY:
CHECKED BY:
DATE:
REVISION:
COPYRIGHT 2025
This document is an instrument of service, and as such remains the property of the Architect. Permission for use of this document is limited and can be extended only by written agreement with EVstudio, LLC.
Denver, CO Evergreen, CO Boise, ID Austin, TX
Main Office: 303.670.7242 inspections@evstudio.com design@evstudio.com www.evstudio.com
Contact:
/3
/2
:4
:4 A
M
G000
COVER SHEET
JS
JH
MA24019
PERMIT/BID
03.31.2025
W e ld
C o u n ty
H u m a n R e s o u rc e s B ld g B
N
T H
A V
E G
R E
E L E
Y C
O
H V
A C
U p g ra d e s
Contact
Architect
EVstudio
DENVER, CO 80212
5335 W 48TH AVE, STE 300
ph: 303.670.7242 x 53
JEFFREY SCOTT, NCARB
jeffrey.scott@evstudio.com
Contact
Owner
WELD COUNTY
GREELEY, CO 80632
1105 H STREET, P.O. BOX 758
ph: 970.400.2044
WILL HOPKINS
whopkins@weld.gov
Contact
Structural Engineer
EVstudio
DENVER, CO 80212
5335 W 48TH AVE, STE 300
ph: 303.670.7242 x 62
KATELYN WAGER, PE
katelyn@evstudio.com
Contact
Electrical Engineer
EVstudio
DENVER, CO 80212
5335 W 48TH AVE, STE 300
ph: 303.670.7242 x 222
ERIC REITAN, PE
eric.reitan@evstudio.com
Weld County Human Resources Bldg B - HVAC Upgrades
315 N 11TH AVE, GREELEY, CO 80631
ARCHITECTURAL
A001 SPECIFICATIONS
A002 SPECIFICATIONS
A003 SPECIFICATIONS
A004 SPECIFICATIONS
STRUCTURAL
SHEET INDEX
Contact
MP Engineer
EVstudio
DENVER, CO 80212
5335 W 48TH AVE, STE 300
ph: 720.399.6453
JON ANDERSON, PE
jon.anderson@evstudio.com
GENERAL
G000 COVER SHEET
G001 GENERAL NOTES
G010 CODE PLAN
MECHANICAL
M000 MECHANICAL LEGEND & NOTES
M001 MECHANICAL SPECIFICATIONS
M002 MECHANICAL SPECIFICATIONS
MD101 MECHANICAL DEMO LVL 1 FLOOR PLAN
MD102 MECHANICAL DEMO LVL 2 FLOOR PLAN
MD103 MECHANICAL DEMO ROOF PLAN
M101 MECHANICAL LVL 1 FLOOR PLAN
M102 MECHANICAL LVL 2 FLOOR PLAN
M103 MECHANICAL ROOF PLAN
M401 CONTROLS DIAGRAMS AND SEQUENCES
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M701 VENTILATION CALCULATIONS
ELECTRICAL
E000 ELECTRICAL LEGEND & NOTES
E001 ELECTRICAL SPECIFICATIONS
E101 ELECTRICAL LVL 1 FLOOR PLAN
E102 ELECTRICAL LVL 2 FLOOR PLAN
E103 ELECTRICAL ROOF PLAN
E201 ELECTRICAL EXISTING 1-LINE DIAGRAM
E601 ELECTRICAL SCHEDULES
100% CONSTRUCTION DOCUMENTS
ROOF VIEW NOT TO SCALE
STRUCTURAL SUPPORT LETTER FOR NEW ROOFTOP UNITS
STRUCTURAL
STRUCTURAL SUPPORT LETTER FOR NEW ROOFTOP UNITS
STRUCTURAL CALCULATION BOOK
3/
/2
MECHANICAL
M000 MECHANICAL LEGEND & NOTES
M001 MECHANICAL SPECIFICATIONS
M002 MECHANICAL SPECIFICATIONS
MD101 MECHANICAL DEMO LVL 1 FLOOR PLAN
MD102 MECHANICAL DEMO LVL 2 FLOOR PLAN
MD103 MECHANICAL DEMO ROOF PLAN
M101 MECHANICAL LVL 1 FLOOR PLAN
M102 MECHANICAL LVL 2 FLOOR PLAN
M103 MECHANICAL ROOF PLAN
M401 CONTROLS DIAGRAMS AND SEQUENCES
M501 MECHANICAL DETAILS
M601 MECHANICAL SCHEDULES
M701 VENTILATION CALCULATIONS
ELECTRICAL
E000 ELECTRICAL LEGEND & NOTES
E001 ELECTRICAL SPECIFICATIONS
E101 ELECTRICAL LVL 1 FLOOR PLAN
E102 ELECTRICAL LVL 2 FLOOR PLAN
E103 ELECTRICAL ROOF PLAN
E201 ELECTRICAL EXISTING 1-LINE DIAGRAM
E601 ELECTRICAL SCHEDULES
STRUCTURAL
STRUCTURAL SUPPORT LETTER FOR NEW ROOFTOP UNITS
STRUCTURAL CALCULATION BOOK
GENERAL NOTES
ELEVATION INDICATOR
WINDOW INDICATOR
ROOM DESIGNATION
WALL TYPE INDICATOR
DOOR INDICATOR
DRAWING
TITLE
SECTION
REFERENCE
EXTERIOR
ELEVATION
REFERENCE
DETAIL
REFERENCE
FLOOR MATERIAL
TRANSITION INDIC.
REVISION
INDICATOR
ACCESSORY INDICATOR
CORNER GUARD
WALL MOUNTED
FIRE EXTINGUISHER
BRACKET
SEMI-RECESSED
FIRE EXTINGUISHER
CABINET
SURFACE MOUNTED
FIRE EXTINGUISHER
CABINET
INTERIOR ELEVATION
REFERENCE
CONSTRUCTION NOTES
DRAWINGS AND DIMENSIONS
GENERAL REQUIREMENTS
1 1/2" = 1'-0"
RFI
FLRG. FLOORING
TOP OF CONCRETET.O.C.
MASONRY OPENING
MANUFACTURER
MISCELLANEOUS
MECHANICAL
MINIMUM
MEETING
METAL
MOUNTED
LAVATORY
MANHOLE
MAXIMUM
MATERIAL
KITCHEN
LAMINATE(D)
INTERIOR
JOIST
JOINT
FIBER REINFORCED PANEL
INSIDE DIAMETER
FIRE RESISTIVE
HARDWARE
HOLLOW CORE
GYPSUM BOARD
GENERAL CONTRACTOR
GLASS MESH GYPSUM UNIT
GALVANIZED
HEIGHT
HEATER
INSULATION
HORIZONTAL
HOLLOW METAL
HARDBOARD
GRADE
HOSE BIB
GLASS
FUTURE
GALLON
GAUGE
FRAMING
FOOTING
FRAME
FOOT/FEET
MTG
MTL.
