This is a Bid Tab document for the Laurel Meadows Stream Restoration project in Mauldin, South Carolina, covering two separate stream restoration sections: a primary stream section and a southwest tributary. The bid is dated May 2025 and includes comprehensive itemized quantities for stream restoration activities such as mobilization, clearing and grubbing, excavation, boulder placement, erosion control, and vegetation establishment. The project involves approximately 5,000 feet of stream restoration with varying restoration approaches based on space availability and flooding constraints.
The bid tab details multiple line items with specific quantities, including 10.4 acres of clearing and grubbing for the primary section, 5,880 cubic yards of cut and fill in place, 6,960 linear feet of rock toe, and extensive use of coir turf reinforcement matting. Notable provisions include no-cost boulders available from Twin Chimneys Landfill, flexible spoil removal options within a 17-mile radius, and a 5% contingency allocation. The document notes potential fill quantity adjustments due to Hurricane Helene's impact and emphasizes that GPS is the preferred measurement method, though other methods may be accepted. Unit prices are not specified, leaving room for contractor bidding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 MOBILIZATION - LS -
2 AS-BUILTS - LS -
3 EROSION AND SEDIMENT CONTROL - LS -
4 CLEARING AND GRUBBING 10.4 AC
5 BEDDING STONE 240 CY
6 RIPRAP, BOULDERS AND AGGREGATE 600 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND FILL IN PLACE
5,880 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND REMOVE SPOILS
6,480 CY
9 CROSS VANE 11 EA
10 BOULDER RIFFLE 14 EA
11 CONSTRUCTED RIFFLE 96 CY
12 ARCHED BOULDER STEP 12 EA
13 ROCK TOE 6,960 LF
14 SEWER CROSSING PROTECTION 100 CY
15 COIR TURF REINFORCEMENT MATTING 700g 14,900 SY
16 COIR TURF REINFORCEMENT MATTING 400g 4,600 SY
17 PERMANENT TRM 600 SY
SEEDING, MULCHING AND VEGETATION
ESTABLISHMENT
9.6 AC
19 ADDITIONAL VEGETATIVE ESTABLISHEMENT AREA 3.7 AC
20 LIVE STAKES 370 BN
21 PLUGS/BARE ROOT STEMS 5,200 EA
22 CONTINGENCY 5 %
LAUREL MEADOWS STREAM RESTORATION (PRIMARY):
BID TAB
MAY 2025
TOTAL
NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT TO THE PLANS. GPS IS THE PREFERRED METHOD, BUT OTHER METHODS MAY BE
ACCEPTED.
NOTE: ALL SPOIL MATERIAL MAY BE TAKEN TO A LOCAL BORROW PIT (WHICH WILL BE PROVIDED) OR TWIN CHIMNEYS LANDFILL (NO TIPPING FEE).
ALL ARE WITHIN A 17-MILE RADIUS OF THE SITE.
NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THIS PROJECT. BOULDERS ARE LOCATED AT TWIN CHIMNEYS LANDFILL. SPOILS MAY ALSO BE TAKEN TO THIS LOCATION (NO TIPPING FEE). SEE ATTACHMENT FOR ADDITIONAL INFORMATION.
NOTE: FILL QUANTITIES HAVE LIKELY BEEN EFFECTED BY HURRICANE HELENE. WE EXPECT THE REQUIRED REMOVAL OF FILL OFFSITE TO BE LESS
THAN THAN THE SURVEY DATA INDICATES (THE SURVEY IS MORE THAN 1 YEAR OLD).
ITEM # DESCRIPTION QTY UNIT UNIT PRICE TOTAL PRICE
1 MOBILIZATION - LS -
2 AS-BUILTS - LS -
3 EROSION AND SEDIMENT CONTROL - LS -
4 CLEARING AND GRUBBING 1.6 AC
5 BEDDING STONE 120 CY
6 RIPRAP, BOULDERS AND AGGREGATE 240 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND FILL IN PLACE
1,700 CY
EXCAVATION, FILLING, AND GRADING:
CUT AND REMOVE SPOILS
1,000 CY
9 ARCHED BOULDER STEP 32 EA
10 ROCK TOE 2,520 LF
11 SEWER CROSSING PROTECTION 50 CY
12 COIR TURF REINFORCEMENT MATTING 700g 5,000 SY
13 COIR TURF REINFORCEMENT MATTING 400g 1,700 SY
14 PERMANENT TRM 1,080 SY
SEEDING, MULCHING AND VEGETATION
ESTABLISHMENT
0.8 AC
16 ADDITIONAL VEGETATIVE ESTABLISHEMENT AREA 1 AC
17 LIVE STAKES 150 BN
18 PLUGS/BARE ROOT STEMS 2,000 EA
19 CONTINGENCY 5 %
LAUREL MEADOWS STREAM RESTORATION (SW TRIBUTARY):
TOTAL
LAUREL MEADOWS STREAM RESTORATION (SW TRIBUTARY):
BID TAB
MAY 2025
TOTAL
PROJECT TOTAL
LAUREL MEADOWS STREAM RESTORATION (PRIMARY)
NOTE: IT IS THE CONTRACTOR'S RESPONSIBILITY TO CONSTRUCT TO THE PLANS. GPS IS THE PREFERRED METHOD, BUT OTHER METHODS MAY BE
ACCEPTED.
NOTE: ALL SPOIL MATERIAL MAY BE TAKEN TO A LOCAL BORROW PIT (WHICH WILL BE PROVIDED) OR TWIN CHIMNEYS LANDFILL (NO TIPPING FEE).
ALL ARE WITHIN A 17-MILE RADIUS OF THE SITE.
NOTE: BOULDERS ARE AVAILABLE AT NO COST WHEN USED ON THIS PROJECT. BOULDERS ARE LOCATED AT TWIN CHIMNEYS LANDFILL. SPOILS MAY ALSO BE TAKEN TO THIS LOCATION (NO TIPPING FEE). SEE ATTACHMENT FOR ADDITIONAL INFORMATION.
NOTE: FILL QUANTITIES HAVE LIKELY BEEN EFFECTED BY HURRICANE HELENE. WE EXPECT THE REQUIRED REMOVAL OF FILL OFFSITE TO BE LESS
THAN THAN THE SURVEY DATA INDICATES (THE SURVEY IS MORE THAN 1 YEAR OLD).