Bid_Schedule.pdf

PDF 151 KB Posted

Attached to
RUTABAGA-BITTERBRUSH MASTICATION
Solicitation number
140L3924R0019
Issued by

About this file

This document is a Bid Schedule for the Rutabaga-Bitterbrush South Mastication FY24 project. The Bid Schedule outlines the units, acreages, and bid prices per acre for three separate work areas: Sulphur Springs-Bitterbrush South (100% Removal), Sulphur Springs-Bitterbrush South (Leave 2-6 Tree Islands with 200' Spacing), and Rutabaga (Leave 2-6 Tree Islands with 500' Spacing). The total project area is 854 acres. The bid price is to include all labor, equipment, supplies, materials, and incidentals to complete the work. Payments will be made at the unit price per acre specified in the Bid Schedule. All work is to be measured and paid based on a horizontal plane.

The Bid Schedule is related to the RUTABAGA-BITTERBRUSH MASTICATION federal contract opportunity, Solicitation Number 140L3924R0019, issued by the Department of the Interior Bureau of Land Management Nevada Region. The project involves mastication work in the Rutabaga-Bitterbrush South area.

View the file

Other files

File Type Posted
Sol_140L3924R0019.pdf PDF
B03_SCA_Wage_Determination.pdf PDF
A04_SOW.docx DOCX document
A06_Map_4.pdf PDF
A06_Map_1.pdf PDF
A06_Map_2.pdf PDF
A06_Map_3.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rutabaga-Bitterbrush South Mastication FY24

Bid Schedule

Table 1: Bid Schedule

Unit Acres Bid Price Per Acre Bid Totals Per Unit

Sulphur Springs-Bitterbrush South (100% Removal) 374 acres

Sulphur Springs-Bitterbrush South (Leave 2-6 Tree Islands with 200’ Spacing) 150 acres

Rutabaga (Leave 2-6 Tree Islands with 500’ Spacing) 330 acres

Total 854 acres

NOTE:

The bid shall include the cost of all labor, equipment, supplies, materials, and incidentals to complete the work in the contract. Mobilization includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, plants, and incidentals to the project site; and for other work and operations which must be performed, or cost incurred prior to beginning work and after completion on the various items on the project site.

Work will be measured and paid for by the number of acres that are satisfactorily completed in accordance with specifications in this contract. Payment will be made at the unit price per acre specified in the Bid Schedule and shall include cost of all work described in these specifications. All measurements will be based on a horizontal plane.