Bid Results~24.doc

DOC document 32 KB Posted

Attached to
DRM 2016-07/Cooling Tower Replacement @ Souza Baranowki Correctional Center
Solicitation number
BD-19-1025-DOCFS-9892-37449
Issued by
Worcester County, Massachusetts

About this file

This document is a bid results summary for the DRM 2016-07 Cooling Towers Replacement project at the Souza Baranowski Correctional Center in Massachusetts. The project involves the removal and replacement of the existing cooling tower, related components, and the existing exhaust vent and gravity damper. The bid results show that NB Kenney of Devens, MA submitted the lowest bid of $679,000.00, while Fraser Engineering Company of Newton, MA bid $797,098.00 for the work.

The document does not provide additional details on the pricing terms, any set asides, incumbent contractors, funding requirements or sources, or the term of the contract. It solely focuses on the bid results for the two contractors that responded to the solicitation.

View the file

Other files

File Type Posted
Bid Closeout Form~3.doc DOC document
Prevailing Wage Payroll Report Form~18.pdf PDF
Prevailing Wage Statement of Compliance~17.pdf PDF
Plan Holders List Updated.docx DOCX document
SDP plan form 3 - reporting~14.xlsx XLSX spreadsheet
Addendum No. 1~1.pdf PDF
Bidder Checklist~11.doc DOC document
Plan Holders List~9.docx DOCX document
Where to get plans and specs~11.docx DOCX document
Wage Rates~5.pdf PDF
Bid_Intent_Form~29.rtf RTF text file
Bid Package_DRM 2016-07.doc DOC document
Site Visit List.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESULTS

DRM 2016-07

Cooling Towers Replacement – Souza Baranowski

Bidder’s Name
Bid Amount

Fraser Engineering Company Newton, MA

$797,098.00

NB Kenney Devens, MA

$679,000.00

File details come from the government source that posted it. Updated .