MIN.
MTD.
M.O.
MANUF
MECH.
HM
MISC.
M.H.
MAX.
MAT.
LAV.
LAM.
KIT.
INSUL.
JST.
JT.
INT.
HORIZ.
HT.
I.D.
HTR.
GALV.
HDBD.
HDWR
H.C.
H.B.
GMGU
GR.
GL.
G.C.
FUT.
GAL.
GA.
FTG.
F.R.
FRMG.
F.R.P.
FR.
FT.
WEIGHT
WITHOUT
VERTICAL
WINDOW
WELDED WIRE FABRIC
WAINSCOT
WROUGHT IRON
VESTIBULE
VINYL COMPOSITION TILE
WATER HEATER
WATER CLOSET
VINYL WALL COVERING
TYPICAL
UNFINISHED
TOP OF SLAB/STEEL
TOP OF FLOOR/FOOTING
TOP OF MASONRY
TELEVISION
VARIES
UNLESS OTHERWISE NOTED
W/O
W.W.F.
WSCI
WT.
WDW.
V.W.C.
VERT.
VCT
VEST.
W.C.
W.I.
W.H.
WD. WOOD
T.O.M.
U.O.N.
T.O.STL
T.O.F.
UNFIN.
VAR.
TYP.
T.V.
FINISHED FLOOR
EXPANSION JOINT
ENGINEERED
EXPANSION JOINT
FINISH GRADE
FLOOR DRAIN
FIRE EXTINGUISHER CABINET
FINISHED FLOOR
FIRE EXTINGUISHER
ELECTRIC WATER COOLER
FIRE HOSE CABINET
DRINKING FOUNTAIN
DEPARTMENT
DOWNSPOUT
EPOXY PAINT
EXTERIOR INSULATION & FINISH SYSTEM
FINISH(ED)
FIXTURE
FLOOR
FOUNDATION
FIBERGLASS
EQUIPMENT
EXTERIOR
EXHAUST
EXPANSION
EQUAL
ENCLOSURE
DRAWING
ELECTRICAL
ELEVATION
EACH
EACH WAY
DOOR
DETAIL
DIAMETER
DOWN
DISPENSER
CERAMIC TILE
CONSTRUCTION
CONTINUOUS
CONCRETE MASONRY UNIT
CAST IN PLACE
CONTROL JOINT
CERAMIC TILE PAVERS
ARCHITECT/ARCHITECTURAL
APPROXIMATE
ABOVE FINISHED FLOOR
AIR CONDITIONING
ANCHOR BOLT
BENCH MARK
DOUBLE
COLUMN
CONCRETE
CHANNELS
CEILING
CENTERLINE
CARPET
CABINET
BEARING
BASEMENT
BOTTOM OF
BUILDING
BLOCKING
BLOCK
BITUMINOUS
ASPHALT
BOARD
ALUMINUM
ALTERNATE
ACOUSTICAL
C.T.
F.E.
FIN.FLR.
F.H.C.
FIXT.
FLR.
F.G.
FDN.
F.E.C.
FIN.
F.D.
F.F.
EXH.
FBGL.
E.W.C.
EXT.
EQUIP.
EPOXY
EXP.JT.
EXP.
EQ.
E.I.F.S.
ENGR.
ENCL.
ELEC.
ELEV/EL.
E.J.
DWG.
EA.
E.W.
DISP.
DR.
DTL.
DIA.
DS.
DN.
DEPT.
D.F.
CTP
DBL.
BITUM.
C.M.U.
CONSTR.
CONT.
CONC.
COL.
CHNLS.
C.I.P.
CLG.
C.L.
C.J.
BRG.
CPT.
CAB.
BSMT.
BLKG.
BLDG.
B.O.
B.M.
BLK.
ADJ
ASPH.
BD.
APPROX.
ARCH.
ALT.
ALUM.
A.F.F.
ACOUST
A.B.
A.C.
ROOFINGRFG.
ROUGH OPENING
TOP OF
THRESHOLD
TOP OF BEAM
THICKNESS
TONGUE & GROOVE
TOP OF CURB
STATION
STEEL
SYSTEM
STORAGE
TREAD (IN PLAN)
SYMMETRICAL
STRUCTURAL
TOP AND BOTTOM
TEMPERED
TELEPHONE
SHEET VINYL
SUSPENDED
SUPPLIED
STAINLESS STEEL
STANDARD
TILE BACKER BOARD
SQUARE
SHEET
SEALER
SPECIFICATION(S)
SPANDREL
SQUARE FOOT/FEET
SCHEDULE
SOLID CORE
SUSPENDED ACOUSTICAL TILE
RIGHT OF WAY
S.STL.
T.
T.O.B.
THLD.
T.&G.
TEMP.
T.&B.
T.O.
THK.
T.C.
TEL.
TBB
SYST.
SUPPL.
SUSP.
STRL.
STOR.
SYM.
SV
STL.
S.F.
SPRL.
SPEC.
STA.
STD.
SQ.
SHT.
S.A.T.
SEAL.
SCHED.
R.O.W.
S.C.
R.O.
RM. ROOM
PORCELAIN TILE
REFER/REFERENCE
RISER
REQUIRED
QUARRY TILE
PARTITION
REINFORCED
ROOF DRAIN
RESILIENT
RUBBER BASE
OPENING
OWNER FURNISHED CONTRACTOR INSTALLED
PANEL
PLATE
PREFABRICATED
PLASTIC LAMINATE
PLUMBING
PROPERTY LINE
PRECAST CONCRETE
OPPOSITE
OVER HEAD
OUTSIDE DIAMETER
ON CENTER
NUMBER
NON-COMBUSTIBLE
NOT TO SCALE
NOT IN CONTRACT
P.C.
REQ
REINF.
RESIL.
RB
RE:
R.D.
Q.T.
R
RAD. RADIUS
PREFAB.
PLAM
PR.
POR.T.
PTN.
PNL.
PLG.
PL.
P.L.
PAIR
NO.
OPP.
OPG.
O.H.
PT
OFCI
O.D.
O.C.
PAINT
N.I.C.
NON-COM.
N.T.S.
STAINLESS STEELS.S.
WOOD GLULAM
RIGID INSULATION
BATT/LOOSE FILL INSULATION
GYPSUM BOARD
PLYWOOD
WOOD FINISH
NON-CONTINUOUS WOOD BLOCKING
CONTINUOUS WOOD BLOCKING
ALUMINUM
STEEL
CONCRETE (PRECAST OR CAST IN PLACE)
GRAVEL/POROUS FILL
COMPACT FILL
WHERE DRAWN
DETAIL NUMBER
SHEET
SHEET WHERE DRAWN
DETAIL NUMBER
WHERE DRAWN
SHEET
DETAIL NUMBER
DRAWING SCALE
ON SHEET
DETAIL LOCATION
DRAWING TITLE
STRUCTURE, STRUCTURALSTRUCT.
