BID SPECS 05415-0021-01.pdf

PDF 9 MB Posted

Attached to
Court Lift Station No. 1 Expansion
Solicitation number
05415-0021-01
Issued by
Fort Bend County, Texas

About this file

Summary

This is a bid specification and contract document for construction services issued by Katy West Municipal Utility District for the Katy Court Lift Station No. 1 Expansion project located in Harris County, Texas. The project scope includes mobilization, performance and payment bonds, insurance, City of Katy inspection fees, demolition of two existing submersible pumps and cables, installation of two new submersible pumps with base elbows and cables, riser pipe modifications with protective coatings, motor overload adjustments, installation of elapsed time meters and closed seal barrier entry seals, conduit and wiring work, and installation and operation of a temporary bypass pumping system for the project duration including temporary power, piping, valves, fuel, and site restoration. Bids must be submitted electronically through www.CivcastUSA.com by 10:00 a.m. local time on September 18, 2026, with public opening at Quiddity Engineering LLC in Houston, Texas. A non-mandatory pre-bid conference may be held at the location and time specified in addenda. Bid security of two percent of the total bid amount is required, submitted as either a bid bond or certified/cashier's check. The successful bidder will be notified of award within sixty days of bid opening and must execute all contract documents, bonds, and provide insurance certificates within seven calendar days of notification.

Contract pricing is submitted as a lump sum bid with six line items including mobilization and startup, City of Katy inspection fee (3% of construction total), main construction work, purchase and delivery of two submersible non-clog centrifugal pumps (not to exceed $43,736.00), temporary bypass system operation, and a $10,000 allowance for unforeseen conditions. The successful bidder must furnish performance and payment bonds each equal to 100 percent of the contract price and a two-year maintenance bond for 50 percent of construction costs. The surety company must hold a minimum Best Key Rating of "B+" or better and be authorized to issue bonds in Texas. Contractor must comply with prevailing wage requirements specified in Attachment B, with penalties of $60 per worker per day for non-compliance. Economic disincentives of $1,000 per calendar day apply for failure to complete work by the specified contract time, with limited exceptions for Force Majeure events. Contractor must maintain a construction schedule using critical path method, submit shop drawings and submittals for engineer approval within specified timeframes, and complete work in strict accordance with contract documents and applicable Laws and Regulations of the State of Texas.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1235 North Loop West, Suite 300 Houston, Texas 77008 - 281.202.6084

FOR CIVIL ONLY: FOR ELECTRICAL ONLY:

7/28/2026

INTERIM REV

NOT INTENDED FOR CONST

BIDDING OR PERMIT PUR

P.E. SERIAL NO.:

DATE:

ENGINEER:

JULY 2026

41075

C.J. TROUTT, P.E.

VIEW

TRUCTION,

RPOSES.03-07-20228/10/20239/25/202310/03/202310/09/202312/10/202502/05/202607/28/26

7/28/2026

BID SET

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

FOR CONSTRUCTION OF

KATY COURT LIFT STATION NO. 1 EXPANSION

FOR

KATY WEST MUNICIPAL UTILITY DISTRICT

IN

CITY OF KATY, TEXAS

TABLE OF CONTENTS

Page No.

BIDDING REQUIREMENTS

Invitation to Bidders ................................................................................................... A-1

Instruction to Bidders................................................................................................. A-2

Bid Form ..................................................................................................................... A-9

CONDITIONS OF THE CONTRACT

Contract ...................................................................................................................... C-1

General Conditions of the Contract ........................................................................... GC-1

Form 1295 .................................................................................................................. 1295-1

Attachment A to the General Conditions Insurance Requirements .......................... GCA-1

Attachment B to the General Conditions Minimum Wage Rate Scale ...................... GCB-1

Minimum Wage Rate Scale ........................................................................................ PW-1

Special Conditions of the Contract Part A .................................................................. SCA-1

Special Conditions of the Contract Part B .................................................................. SCB-1

Texas Sales and Use Tax Exemption Certification ...................................................... TEC-1

Payment Bond ............................................................................................................ PB-1

Performance Bond ..................................................................................................... PB-3

Maintenance Bond ..................................................................................................... MB-1

SPECIFICATIONS

DIVISION 1 - GENERAL REQUIREMENTS

Summary of Work ...................................................................................................... 01010-1

Cutting and Patching ................................................................................................. 01070-1

Submittals .................................................................................................................. 01300-1

Construction Progress Schedule ................................................................................ 01330-1

Shop Drawings, Products Data and Samples ............................................................. 01340-1

Schedule of Values ..................................................................................................... 01370-1

Field Project Representative Services ........................................................................ 01420-1

Temporary Facilities and Controls ............................................................................. 01500-1

Bypass Plan ...............................................................................................................01652-1

Cleaning and Adjusting............................................................................................... 01710-1

Project Record Documents ........................................................................................ 01720-1

DIVISION 2 - SITE WORK

Demolition .................................................................................................................. 02110-1

Waste Material Disposal ............................................................................................ 02227-1

DIVISION 3 - CONCRETE

Grouting ..................................................................................................................... 03350-1

Concrete Rehabilitation ............................................................................................ 03931-1

DIVISION 5 - METALS

Miscellaneous Metal .................................................................................................. 05501-1

DIVISION 9 - COATING

Protective Coating ...................................................................................................... 09921-1

DIVISION 11 - EQUIPMENT

Submersible Non-Clog Centrifugal Pumps ................................................................. 11111-1

