Bid Schedule Big Hill PCMC April 2022- March 2027 for release.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Big Hill Lake, Kansas - Project Consolidated Maintenance Contract (PCMC) (Mowing, Janitorial, Park Cleaning, Herbicide Application, and Vault Pumping)
Solicitation number
w912bv22q0008
Issued by

About this file

This document contains a pricing schedule for a five-year project consolidated maintenance contract (PCMC) at Big Hill Lake in Kansas. The contract involves services such as mowing improved and semi-improved areas, janitorial work, cleaning parks, applying herbicides, and pumping sanitary facilities. The pricing schedule provides unit rates for these services across five option years from April 2022 through March 2027. The solicitation is being conducted by the U.S. Army Corps of Engineers Tulsa District for maintenance at Big Hill Lake. The pricing schedule requires unit prices for services on a monthly or annual basis over the potential five-year period of performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base YR April 22 - March 23

W912BV22Q0008 Big Hill KS PCMC
BID SCHEDULEBase YR 1 APR 22 - 31 MAR 23
CONTRACTOR:Contract No.:TOTAL BY
ITEM NOSERVICESQUANTITYUNITUNIT PRICEAMOUNTAPPENDIX
SCHEDULE I - BIG HILL LAKE
APPENDIX A - MOWING
* IMPROVED AREAS
0001Cherryvale Area7MO0.00
0002Project Office7MO0.00
0003Dam Area7MO0.00
0004Mound Valley Park7MO0.00
TOTAL IMPROVED AREAS0.00
* SEMI-IMPROVED AREAS
0005Embankment/Spillway Area4EA0.00
0006Mound Valley Park2EA0.00
TOTAL SEMI-IMPROVED AREAS0.00
* NATURE/HIKING TRAILS
0007Ruth Nixon Trail3EA0.00
0008* BOUNDARY LINE1EA0.00
TOTAL NATURE HIKING TRAILS0.00
TOTAL APPENDIX A0.00
APPENDIX B - JANITORIAL WORK
0009Janitorial Work - 1 Apr thru 31 Oct7MO0.00
0010Janitorial Work - 1 Nov thru 31 Mar5MO0.00
0011Carpet Cleaning1EA0.00
0012Window Cleaning2EA0.00
TOTAL APPENDIX B0.00
APPENDIX C - CLEANING OF PARKS
* SUMMER PERIOD
0013Branham Trailhead7MO0.00
0014Cherryvale Park7MO0.00
0015Downstream Point7MO0.00
0016Mound Valley Beach5MO0.00
0017Mound Valley Park7MO0.00
0018Overlook7MO0.00
0019Timber Hill Park7MO0.00
TOTAL SUMMER PERIOD0.00
* WINTER PERIOD
0020Branham Trailhead5MO0.00
0021Cherryvale Park5MO0.00
0022Downstream Point5MO0.00
0023Mound Valley Park5MO0.00
0024Overlook5MO0.00
0025Timber Hill Park5MO0.00
TOTAL WINTER PERIOD0.00
TOTAL APPENDIX C0.00
APPENDIX D - HERBICIDE APPLICATION
* SOIL STERILANT
0026PUAs Campsite Pads, Lots, Misc6MO0.00
Total Soil Sterilant0.00