W/ WITH
AMERICANS WITH DISABILITIES ACTADA
ADJACENT
AUTOMATICAUTO
AMERICAN WOODWORKING INST.AWI
BEAMBM
CEMENTITIOUS BACKER BOARDCBB
COORDINATECOORD.
CONSTRUCTION SPEC. INSTITUTECSI
CABINET UNIT HEATERC.U.H.
DRYERD
DEMOLISH, DEMOLITIONDEMO
DIMENSIONDIM
HANDICAP, HANDICAPPEDHC
DISHWASHERDW
EXISTING(E)
FURNITURE, FIXTURES & EQUIPF.F.&E.
F.O.S. FACE OF STUD
GLUE LAMINATED WOODGLU LAM
NORTHN
NOT APPLICABLENA
NOMINALNOM
PLYWOODPLYWD
REFLECTED CEILING PLANRCP
REFRIGERATORREF
REVISIONREV.
SECTIONSECT
SHEATHINGSHTG
SHOWERSHWR
SOUND TRANSMISSION CLASSSTC
UNIFORM BUILDING CODEUBC
VERIFY IN FIELDVIF
W WASHER (IN PLAN)
WATERPROOFWP
WATER RESISTANTWR
KNOCK DOWNKD
JANITORJAN
INTERNATIONAL BUILDING CODEIBC
HEATING,VENTILATING & AIR COND.HVAC
HEADERHDR
REFER TO CONSTRUCTION SPECIFICATION
INSTITUTE, UNIFORM DRAWING SYSTEM AND
TO
PROJECT SPECIFICATIONS FOR REFERENCE
STANDARDS & ADDITIONAL ABBREVIATIONS
MASONRY
ACRYLIC POLYMER COATINGA.P.C.
ACCENTACCT
BY OTHERSBO
CLEARCLR
EQUIVALENTEQUIV.
CERAMIC TILE BASECTB
CERAMIC WALL TILECWT
EX
FIELDFLD
F.O. FACE OF
GALVANIZED HOLLOW METALGHM
TACK BOARDTB
TO BE DETERMINEDTBD
TUBE STEELTS
WIDE FLANGEWF
W WIRE GLASS (ON WINDOW)
TEMPERED (ON WINDOW)
T
UNDERWRITERS LABORATORYU.L.
HEIGHTH
LINEAR FOOTL.F.
MIRRORMIR
MARKER BOARDMB
METAL DECKMD
MEDIUM DENSITY FIBERBOARDMDF
NEW(N)
POLYVINYL CHLORIDEPVC
ROOF TOP UNITRTU
SEALED CONCRETES-CONC
STAINST
STRINGERSTR
FIRE RATED GYPSUM BOARDTYPE 'X'
GYP.
A1.1
PLAN
1A1.1
A1.1
A1.1
A
VCT CPT
VESTIBULE
W5
100A
F.E.
BRACKET
F.E.C.
SURFACE
F.E.C.
SEMI-R
XXXX
NECESSARYNECE.
EXISTING
ABBREVIATIONS SYMBOLS
CG
MATERIALS
SOAP DISPENSERSD
SPRAY INSULATION
1. ATTENTION ALL USERS OF THESE DRAWINGS, GENERAL CONTRACTORS, SUB-
CONTRACTORS, MANUFACTURERS, SUPPLIERS: CAREFULLY AND THOROUGHLY REVIEW
THESE GENERAL NOTES. IT IS YOUR RESPONSIBILITY TO KNOW AND ADHERE TO THESE
REQUIREMENTS.
2. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR THE
CONVENIENCE OF THE ARCHITECT AND THE CONTRACTOR. THE SEPARATIONS USED
HEREIN ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE, AND IN
NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE
DRAWINGS, OR OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT
THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO BE
CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
3. EVERY EFFORT HAS BEEN MADE TO MAKE THESE DOCUMENTS CONCISE AND
COORDINATED, TO DEFINE WORK IN THE MOST LOGICAL PLACE AND TO ELIMINATE
REDUNDANCY. DO NOT PRESUME THAT YOUR SCOPE OF WORK IS SINGULARLY DEFINED.
YOUR SCOPE OF WORK IS DEFINED THROUGHOUT THE ENTIRE SET OF DRAWINGS AND
SPECIFICATIONS AND IS NOT CONTAINED IN JUST ONE SERIES OF DRAWINGS OR DIVISION
OF SPECIFICATIONS. YOU MUST REVIEW THE ENTIRE SET OF CONTRACT DOCUMENTS TO
DETERMINE YOUR SCOPE OF WORK.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC
ENGINEERING DISCIPLINES (SUCH AS CIVIL, STRUCTURAL, MECHANICAL, ELECTRICAL,
ETC.) ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS
SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION.
IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR
WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR
INTERPRETATION FROM THE ARCHITECT PRIOR TO BIDDING. WHERE INCONSISTENCIES
ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT
CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER
QUALITY OR GREATER QUANTITY OF WORK.
5. MECHANICAL AND ELECTRICAL DRAWINGS SHOW INFORMATION IN A DIAGRAMMATIC
FASHION WITHOUT DIMENSIONING. THE GENERAL CONTRACTOR IS TO COORDINATE THE
LOCATIONS OF ALL M.E. EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, AND SUCH.
6. THE CONTRACTOR AND ALL SUB-CONTRACTORS SHALL VISIT THE SITE AND BECOME
FAMILIAR WITH SITE CONDITIONS AS THEY MAY AFFECT CARRYING OUT THE WORK AS
DESCRIBED IN THESE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL INVESTIGATE,
VERIFY, AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE PROJECT, AND NOTIFY THE
ARCHITECT OF ANY CONDITIONS THAT REQUIRE MODIFICATION BEFORE PROCEEDING
WITH THE WORK.
7. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING
ALL UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE OWNER.
8. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
9. THE CONTRACTOR SHALL PROVIDE ALL MATERIALS, EQUIPMENT, LABOR, AND
SERVICES NECESSARY TO COMPLETE THE WORK.
10. ALL WORK PERFORMED SHALL BE IN ACCORDANCE WITH THE BUILDING CODE & LOCAL
AMENDMENTS. RE: CODE SHEET.
11. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION OF ALL
TRADES AND THE PREVENTION OF CONFLICT BETWEEN ALL TRADES.
12. THE CONTRACTOR SHALL PLAN FOR 10 BUSINESS DAYS FOR RFIS AND SUBMITTAL
REVIEWS FOR ALL WRITTEN REQUESTS UNLESS INFORMATION CANNOT REASONABLY BE
ASCERTAINED WITHIN THAT TIMEFRAME.
13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DOCUMENT MANAGEMENT AS
WELL AS DISTRIBUTION AND COORDINATION OF DOCUMENTS TO ALL CONTRACTORS,
SUBCONTRACTORS AND AUTHORITIES HAVING JURISDICTION.
