This document is a Bid Schedule for the Rutabaga-Bitterbrush South Mastication FY24 project. The Bid Schedule outlines the units, acreages, and bid prices per acre for three separate work areas: Sulphur Springs-Bitterbrush South (100% Removal), Sulphur Springs-Bitterbrush South (Leave 2-6 Tree Islands with 200' Spacing), and Rutabaga (Leave 2-6 Tree Islands with 500' Spacing). The total project area is 854 acres. The bid price is to include all labor, equipment, supplies, materials, and incidentals to complete the work. Payments will be made at the unit price per acre specified in the Bid Schedule. All work is to be measured and paid based on a horizontal plane.
The Bid Schedule is related to the RUTABAGA-BITTERBRUSH MASTICATION federal contract opportunity, Solicitation Number 140L3924R0019, issued by the Department of the Interior Bureau of Land Management Nevada Region. The project involves mastication work in the Rutabaga-Bitterbrush South area.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140L3924R0019.pdf | ||
| B03_SCA_Wage_Determination.pdf | ||
| A04_SOW.docx | DOCX document | |
| A06_Map_4.pdf | ||
| A06_Map_1.pdf | ||
| A06_Map_2.pdf | ||
| A06_Map_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rutabaga-Bitterbrush South Mastication FY24
Bid Schedule
Table 1: Bid Schedule
Unit Acres Bid Price Per Acre Bid Totals Per Unit
Sulphur Springs-Bitterbrush South (100% Removal) 374 acres
Sulphur Springs-Bitterbrush South (Leave 2-6 Tree Islands with 200’ Spacing) 150 acres
Rutabaga (Leave 2-6 Tree Islands with 500’ Spacing) 330 acres
Total 854 acres
NOTE:
The bid shall include the cost of all labor, equipment, supplies, materials, and incidentals to complete the work in the contract. Mobilization includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies, plants, and incidentals to the project site; and for other work and operations which must be performed, or cost incurred prior to beginning work and after completion on the various items on the project site.
Work will be measured and paid for by the number of acres that are satisfactorily completed in accordance with specifications in this contract. Payment will be made at the unit price per acre specified in the Bid Schedule and shall include cost of all work described in these specifications. All measurements will be based on a horizontal plane.