Bid Results - Replace Learning Exchange Roof.pdf
PDF 62 KB Posted
- Solicitation number
- 36C25026B0010
About this file
This is a bid results summary document for a construction project to replace the Learning Exchange roof. Four contractors submitted bids for the base bid and alternate bid pricing: Scapcon LLC submitted the apparent low bid of $505,416.00 for Bid Alt 1 and $579,336.00 for the base bid; Beckwith Services Inc bid $738,000.00 base and $558,000.00 alternate; Armcorp Construction Inc bid $835,645.00 base and $480,570.00 alternate; and LC Fluharty Construction LLC bid $847,963.00 for the base bid with no alternate submitted. The government's independent cost estimate was $389,795.53 for the base bid and $309,841.00 for the alternate bid. All submitted bids exceeded the government estimate, with the lowest base bid being approximately 48% higher than the estimate and the lowest alternate bid being approximately 63% higher than the alternate estimate.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25026B0010_7.docx | DOCX document | |
| Abstact of Offers - Replace Learning Exchange Roof.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Company Base Bid Bid Alt 1 1 Scapcon LLC 579,336.00$ 505,416.00$ (Apparent Low) 2 Beckwith Services Inc 738,000.00$ 558,000.00$ 3 Armcorp Construction Inc 835,645.00$ 480,570.00$ 4 LC Fluharty Construction LLC 847,963.00$ No Bid
Govt Estimate: 389,795.53$ 309,841.00$
Bid Results - Replace Learning Exchange Roof
Sheet1