14. THE CONTRACTOR MAY REQUEST SPECIFIC FORMATTING OF DOCUMENTS,
HOWEVER EVSTUDIO WILL REQUIRE OWNER APPROVAL FOR ADDITIONAL FEES FOR TIME
REQUIRED TO CHANGE THE DOCUMENTS TO A REQUESTED FORMAT.
15. EVSTUDIO RESERVES THE RIGHT TO DISTINGUISH IN WRITING RFIS TO CLARIFY
CONSTRUCTION DOCUMENTS SEPARATELY FROM RFIS GENERATED BY ISSUES NOT
RESULTING FROM THE NEED TO CLARIFY INFORMATION IN THE DRAWINGS.
1. DO NOT SCALE THE DRAWINGS.
2. ALL DIMENSIONS ON PLANS ARE TO FACE OF BLOCK OR TO FACE OF STUD UNLESS
NOTED OTHERWISE.
3. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE ARCHITECT
IMMEDIATELY SHOULD ANY DISCREPANCIES BE FOUND IN THE DRAWINGS AND
SPECIFICATIONS.
4. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS
AND DIMENSIONS AS THEY RELATE TO THIS PROJECT. SHOULD DISCREPANCIES EXIST
BETWEEN THE WORK INDICATED AND ACTUAL FIELD CONDITIONS NOTIFY THE
ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
5. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY THE CONTRACTOR AND
APPROVED BY THE OWNER BEFORE ACTUAL CONSTRUCTION WORK BEGINS. ANY
INDICATION OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR THE
CONVENIENCE OF THE CONTRACTOR, AND ARE NOT TO BE TAKEN LITERALLY.
6. SEE GENERAL NOTES ON ALL 'A' SERIES DRAWINGS FOR INFORMATION RELATED TO
PLANS AND DETAILS ON THOSE SHEETS.
7. THE TERM "ALIGN" REFERS TO LOCATING DIFFERENT COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
8. CONTRACTORS AND ALL SUB-CONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS
PRIOR TO FABRICATION AND/OR ORDERING OF MATERIALS.
9. USE OF THE WORD "VERIFY" POINTS OUT A SITUATION WHICH MUST BE CONFIRMED
PRIOR TO PROCEEDING WITH THE WORK, FABRICATION OF EQUIPMENT, OR ORDERING
MATERIAL. NOTIFY THE ARCHITECT OF ANY DISCREPANCY.
10. REFER TO THE ARCHITECTURAL REFLECTED CEILING PLAN FOR EXACT LOCATIONS
OF ALL CEILING FIXTURES. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR
COMPLETE CONSTRUCTION REQUIREMENTS.
11. ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS SHOW WHERE
EXPOSED DUCTWORK IS TO BE INSTALLED AT A SPECIFIC ELEVATION IN A CONTROLLED
PATTERN. THE CONTRACTOR MUST RELY ON ALL OF THESE DISCIPLINES TO COMPLETE
THE WORK AND SHOULD NOTIFY THE ARCHITECT OF ANY DISCREPANCIES.
12. THE GENERAL CONTRACTOR SHALL COORDINATE THE WORK OF ALL TRADES
INSTALLING THEIR RESPECTIVE EQUIPMENT IN THE CEILING PLENUMS. MECHANICAL,
ELECTRICAL, STRUCTURAL, AND FIRE SPRINKLER SYSTEMS ALL SHARE THIS SAME
SPACE. EACH SUB CONTRACTOR IS TO REVIEW THE REQUIREMENTS OF THEIR WORK
WITH THE AWARENESS OF THE OTHER TRADES THAT NEED TO SHARE THESE SPACES
AND MUST NOT ASSUME THAT THEIR INSTALLATION HAS BEEN CONSIDERED IN THE
DESIGN AND SHOP DRAWINGS OF THE OTHER TRADES.
1. DRAWINGS ARE PREPARED USING DIMENSIONS AND PRODUCT CONFIGURATIONS OR
DETAILS OF SPECIFIC MANUFACTURERS (TYPICALLY THE FIRST MANUFACTURER LISTED
UNDER "ACCEPTABLE MANUFACTURERS" IN THE SPECIFICATIONS). DIMENSIONS AND
DETAILS FOR SPECIFIC PRODUCTS MAY CHANGE BEFORE THEY ARE ACTUALLY
INCORPORATED INTO THE WORK, AND PRODUCTS BY OTHER MANUFACTURERS MAY ALSO
BE ACCEPTABLE. THEREFORE, ACTUAL INSTALLATION DETAILS AND DIMENSIONS MAY
DIFFER FROM THOSE SHOWN. CONTRACTOR SHALL VERIFY INSTALLATION
REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED IN THE WORK (INCLUDING
PARTITION THICKNESSES FOR RECESSED OR SEMI-RECESSED PRODUCTS), AND IS
RESPONSIBLE FOR ACCOMMODATING AND COORDINATING CHANGES TO OTHER
MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
2. PROVIDE & INSTALL SOLID BLOCKING WITHIN PARTITIONS AT ALL LOCATIONS WHERE
ITEMS WILL BE MOUNTED ON PARTITIONS INCLUDING, BUT NOT LIMITED TO: ACCESSORIES,
CASEWORK TRIM, FLASHING, WALL MOUNTED EQUIPMENT, TACK/BULLETIN/MARKER
BOARDS, ETC.
3. ALL WOOD BLOCKING SHALL BE FIRE-RETARDANT WOOD.
4. MAINTAIN RATING AT ALL BLOCKOUTS FOR ALL FIRE EXTINGUISHERS AND TOILET
ACCESSORIES THAT ARE TO BE INSTALLED IN RATED WALLS.
5. PROVIDE & INSTALL 24" X 24" ACCESS PANELS IN PARTITIONS WHERE REQUIRED FOR
MECHANICAL EQUIPMENT EXCEPT WHERE SIZES ARE OTHERWISE NOTED.
6. PROVIDE & INSTALL GYPSUM BOARD CONTROL JOINTS IN PARTITIONS AND CEILINGS AT
30'-0" MAX. SPACING. COORDINATE TO MEET FIRE RESISTIVE RATINGS OF THE ASSEMBLY,
FIRESTOP JOINTS AT RATED PARTITIONS. SUB-CONTRACTOR MUST PROVIDE A SUBMITTAL
FOR JOINT MATERIAL.
7. CAULK ALL JOINTS OR CRACKS WHICH OCCUR WHERE DISSIMILAR MATERIALS
INTERSECT PERPENDICULAR TO EACH OTHER AND WHERE THE INTERSECTION IS
EXPOSED TO VIEW, UNLESS INDICATED OTHERWISE ON THE DRAWINGS.
8. FIREBLOCK ALL CONCEALED SPACES, SOFFITS, SHAFTS, CHASES AND CEILING AREAS
PER REQUIREMENTS OF THE 2009 IBC AND THE LOCAL JURISDICTION'S AMENDMENTS.
