Bid Schedule.pdf
PDF 49 KB Posted
- Solicitation number
- W912EE24Q0004
About this file
This document is a bid schedule template for a federal contract solicitation issued by the Department of the Army Corps of Engineers Engineering District Vicksburg. The solicitation seeks bids for slop oil and sewage removal and disposal services from mooring barges, power barges, and matboats located at the Mat Sinking Unit. Bidders are required to provide unit pricing per gallon for the removal of slop oil and sewage from each vessel type for the base year and four option years. Estimated removal quantities are provided for each period. The bid schedule requires the bidder's contact information, pricing for each material and vessel type by year, and an authorized signature. The related federal contract opportunity provides the solicitation number and further identifies the requirement as slop oil and sewage removal and disposal services for the Mat Sinking Unit.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A22_Solicitation_24Q0004.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineer, Vicksburg District Contracting Division
4155 Clay Street, Suite 120
Vicksburg, MS 39183
Mat Sinking Unit Slop Oil and Sewage Removal and Disposal
Submitted By:
Offeror Name:
Street Address:
City, State, Zip:
Cage Code:
UEI Number:
Tax Identification Number:
Email Address:
Phone Number:
Bidding Schedule
Bid Schedule – Base Year
Slop Oil on Mooring Barge -------------------------$________/gallon x 15,000 = $________________
Slop Oil on Power Barge -----------------------------$________/gallon x 7,500 = $________________
Slop Oil on Matboat -----------------------------------$________/gallon x 7,500 = $________________
Sewage on Mooring Barge --------------------------$________/gallon x 5,000 = $________________
Sewage on Power Barge ---------------------------$________/gallon x 10,000 = $________________
Bid Schedule – Option Period 1
Slop Oil on Mooring Barge ----------------------------$________/gallon x 9,000 = $_______________
Slop Oil on Power Barge -------------------------------$________/gallon x 3,000 = $_______________
Slop Oil on Matboat -----------------------------------$________/gallon x 3,000 = $________________
Sewage on Mooring Barge --------------------------$________/gallon x 3,000 = $________________
Sewage on Power Barge -----------------------------$________/gallon x 5,000 = $________________
Bid Schedule – Option Period 2
Bid Schedule – Option Period 3
Bid Schedule – Option Period 4
Please sign and date below:
Signature:
Title: ______________________________________
Date:
File details come from the government source that posted it. Updated .