This is a Bid Schedule for construction renovation work at the San Marcos Aquatic Resource Center Shop & 2 Stall Garage Building located in Hays County, Texas. The bid schedule outlines eight line items requiring various building improvements and replacements.

The scope of work includes: (1) removal and replacement of three overhead sectional doors with hardware, weather stripping, and openers (3 each); (2) removal and replacement of existing light fixtures with LED fixtures to meet OSHA requirements (1 job); (3) removal of all suspended ceiling grids and tiles (1 job); (4) removal and replacement of three exterior personnel doors with insulated hollow metal doors including frames, hardware, weather stripping, and thresholds (3 jobs); (5) termination, capping, and removal of existing gas lines (1 job); (6) removal and replacement of existing gutter system and downspouts (110 linear feet); (7) removal and replacement of existing roof with new roofing sheets (1 job); and (8) removal of existing gas-fired unit heaters (1 job). All unit prices and amounts are currently blank, indicating this is a template awaiting bidder pricing. The bid schedule includes a Cost Subtotal line and a TB (to be completed) line for final bid totals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

San Marcos Aquatic Resource Center Shop & 2 Stall Garage Building

Hays County, Texas

BID SCHEDULE

ITEM

NO. Bid Item Description Unit Est QTY Unit Price AMOUNT

Remove and replace the three overhead sectional doors to include hardware, weather s tripping and openers

EA

Remove and replace existing light fixtures with LED light fixtures to meet OSHA requirements JOB 1

3 Remove all suspended ceiling grids and tiles JOB 1 $ -

Remove and replace the existing three (3) exterior personnel doors with insulated hollow metal doors to include frames, hardware, weather stripping and thresh hold

JOB

5 Terminate, cap and remove existing gas lines from the building JOB 1 $ -

Remove and replace existing gutter system to include and replace down spouts LF 110

7 Remove and replace existing roof with new roofing sheets JOB 1 $ -

8 Remove existing gas fired unit heaters JOB 1 $ -

Cost SUBTOTAL

TB $ -