DIVISION 15 - MECHANICAL

Mechanical General Provisions .................................................................................. 15011-1

Mechanical Identification .......................................................................................... 15190-1

Plant Piping ................................................................................................................ 15600-1

DIVISION 16 - ELECTRICAL

General Provisions with Existing Facilities ................................................................. 16011-1

Conduits, Fitting, and Bodies ..................................................................................... 16111-1

Wire and Cable 600 Volt and Below .......................................................................... 16122-1

Electrical Identification .............................................................................................. 16195-1

Motor Control Panel .................................................................................................. 16462-1

ATTACHMENTS

Attachment I – Flygt Submersible Non-Clog Pumps Scope of Work

KATY WEST MUNICIPAL UTILITY DISTRICT

Electronic Bids Only, Electronic Signatures

Option, and Remote Public Bid Opening Option A-1 April 2026

INVITATION TO BIDDERS

Sealed Bids addressed to Katy West Municipal Utility District, will be received at the office of Quiddity

Engineering, LLC, 1235 North Loop West, Suite 300, Houston, Texas 77008, until 10:00 a.m. Local Time, September 18, 2026, and then publicly opened and read at Quiddity Engineering for “Katy Court Lift

Station No. 1 Expansion, Harris County, Texas”.

Scope of Work of the Contract Documents includes the following: Construction of Katy Court Lift Station

No. 1 Expansion.

Bids received after closing time will be returned unopened. A mandatory pre-bid conference will not be held.

Each Bid must be accompanied by a Bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two percent (2%) of the total amount Bid, as a guarantee that the successful bidder will enter into the Contract Documents and execute the Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. If a certified or cashier’s check is provided, the successful bidder shall deliver, at the bid opening address, the original certified or cashier’s check within one (1) business day of receipt of the bid opening.

Copies of the bidding documents may be reviewed and obtained from www.CivcastUSA.com. Bidders must register on this website to view and/or download specifications, plans, soils report, and environmental reports for this Project. There is NO charge to view or download documents.

Bidder must submit its Bid and Bid Securities in compliance with Owner’s Order Adopting Section 49.2731

Electronic Bidding Rules and all Bids and Bid Securities must be submitted through www.CivcastUSA.com. Bidder must register on this website to submit a Bid and Bid Security and there is no charge to submit Bids and Bid Securities on this website.

By submitting a Bid, bidder acknowledges and agrees that the Contract Documents may be accepted, executed, or agreed to using an Electronic Signature, as defined by and in accordance with Owner’s

Electronic Signature Rules for Construction Contracts.

The Owner reserves the right to reject any or all Bids and to waive all defects and irregularities in bidding or bidding process except the time for submitting a Bid. The successful bidder, if any, will be the responsible bidder, which in the Board’s judgment will be most advantageous to the District and result in the best and most economical completion of the Project.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the bidder agrees that the Contract Documents can be terminated if the bidder knowingly or intentionally fails to comply with a requirement of that subchapter.

4907-8155-3542 v.1

KATY WEST MUNICIPAL UTILITY DISTRICT INSTRUCTIONS TO BIDDERS

A-2 Instructions to Bidders April 2026

INSTRUCTIONS TO BIDDERS

1. PREPARATION OF BIDS. Unless otherwise directed in the Invitation to Bidders, each Bid must be submitted on the bid forms provided or on photocopies of the forms, in conformity with the requirements of the Invitation to Bidders, these Instructions to Bidders (“Instructions”), and the instructions printed on the bid form. In addition, if submitting a paper Bid, the Bid must be submitted in duplicate.

All blanks on the bid form must be completed and no change shall be made to the bid form or any other of the Contract Documents. All amounts must be in figures, with amounts extended and totaled. If minimum unit prices have been established for certain items, the minimum unit prices will be shown on the bid form.

See Paragraph 8 of these Instructions. If the bidder chooses not to bid on optional items (if any), “No Bid” must be entered in the bid space. Any Bid may be rejected if it contains any omission, erasure, alteration, addition, irregularity of any kind, or items not called for; if it does not submit prices for each of the items in the bid form; if it is not signed by the bidder; if it is unbalanced; or if it in any manner, fails to conform to the conditions of the Invitation to Bidders and these Instructions. An “unbalanced” Bid means a Bid containing unit prices that are significantly less than cost for some items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost is significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the same Project.

The bidder must sign its Bid. If the Bid is made by a partnership or corporation, the name and address of the partnership or corporation must be shown together with the names and addresses of the partners or officers. If the Bid is made by an individual, it must be executed by that person; if made by a partnership, it must be executed by one of the partners (and if by a limited partnership, then executed by the general partner); or if made by a corporation, it must be executed in the corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or assistant secretary of the corporation. The corporate address and state of incorporation shall be shown below the signature.

When applicable, evidence of authority to conduct business as an out-of-state corporation in the State of Texas must be provided in accordance with the paragraph entitled QUALIFICATION OF BIDDERS. State contractor license number, if any, must also be shown.

The Bid and the Bid Security must be sealed and must identify the contents (i.e., Bid or Bid Security), the bidder’s name, and the job name and number, and be addressed to the Owner as prescribed in the Invitation to Bidders.

2. CONTRACT DOCUMENTS. The Contract Documents are complementary and must be read together as a whole; what is called for by one is binding as if called for by all.