9. PROVIDE & INSTALL SLIP JOINT CONNECTIONS AT PARTITIONS THAT EXTEND TO
STRUCTURE ABOVE. PROVIDE BRACING ABOVE AS REQUIRED. REFER TO STRUCTURAL
DRAWINGS AND TO SLIP JOINT DETAILS.
10. IT IS THE INTENT OF THE DESIGN THAT ALL METAL STUD PARTITIONS BE OF SUFFICIENT
WIDTH TO ADEQUATELY ENCLOSE PIPING, CONDUITS, AND RECESSED EQUIPMENT.
NOTIFY THE ARCHITECT OF ANY DISCREPANCIES WITH THIS INTENT.
11. ALL VERTICAL AND HORIZONTAL PIPES, CONDUITS, DUCTS, ETC. IN FINISHED ROOMS
OR AREAS THROUGHOUT THE BUILDING SHALL BE FURRED IN TO MATCH THE ROOM
FINISH, UNLESS OTHERWISE NOTED.
12. WHERE MECHANICAL WORK PENETRATES ANY COMPONENT OF A FIRE-RATED
ASSEMBLY, PROVIDE & INSTALL THE APPROPRIATE FIRE AND/OR SMOKE DAMPERS. IF IT IS
NOT CLEAR WHETHER DUCTWORK PENETRATES A PORTION OF THE RATED ASSEMBLY,
OBTAIN CLARIFICATION FROM THE ARCHITECT PRIOR TO BIDDING. SEAL AROUND ALL
PENETRATIONS THROUGH PROPOSED FIRE RATED PARTITIONS. PROVIDE UL APPROVED
FIRESTOP SYSTEM TO MEET REQUIRED RATING.
13. THE FIRE ALARM SYSTEM WILL BE DESIGNED BY THE INSTALLING SUB-CONTRACTOR.
THE GENERAL CONTRACTOR SHALL COORDINATE LAYOUT, CLEARANCES, AND LOCATION
OF SYSTEM WITH THE STRUCTURE, MECHANICAL DUCTWORK, ELECTRICAL LIGHTING,
DRAINAGE PIPING, AND THE ARCHITECTURAL REFLECTED CEILING PLANS. THE ALARM
DESIGN MUST BE COORDINATED WITH THE PROVISIONS OF ALL ENGINEERING AND
ARCHITECTURAL DOCUMENTS AND SHOULD NOT RELY SOLELY ON ONE SERIES OF
DRAWINGS OR ONE DISCIPLINE. CONTRACTOR SHALL ADJUST OR ADD FIRE ALARM
DEVICES TO ACCOMMODATE PARTITION LAYOUT. ALARM SPACING AND PLACEMENT SHALL
MEET CODE REQUIREMENTS. SUB-CONTRACTOR SHALL COORDINATE ANY ALARM DEVICE
LAYOUT CONFLICTS WITH THE ARCHITECT.
14. INTERIOR SIGNAGE TO BE DESIGN BUILD AND COMPLY WITH THE SFO, ANSI 117.1, TAS, AND ADA.OVERFRAME / OPENING / STEP DOWN
EARTH
DRIVEWAY
N O
T
FO
R
REG
U
LA
TO
RY
A
PPRO
V
IN
G
O R
C O
N
ST
RU
C
TI
O N
DRAWN BY:
CHECKED BY:
DATE:
REVISION:
COPYRIGHT 2025
This document is an instrument of service, and as such remains the property of the Architect. Permission for use of this document is limited and can be extended only by written agreement with EVstudio, LLC.
Denver, CO Evergreen, CO Boise, ID Austin, TX
Main Office: 303.670.7242 inspections@evstudio.com design@evstudio.com www.evstudio.com
Contact:
/3
/2
:4
:4 A
M
G001
GENERAL NOTES
Checker
Author
MA24019
PERMIT/BID
03.31.2025
W e ld
C o u n ty
H u m a n R e s o u rc e s B ld g B
N
T H
A V
E G
R E
E L E
Y C
O
H V
A C
U p g ra d e s
3/
/2
JS
JH
03.31.2025
STORAGE
STORAGE
HALL
CLASSROOM
ELEV.
RECEPTION
OFFICE
CONFERENCE
UNIFORMS &
SUPPLIES
ELEV. MECH.
WOMEN'S
VESTIBULE
MEN'S
STAIR 1
STORAGE
OFFICE
OFFICE
YOUTH ROOM --
TIGHT/AMERICORPS
IT
ELEC./TEL.
JAN.
TESTING
TESTING
ASSESSMENT &
LEARNING LAB
RESOURCE ROOM
CLASSROOM
WORK AREA
WOMEN'S
MEN'S
TESTING
STORAGE
BREAK ROOM
STAIR 2
MECH.
OFFICE
NEW OFFICE
NEW OFFICE
NEW OFFICE
NEW OFFICE
OFFICE
COPY
OFFICE
PATIO
OPEN
HALLWAY
HALLWAY
STAIR 1
OFFICE
OFFICE
OFFICE
OFFICE
COPY/COFFEE
233 CONFERENCE
ELEV.
202 STORAGE
OFFICE
OFFICE
227 OFFICE
CONFERENCE
OFFICE
226 OFFICE
CONFERENCE
ELEC./TEL.
OPEN OFFICE
JAN.
OFFICE
224 WOMEN'S
MEN'S
COFFEE
OFFICE
STORAGE
CONFERENCE
STAIR 2
OFFICE
OFFICE
220 219 218 217
OFFICE
OFFICE
OFFICE
MOTHER RM
OFFICE
OFFICEOFFICEOFFICE
CODE SUMMARY
PROJECT
DESCRIPTION
CURRENT
CODES
HVAC UPGRADE
2018 INTERNATIONAL BUILDING CODE
2018 INTERNATIONAL EXISTING CODE
2018 INTERNATIONAL MECHANICAL CODE
2018 INTERNATIONAL FUEL GAS CODE
2018 INTERNATIONAL PLUMBING CODE
2023 NATIONAL ELECTRICAL CODE
2018 INTERNATIONAL ENERGY CODE
2009 ICC/ANSI /A117.1
EXISTING
OCCUPANCY GROUP
B (BUSINESS GROUP) SECTION 304
EXISTING BLDG
HEIGHT
+/-30', 2 STORIES TABLE 504.3 & 4
EXISTING BLDG
AREA
LEVEL 1 13,685 SF
LEVEL 2 13,685 SF
OCCUPANCY
CLASSIFICATION
NONSEPARATED OCCUPANCIES
NO SEPARATION REQ'D
SECTION 508.3
SECTION 508.3.3
SPRINKLER SYSTEM YES
TYPE VB SECTION 602
SECTION 903
CONSTRUCTION
TYPE
EXISTING
OCCUPANT LOAD
TOTAL OCC LOAD 449 PER (E) PERMIT TABLE 1004.5
PREVIOUSLY APPROVED AND UNCHANGED
(2) EXISTING STAIRS, (4) EGRESS DOORS ON 1ST FLOOR
SECTION 1006EXISTING NUMBER
OF EXITS
PROJECT
ADDRESS
WELD COUNTY HUMAN RESOURCES BLDG B - HVAC UPGRADE
315 N 11TH AVE
GREELEY, CO 80631
EXISTING PLUMBING
FIXTURES
TABLE 2902.1THE OCCUPANT LOAD OR OCCUPANCIES DON'T CHANGE IN THIS PROJECT.
