Bid Sheet 2026 Bag Wall District 11 and 12 IDIQ revised.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- RFB 605 2700000120 1
- Issued by
- Kentucky
About this file
This is a bid sheet for polypropylene barrier wall construction services under an Indefinite Delivery/Indefinite Quantity (ID/IQ) contract covering Districts 11 and 12 for what appears to be a Kentucky state or local transportation agency. The project requires vendors to bid on all line items for each district in which they wish to provide services. Line items include mobilization, foundation preparation (non-yielding and yielding surfaces), polypropylene bags in heights ranging from 2 to 6 feet, concrete placement via transfer pump and pump truck, traffic control, aggregate materials, channel lining, Class B concrete, and long-reach trackhoe services. District 11 requires substantially smaller quantities across most categories, while District 12 requires significantly higher volumes, with concrete placement ranging from 25 to 100 hours for District 11 and 75 to 100 hours for District 12, and Class B concrete from 300 to 1,000 cubic yards respectively.
The bid sheet requires vendors to enter actual bid prices and response times for submission into the e-procurement system and to specify the number of days required to start work for each district. Vendors must demonstrate a minimum number of years of experience providing similar barrier wall construction services, though the specific experience requirement appears to be left blank for vendors to note. Concrete placement items include an 8-hour minimum per delivery order, and traffic control services must comply with current Kentucky Transportation Cabinet (KYTC) specifications, the Manual on Uniform Traffic Control Devices (MUTCD), and standard drawings. The agency reserves the right to supply fill material through other master agreements. Extended pricing totals are calculated for each district, though the bid sheet template shows $0.00 totals pending vendor price submissions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Final_RFB_605_2700000120_1_SO_FORM.PDF | ||
| How to Submit an Online Response - March 2023.pdf | ||
| District Map.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Polypropylene Barrier Wall Construction District 11 & 12 ID/IQ | |
| Vendor: | Vendor Rep: |
Instructions: Actual bid prices and response time must be entered on this bid sheet and uploaded into the e-procurement system. Vendors shall bid all line items for each district for which they wish to provide services. A vendor is not required to bid all districts.
| Vendor guarantees ___ years of experience in providing similar services as requested in this solicitation. | ||||||||||
| District 11 | District 12 | |||||||||
| Bid Item | Extended Description | Estimated Qty | UOM | Unit Price | Ext Price | Estimated Qty | UOM | Unit Price | Ext Price | |
| Line 1 | Mobilization | This item will be for mobiliizing all materials and equipment to construct barrier wall as required in the specs. | 5 | LS | 10 | LS | ||||
| Line 2 | Foundation Preparation-Non-Yielding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 150 | LNFT | 450 | LNFT | ||||
| Line 3 | Foundation Preparation-Yielding | This item includes all equipment, labor and materials needed to excavate project site necessary to install barrier wall. If a hoe ram is needed, it will be incidental to this bid item. Any tree removal will be incidental to this bid item. | 150 | LNFT | 450 | LNFT | ||||
| Line 4 | 2' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 150 | LNFT | 1000 | LNFT | ||||
| Line 5 | 3' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 500 | LNFT | ||||
| Line 6 | 4' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 300 | LNFT | 500 | LNFT | ||||
| Line 7 | 5' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 8 | 6' Bags | This item will include all equipment, labor and materials needed to install barrier wall on project site. Includes but not limited to materials for bags, ties to tie bags together when needed. All labor needed to install bags. All equipment necessary to install bags include sled (any apparatus to hold bags in place while concrete is poured in them). | 200 | LNFT | 200 | LNFT | ||||
| Line 9 | Concrete Placement-Transfer Pump or Other Mechanical Support | This item is for any mechanical means of support to place Class B Concrete such as a transfer line truck, conveyor belt or other mechanical. A pump truck will be paid as a separate line item. Minimum of 8 hours per delivery order. | 25 | HR | 100 | HR | ||||
| Line 10 | Concrete Placement-Pump Truck | This item will be for a pump truck to place Class B Concrete. This item also includes all material, labor, and oversight necessary for operating the pump truck and discharging the material into the polypropylene barrier wall apparatus. Minimum of 8 hours per delivery order will be paid. | 25 | HR | 75 | HR | ||||
| Line 11 | Traffic Control | Provide traffic control that meets most current standards in the KYTC Specifications, MUTCD and Standard Drawing. Flaggers will be incidental to this bid item. Any flaggers must have flagger certification. While traffic is still driving through workzone, vendor shall keep roadway clear of debris. | 10 | DAY | 20 | DAY | ||||
| Line 12 | 6" Minus Stone | Aggregate that must pass through a six inch opening. Can be used for backfill behind bags when requested by Engineer. | 300 | TON | 1200 | TON | ||||
| Line 13 | Class II Channel Lining | Can be used for backfill behind bags when requested by Engineer | 100 | TON | 300 | TON | ||||
| Line 14 | Class III Channel Lining | Will be used for erosion control. Item includes material, labor and equipment to install channel lining. | 150 | TON | 150 | TON | ||||
| Line 15 | Class B Concrete | Must meet most current edition of KYTC Standard Specifications. Item will include materal and coordination for supplying concrete to project site. KYTC still reserves the right to opt to supply the fill material using other master agreements. | 300 | CY | 1000 | CY | ||||
| Line 16 | Long Reach Trackhoe | Shall be a CAT 320 or equivalent. Shall be capable of reaching at least 40 feet. 8 hour minimum per delivery order will be paid. | 50 | HR | 50 | HR | ||||
| TOTAL | $0.00 | TOTAL | $0.00 |
# of Days to Start Work: # of Days to Start Work:
File details come from the government source that posted it. Updated .