* RIPRAP AREAS
0027Dam Embankment6MO0.00
0028Fishing Berm6MO0.00
0029Mound Valley Boat Ramp6MO0.00
0030Outlet Channel6MO0.00
0031Timber Hill Boat Ramp6MO0.00
Total Riprap0.00
* RIPRAP EDGING AREAS
0032Dam Embankment6MO0.00
0033Mound Valley Boat Ramp6MO0.00
0034Outlet Channel6MO0.00
0035Timber Hill Boat Ramp6MO0.00
Total Riprap Edging0.00
* GUARDRAIL AREAS
0036Mound Valley Boat Ramp6MO0.00
0037Timber Hill Boat Ramp6MO0.00
Total Guardrail0.00
* PAVED ROADS & PARKING LOTS
0038PUAs Paved Road & Parking Lot Shoulders6MO0.00
Total Paved Road & Parking Lots0.00
* NOXIOUS WEED CONTROL
0039SPOT TREATMENT5AC0.00
0040NOXIOUS WEED CONTROL80AC0.00
Total Paved Road & Parking Lots0.00
TOTAL APPENDIX D0.00
APPENDIX E - PUMPING OF SANITARY FACILITIES
0041Vaults & Tanks (1,000 Gal)5EA0.00
TOTAL APPENDIX E0.00
TOTAL BIG HILL LAKE0.00
ACRONYMS: AC - Acre EA - Each MO - Month MW - Mowing
BID SCHEDULEOption Y1 1 APR 23 - 31 MAR 24
CONTRACTOR:Contract No.:TOTAL BY
ITEM NOSERVICESQUANTITYUNITUNIT PRICEAMOUNTAPPENDIX
SCHEDULE I - BIG HILL LAKE
APPENDIX A - MOWING
* IMPROVED AREAS
1001Cherryvale Area7MO0.00
1002Project Office7MO0.00
1003Dam Area7MO0.00
1004Mound Valley Park7MO0.00
TOTAL IMPROVED AREAS0.00
* SEMI-IMPROVED AREAS
1005Embankment/Spillway Area4EA0.00
1006Mound Valley Park2EA0.00
TOTAL SEMI-IMPROVED AREAS0.00
* NATURE/HIKING TRAILS
1007Ruth Nixon Trail3EA0.00
1008* BOUNDARY LINE1EA0.00
TOTAL NATURE HIKING TRAILS0.00
TOTAL APPENDIX A0.00
APPENDIX B - JANITORIAL WORK
1009Janitorial Work - 1 Apr thru 31 Oct7MO0.00
1010Janitorial Work - 1 Nov thru 31 Mar5MO0.00
1011Carpet Cleaning1EA0.00
1012Window Cleaning2EA0.00
TOTAL APPENDIX B0.00
APPENDIX C - CLEANING OF PARKS
* SUMMER PERIOD
1013Branham Trailhead7MO0.00
1014Cherryvale Park7MO0.00
1015Downstream Point7MO0.00
1016Mound Valley Beach5MO0.00
1017Mound Valley Park7MO0.00
1018Overlook7MO0.00
1019Timber Hill Park7MO0.00
TOTAL SUMMER PERIOD0.00
* WINTER PERIOD
1020Branham Trailhead5MO0.00
1021Cherryvale Park5MO0.00
1022Downstream Point5MO0.00
1023Mound Valley Park5MO0.00
1024Overlook5MO0.00
1025Timber Hill Park5MO0.00
TOTAL WINTER PERIOD0.00
TOTAL APPENDIX C0.00
APPENDIX D - HERBICIDE APPLICATION
* SOIL STERILANT
10026PUAs Campsite Pads, Lots, Misc6MO0.00
Total Soil Sterilant0.00
* RIPRAP AREAS
1027Dam Embankment6MO0.00
1028Fishing Berm6MO0.00
1029Mound Valley Boat Ramp6MO0.00
1030Outlet Channel6MO0.00
1031Timber Hill Boat Ramp6MO0.00
Total Riprap0.00
* RIPRAP EDGING AREAS
1032Dam Embankment6MO0.00
1033Mound Valley Boat Ramp6MO0.00
