Bid_Schedule_-_Siding_Replacement.pdf

PDF 135 KB Posted

Attached to
Siding Replacement Federal contract opportunity
Solicitation number
140P6421R0029
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document contains a bid schedule and solicitation notice for a siding replacement project. The National Park Service is seeking bids to remove and replace wood siding, trim, wall sheathing, gutters, downspouts and one window at Perry's Victory IPM NHP in Put-In-Bay, Ohio. The project magnitude is estimated between $100,000 and $250,000. Offerors must visit the site to fully understand the requirement. The solicitation will be a firm-fixed price construction contract adhering to Construction Wage Rate Requirements for Ottawa County, OH. The NAICS code is 238170 for the 100% small business set-aside. Interested parties must register in SAM and complete ORCA representations by the solicitation close date once posted. Christopher Bauer is the contract specialist at the National Park Service Midwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to Siding Replacement, newest first.
File Type Posted
Wage_Determination.pdf PDF
Technical_Questionnaire.pdf PDF
Technical_Questionnaire.docx DOCX document
Project_Specifications.pdf PDF
Past_Performance_Questionnaire.pdf PDF
Bid_Schedule_-_Siding_Replacement.xlsx XLSX spreadsheet
Notice_to_Contractors.pdf PDF
Past_Performance_Questionnaire.docx DOCX document
Updated_-_COVID-19_Mask_Policy.pdf PDF
Sol_140P6421R0029.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Siding Replacement Bid Schedule - Perry's Victory IPM NHP

Unit Quantity Price/ Unit Subtotal

LS 1 -$ -$

SF 1950 -$ -$

Remove Siding plus all Trim (Labor) SF 1950 -$ -$ Replace Damaged Wall Sheathing (Labor) SF 320 -$ -$ Replace Damaged Wall Sheathing (Material) SF 320 -$ -$

SF 1950 -$ -$

SF 1950 -$ -$

LS 1 -$ -$

Install Simulated Wood Trim (Material) LS 1 -$ -$

LF 135 -$ -$

Install Gutters and Downspouts (Labor) LF 135 -$ -$ Install Gutters and Downspouts (Material) LF 135 -$ -$

EA 1 -$ -$

Install New Window (Labor) EA 1 -$ -$ Install New Window (Material) EA 1 -$ -$ Trim out and finish/paint window opening (Labor) EA 1 -$ -$ Trim out and finish/paint window opening (Material) EA 1 -$ -$

SF 1950 -$ -$

SF 1950 -$ -$

LS 1 -$ -$

LS 1 -$ -$

% 0% -$ % 0% -$ % 0% -$

U.S. Department of Interior

Subtotal

Install House Wrap (Material)

Install Fiber Cement Siding (Labor)

Mobilize/Demobilize ‐ Including Transport to and from Park (Labor)

Grand Total

Remove Gutters and Downspouts (Labor)

Install Simulated Wood Trim (Labor)

Paint trim (Material)

Remove Picture Window (Labor)

Lead Based Paint Material Demo and Disposal Factor (Labor)

Install Fiber Cement Siding (Material)

Overhead Profit Bonds

Bid Schedule

Install House Wrap (Labor)

Paint trim ‐ 2 coats (Labor)

National Park Service

Siding Replacement - Perrys Victory IPM NHP

Costs

File details come from the government source that posted it. Updated .