Bidders desiring further information or further interpretation of any part of the Contract Documents are hereby obligated to submit a written request online to the www.CivcastUSA.com system for such information to Engineer not less than seven (7) calendar days before the Bid opening. If appropriate, answers to these requests will be given, in writing, to all bidders as addenda to the Contract Documents, and when each addendum is issued it becomes a part of the Contract Documents. No explanation or interpretation of the Contract Documents, other than written addenda, is binding.

Should a bidder find discrepancies or errors in or omissions from the Contract Documents or should the bidder be in doubt as to any meaning, the bidder is hereby obligated to notify Engineer in writing. It is the responsibility of each bidder to determine if it has received all addenda, complete files of which will be maintained at the Engineer’s office and the office designated to receive the Bids, if any.

4926-9402-5094 v.1 4926-9402-5094 v.1

A-3

Each bidder must inform itself fully of the construction and labor conditions under which the Work will be performed and will be presumed to have inspected the Site and to have read and to be thoroughly familiar with the Contract Documents. Failure to do so will not relieve the successful bidder of its obligation to furnish all materials and labor necessary to carry out the requirements of the Contract Documents and to complete the Work for the consideration in its Bid.

3. PRE-BID CONFERENCE. A NON-MANDATORY pre-bid conference among Owner, Engineer, prospective bidders, and others will be held to discuss the scope of the Work and to answer questions concerning the Work. No addendum will be issued at this conference, but an addendum will be issued afterwards, if necessary, to answer questions. The NON-MANDATORY pre-bid conference will be held at the place and time stated in the Invitation to Bidders or as modified by written addenda.

4. BID SECURITY. Each Bid must be accompanied by a bid bond or a certified or cashier’s check, acceptable to the Owner, in an amount not less than two (2) percent of the total amount bid (the “Bid Security”), as a guarantee that the successful bidder will enter into the Contract and execute the required Bonds on the forms provided and provide the required insurance certificates and Bonds within seven (7) days after the date Contract Documents are received by the successful bidder. Bid Securities will be returned to all but the three (3) most qualified, responsible bidders within three (3) days after opening of Bids, and the latter’s Bid Securities will be returned after complete execution of the Contract Documents.

If the successful bidder does not enter into the Contract after notice of award, then the bidder’s Bid Security will be forfeited and will be retained by Owner. If the award of the Contract to the successful bidder is canceled or not executed for any reason, the Owner may accept the next lowest bid and proceed with the next-lowest qualified bidder.

5. BONDS. The successful bidder must furnish a performance bond and a payment bond each in the sum of 100 percent (100%) of the Contract. The successful bidder must also provide a two-year (2) Maintenance Bond for fifty (50) percent of the cost of the construction of the improvements that will be owned by Katy West Municipal Utility District; The Bonds must be in the form prescribed by the Contract Documents except as required otherwise by Laws and Regulations. The Bonds must be from a surety company holding a permit from the State of Texas to act as surety. Unless otherwise specified, the cost of proving Bonds must be included in the bidder’s total Bid amount. The surety company must have a minimum Best Key Rating of “B+” or better. The surety company, the agency and agent issuing the Bonds must be authorized to issue Bonds in Texas in an amount equal to the total Contract Price and such authorization must be recorded in the files of the Texas Department of Insurance. The person executing the Bonds must be a licensed Texas local recording agent and such licensing must be recorded in the files of the Texas Department of Insurance. All Bonds signed by an agent must be accompanied by a certified copy of the agent’s authority to act. The Bonds must be executed by a duly appointed representative of the surety company licensed by the State of Texas as a General Lines Agent and such licensing must be recorded in the files of the Texas Department of Insurance. If the surety company does not have such a rating due to the length of time it has existed, the surety company must be eligible to participate in the surety bond guarantee program of the Small Business Administration and must be an approved surety listed in the current U.S. Department of Treasury Circular 570, and must meet all of the rules and regulations of the Treasury Department with respect to performance and payment bonds for federal jobs, including specifically the rules related to underwriting limitation. For contracts over $100,000, the surety must also hold a certificate of authority from the United States Secretary of Treasury to qualify as a surety on obligations permitted or required under federal law, or have obtained reinsurance for any liability in excess of $1,000,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas and is the holder of a certificate of authority from the United States Secretary of Treasury to qualify as a surety or reinsurer on obligations permitted or required under federal law. If bidder’s proposed surety company, agency or agents do not meet the requirements herein, then Owner may refrain from considering the bidder for Contract award and Owner may require bidder to forfeit its Bid Security.

4926-9402-5094 v.1

A-4

It is further agreed that the successful bidder will execute the Bonds required for the satisfactory performance of the Work, the fulfillment of any guarantees required, and the prompt payment to all persons supplying labor and materials in the prosecution of the Work, in accordance with the Contract Documents and on the forms provided for this purpose. It is agreed that this Contract is not in effect until the required Bonds are furnished and approved by Owner. Upon increase of the Contract Price authorized by Change Order, Contractor must immediately provide revised Bonds for such increased Contract Price. Contractor’s failure to provide compliant Bonds may be grounds for immediate termination regardless of whether the Contractor has started the Work on the Project.

If the surety on any Bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located or it ceases to meet the requirements herein Contractor must promptly notify Owner; Developer, if there is a Special Conditions of the Contract Part B; and Engineer and must, within ten (10) calendar days after the event giving rise to such notification, provide another Bond and surety to fulfill the required obligations.