1034Outlet Channel6MO0.00
1035Timber Hill Boat Ramp6MO0.00
Total Riprap Edging0.00
* GUARDRAIL AREAS
1036Mound Valley Boat Ramp6MO0.00
1037Timber Hill Boat Ramp6MO0.00
Total Guardrail0.00
* PAVED ROADS & PARKING LOTS
1038PUAs Paved Road & Parking Lot Shoulders6MO0.00
Total Paved Road & Parking Lots0.00
* NOXIOUS WEED CONTROL
1039SPOT TREATMENT5AC0.00
1040NOXIOUS WEED CONTROL80AC0.00
Total Paved Road & Parking Lots0.00
TOTAL APPENDIX D0.00
APPENDIX E - PUMPING OF SANITARY FACILITIES
1041Vaults & Tanks (1,000 Gal)5EA0.00
TOTAL APPENDIX E0.00
TOTAL BIG HILL LAKE0.00
ACRONYMS: AC - Acre EA - Each MO - Month MW - Mowing
BID SCHEDULEOption Y2 1 APR 24 - 31 MAR 25
CONTRACTOR:Contract No.:TOTAL BY
ITEM NOSERVICESQUANTITYUNITUNIT PRICEAMOUNTAPPENDIX
SCHEDULE I - BIG HILL LAKE
APPENDIX A - MOWING
* IMPROVED AREAS
2001Cherryvale Area7MO0.00
2002Project Office7MO0.00
2003Dam Area7MO0.00
2004Mound Valley Park7MO0.00
TOTAL IMPROVED AREAS0.00
* SEMI-IMPROVED AREAS
2005Embankment/Spillway Area4EA0.00
2006Mound Valley Park2EA0.00
TOTAL SEMI-IMPROVED AREAS0.00
* NATURE/HIKING TRAILS
2007Ruth Nixon Trail3EA0.00
2008* BOUNDARY LINE1EA0.00
TOTAL NATURE HIKING TRAILS0.00
TOTAL APPENDIX A0.00
APPENDIX B - JANITORIAL WORK
2009Janitorial Work - 1 Apr thru 31 Oct7MO0.00
2010Janitorial Work - 1 Nov thru 31 Mar5MO0.00
2011Carpet Cleaning1EA0.00
2012Window Cleaning2EA0.00
TOTAL APPENDIX B0.00
APPENDIX C - CLEANING OF PARKS
* SUMMER PERIOD
2013Branham Trailhead7MO0.00
2014Cherryvale Park7MO0.00
2015Downstream Point7MO0.00
2016Mound Valley Beach5MO0.00
2017Mound Valley Park7MO0.00
2018Overlook7MO0.00
2019Timber Hill Park7MO0.00
TOTAL SUMMER PERIOD0.00
* WINTER PERIOD
2020Branham Trailhead5MO0.00
2021Cherryvale Park5MO0.00
2022Downstream Point5MO0.00
2023Mound Valley Park5MO0.00
2024Overlook5MO0.00
2025Timber Hill Park5MO0.00
TOTAL WINTER PERIOD0.00
TOTAL APPENDIX C0.00
APPENDIX D - HERBICIDE APPLICATION
* SOIL STERILANT
2026PUAs Campsite Pads, Lots, Misc6MO0.00
Total Soil Sterilant0.00
* RIPRAP AREAS
2027Dam Embankment6MO0.00
2028Fishing Berm6MO0.00
2029Mound Valley Boat Ramp6MO0.00
2030Outlet Channel6MO0.00
2031Timber Hill Boat Ramp6MO0.00
Total Riprap0.00
* RIPRAP EDGING AREAS
2032Dam Embankment6MO0.00
2033Mound Valley Boat Ramp6MO0.00
2034Outlet Channel6MO0.00
2035Timber Hill Boat Ramp6MO0.00
Total Riprap Edging0.00
* GUARDRAIL AREAS
2036Mound Valley Boat Ramp6MO0.00
2037Timber Hill Boat Ramp6MO0.00
Total Guardrail0.00
* PAVED ROADS & PARKING LOTS
