Bid Sheet_Excel File 125 Canal St_Shelton.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
125 Canal Street, Shelton Remedial Construction Services – System Trenching
Solicitation number
33866
Issued by
Fairfield County, Connecticut

About this file

This is a Bid Price Form for a Request for Proposal (RFP) issued by Arcadis U.S., Inc. on behalf of the City of Shelton, Connecticut, for remedial construction services involving system trenching at 125 Canal Street, Shelton. The project encompasses installation of a subsurface piping network and includes five primary work categories: Site Preparation, Trenching Activities, Subgrade Conveyance Piping Installation with Backfill and Well Connections, Material and Waste Management, and Close Out. Key quantities include 500 linear feet of temporary safety fencing, 1,415 linear feet of backfill, 4,145 linear feet of 1-inch diameter air supply piping, 3,235 linear feet of 2-inch diameter SVE recovery piping, and 21 soil vapor extraction well vaults. The bid form requires contractors to provide an estimated completion date and duration along with a draft project schedule. Additional required submissions include a CHRO Bidder Compliance Monitoring Report and documentation of any applicable liquidated damages per Section 16 of the DECD Guidelines.

The bid sheet presents all line items with estimated quantities and space for unit costs and total item costs to be completed by bidders. Earthwork quantities represent estimated in-place measurements, with final volumes and quantities to be determined by the contractor and agreed upon between the engineer and contractor. The RFP specifies that Davis-Bacon and prevailing wage labor rates are required for all work performed. Supplemental bid items include standby rates on both hourly and daily bases. This project is binding per the agreement terms, and bidders must submit comprehensive proposals addressing all specified work categories and compliance requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BIDSheet

REQUEST FOR PROPOSAL
REMEDIAL CONSTRUCTION SERVICES - SYSTEM TRENCHING
SHELTON, CONNECTICUT

BID PRICE FORM

Item No.Payment ItemUnitEstimated
QuantityUnit CostTotal Item Cost
A. SITE PREPARATION
1MobilizationLump Sum2$ - 0$ - 0
2Contractor SubmittalsLump Sum1$ - 0$ - 0
3Project Support/Health and SafetyLump Sum1$ - 0$ - 0
4Utility Locate (if needed)Lump Sum1$ - 0$ - 0
5Pre-Construction InspectionLump Sum1$ - 0$ - 0
6Dust Control (if needed)Lump Sum1$ - 0$ - 0
B. TRENCHING ACTIVITIES
1Temporary Safety FencingLinear Foot500$ - 0$ - 0
2Temporary Erosion and Sediment ControlsLinear Foot150$ - 0$ - 0
3Trenching - Labor, Equipment, Misc ToolsLump Sum1$ - 0$ - 0
C. SUBGRADE CONVEYANCE PIPING INSTALL, BACKFILL AND WELL CONNECTIONS
1Pipe Installation, Backfill, and Well Connections - Labor, Equipment, Misc ToolsLump Sum1$ - 0$ - 0
2BackfillLinear Foot1,415
31-inch Diameter, Duratec, Air Supply PipingLinear Foot4,145$ - 0$ - 0
42-inch Diameter, SCH 40 PVC, SVE Recovery PipingLinear Foot3,235$ - 0$ - 0
58 oz, Non-woven, Geotextile Demarcation Layer (4' feet wide)Linear Feet1,415$ - 0$ - 0(1.7 Tons per Cubic Yard; Backfill 3' to 16' below ground surface)
6Soil Vapor Extraction Well Vault SettingPer Vault21$ - 0$ - 0
7Surface RestorationSquare Feet0$ - 0$ - 0(1.7 Tons per Cubic Yard; Backfill 0' to 3' below ground surface)
D. MATERIAL AND WASTE MANAGEMENT
1Material Staging AreaLump Sum1$ - 0$ - 0
2Transportation and Disposal - Construction & Demolition Debris (20 Yard)Roll-Offs2$ - 0$ - 0
3Handling and Excess Soil StockpilingLump Sum1$ - 0$ - 0
4On-Site Stormwater Handling/Management (if needed)Lump Sum1$ - 0$ - 0
5Pressure Testing Water (Clean Pressure Testing Water, to Ground)Gallons1,000$ - 0$ - 0
E. Close Out
1Closeout SubmittalsLump Sum1$ - 0$ - 0
2Post-Construction Survey and InspectionLump Sum1$ - 0$ - 0
3DemobilizationLump Sum2$ - 0$ - 0
Total Base Bid
Supplemental Bid Items
AStandby Rate - HourlyHourNA$ - 0NA
BStandby Rate - DailyDayNA$ - 0NA
Additional Required Bid SubmissionsEstimated Completion DateEstimated Duration
----
Draft Project Schedule with completion date/estimated duration----
Include any applicable liquidated damages. See Section 16 of the DECD Guidelines for further information(Attachment 5).--------
CHRO Bidder Complinace Monitoring Report (See Attachment 6)--------
Notes:
NA = Not Applicable
This bid table is binding per the agreement.
Earthwork quantities represent estimated in place measurements.
Final volumes and quantities to be determined by contractor and agreed upon between ENGINEER and CONTRACTOR.