Bid Schedule 24-ENG-063 2024 Sanitary Sewer Open Cut Construction Services REISSUE.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 25-ENG-063
- Issued by
- Colorado
About this file
The document is a Bid Schedule for the City of Arvada, Colorado, specifically for the 2024 Sanitary Sewer Open Cut Construction Services (Project 24-SR-01 REISSUE). The project encompasses two primary areas: Area A (W 74th Circle and Jay Ct.) and Area B (Oak St & W 69th Ave), involving comprehensive sanitary sewer and waterline infrastructure work. The bid schedule details multiple construction activities including maintenance hole removal and replacement, sewer pipe removal and installation, waterline replacements, fire hydrant installations, asphalt removal and patching, and various connection and testing services. The project includes specific quantities for different construction elements, such as 994 linear feet of sewer pipe removal in Area A, 1,602 linear feet in Area B, and multiple maintenance hole and service line interventions.
The total base bid for the project is $180,000, with a specific line item of $180,000 allocated for owner-controlled minor contract revisions. The bid schedule allows for comprehensive infrastructure improvements, including temporary bypass pumping, utility locates, construction surveys, and extensive roadway and sidewalk restoration. While no specific bid submission or project completion dates are explicitly stated in the document, the bid schedule provides a detailed breakdown of anticipated construction activities, quantities, and associated costs. The project appears to be a comprehensive municipal infrastructure renewal effort focusing on sanitary sewer systems and associated water infrastructure in specific neighborhoods within the City of Arvada.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25-ENG-063 2024 Sanitary Sewer Open Cut Construction Services 24-SR-01 REISSUE.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| BID SCHEDULE |
| 25-ENG-063 2024 Sanitary Sewer Open Cut Construction Services 24-SR-01 REISSUE |
Contractor: DATE:
BID PREPARED BY:
| ITEM | TOTAL | UNIT | |||
| NO. | ITEM | UNIT | QUANTITY | PRICE | COST |
| General | |||||
| 1 | Mobilization, Demobilization, Permits, Fees, Licenses, Administration | LS | 1 | $0.00 | |
| 2 | Traffic and Pedestrian Control | LS | 1 | $0.00 | |
| 3 | Sediment and Erosion Control | LS | 1 | $0.00 | |
| 4 | Utility Locate Potholing | LS | 1 | $0.00 | |
| 5 | Construction Survey | LS | 1 | $0.00 | |
| 6 | Owner Controlled Minor Contract Revisions | ALLOW | 1 | $180,000.00 | $180,000.00 |
| GENERAL COST SUB-TOTAL | 0 | 0 | $180,000.00 |
| Area A (W 74th Circle and Jay Ct.) | ||||
| 7 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 |
| 8 | Remove 8" CIPP Sanitary Sewer Pipe | LF | 994 | $0.00 |
| 9 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 |
| 10 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 6 | $0.00 |
| 11 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 3 | $0.00 |
| 12 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 6 | $0.00 |
| 13 | 8" SDR35 PVC, Complete in Place | LF | 905 | $0.00 |
| 14 | 8" C900 PVC, Complete in Place | LF | 89 | $0.00 |
| 15 | Connect Sanitary Sewer Service | EA | 20 | $0.00 |
| 16 | 6" Asphalt Removal and Patching, Complete in Place | SY | 932 | $0.00 |
| 17 | Concrete Pan, Sidewalk, & Curb Ramp Remove and Replace, Complete in Place | SY | 45 | $0.00 |
| AREA B SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area A 8" AC Waterline Replacement | ||||
| 18 | Remove Existing Fire Hydrant | EA | 1 | $0.00 |
| 19 | 8" C900 PVC and fittings, Complete in Place | LF | 1,080 | $0.00 |
| 20 | Fire Hydrant Assembly | EA | 2 | $0.00 |
| 21 | Chlorination and Pressure Test | LS | 1 | $0.00 |
| 22 | Connect to Existing 8" AC Waterline | EA | 2 | $0.00 |
| 23 | Water Service Tap Reconnection | EA | 19 | $0.00 |
| 24 | 6" Asphalt Removal and Patching, Complete in Place | SY | 931 | $0.00 |
| 25 | 6" Thick Concrete Sidewalk Removal and Replacement | SY | 7 | $0.00 |
| 26 | 2" Depth Milling (full width) | SY | 3,790 | $0.00 |
| 27 | 2" SX PG 64-22 Top Course | TON | 451 | $0.00 |
| 28 | HMA Patching (Grading S) (75) PG 64-22 | TON | 22 | $0.00 |
| AREA B WATERLINE COST SUB-TOTAL | 0 | 0 | $0.00 |
| Area B (Oak St & W 69th Ave) | ||||
| 29 | Temporary Bypass Pumping Sewer | LS | 1 | $0.00 |
| 30 | Remove 8" SLIP Sanitary Sewer Pipe | LF | 1,602 | $0.00 |
| 31 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 |
| 32 | Remove Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10') | EA | 2 | $0.00 |
| 33 | Remove Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 1 | $0.00 |
| 34 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10'), Complete In Place | EA | 3 | $0.00 |
| 35 | Sanitary Sewer Maintenance Hole - 4' Diameter (Depth > 10'), Complete In Place | EA | 2 | $0.00 |
| 36 | Drop Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 1 | $0.00 |
| 37 | Rehabilitate Sanitary Sewer Maintenance Hole - 4' Diameter (Depth < 10') | EA | 3 | $0.00 |
| 38 | Protective Lining of 4' Maintenance Hole | EA | 1 | $0.00 |
| 39 | 8" C900 PVC, Complete in Place | LF | 794 | $0.00 |
| 40 | 8" SDR35 PVC, Complete in Place | LF | 808 | $0.00 |
| 41 | Connect to Existing Sanitary Sewer Maintenance Hole | EA | 2 | $0.00 |
| 42 | Connect Sanitary Sewer Service | EA | 30 | $0.00 |
| 43 | 6" Asphalt Removal and Patching, Complete in Place | SY | 1,492 | $0.00 |
| AREA H SEWER COST SUB-TOTAL | 0 | 0 | $0.00 |
| TOTAL BASE BID | $180,000.00 |
| TOTAL BASE BID WRITTEN: |