2038PUAs Paved Road & Parking Lot Shoulders6MO0.00
Total Paved Road & Parking Lots0.00
* NOXIOUS WEED CONTROL
2039SPOT TREATMENT5AC0.00
2040NOXIOUS WEED CONTROL80AC0.00
Total Paved Road & Parking Lots0.00
TOTAL APPENDIX D0.00
APPENDIX E - PUMPING OF SANITARY FACILITIES
2041Vaults & Tanks (1,000 Gal)5EA0.00
TOTAL APPENDIX E0.00
TOTAL BIG HILL LAKE0.00
ACRONYMS: AC - Acre EA - Each MO - Month MW - Mowing
BID SCHEDULEOption Y3 1 APR 25 - 31 MAR 26
CONTRACTOR:Contract No.:TOTAL BY
ITEM NOSERVICESQUANTITYUNITUNIT PRICEAMOUNTAPPENDIX
SCHEDULE I - BIG HILL LAKE
APPENDIX A - MOWING
* IMPROVED AREAS
3001Cherryvale Area7MO0.00
3002Project Office7MO0.00
3003Dam Area7MO0.00
3004Mound Valley Park7MO0.00
TOTAL IMPROVED AREAS0.00
* SEMI-IMPROVED AREAS
3005Embankment/Spillway Area4EA0.00
3006Mound Valley Park2EA0.00
TOTAL SEMI-IMPROVED AREAS0.00
* NATURE/HIKING TRAILS
3007Ruth Nixon Trail3EA0.00
3008* BOUNDARY LINE1EA0.00
TOTAL NATURE HIKING TRAILS0.00
TOTAL APPENDIX A0.00
APPENDIX B - JANITORIAL WORK
3009Janitorial Work - 1 Apr thru 31 Oct7MO0.00
3010Janitorial Work - 1 Nov thru 31 Mar5MO0.00
3011Carpet Cleaning1EA0.00
3012Window Cleaning2EA0.00
TOTAL APPENDIX B0.00
APPENDIX C - CLEANING OF PARKS
* SUMMER PERIOD
3013Branham Trailhead7MO0.00
3014Cherryvale Park7MO0.00
3015Downstream Point7MO0.00
3016Mound Valley Beach5MO0.00
3017Mound Valley Park7MO0.00
3018Overlook7MO0.00
3019Timber Hill Park7MO0.00
TOTAL SUMMER PERIOD0.00
* WINTER PERIOD
3020Branham Trailhead5MO0.00
3021Cherryvale Park5MO0.00
3022Downstream Point5MO0.00
3023Mound Valley Park5MO0.00
3024Overlook5MO0.00
3025Timber Hill Park5MO0.00
TOTAL WINTER PERIOD0.00
TOTAL APPENDIX C0.00
APPENDIX D - HERBICIDE APPLICATION
* SOIL STERILANT
3026PUAs Campsite Pads, Lots, Misc6MO0.00
Total Soil Sterilant0.00
* RIPRAP AREAS
3027Dam Embankment6MO0.00
3028Fishing Berm6MO0.00
3029Mound Valley Boat Ramp6MO0.00
3030Outlet Channel6MO0.00
3031Timber Hill Boat Ramp6MO0.00
Total Riprap0.00
* RIPRAP EDGING AREAS
3032Dam Embankment6MO0.00
3033Mound Valley Boat Ramp6MO0.00
3034Outlet Channel6MO0.00
3035Timber Hill Boat Ramp6MO0.00
Total Riprap Edging0.00
* GUARDRAIL AREAS
3036Mound Valley Boat Ramp6MO0.00
3037Timber Hill Boat Ramp6MO0.00
Total Guardrail0.00
* PAVED ROADS & PARKING LOTS
3038PUAs Paved Road & Parking Lot Shoulders6MO0.00
Total Paved Road & Parking Lots0.00
* NOXIOUS WEED CONTROL
3039SPOT TREATMENT5AC0.00
3040NOXIOUS WEED CONTROL80AC0.00
Total Paved Road & Parking Lots0.00
TOTAL APPENDIX D0.00