6. DELIVERY OF BIDS. It is each bidder’s responsibility to deliver its Bid and Bid Security as stated in the Invitation to Bidders before the closing time. The fact that a Bid and a Bid Security were dispatched will not be considered. The Bid and Bid Security must be timely delivered to be considered.

7. “OR EQUAL” SUBMISSIONS. Where materials or equipment are specified by a trade or brand name, it is not the intention of the Owner to discriminate against an equal product of another manufacturer, but to set a definite standard of quality or performance. In preparing its proposal, each bidder is expected to include in its base Bid the cost of the item so specified. However, in certain Technical Specification sections, manufacturers are listed followed by “or equal”. In certain other Technical Specification sections, manufacturers are listed with “or equal” not included. In those items where “or equal” is not included, it is hereby added and understood to be included, even though not specifically stated in each Technical Specification. If a bidder chooses to submit a suggested “or equal” product in lieu of a product by one of the named manufacturers, Owner will evaluate the item to determine if it is an “equal”. The bidder is responsible for providing all data required to evaluate an item submitted as a suggested “or equal.” Owner’s decision on whether a suggested manufacturer is an “equal” is final. No claims for additional cost or time delay, etc. will be accepted if a suggested manufacturer is submitted by bidder as an “equal” and Owner decides the item is not “equal”.

Bidder must submit its list of suggested “or equal” items at time of Bid submission. No additional suggested “or equal” items will be considered after bid opening.

8. MINIMUM UNIT PRICE ITEMS. If the approximate quantity and a minimum unit price have been established for items in the bid form, the bidder may not bid a unit price less than the minimum value;

however, it may bid an amount greater than the minimum unit price. If no entry is made in the spaces provided, the minimum unit prices shown apply.

9. EXTRA UNIT PRICE ITEMS. Extra Unit Price Items are included to facilitate payment for changes and alterations that may be required to complete the Work. The Work, as provided by the Contract Documents, is described in bid items other than Extra Unit Price Items. When additional Work covered by Extra Unit Price Items is performed, payment will be based on the quantity constructed and the unit prices entered in the Bid.

10. TIME FOR COMPLETION. Contractor will not be allowed time extensions (i) due to inclement weather except for Force Majeure events as defined under Section 1.01 of the General Conditions of the

Contract; (ii) due to non-availability of equipment or material, when the principal units of Work and tasks on the critical path are not in progress or are not delayed by the event of delay, interference, disruption, or

A-5 hindrance; (iii) when at least seven (7) hours of available working time remain out of the working day; (iv) while materials are drying and it is possible for the Contractor to enclose the area and use drying devices;

(v) when an event of delay, interference, disruption, or hindrance occurs on a day other than a working day or other day when the Contractor had not originally planned to work; (vi) when an event of delay, interference, disruption, or hindrance occurs after the expiration of the Contract Time; (vii) to the extent the Contractor could have anticipated or alleviated the impact of the event of delay, interference, disruption, or hindrance through reasonable efforts; (viii) when events of concurrent delay overlap the claimed delay;

and/or (ix) when an extension of time is precluded by any provision of the Contract Documents.

11. QUALIFICATION OF BIDDERS. The apparent most qualified, responsible bidder must submit to Owner, within five (5) calendar days of notification of award of the Contract, either (i) a fully completed contractor’s statement of qualification or (ii) a written statement that the most recently submitted contractor’s statement of qualification is accurate, which statement of qualification must be considered in the award of the Contract. Failure to accurately complete the contractor’s statement of qualification or to timely submit the statement of qualification will, at Owner’s option, disqualify the bidder from consideration in the award of the Contract. The form of the Contractor’s statement of qualification is available from the Engineer. Owner may reject, at Owner’s sole discretion, a bidder’s statement of qualification if the bidder’s statement of qualification is not on the form provided. Evidence of out-of-state incorporation to conduct business in the state in which the Work is to be performed, along with state contractor license number, must also be provided and is a consideration in the award of the Contract.

12. MODIFICATION AND WITHDRAWAL OF BIDS. Bids may be modified or withdrawn by an appropriate document duly executed (in the manner that a Bid must be executed) and delivered in the same manner as Bids were submitted at any time prior to the opening of Bids. If, within twenty-four (24) hours after Bids are opened, any bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid despite the exercise of ordinary care, that bidder may withdraw its Bid and the Bid Security will be returned.

13. HOUSE BILL 1295. Provision of Texas Ethics Commission Form 1295 (“TEC Form 1295”) pursuant to Texas Government Code § 2252.908 (the “Interested Party Disclosure Act” or the “Act”): Unless bidder is exempt from such requirements pursuant to Texas Government Code Section

2252.908(c)(4), the Owner may not award the Contract to a bidder unless the bidder has provided to the Owner a completed and signed TEC Form 1295 which has been assigned a certificate number by the Texas Ethics Commission (the “TEC”). Pursuant to the rules prescribed by the TEC, the TEC Form 1295 must be completed online through the TEC’s website, assigned a certificate number, printed, signed, and provided to the Owner. For purposes of completing the TEC Form 1295, the entity’s name is Katy West Municipal Utility District; the contract ID number is 05415-0021-01; and the description of goods and services is Katy Court Lift Station No. 1 Expansion. Neither the Owner nor its consultants have the ability to verify all of Contractor’s information included in a TEC Form 1295, and neither have an obligation nor undertake responsibility for advising any bidder with respect to the proper completion of the TEC Form

1295. BIDDERS SHOULD SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE

CONTRACT WILL NOT BE AWARDED TO A BIDDER UNLESS A TEC FORM 1295 HAS BEEN

COMPLETED BY THE BIDDER.