NUMBER OF PLUMBING FIXTURES WAS PREVIOUSLY APPROVED AND REMAIN
AS IS.
N O
T
FO
R
REG
U
LA
TO
RY
A
PPRO
V
IN
G
O R
C O
N
ST
RU
C
TI
O N
DRAWN BY:
CHECKED BY:
DATE:
REVISION:
COPYRIGHT 2025
This document is an instrument of service, and as such remains the property of the Architect. Permission for use of this document is limited and can be extended only by written agreement with EVstudio, LLC.
Denver, CO Evergreen, CO Boise, ID Austin, TX
Main Office: 303.670.7242 inspections@evstudio.com design@evstudio.com www.evstudio.com
Contact:
/3
/2
:4
:4 A
M
G010
CODE PLAN
JS
JH
MA24019
PERMIT/BID
03.31.2025
W e ld
C o u n ty
H u m a n R e s o u rc e s B ld g B
N
T H
A V
E G
R E
E L E
Y C
O
H V
A C
U p g ra d e s
1/16" = 1'-0"
(E) LEVEL 1 FLOOR PLAN
1/16" = 1'-0"
(E) LEVEL 2 FLOOR PLAN
3/
/2
O
T
FO
R
REG
U
LA
TO
RY
A
PPRO
V
IN
G
O R
C O
N
ST
RU
C
TI
O N
DRAWN BY:
CHECKED BY:
DATE:
REVISION:
COPYRIGHT 2025
This document is an instrument of service, and as such remains the property of the Architect. Permission for use of this document is limited and can be extended only by written agreement with EVstudio, LLC.
Denver, CO Evergreen, CO Boise, ID Austin, TX
Main Office: 303.670.7242 inspections@evstudio.com design@evstudio.com www.evstudio.com
Contact:
/3
/2
:4
:4 A
M
A001
SPECIFICATIONS
Checker
Author
MA24019
PERMIT/BID
03.31.2025
W e ld
C o u n ty
H u m a n R e s o u rc e s B ld g B
N
T H
A V
E G
R E
E L E
Y C
O
H V
A C
U p g ra d e s
SECTION 01 25 00 - SUBSTITUTION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for substitutions.
B. Related Requirements:
1. Division 01 Section "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.
2. Sections of other Divisions for specific requirements and limitations for substitutions.
1.2 DEFINITIONS
A. Substitutions: Changes in products, materials, equipment, and methods of construction from those required by the Contract Documents and proposed by Contractor.
1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms.
2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner.
1.3 ACTION SUBMITTALS
A. Substitution Requests: Submit one copy of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.
1. Documentation: Show compliance with requirements for substitutions and the following, as applicable:
a. Statement indicating why specified product or fabrication or installation cannot be provided, if applicable.
b. Coordination information, including a list of changes or revisions needed to other parts of the Work, that will be necessary to accommodate proposed substitution.
c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.
d. Samples, where applicable or requested.
e. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.
f. Cost information, including a proposal of change, if any, in the Contract Sum.
g. Contractor's certification that proposed substitution complies with requirements in the
Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.
h. Contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.
2. Architect's Action: If necessary, Architect will request additional information or documentation for evaluation within seven days of receipt of a request for substitution. Architect will notify Contractor of acceptance or rejection of proposed substitution within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later.
a. Use product specified if Architect does not issue a decision on use of a proposed substitution within time allocated.
1.4 QUALITY ASSURANCE
A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage a qualified testing agency to perform compatibility tests recommended by manufacturers.
1.5 PROCEDURES
A. Coordination: Revise or adjust affected work as necessary to integrate work of the approved substitutions.
PART 2 - PRODUCTS
2.1 SUBSTITUTIONS
A. Substitutions for Cause: Submit requests for substitution immediately on discovery of need for change, but not later than 15 days prior to time required for preparation and review of related submittals.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution is consistent with the Contract Documents and will produce indicated results.
b. Substitution request is fully documented and properly submitted.
c. Requested substitution will not adversely affect Contractor's construction schedule.
d. Requested substitution has received necessary approvals of authorities having jurisdiction.
e. Requested substitution is compatible with other portions of the Work.
f. Requested substitution has been coordinated with other portions of the Work.
g. Requested substitution provides specified warranty.
B. Substitutions for Convenience: Architect will consider requests for substitution if received within 15 days after commencement of the Work. Requests received after that time may be considered or rejected at discretion of Architect.
1. Conditions: Architect will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, Architect will return requests without action, except to record noncompliance with these requirements:
a. Requested substitution offers Owner a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional responsibilities Owner must assume. Owner's additional responsibilities may include compensation to Architect for redesign and evaluation services, increased cost of other construction by Owner, and similar considerations.
b. Requested substitution does not require extensive revisions to the Contract Documents.
c. Requested substitution is consistent with the Contract Documents and will produce indicated results.
d. Substitution request is fully documented and properly submitted.
e. Requested substitution will not adversely affect Contractor's construction schedule.
f. Requested substitution has received necessary approvals of authorities having jurisdiction.
g. Requested substitution is compatible with other portions of the Work.
h. Requested substitution has been coordinated with other portions of the Work.
i. Requested substitution provides specified warranty.
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 25 00
SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements for handling and processing Contract modifications.
B. Related Requirements:
1. Division 01 Section "Substitution Procedures" for administrative procedures for handling requests for substitutions made after the Contract award.
1.2 MINOR CHANGES IN THE WORK
A. Architect will issue supplemental instructions authorizing minor changes in the Work, not involving adjustment to the Contract Sum or the Contract Time, on AIA Document G710, "Architect's Supplemental Instructions." or equivalent document of the Architect's standard practice.
1.3 PROPOSAL REQUESTS
A. Owner-Initiated Proposal Requests: Architect will issue a detailed description of proposed changes in the Work that may require adjustment to the Contract Sum or the Contract Time. If necessary, the description will include supplemental or revised Drawings and Specifications.
1. Work Change Proposal Requests issued by Architect are not instructions either to stop work in progress or to execute the proposed change.
2. Within 10 days after receipt of Proposal Request, submit a quotation estimating cost adjustments to the Contract Sum and the Contract Time necessary to execute the change.
a. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
b. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
c. Include costs of labor and supervision directly attributable to the change.
d. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
e. Quotation Form: Use forms acceptable to Architect.
