Bid sheetPawnee Water Softener Filtration ReplacementProj OK3PAA02CB - Bid Sheet.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- 246-23-Q-0168r1
About this file
This document contains a bid sheet template for a federal contract opportunity to replace the domestic water softener and filtration system at the Pawnee Indian Health Center in Pawnee, Oklahoma. The bid sheet requests itemized direct and material costs, sales tax, overhead, profit, bond costs, and a total estimate. It includes 15 line items for general requirements, administration, onsite supervision, removal of existing equipment and piping, installation of new equipment and piping, electrical work, concrete work, and DDC integration. The related federal contract opportunity is solicitation number 246-23-Q-0168r1 from the Department of Health and Human Services Indian Health Service to furnish and install a domestic water softener and filtration system replacement for the Pawnee Indian Health Center. Bids are requested using the provided template to complete the cost breakdown for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 24 Bid Gurantee.pdf | ||
| SOW Pawnee Domestic Water Softener Filtration System Replacement Proj OK3PAA02CB.pdf | ||
| SF25 Performance Bond.pdf | ||
| OF306AddendumToDeclarationForFederalEmp updated.pdf | ||
| Drawing.pdf | ||
| SF18 RFQ and Clauses.pdf | ||
| ok51.txt | TXT text file | |
| of0306.pdf | ||
| SF25A Payment Bond.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID Schedule
| Bid Sheet | |
| Pawnee Indian Health Center | |
| Domestic Water Softener & Filtration System Replacement | Project # OK3PAA02CB |
| Date: |
Summary
| Direct Labor Cost | $ | |
| Direct Material Costs | $ | |
| Sales Tax ( %) | $ | |
| Subtotal: | $ | |
| Overhead ( %) | $ | |
| Subtotal: | $ | |
| Profit ( %) | $ | |
| Totla with Overhead and Profit: | $ | |
| Bond ( %) | $ |
Estimate Total: $
Cost Breakdown
| No. | Description | Material | Sales Tax ( %) | Labor | Subtotal |
| 1 | General Requirements and Admin | ||||
| 2 | GC Admin Supervision | ||||
| 3 | GC Onsite Supervision | ||||
| 4 | Domestic Water Softener & Filtration System Replacement | ||||
| 5 | Water Softner System | ||||
| 6 | Brine Tank Sytem | ||||
| 7 | Carbon Filter System | ||||
| 8 | Booster Pump Unit | ||||
| 9 | Ultra Violet Disenfectant Unit | ||||
| 10 | Bag Filter Unit | ||||
| 11 | Final Filter Unit | ||||
| 12 | Removal Existing Equipment & Piping | ||||
| 13 | Installation of New Equipment | ||||
| 14 | Installation of New Piping & Accessories | ||||
| 15 | Electrical Old Equipment Disconnect | ||||
| 16 | Electrical New Equipment Installation | ||||
| 17 | Demo of Existing Concrete Pad | ||||
| 18 | New Concrete Pad | ||||
| 19 | DDC Integration | ||||
| 20 | |||||
| 21 |
| SubTotal: | $ | $ | $ | $ | ||
| Input Sum | ||||||
| Total Above | Input Sum | |||||
| Total Above | Input Sum |
Total Above
File details come from the government source that posted it. Updated .