14. AWARD OF CONTRACT. Owner reserves the right to reject any or all Bids, including without limitation the right to reject any or all nonconforming, non-responsive, unbalanced or conditional Bids and to reject the Bid of any bidder if Owner believes that it would not be in the best interest of the Project to make award to that bidder, whether because the Bid is not responsive or the bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria of Owner. Owner also reserves the right to waive all informalities and defects in bidding, except time of submitting a Bid.

A-6

Discrepancies between the multiplication of units and unit prices in a Bid will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum if the correct sum is evident from the face of the Bid.

In evaluating Bids, Owner will consider, among other things, the qualifications of bidders, whether the Bids comply with the prescribed requirements, and such substitutions, alternates, unit prices and other data, as may be requested in the bid form or prior to the notice of award. Alternate bid items will not be considered unless requested in the bid form.

Owner may consider the qualifications and experience of subcontractors, suppliers, and other persons and organizations proposed for the Work. Owner also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work.

Owner may conduct such investigations as Owner deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications and financial ability of bidders, proposed subcontractors, suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents, to Owner’s satisfaction.

BY SUBMITTING A BID, EACH BIDDER AUTHORIZES OWNER TO PERFORM ALL

INVESTIGATIONS INTO THE BIDDER’S BACKGROUND, CAPABILITIES, PRIOR EXPERIENCE,

AND OTHER FACTORS PERTAINING TO BIDDER’S PERFORMANCE OF THE WORK, AS

OWNER DEEMS NECESSARY IN ITS SOLE DISCRETION, AND FOR THAT PURPOSE,

SUBMISSION OF A BID ACTS AS BIDDER’S SPECIFIC AUTHORIZATION TO PERSONS AND

ENTITIES CONTACTED BY OWNER IN CONNECTION WITH SUCH INVESTIGATIONS TO

PROVIDE OWNER WITH THE INFORMATION REQUESTED BY OWNER AND TO DISCUSS AND

EXPRESS OPINIONS CONCERNING BIDDER. FURTHER, BY SUBMISSION OF A BID, BIDDER

AGREES TO FULLY AND FOREVER WAIVE AND RELEASE ANY CLAIM (KNOWN OR

UNKNOWN) IT HAS OR MAY HAVE AGAINST THE OWNER, ENGINEER, DEVELOPER AND

THEIR RESPECTIVE ATTORNEYS, EMPLOYEES, CONSULTANTS, REPRESENTATIVES, AND

AGENTS (“THE EVALUATING PARTIES”) ARISING OUT OF OR IN CONNECTION WITH THE:

(1) ADMINISTRATION, EVALUATION, OR RECOMMENDATION (OR LACK THEREOF) OF ANY

BID; (2) WAIVER OF ANY REQUIREMENTS UNDER THE BID DOCUMENTS OR THE

CONTRACT DOCUMENTS; AND (3) ACCEPTANCE OR REJECTION OF ANY BIDS AND AWARD

OF THE CONTRACT.

Owner reserves the right to award the Bid, at Owner’s discretion, based on the amount of the total base bid (without including “Extra Unit Price Items” or “alternate” bid items) or on the amount of the total amount bid (including “Extra Unit Price Items” or “alternate” bid items), or based on any other combination, means or method determined appropriate by Owner.

If the Contract is to be awarded, it will be awarded to the responsible bidder whose evaluation by Owner indicates that the award will be most advantageous to the Owner and result in the best and most economical completion of the Work.

If the Contract is to be awarded, Owner will give the successful bidder a notice of award within sixty

(60) days after the day of the Bid opening. All bidders must honor the Contract Price on their bid form, if the Contract is awarded within the timeframe provided herein. A Notice to Proceed will be issued within a reasonable period after the Contract Documents are fully executed.

Within seven (7) calendar days of receipt from the Owner of the notice of award, the successful bidder must submit to the Engineer the payment and performance bonds and all information or other items necessary to

A-7 complete the Contract Documents, including the required insurance, anticipated construction schedule, and Contractor’s safety program. See SAFETY under Section 5.20 of the General Conditions of the Contract.

The successful bidder must return the fully executed Contract Documents to Engineer within seven (7) calendar days of receipt, or Owner may at its sole discretion disqualify the Bid and accept another Bid and the bidder must, at Owner’s option, forfeit its Bid Security.

15. TAXES, LICENSES AND FEES. Certain taxes, licenses, fees, and other similar items are part of the cost of the Work, and it is bidder’s responsibility to familiarize itself with these costs and to observe and comply with the Laws and Regulations relating to same. The prices, sums, rates, and other charges set forth in the bidder’s Bid must cover and include all such costs. Owner is exempt from Texas sales and use taxes pursuant to Texas Tax Code § 151.309 as a political subdivision of the State of Texas. Owner shall provide Contractor, if requested by Contractor in writing, with a completed Texas Sales and Use Tax

Exemption Certification as evidence of the applicability of such exemption, as limited by applicable statute. In addition, Contractor, and all subcontractors to Contractor (i) must not include any provision for Texas sales and use taxes with respect to such exempt items in any Bid or the Contract Price, and (ii) must pass on to the Owner cost savings due to the exempt status of such exempt items. Contractor’s contracts with all subcontractors to Contractor must include the foregoing provision regarding the exemption from Texas sales and use taxes. Contractor must pay taxes on items that are not exempt.