B. Contractor-Initiated Proposals: If latent or changed conditions require modifications to the Contract, Contractor may initiate a claim by submitting a request for a change to Architect.
1. Include a statement outlining reasons for the change and the effect of the change on the Work. Provide a complete description of the proposed change. Indicate the effect of the proposed change on the Contract Sum and the Contract Time.
2. Include a list of quantities of products required or eliminated and unit costs, with total amount of purchases and credits to be made. If requested, furnish survey data to substantiate quantities.
3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of trade discounts.
4. Include costs of labor and supervision directly attributable to the change.
5. Include an updated Contractor's construction schedule that indicates the effect of the change, including, but not limited to, changes in activity duration, start and finish times, and activity relationship. Use available total float before requesting an extension of the Contract Time.
6. Comply with requirements in Division 01 Section "Substitution Procedures" if the proposed change requires substitution of one product or system for product or system specified.
7. Proposal Request Form: Use form acceptable to Architect.
SECTION 01 26 00 - CONTRACT MODIFICATION PROCEDURES (Con't)
1.4 CHANGE ORDER PROCEDURES
A. On Owner's approval of a Work Changes Proposal Request, Architect will issue a Change Order for signatures of Owner and Contractor on AIA Document G701 or equivalent document of the Architect's standard practice.
1.5 CONSTRUCTION CHANGE DIRECTIVE
A. Construction Change Directive: Architect may issue a Construction Change Directive on AIA Document G714 or equivalent document of the Architect's standard practice. Construction Change Directive instructs Contractor to proceed with a change in the Work, for subsequent inclusion in a Change Order.
1. Construction Change Directive contains a complete description of change in the Work. It also designates method to be followed to determine change in the Contract Sum or the Contract Time.
B. Documentation: Maintain detailed records on a time and material basis of work required by the Construction Change Directive.
1. After completion of change, submit an itemized account and supporting data necessary to substantiate cost and time adjustments to the Contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION 01 26 00
SECTION 01 29 00 - PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative and procedural requirements necessary to prepare and process Applications for Payment.
B. Related Requirements:
1. Division 01 Section "Contract Modification Procedures" for administrative procedures for handling changes to the Contract.
2. Division 01 Section "Construction Progress Documentation" for administrative requirements governing the preparation and submittal of the Contractor's construction schedule.
1.2 DEFINITIONS
A. Schedule of Values: A statement furnished by Contractor allocating portions of the Contract Sum to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment.
1.3 SCHEDULE OF VALUES
A. Coordination: Coordinate preparation of the schedule of values with preparation of Contractor's construction schedule.
1. Coordinate line items in the schedule of values with other required administrative forms and schedules, including the following:
a. Application for Payment forms with continuation sheets.
b. Submittal schedule.
c. Items required to be indicated as separate activities in Contractor's construction schedule.
2. Submit the schedule of values to Owner at earliest possible date, but no later than seven days before the date scheduled for submittal of initial Applications for Payment.
B. Format and Content: Use Project Manual table of contents as a guide to establish line items for the schedule of values. Provide at least one line item for each Specification Section.
1. Identification: Include the following Project identification on the schedule of values:
a. Project name and location.
b. Name of Architect.
c. Architect's project number.
d. Contractor's name and address.
e. Date of submittal.
2. Arrange the schedule of values in tabular form with separate columns to indicate the following for each item listed:
a. Related Specification Section or Division.
b. Description of the Work.
c. Name of subcontractor.
d. Name of manufacturer or fabricator.
e. Name of supplier.
f. Change Orders (numbers) that affect value.
g. Dollar value of the following, as a percentage of the Contract Sum to nearest one-hundredth percent, adjusted to total 100 percent.
1) Labor.
2) Materials.
3) Equipment.
3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Applications for Payment and progress reports. Coordinate with Project Manual table of contents. Provide multiple line items for principal subcontract amounts in excess of five percent of the Contract Sum.
4. Round amounts to nearest whole dollar; total shall equal the Contract Sum.
5. Provide a separate line item in the schedule of values for each part of the Work where Applications for Payment may include materials or equipment purchased or fabricated and stored, but not yet installed.
a. Differentiate between items stored on-site and items stored off-site. If required, include evidence of insurance.
6. Provide separate line items in the schedule of values for initial cost of materials, for each subsequent stage of completion, and for total installed value of that part of the Work.
7. Allowances: Provide a separate line item in the schedule of values for each allowance. Show line-item value of unit-cost allowances, as a product of the unit cost, multiplied by measured quantity. Use information indicated in the Contract Documents to determine quantities.
8. Each item in the schedule of values and Applications for Payment shall be complete. Include total cost and proportionate share of general overhead and profit for each item.
a. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at Contractor's option.
9. Schedule Updating: Update and resubmit the schedule of values before the next Applications for Payment when Change Orders or Construction Change Directives result in a change in the Contract Sum.
1.4 APPLICATIONS FOR PAYMENT
A. Each Application for Payment following the initial Application for Payment shall be consistent with previous applications and payments as certified by Architect and paid for by Owner.
1. Initial Application for Payment, Application for Payment at time of Substantial Completion, and final Application for Payment involve additional requirements.
B. Payment Application Times: Submit Application for Payment to Architect by the last day of the month. The period covered by each Application for Payment is one month, ending on the last day of the month.
1. Submit draft copy of Application for Payment seven days prior to due date for review by Architect.
C. Application for Payment Forms: Use AIA Document G702 and AIA Document G703 as form for Applications for Payment.
D. Application Preparation: Complete every entry on form. Notarize and execute by a person authorized to sign legal documents on behalf of Contractor. Architect will return incomplete applications without action.
1. Entries shall match data on the schedule of values and Contractor's construction schedule. Use updated schedules if revisions were made.
2. Include amounts for work completed following previous Application for Payment, whether or not payment has been received. Include only amounts for work completed at time of Application for Payment.
3. Include amounts of Change Orders and Construction Change Directives issued before last day of construction period covered by application.
4. Indicate separate amounts for work being carried out under Owner-requested project acceleration.
E. Stored Materials: Include in Application for Payment amounts applied for materials or equipment purchased or fabricated and stored, but not yet installed. Differentiate between items stored on-site and items stored off-site.
1. Provide certificate of insurance, evidence of transfer of title to Owner, and consent of surety to payment, for stored materials.
2. Provide supporting documentation that verifies amount requested, such as paid invoices. Match amount requested with amounts indicated on documentation; do not include overhead and profit on stored materials.
3. Provide summary documentation for stored materials indicating the following:
a. Value of materials previously stored and remaining stored as of date of previous Applications for Payment.
b. Value of previously stored materials put in place after date of previous Application for Payment and on or before date of current Application for Payment.
c. Value of materials stored since date of previous Application for Payment and remaining stored as of date of current Application for Payment.
