About this file
This document appears to be a bid sheet for the Fine Arts Connector Road project in Glynn County, Georgia. The project consists of earthwork and construction, paving for a 24-foot-wide road, water distribution system, storm drainage system, and erosion control. The bid sheet provides a detailed breakdown of the various work items, including quantities and unit prices, across these major project elements. Key details include 2.5 acres of clearing and grubbing, 5,000 square yards of grading, 2,310 linear feet of curb and gutter, 745 linear feet of 8-inch waterline, and 136 linear feet of reinforced concrete pipe for the storm drainage system. The bid sheet does not specify a due date or award date, but the related state and local contract opportunity identifies Glynn County as the jurisdiction overseeing the project.
The bid sheet also provides subtotals for each major project element, as well as a total for the overall road construction. Pricing information is presented in a unit price format, allowing for the calculation of extended amounts. The document does not mention any set-asides, incumbent contractors, funding sources, or other salient commercial terms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Sheet.pdf | ||
| Bid Docs.pdf | ||
| 30472_0001 _ Technical Specifications.pdf | ||
| CCGA_2430 NOIA.pdf | ||
| NOA CCGA 2430 Fine Arts Road.pdf | ||
| Bid Docs.docx | DOCX document | |
| 30472_0001 _ Site Development Plans 2024_4_10.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EARTHWORK & CONSTRUCTION
| Item |
| Description |
| Units |
| Unit Price |
| Total |
| 1 |
| Clearing and Grubbing (Roadway) |
| 2.5 |
| AC |
| $ |
| $ |
| 2 |
| Demolition |
| 1.0 |
| LS |
| $ |
| $ |
| 3 |
| Grading |
| 5,000 |
| SY |
| $ |
| $ |
| 4 |
| Ditch Grading |
| 700 |
| LF |
| $ |
| $ |
| 4 |
| Muck and Fill Unsuitable Material (15% of Roadway) |
| 500 |
| CY |
| $ |
| $ |
| SubTotal, EARTHWORK & CONSTRUCTION |
| $ |
PAVING (24' WIDE ROAD)
| Item |
| Description |
| Units |
| Unit Price |
| Total |
| 1 |
| 8" Granite Aggregate Base Course |
| 2,250 |
| SY |
| $ |
| $ |
| 2 |
| 2" 12.5mm Asphaltic Concrete Surface Course |
| 2,310 |
| SY |
| $ |
| $ |
| 3 |
| Prime Coat |
| 2,250 |
| SY |
| $ |
| $ |
| 4 |
| 18" Curb & Gutter |
| 2,310 |
| LF |
| $ |
| $ |
| 5 |
| Tack Coat |
| 2,310 |
| SY |
| $ |
| $ |
| 6 |
| 2" 19mm SuperPave Asphaltic Concrete Binder Course |
| 2,250 |
| SY |
| $ |
| $ |
| 7 |
| Multiuse Path |
| 575 |
| SY |
| $ |
| $ |
| 8 |
| Detectable Warning |
| 3 |
| EA |
| $ |
| $ |
| 9 |
| Signing and Striping |
| 1 |
| LS |
| $ |
| $ |
| 10 |
| 4” PVC Conduit |
| 364 |
| LF |
| $ |
| $ |
| SubTotal, PAVING 22' WIDE ROADS |
| $ |
WATER DISTRIBUTION SYSTEM
| Item |
| Description |
| Units |
| Unit Price |
| Total |
| 1 |
| 8" Waterline and Fittings |
| 745 |
| LF |
| $ |
| $ |
| 2 |
| Fire Hydrant, complete with valve and box |
| 1 |
| EA |
| $ |
| $ |
| 3 |
| 8" Gate Valve |
| 2 |
| EA |
| $ |
| $ |
| 4 |
| 2" Flush Valve |
| 1 |
| EA |
| $ |
| $ |
| 5 |
| Connect to Existing Water |
| 1 |
| EA |
| $ |
| $ |
| SubTotal, WATER DISTRIBUTION SYSTEM |
| $ |
STORM DRAINAGE SYSTEM
| Item |
| Description |
| Units |
| Unit Price |
| Total |
| 1 |
| 18" RCP |
| 40 |
| LF |
| $ |
| $ |
| 2 |
| 24" RCP |
| 96 |
| LF |
| $ |
| $ |
| 3 |
| Concrete Flumes |
| 4 |
| EA |
| $ |
| $ |
| 4 |
| 18" FES |
| 2 |
| EA |
| $ |
| $ |
| 5 |
| 24" FES |
| 2 |
| EA |
| $ |
| $ |
| SubTotal, STORM DRAINAGE SYSTEM |
| $ |
EROSION CONTROL
| Item |
| Description |
| Units |
| Unit Price |
| Total |
| 1 |
| Erosion Control Installation |
| 1 |
| LS |
| $ |
| $ |
| 2 |
| Erosion Control Maintenance |
| 1 |
| LS |
| $ |
| $ |
| 3 |
| Grassing |
| 10,000 |
| SY |
| $ |
| $ |
| 4 |
| NPDES Monitoring |
| 1 |
| LS |
| $ |
| $ |
| SubTotal, EROSION CONTROL |
| $ |
| Sub-Total, EARTHWORK & CONSTRUCTION |
| $ |
| Sub-Total, PAVING 24' WIDE ROAD |
| $ |
| SubTotal, WATER DISTRIBUTION SYSTEM |
| $ |
| SubTotal, STORM DRAINAGE SYSTEM |
| $ |
| SubTotal, EROSION CONTROL |
| $ |
| SubTotal, ALL DIVISIONS |
| $ |
| TOTAL - Road |
| $ |