16. NUMBER OF SIGNED SETS OF DOCUMENTS. The Contract Documents will be prepared in at least five (5) original sets for signature, one (1) for delivery to the successful bidder. Owner will furnish the successful bidder six (6) sets of Plans and Technical Specifications free of charge, and additional sets may be obtained from Engineer at Engineer’s reproduction rates.

17. ELECTRONIC COUNTERPARTS; FORM OF BONDS TO BE PROVIDED TO OWNER.

The Contract Documents may be executed and delivered in any number of counterparts, each of which so executed and delivered will be deemed to be an original and all of which will constitute one and the same instrument.

18. INSURANCE. See section entitled “INSURANCE REQUIREMENTS” attached to and incorporated into the General Conditions of the Contract as Attachment A to the General Conditions of the Contract and Special Conditions of the Contract Part B, if attached..

19. SOILS REPORT. If a soils investigation has been made for this Project, the soils report and log of borings is available for bidder’s information only. The report is not a warranty of subsurface conditions, nor is it a part of the Contract Documents. Bidders are expected to examine the Site and such reports and then decide for themselves the soils or conditions that may be encountered.

Owner, Engineer, and Developer, if applicable, disclaim any responsibility for the accuracy, true location and extent of the surface and subsurface investigations that have been prepared by others. Owner, Engineer, and Developer, if applicable, further disclaim responsibility for interpretation of that data by bidder, e.g., projecting soil-bearing values, rock profiles, soil stability and the presence, level and extent of underground water or other underground facilities or utilities.

A-8

20. LABOR CLASSIFICATION AND MINIMUM WAGE SCALE.

(A) General: Chapter 2258 of the Texas Government Code provides that any political subdivision of the State of Texas shall determine the general prevailing wage rate received by the classes of workers employed on projects similar to this Project and shall specify in the call for bids and in the Contract Documents the minimum wage rates which must be paid for each type of worker. This statute further provides that the Contractor or subcontractors must pay, as penalty to Owner, Sixty Dollars ($60.00) for each worker employed for each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. Owner is authorized to withhold from the Contractor the amount of this penalty from any payment due under the Contract Documents.

The statute likewise requires that the Contractor and subcontractors keep an accurate record of the names and occupations of all persons employed by them on the construction of the Project and to show the actual per diem wages paid to each worker. These records are open to the inspection of Owner.

(B) The minimum wage rates that apply to this Contract are specified in Attachment B to the

General Conditions of the Contract. Contractor and subcontractors must review and ascertain such wage rates and pay at least such minimum rates.

21. ECONOMIC DISINCENTIVES. The Contractor and the Owner agree that time is of the essence of this Contract. The Contractor and the Owner agree that a breach of this Contract by failure to complete the Work in the specified time will cause harm to the Owner. Therefore, the

Contractor and the Owner agree that for each and every calendar day the Work or any portion thereof shall remain uncompleted after the expiration of the time limit(s) set in the Contract, or as extended under the provisions of these General Conditions (including, without limitation, due to a delay caused by Contractor’s failure to comply with the Contract Documents or due to Owner’s termination of Contractor for default under the Contract Documents), Contractor shall be liable to

Owner for economic disincentives under Section 49.271(e) of Texas Water Code, in the amount of

$1,000.00 for each such calendar day. The Owner shall have the option to deduct and withhold said amount from any monies that the Owner owes the Contractor or its sureties or to recover such amount from the Contractor or the sureties on the Contractor’s bond.

A-9

BID FORM

Bidding Firm:

Address:

City, State, Zip:

Date:

Telephone:

Owner: Katy West Municipal Utility District

Address: c/o Allen Boone Humphries Robinson, L.L.P.

3200 Southwest Freeway, Suite 2600

Houston, Texas 77027

Attention: Ms. Katie Sherborne

Telephone: (713) 860-6400

Bid Location: Quiddity Engineering, LLC

1235 North Loop West, Suite 300

Houston, Texas 77008

Attn: Ms. Caitlyn M. Luhrs, PE

Telephone: (713) 353-7271

BID FOR CONSTRUCTION OF

KATY COURT LIFT STATION NO. 1 EXPANSION

Directors:

The undersigned bidder has carefully examined the Contract Documents, the Technical Specifications, and the

Construction Plans for the work herein above described and referred to in the Invitation to Bid and has carefully examined the site of the work and will provide all necessary labor, superintendence, machinery, equipment, tools, materials, services and other means of construction to complete all the work upon which he bids, as called for in the Contract, the Specifications and shown on the Construction Plans, and in the manner prescribed therein and according to the requirements of the Engineer as therein set forth for the amounts below. The bidding documents

I have examined include the project specifications and drawings for the subject project and addenda listed as follows:

1. Specifications and Contract Documents dated .

2. Drawings including sheets dated .

3. Addenda as acknowledged below:

No. Date No. Date

A-10

In submitting this bid, I agree:

1. To hold my bid open, not withdraw or modify the bid, until 60 calendar days following the bid date.

2. To accept the provisions of the instructions to bidders regarding the bases for bidding and the disposition of the bid security.

