Bid Sheet.docx
DOCX document 21 KB Posted
- Solicitation number
- W912HZ25QA007
About this file
The file is a Bid Sheet for a Request for Quote (RFQ) W912HZ25QA007 issued by the US Army Corps of Engineers, Engineer Research and Development Center (ERDC) for a Concrete Coefficient of Thermal Expansion Machine. The solicitation requires a small business contractor to provide specialized scientific equipment, specifically: one 110V/60 Hz Concrete Coefficient of Thermal Expansion Machine (Model AFCT2), two additional CTE Frames with transducers to evaluate three specimens of Model AFCTS02F, and one Water Chiller (Model KZXXA05A1).
The procurement is 100% set aside for small businesses under NAICS 334519 with a size standard of 500 employees. The government will evaluate offers based on technical acceptability, delivery lead time, and price, with a preference for shorter lead times. The award will be made to the most advantageous and responsive offeror, with the expectation of awarding the contract without further discussions. Shipping and handling costs are to be included in the total pricing, and the equipment is intended for evaluating the thermal expansion characteristics of concrete specimens.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Item
| Description |
| Quantity |
| Paret Number/Manufacturer |
| Unit Price |
| Total |
| 1 |
| The Contractor shall provide one (1) |
110V/60 Hz Concrete Coefficient of Thermal Expansion Machine (Model AFCT2) in accordance with the Description of Requirements (DOR).
| 2 |
| The contractor shall provide two (2) |
additional CTE Frames with transducers to evaluate a total of three (3) specimens of Model AFCTS02F in accordance with the Description of Requirements (DOR).
| 3 |
| The Contractor shall provide one (1) |
Water Chiller - Model KZXXA05A1 in accordance with the Description of Requirement (DOR).
| 4 |
| The Contractor shall include all |
shipping and handling costs to deliver equipment in accordance with the Description of Requirement in Section C.
Total Price
File details come from the government source that posted it. Updated .