Bid_Scope_Materials_List.docx

DOCX document 18 KB Posted

Attached to
NED Home Rehab - 7 Mississippi Circle
Solicitation number
NED-S-7-050726
Issued by
Escambia County, Florida

About this file

This is a Bid Scope Materials List for a residential rehabilitation project managed by Escambia County, Florida, specifically for a property located at 7 Mississippi Circle. The scope encompasses comprehensive home rehabilitation work including kitchen appliances (sink, faucet, range, cooktop, microwave, hood vent, and refrigerator), bathroom fixtures (vanity sink, faucet, tub, shower, toilet, and fan), flooring materials (vinyl plank and carpet), heating and cooling systems (hot water heater and HVAC), lighting fixtures throughout the home, roofing materials, gutters, and windows. The project specifies particular brand and model requirements for each item, including Delta faucets, GE kitchen appliances, American Standard bathroom fixtures, Shaw flooring products, and CertainTeed roofing materials. The contract is open to licensed, insured general contractors in good standing with Escambia County, with new contractors required to submit a letter of insurability. Bids must be submitted through OPENGOV, and Escambia County reserves the right to award line items individually for emergency work limited to roofing and septic or sewer services.

The scope includes detailed construction and installation standards requiring contractors to use braided supply lines for plumbing, properly finish trim with putty, caulk, and paint, and complete all drywall work with taping, mudding, texturing, and painting. Cabinetry must be constructed of plywood or better with solid hardwood fronts and frames, and countertops must be laminate with a 4-inch backsplash. All electrical appliances must be Energy Star approved with LED bulbs. The contract language specifies that contractors are obligated to use like, similar, or equal valued products when the specified items are unavailable. Contractors are responsible for moving furniture while homeowners retain responsibility for contents, and all surfaces, furniture, decorations, and homeowner property must be protected from damage throughout the project.

View the file

Other files

File Type Posted
NED_Home_Rehab_-_7_Mississippi_Circle.pdf PDF
SCOPE_-_SHIP_-_7_Mississippi_Circle_-_Jones_V.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Scope Materials List

Kitchen SinkDouble bowl aluminum drop-in.
Kitchen FaucetDelta, Savile pull-down
RangeGE, JB645RKSS
CooktopGE, JP3030DJBB
Micro-VentedGE, JVM3160RFSS
Hood VentBroan, BCSEK 30-in, 250cfm
RefrigeratorWhirlpool, WRT348FMES
Vanity SinkRound ceramic drop-in
Bathroom FaucetDelta, Woodhurst 1.5-gpm centerset
Tub FaucetDelta, T13420-SS
Shower FaucetDelta, T13220-SS
TubAmerican Standard Solar, (60x30)
Tub SurroundSterling, 61044100-0 (60x31.5) with corresponding tub
ShowerAquatic, AX160304PS-WH
ToiletAmerican Standard Cadet 3, comfort height, elongated 1.28-GPF
Bathroom FanBroan QK60s, 60cfm
Flooring – LVPShaw, Torino Plus Floorte 500RG
CarpetShaw, Burghley 2 - 60oz. – 6lbs. Pad
Hot Water HeaterA.O. Smith Signature 900, 50-gallon
Ceiling FanHunter, Anisten 52-in
Kitchen LightCommercial Electric, 54663141
Bathroom LightHampton Bay, V1124-79
Hall LightHampton Bay, FZP8012-A
Coach LightHampton Bay, 245 746
Ext. Ceiling LightHampton Bay, WB0325
Light BulbsLED
RoofingCertainTeed, Landmark
Gutter6” Aluminum with 4” downspouts

Windows HVAC seer

· When repairing or replacing plumbing fixtures always use new braded supply lines.

· When repairing or replacing trim always putty, caulk, and paint.

· When repairing or replacing drywall always tape, mud, texture, and paint.

· When repairing or replacing electrical wiring always repair the drywall.

· Counter tops are to be square-edged, laminate with a 4” backsplash.

· Cabinetry shall be constructed of ½” plywood or better with ¾” solid hardwood fronts and frames, no particle board. All exposed ends will be finished and have side-mounted drawer guides.

· Moving furniture is the contractor’s responsibility, its contents are the homeowners.

· All electrical appliances are to be EnergyStar approved with LED bulbs.

· Protect all surfaces, furniture, decorations, and the homeowner’s property from damage.

“Contractors are obligated to use like, similar, or equal valued products”.

File details come from the government source that posted it. Updated .