3. To enter into a contract with the Owner by executing an agreement on the basis of this bid and to furnish a performance bond, a payment bond, and a certificate of insurance as required by the condition of the contract, all within 7 calendar days of receipt of unsigned contracts.

4. To accomplish the work in accord with the contract documents by furnishing all materials, equipment, and labor for proper construction and completion of the work.

5. A Notice to Proceed will be given upon execution of the contracts.

6. To complete the work within _____ calendar days from the Notice to Proceed and to achieve final completion within 30 calendar days from the date of substantial completion.

The following items shall include all the labor, equipment, and materials necessary for construction of this lift station facility as shown on the plans and described in the specifications for the project.

Item No.

Description of Item With Unit Bid Price In Written Words Unit

Approx.

Quantity Unit Amount

Total Price

1. Move-in and start-up, including performance and payment bonds for 100 percent (100%) of the contract amount, maintenance bonds for 50 percent (50%) of the contract amount, insurance, including all local, state, and federal permits, complete as specified:

L.S. 1 $ $

Per Lump Sum

2. City of Katy Inspection Fee (3% of construction total).

A-11

3. Construction of Katy Court Lift Station No. 1 Expansion including, but not limited to the demolition of two (2) submersible pumps and cables; installation of two (2) submersible pumps, base elbows and cables; riser pipe modification, including protective coatings; adjustment of motor overloads; installation of new elapsed time meters and closed seal barrier entry (CSBE) seals, conduit and wire; and all else as shown on the construction drawings and detailed in the specifications for a fully functioning lift station, complete as specified:

LS 1 $ $

4. Move-in and Purchase and delivery of two (2) submersible non-clog centrifugal pumps ready for installation, lifting chains, and all other appurtenances necessary for complete and operational systems as outlined in the supplied scope of work by Flygt included in the specifications for the sum of (not to exceed $43,736.00):

5. Installation, rental and operation of a temporary bypass system for the duration needed by the Contractor to complete all work in Bid Item No. 3 and 4, including but not limited to temporary power, associated piping and valves, fuel, oil, consumables, site restoration and removal, and all else specified and shown on the contract documents but not addressed in separate bid items, complete as specified.

6. Allowance for the proposed improvements as described in the contract documents due to unforeseen conditions not determinable at the time of bidding, complete as specified and approved by the Engineer on an as needed basis:

@ Ten Thousand Dollars and Zero Cents

L.S. 1 $ 10,000.00 $ 10,000.00

TOTAL BASE BID $

Item

No.

Description of Item With Unit Bid Price In

Written Words Unit

Approx.

Quantity Unit Amount

Total

Price

A-12

List of Subcontractors

Bypass Pumping:

Coatings:

Other:

As bidder I acknowledge that:

1. The Owner reserves the right to reject any and all bids, and to waive any minor informality in any Bid of solicitation procedure. (A minor informality is one that does not affect the competitiveness of the bidders.)

2. The award of the Contract may be made on the BASE BID only or any combination of the BASE BID and selected SUBCONTRACTORS.

3. I have reviewed and understood all the required bid documents needed to constitute a complete bid, and that to be considered a complete and valid bid, I must submit all items outlined in this bid form in a sealed envelope on or before the designated bid time and date.

4. The contract price may be increased or decreased, or the contract time reduced or extended to compensate for changes in the work as ordered by the Engineer and provided for in the Conditions of the Contract.

5. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

A-13

Furthermore, as bidder I certify that:

1. I am the only person or party associated with or having an interest in this bid and it is made without collusion involving any other person, partnership or corporation.

2. The amounts given in this bid have been carefully checked and are submitted as correct and final. Attached is a either a 2% certified or cashier's check or a two percent (2%) bid bond of the maximum total bid amount.

3. I understand that the bid security accompanying this proposal shall be returned to the undersigned unless, in case of the acceptance of this proposal the undersigned should fail to enter into a construction contract and execute bonds as provided in the specifications. In the event the undersigned should fail to enter into a construction contract and execute bonds as required within 7 calendar days after the Engineer has given unsigned contracts to the Contractor, it is understood and agreed that the bid security shall be forfeited to the Owner and shall be considered as payment for damages due to delay and other inconveniences suffered by the Owner as a result of such failure on the part of the undersigned.

4. the event of Award of the Contract to the undersigned, the undersigned agrees to furnish Performance, Payment, and Maintenance Bonds as provided in the Specifications.

Bidder's Signature:

Title: SEAL

Witness:

END OF SECTION

KATY WEST MUNICIPAL UTILITY DISTRICT CONTRACT

Contract C-1 April 2026

CONTRACT

STATE OF TEXAS }

COUNTY OF HARRIS }

THIS CONTRACT (“Contract”) is made and entered into effective as of the ____ day of ___________, 20____ (the “Effective Date”) by and between Katy West Municipal Utility District (the “Owner”) c/o Allen Boone Humphries Robinson LLP, 3200 Southwest Fwy, Suite 2600, Houston, TX 77027, of Harris County, Texas, and _______________, of the City of _______________, County of ______________, and State of _____________, hereinafter termed “Contractor.”

All capitalized terms used herein shall be given the meanings set forth in the General Conditions of the Contract. Quiddity Engineering, LLC shall be referred to herein as the “Engineer.”

