BID PRICE SUBMISSION.pdf

PDF 160 KB Posted

Attached to
26-028 Demolition & Installation of Sidewalks & Handicap Ramps
Solicitation number
PE-65700-NONST-2026-000000098
Issued by
Fayette County, Georgia

About this file

This is a Bid Price Submission Form for Floyd County, Georgia, for Bid #26-028, which involves the demolition and installation of sidewalks and handicap ramps in Lindale, Georgia. The project encompasses multiple locations across several streets including S. 2nd Street, S. 3rd Street, S. 4th Street, S. Terrace Avenue, S. Central Avenue, and N. Central Avenue. The scope of work includes sidewalk installation on both north and south sides of designated streets, installation of two handicap ramps at multiple locations using yellow ADA pads, curb replacement on S. 2nd Street, and driveway tie-ins on N. Central Avenue. Bidders are required to provide pricing on a linear feet basis for each item, with separate line items for each street location and work type. The form requires contractors to submit an estimated start date and estimated completion date for the project.

The pricing structure requires bidders to calculate costs per linear foot for sidewalk and curb work, with lump sum pricing for handicap ramp installations and driveway tie-ins. Floyd County will award the contract to the lowest responsive, responsible bidder and operates on net 30 payment terms, with invoices paid within 30 days of invoice date. All prices submitted are considered maximum prices and are not subject to increase due to taxes, shipping, handling charges, or any other cause. Contractors are responsible for all utility locates, damages to private and government properties, and ensuring all work meets specifications including smooth transitions between ramps and existing asphalt and the use of radiuses in intersecting areas. All work must be performed on county property within the right-of-way, and Floyd County will not be responsible for work performed on private property.

View the file

Other files

File Type Posted
BID _26_028 DEMOLITION _ INSTALLATION OF SIDE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID #26-028

BID PRICE SUBMISSION FORM

Demolition and Installation of Sidewalks and Handicap Ramps Lindale, GA

Please provide pricing as follows:

ADDRESS DESCRIPTION LINEAR

FEET

PRICE/ LN.

FT

TOTAL

PRICE

S. 2ND STREET NORTH SIDE

SIDEWALK

S. 2ND STREET NORTH SIDE

2 HANDICAP RAMPS

S. 2ND STREET CURB

REPLACEMENT

S. 2ND STREET SOUTH SIDE

SIDEWALK

S. 2ND STREET SOUTH SIDE

2 HANDICAP RAMPS

S. 3RD STREET NORTH SIDE

SIDEWALK

S. 3RD STREET NORTH SIDE

2 HANDICAP RAMPS

S. 3RD STREET SOUTH SIDE

SIDEWALK

S. 3RD STREET SOUTH SIDE

2 HANDICAP RAMPS

S. 4TH STREET NORTH SIDE

SIDEWALK

S. TERRACE AVE. EAST SIDE

SIDEWALK

S. CENTRAL AVE. EAST SIDE

SIDEWALK

S. CENTRAL AVE. WEST SIDE

SIDEWALK

N. CENTRAL AVE. EAST SIDE

SIDEWALK

N. CENTRAL AVE. WEST SIDE

SIDEWALK

N. CENTRAL AVE. 2 DRIVEWAY TIE

INS

TOTAL PRICE: $________________

Estimated Start Date: ________________ Estimated Completion Date: ________________

Please keep the following notes in mind when bidding:

• Contractor is responsible for all Utility locates where required.

• Contractor is responsible for all damages to private and Government properties.

• Radiuses are to be used in all intersecting areas.

• Yellow ADA pads will be used.

• All ramps must meet existing asphalt making a smooth transition.

• All work is to be performed on County Property (right-of-way) with respect to private property. Floyd County will not be responsible for work done on Private Property, monetary or damage wise.

Floyd County terms are net 30. Invoices will be paid within 30 days of date on invoice.

Floyd County is exempt from all local, state, and federal taxes, and prices stipulated by the bidder are considered maximum, and are not subject to any increase due to any taxes, shipping & handling charges, or any other cause or reason.

Name of Individual, Partner Company

Or Corporation

Title Address

Authorized Signature City, State, Zip Code

Company Phone E-Mail

File details come from the government source that posted it. Updated .