The document is a Bid Schedule for the City of Arvada, Colorado, specifically for the 2024 Sanitary Sewer Open Cut Construction Services (Project 24-SR-01 REISSUE). The project encompasses two primary areas: Area A (W 74th Circle and Jay Ct.) and Area B (Oak St & W 69th Ave), involving comprehensive sanitary sewer and waterline infrastructure work. The bid schedule details multiple construction activities including maintenance hole removal and replacement, sewer pipe removal and installation, waterline replacements, fire hydrant installations, asphalt removal and patching, and various connection and testing services. The project includes specific quantities for different construction elements, such as 994 linear feet of sewer pipe removal in Area A, 1,602 linear feet in Area B, and multiple maintenance hole and service line interventions.

The total base bid for the project is $180,000, with a specific line item of $180,000 allocated for owner-controlled minor contract revisions. The bid schedule allows for comprehensive infrastructure improvements, including temporary bypass pumping, utility locates, construction surveys, and extensive roadway and sidewalk restoration. While no specific bid submission or project completion dates are explicitly stated in the document, the bid schedule provides a detailed breakdown of anticipated construction activities, quantities, and associated costs. The project appears to be a comprehensive municipal infrastructure renewal effort focusing on sanitary sewer systems and associated water infrastructure in specific neighborhoods within the City of Arvada.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE
25-ENG-063 2024 Sanitary Sewer Open Cut Construction Services 24-SR-01 REISSUE

Contractor: DATE:

BID PREPARED BY:

ITEMTOTALUNIT
NO.ITEMUNITQUANTITYPRICECOST
General
1Mobilization, Demobilization, Permits, Fees, Licenses, AdministrationLS1$0.00
2Traffic and Pedestrian ControlLS1$0.00
3Sediment and Erosion ControlLS1$0.00
4Utility Locate PotholingLS1$0.00
5Construction SurveyLS1$0.00
6Owner Controlled Minor Contract RevisionsALLOW1$180,000.00$180,000.00
GENERAL COST SUB-TOTAL00$180,000.00
Area A (W 74th Circle and Jay Ct.)
7Temporary Bypass Pumping SewerLS1$0.00
8Remove 8" CIPP Sanitary Sewer PipeLF994$0.00
9Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10')EA3$0.00
10Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10')EA6$0.00
11Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In PlaceEA3$0.00
12Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In PlaceEA6$0.00
138" SDR35 PVC, Complete in PlaceLF905$0.00
148" C900 PVC, Complete in PlaceLF89$0.00
15Connect Sanitary Sewer ServiceEA20$0.00
166" Asphalt Removal and Patching, Complete in PlaceSY932$0.00
17Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in PlaceSY45$0.00
AREA B SEWER COST SUB-TOTAL00$0.00
Area A 8" AC Waterline Replacement
18Remove Existing Fire HydrantEA1$0.00
198" C900 PVC and fittings, Complete in PlaceLF1,080$0.00
20Fire Hydrant AssemblyEA2$0.00
21Chlorination and Pressure TestLS1$0.00
22Connect to Existing 8" AC WaterlineEA2$0.00
23Water Service Tap ReconnectionEA19$0.00
246" Asphalt Removal and Patching, Complete in PlaceSY931$0.00
256" Thick Concrete Sidewalk Removal and ReplacementSY7$0.00
262" Depth Milling (full width)SY3,790$0.00
272" SX PG 64-22 Top CourseTON451$0.00
28HMA Patching (Grading S) (75) PG 64-22TON22$0.00
AREA B WATERLINE COST SUB-TOTAL00$0.00
Area B (Oak St & W 69th Ave)
29Temporary Bypass Pumping SewerLS1$0.00
30Remove 8" SLIP Sanitary Sewer PipeLF1,602$0.00
31Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10')EA3$0.00
32Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10')EA2$0.00
33Remove Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10')EA1$0.00
34Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In PlaceEA3$0.00
35Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In PlaceEA2$0.00
36Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10')EA1$0.00
37Rehabilitate Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10')EA3$0.00
38Protective Lining of 4' Maintenance HoleEA1$0.00
398" C900 PVC, Complete in PlaceLF794$0.00
408" SDR35 PVC, Complete in PlaceLF808$0.00
41Connect to Existing Sanitary Sewer Maintenance HoleEA2$0.00
42Connect Sanitary Sewer ServiceEA30$0.00
436" Asphalt Removal and Patching, Complete in PlaceSY1,492$0.00
AREA H SEWER COST SUB-TOTAL00$0.00
TOTAL BASE BID$180,000.00
TOTAL BASE BID WRITTEN:

image1.jpeg

File details come from the government source that posted it. Updated .