For and in consideration of the mutual covenants hereinafter set forth, and under the conditions expressed in the Bonds bearing even date herewith, the Contractor and Owner hereby agree as follows:

Contractor shall commence and complete the Work generally described as follows:

Construction of Katy Court Lift Station No. 1 Expansion for Katy West Municipal Utility District, Harris County, Texas, according to those Plans and Technical Specifications prepared by Engineer in the initial Contract Price of $_______________ and all Extra Work in connection therewith, under the terms as stated in the Contract Documents, and, at Contractor’s own proper cost and expense, to furnish all the materials, supplies, machinery, equipment, tools, superintendence, labor, insurance, and other accessories and services necessary to complete the said Work, in accordance with the conditions and prices stated in the Bid attached hereto and in accordance with the Contract Documents. Contractor represents and warrants to the Owner that it has carefully examined this Contract and all Contract Documents and is thoroughly familiar therewith.

The Contractor hereby agrees to begin work within ten (10) calendar days after the written Notice to Proceed has been given by the Engineer. Contractor hereby also agrees to achieve Substantial Completion of the Work within _______ calendar days after the date of the written Notice to Proceed and to achieve Final Completion of the Work within 30 calendar days after Substantial Completion.

Owner agrees to pay Contractor for completion of the Work in accordance with the Contract Documents for the initial Contract Price of ___________________ ($____________), plus or minus any increases or decreases to the initial Contract Price as provided by the Contract Documents. Contractor will be paid in current funds for the performance of the Contract in accordance with the Bid submitted therefor, subject to additions and deductions as allowed by the Contract Documents and, if applicable, approved by Change Order under the Contract Documents, and to make payments on account thereof as provided therein.

If included as Special Conditions of the Contract Part B, the Developer shall act as “Owner” for the purposes of all payments.

4925-7671-5654 v.1

KATY WEST MUNICIPAL UTILITY DISTRICT CONTRACT

Contract C-2 April 2026

IN WITNESS WHEREOF, the parties to these presents have executed this Contract on the Effective Date.

Katy West Municipal Utility District Owner

By:

Name:

Title:

[CONTRACTOR]

Contractor

By:

Name:

Title:

ALL BIDDERS MUST SUBMIT THEIR TEC FORM 1295 WITH THEIR BID. THE OWNER

WILL NOT AWARD THE CONTRACT WITHOUT THE COMPLETED TEC FORM 1295

NOTED IN THE INSTRUCTIONS TO BIDDERS.

The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Contract and the Contractor agrees that the Contract can be terminated if the Contractor knowingly or intentionally fails to comply with a requirement of that subchapter.

4925-7671-5654 v.1

Katy West Municipal Utility District GENERAL CONDITIONS OF THE CONTRACT

General Conditions of the Contract GC-1 April 2026

GENERAL CONDITIONS OF THE CONTRACT

TABLE OF CONTENTS

ARTICLE I. DEFINITIONS

ARTICLE II. CONTRACT DOCUMENTS

ARTICLE III. PRELIMINARY MATTERS

ARTICLE IV. SITE ACCESS/ CONDITIONS/ REFERENCE POINTS

ARTICLE V. CONTRACTOR’S RESPONSIBILITIES/INDEMNITIES

ARTICLE VI. ENGINEER’S STATUS DURING CONSTRUCTION

ARTICLE VII. EXTRA WORK/ CHANGE ORDERS/ CLAIMS

ARTICLE VIII. TESTS AND INSPECTIONS/ DEFECTIVE WORK/ WARRANTY

ARTICLE IX. MINIMUM WAGE RATE SCALE/PRICE FOR WORK/ PAYMENTS TO

CONTRACTOR …………

ARTICLE X. SUBSTANTIAL COMPLETION, PARTIAL USE,

FINAL COMPLETION AND ACCEPTANCE…………………………

ARTICLE XI. SUSPENSION OF WORK/ TERMINATION/ DEFAULT

ARTICLE XII. MISCELLANEOUS

ATTACHMENT A – INSURANCE REQUIREMENTS

ATTACHMENT B – MINIMUM WAGE RATE SCALE

4900-6000-2182 v.1 4900-6000-2182 v.1

General Conditions of the Contract GC-2 April 2026

GENERAL CONDITIONS OF THE CONTRACT

ARTICLE I. DEFINITIONS

1.01. DEFINITIONS. The following terms shall be defined as described below unless such definition is expressly modified by the Contract Documents. Any capitalized terms used in the Contract Documents not defined in this Section shall have the meaning assigned to such term under the Contract Documents.

a. Bid. The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed.

b. Bond(s). Performance bonds, maintenance bonds and payment bonds, or any of them, as required by the Contract Documents.

c. Change Order. A document signed by Contractor, Engineer, and Owner and entered into in accordance with the Contract Documents that authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time.

d. Claim. A “Claim” is a claim, demand, or assertion by the Contractor seeking for itself or on behalf of a subcontractor or supplier: adjustment or interpretation of any Contract term, including without limitation, adjustment of the Contract Price or Contract Time; payment of money; relief from obligations; or other relief or recovery with respect to the terms of the Contract. The term “Claim” also includes other disputes and matters in question asserted by the Contractor (whether for itself or on behalf of a subcontractor or supplier) arising out of or relating to the Contract.

e. Contract. The entire and integrated written agreement between the Owner and Contractor concerning the Work, including the Contract Documents. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral.

f. Contract Documents. The Bid, Contract, Instructions to Bidders, General Conditions, Addendum to the General Conditions, Special and Supplemental Conditions, if any, Technical Specifications, Plans, Change Orders, any written amendment to the Contract…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .