Bid Results~24.doc
DOC document 32 KB Posted
- Solicitation number
- BD-19-1025-DOCFS-9892-37449
- Issued by
- Worcester County, Massachusetts
About this file
This document is a bid results summary for the DRM 2016-07 Cooling Towers Replacement project at the Souza Baranowski Correctional Center in Massachusetts. The project involves the removal and replacement of the existing cooling tower, related components, and the existing exhaust vent and gravity damper. The bid results show that NB Kenney of Devens, MA submitted the lowest bid of $679,000.00, while Fraser Engineering Company of Newton, MA bid $797,098.00 for the work.
The document does not provide additional details on the pricing terms, any set asides, incumbent contractors, funding requirements or sources, or the term of the contract. It solely focuses on the bid results for the two contractors that responded to the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Closeout Form~3.doc | DOC document | |
| Prevailing Wage Payroll Report Form~18.pdf | ||
| Prevailing Wage Statement of Compliance~17.pdf | ||
| Plan Holders List Updated.docx | DOCX document | |
| SDP plan form 3 - reporting~14.xlsx | XLSX spreadsheet | |
| Addendum No. 1~1.pdf | ||
| Bidder Checklist~11.doc | DOC document | |
| Plan Holders List~9.docx | DOCX document | |
| Where to get plans and specs~11.docx | DOCX document | |
| Wage Rates~5.pdf | ||
| Bid_Intent_Form~29.rtf | RTF text file | |
| Bid Package_DRM 2016-07.doc | DOC document | |
| Site Visit List.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID RESULTS
DRM 2016-07
Cooling Towers Replacement – Souza Baranowski
| Bidder’s Name |
| Bid Amount |
Fraser Engineering Company Newton, MA
$797,098.00
NB Kenney Devens, MA
$679,000.00
File details come from the government source that posted it. Updated .