F. Transmittal: Submit three signed and notarized original copies of each Application for Payment to Architect by a method ensuring receipt within 24 hours. One copy shall include waivers of lien and similar attachments if required.
1. Transmit each copy with a transmittal form listing attachments and recording appropriate information about application.
SECTION 01 29 00 - PAYMENT PROCEDURES (Con't)
G. Waivers of Mechanic's Lien: With each Application for Payment, submit waivers of mechanic's liens from subcontractors, sub-subcontractors, and suppliers for construction period covered by the previous application.
1. Submit partial waivers on each item for amount requested in previous application, after deduction for retainage, on each item.
2. When an application shows completion of an item, submit conditional final or full waivers.
3. Owner reserves the right to designate which entities involved in the Work must submit waivers.
4. Submit final Application for Payment with or preceded by conditional final waivers from every entity involved with performance of the Work covered by the application who is lawfully entitled to a lien.
5. Waiver Forms: Submit executed waivers of lien on forms, acceptable to Owner.
H. Initial Application for Payment: Administrative actions and submittals that must precede or coincide with submittal of first Application for Payment include the following:
1. List of subcontractors.
2. Schedule of values.
3. Contractor's construction schedule (preliminary if not final).
4. Products list (preliminary if not final).
5. Schedule of unit prices.
6. Submittal schedule (preliminary if not final).
7. List of Contractor's staff assignments.
8. List of Contractor's principal consultants.
9. Copies of building permits.
10.Copies of authorizations and licenses from authorities having jurisdiction for performance of the Work.
11.Initial progress report.
12.Report of preconstruction conference.
13.Certificates of insurance and insurance policies.
14.Performance and payment bonds.
15.Data needed to acquire Owner's insurance.
I. Application for Payment at Substantial Completion: After Architect issues the Certificate of Substantial Completion, submit an Application for Payment showing 100 percent completion for portion of the Work claimed as substantially complete.
1. Include documentation supporting claim that the Work is substantially complete and a statement showing an accounting of changes to the Contract Sum.
2. This application shall reflect Certificate(s) of Substantial Completion issued previously for Owner occupancy of designated portions of the Work.
J. Final Payment Application: After completing Project closeout requirements, submit final Application for Payment with releases and supporting documentation not previously submitted and accepted, including, but not limited, to the following:
SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:
1. General coordination procedures.
2. Coordination drawings.
3. Requests for Information (RFIs).
4. Project meetings.
B. Related Requirements:
1. Division 01 Section "Construction Progress Documentation" for preparing and submitting Contractor's construction schedule.
2. Division 01 Section "Execution" for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.
3. Division 01 Section "Closeout Procedures" for coordinating closeout of the Contract.
1.2 DEFINITIONS
A. RFI: Request from Owner, Architect, or Contractor seeking information required by or clarifications of the Contract Documents.
1.3 INFORMATIONAL SUBMITTALS
A. Subcontract List: Prepare a written summary identifying individuals or firms proposed for each portion of the Work, including those who are to furnish products or equipment fabricated to a special design. Include the following information in tabular form:
1. Name, address, and telephone number of entity performing subcontract or supplying products.
2. Number and title of related Specification Section(s) covered by subcontract.
3. Drawing number and detail references, as appropriate, covered by subcontract.
B. Key Personnel Names: Within 15 days of starting construction operations, submit a list of key personnel assignments, including superintendent and other personnel in attendance at Project site. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including home, office, and cellular telephone numbers and e-mail addresses. Provide names, addresses, and telephone numbers of individuals assigned as alternates in the absence of individuals assigned to Project.
1. Post copies of list in project meeting room, in temporary field office, and by each temporary telephone.
Keep list current at all times.
1.4 GENERAL COORDINATION PROCEDURES
A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, that depend on each other for proper installation, connection, and operation.
1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.
2. Coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair.
3. Make adequate provisions to accommodate items scheduled for later installation.
B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.
1. Prepare similar memoranda for Owner and separate contractors if coordination of their Work is required.
C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:
1. Preparation of Contractor's construction schedule.
2. Preparation of the schedule of values.
3. Installation and removal of temporary facilities and controls.
4. Delivery and processing of submittals.
5. Progress meetings.
6. Preinstallation conferences.
7. Project closeout activities.
8. Startup and adjustment of systems.
D. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.
1.5 COORDINATION DRAWINGS
A. Coordination Drawings, General: Within thirty (30) days of execution of contractor for construction, or date of Notice to Proceed, prepare coordination drawings according to requirements in individual Sections, as indicated on Construction Documents, and additionally where installation is not completely shown on Shop Drawings, where limited space availability necessitates coordination, or if coordination is required to facilitate integration of products and materials fabricated or installed by more than one entity.
1. Content: Project-specific information, drawn accurately to a scale large enough to indicate and resolve conflicts. Do not base coordination drawings on standard printed data. Include the following information, as applicable:
a. Use applicable Drawings as a basis for preparation of coordination drawings. Prepare sections, elevations, and details as needed to describe relationship of various systems and components.
b. Indicate functional and spatial relationships of components of architectural, structural, civil, mechanical, and electrical systems.
c. Indicate space requirements for routine maintenance and for anticipated replacement of components during the life of the installation.
1.6 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified.
1. Architect will return RFIs submitted to Architect by other entities controlled by Contractor with no response.
2. Coordinate and submit RFIs in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.
3. RFIs submitted requesting information that is readily available and indicated on the construction documents shall be considered frivolous and the Contractor shall be responsible to pay the Architect’s standard hourly rate for all time spent preparing a response to each frivolous RFI submitted.
a. Contractor shall be responsible to pay to the Architect the Architect’s standard hourly rate for the preparation of responses to frivolous RFIs as described above. Payment shall be made for total actual time spent or a minimum of one-half of one hour (30 minutes); whichever is greater.
B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:
1. Project name.
2. Project number.
3. Date.
4. Name of Contractor.
5. Name of Architect.
6. RFI number, numbered sequentially.
7. RFI subject.
8. Specification Section number and title and related paragraphs, as appropriate.
9. Drawing number and detail references, as appropriate.
10.Field dimensions and conditions, as appropriate.
11.Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract Time or the Contract Sum, Contractor shall state impact in the RFI.
12.Contractor's signature.
13.Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.
a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
C. RFI Forms: Software-generated form with substantially the same content as indicated above, acceptable to Architect.
1. Attachments shall be electronic files in Adobe Acrobat PDF format.
D. Architect's Action: Architect will review each RFI, determine action required, and respond. Allow five (5) working days for Architect's response for each RFI. RFIs received by Architect after 1:00 p.m. will be considered as received the following working day.
1. The following Contractor-generated RFIs will be returned without action:
a. Requests for approval of submittals.
b. Requests for approval of substitutions.
c. Requests for approval of Contractor's means and methods.
d. Requests for coordination information already indicated in the Contract Documents.
e. Requests for adjustments in the Contract Time or the Contract Sum.
f. Requests for…