APPENDIX E - PUMPING OF SANITARY FACILITIES
3041Vaults & Tanks (1,000 Gal)5EA0.00
TOTAL APPENDIX E0.00
TOTAL BIG HILL LAKE0.00
ACRONYMS: AC - Acre EA - Each MO - Month MW - Mowing
BID SCHEDULEOption Y4 1 APR 26 - 31 MAR 27
CONTRACTOR:Contract No.:TOTAL BY
ITEM NOSERVICESQUANTITYUNITUNIT PRICEAMOUNTAPPENDIX
SCHEDULE I - BIG HILL LAKE
APPENDIX A - MOWING
* IMPROVED AREAS
4001Cherryvale Area7MO0.00
4002Project Office7MO0.00
4003Dam Area7MO0.00
4004Mound Valley Park7MO0.00
TOTAL IMPROVED AREAS0.00
* SEMI-IMPROVED AREAS
4005Embankment/Spillway Area4EA0.00
4006Mound Valley Park2EA0.00
TOTAL SEMI-IMPROVED AREAS0.00
* NATURE/HIKING TRAILS
4007Ruth Nixon Trail3EA0.00
4008* BOUNDARY LINE1EA0.00
TOTAL NATURE HIKING TRAILS0.00
TOTAL APPENDIX A0.00
APPENDIX B - JANITORIAL WORK
4009Janitorial Work - 1 Apr thru 31 Oct7MO0.00
4010Janitorial Work - 1 Nov thru 31 Mar5MO0.00
4011Carpet Cleaning1EA0.00
4012Window Cleaning2EA0.00
TOTAL APPENDIX B0.00
APPENDIX C - CLEANING OF PARKS
* SUMMER PERIOD
4013Branham Trailhead7MO0.00
4014Cherryvale Park7MO0.00
4015Downstream Point7MO0.00
4016Mound Valley Beach5MO0.00
4017Mound Valley Park7MO0.00
4018Overlook7MO0.00
4019Timber Hill Park7MO0.00
TOTAL SUMMER PERIOD0.00
* WINTER PERIOD
4020Branham Trailhead5MO0.00
4021Cherryvale Park5MO0.00
4022Downstream Point5MO0.00
4023Mound Valley Park5MO0.00
4024Overlook5MO0.00
4025Timber Hill Park5MO0.00
TOTAL WINTER PERIOD0.00
TOTAL APPENDIX C0.00
APPENDIX D - HERBICIDE APPLICATION
* SOIL STERILANT
4026PUAs Campsite Pads, Lots, Misc6MO0.00
Total Soil Sterilant0.00
* RIPRAP AREAS
4027Dam Embankment6MO0.00
4028Fishing Berm6MO0.00
4029Mound Valley Boat Ramp6MO0.00
4030Outlet Channel6MO0.00
4031Timber Hill Boat Ramp6MO0.00
Total Riprap0.00
* RIPRAP EDGING AREAS
4032Dam Embankment6MO0.00
4033Mound Valley Boat Ramp6MO0.00
4034Outlet Channel6MO0.00
4035Timber Hill Boat Ramp6MO0.00
Total Riprap Edging0.00
* GUARDRAIL AREAS
4036Mound Valley Boat Ramp6MO0.00
4037Timber Hill Boat Ramp6MO0.00
Total Guardrail0.00
* PAVED ROADS & PARKING LOTS
4038PUAs Paved Road & Parking Lot Shoulders6MO0.00
Total Paved Road & Parking Lots0.00
* NOXIOUS WEED CONTROL
4039SPOT TREATMENT5AC0.00
4040NOXIOUS WEED CONTROL80AC0.00
Total Paved Road & Parking Lots0.00
TOTAL APPENDIX D0.00
APPENDIX E - PUMPING OF SANITARY FACILITIES
4041Vaults & Tanks (1,000 Gal)5EA0.00
TOTAL APPENDIX E0.00
TOTAL BIG HILL LAKE0.00

ACRONYMS: AC - Acre EA - Each MO - Month MW - Mowing

File details come from the government source that posted it. Updated .