This document is an Invitation to Bid issued by the Colquitt County Board of Commissioners for repairs to the Transfer Station Loading Area at the Colquitt County Landfill located at 1816 Shade Murphy Road in Moultrie, Georgia.
The project consists of two phases of repairs. Phase 1 involves demolishing the existing 1'-2" thick cantilever concrete slab, constructing a new cantilever slab, repairing damaged concrete wing walls, and repairing/replacing the damaged steel push wall members and steel plate chute. Phase 2 involves removing and replacing 2,897 sq.ft. of concrete paving and steel rails, removing an existing concrete pad and tank, and installing 2,947 sq.ft. of new concrete paving with a drop inlet and 16 feet of 4" HDPE pipe to a 300-gallon concrete tank. Sealed bids are due by 4:00 PM on August 12, 2024 and will be publicly opened and read aloud. There is a mandatory pre-bid meeting on July 22, 2024 at 10:00 AM at the landfill. The Colquitt County Board of Commissioners reserves the right to accept or reject any or all bids.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COLQUITT COUNTY BOARD OF COMMISSIONERS
DENVER F. BRASWELL
CHRIS HUNNICUTT
District 2 Commissioner
MARC DEMOTT
District 3 Commissioner
MIKE BOYD
JOHNNY HARDIN
District 6 Commissioner
July 12, 2024
INVITATION TO BID
CHARLES H. CANNON, IV
County Administrator 229-616-7404
MELISSA E. LAWSON
County Clerk 229-616-7409
LESTER CASTELLOW
County Attorney Post Office Box 190 Moultrie, Georgia 31776-0190 229-985-1213
RE: Transfer Station Loading Area Repairs for Colquitt County Landfill COLQUITT COUNTY is accepting sealed bids for the repairs on the Transfer Station Loading Area.
All potential bidders MUST attend a mandatory pre-bid meeting on July 22, 2024 at 10:00 a.m. The pre-bid meeting will be at the Colquitt County Landfill at 1816 Shade Murphy Rd , Moultrie, GA.
The bid packet is available at the Purchasing office at the Colquitt County Annex, 101 East Central Ave, room 206 or can be accessed on the Colquitt County website at www.colquittcountyga.gov/departments/purchasing and refer to the Bid and RFP List to download this packet.
Sealed bids will be accepted in the office of the County Purchasing Agent, 101 East Central Avenue, Suite 206, Moultrie GA 31768 (PO Box 517, Moultrie GA 31776-0517), until Monday, August 12, 2024 at 4:00 p.m. at which time they will be publicly opened and read aloud.
Bids must be in a sealed envelope plainly marked in the lower left corner “Sealed Bid – Transfer Station Repair". It is the bidder’s responsibility to have all bids turned in by the called time. No bids will be accepted after the called time. No bids may be withdrawn for a period of thirty (30) days after the called time.
The Colquitt County Board of Commissioners reserves the right to accept or reject any or all bids and to waive any and all formalities.
Any and all questions are to be directed to:
Lena Mercer, County Purchasing Agent at 229-616- 7087 or lena.mercer@colquittcountyga.gov or
Purchasing Agent
Chairman
BARBARA JELKS
District 1 Commissioner
District 4 Commissioner
PAUL NAGY
District 5 Commissioner
Mac Lawson,Maintenance Superintendent at 229-616-7469 or mac.lawson@colquittcountyga.gov Thank you for your interest in doing business with Colquitt County.
101 East Central
Post Office Box 517 Moultrie, Georgia 31776-0517
Phone 229-616-7400 Facsimile 229-616-7018 www.ccboc.com
Lena Mercer
Sincerely
Project Description
Phase 1: Project Overview
This project consists of repairs to the Transfer Station Loading Area at the Colquitt County Landfill, 1816 Shade Murphy Road, Moultrie, Georgia, in accordance with the following M-Square Associates, P.C. drawings for Project No. 24-030:
Sheets S1 – S3 of 3, “Solid Waste Transfer Station Loading Area Slab Repair”, dated 06/06/2024
Background
The Transfer Station was originally constructed as shown on Tucker and Associates drawings No. S-1 through S-3, dated 01-17-94. In 2016, the Transfer Building was demolished and replaced with a new building including new foundations and floor slab. The original Loading Area, including the cantilever slab and concrete wing walls, was retained. The Loading Area slab was overlaid with a 6” thick concrete topping and new wing walls were constructed inside the existing walls. Refer to M-Square Associates, P.C. drawings Sheets S3 and S4 of 4, dated 06-06-16.
Scope of Work
Over the 8 years since 2016, the Loading Area cantilever slab and concrete wing walls have sustained considerable physical damage. Similarly, the original steel plate and frame push walls and tapered chute have sustained damage. This project consists of the following repairs to the Loading Area:
1. Sawcut and demolish the remaining existing 1’-2” thick cantilever concrete slab flush with the retaining wall.
2. Construct a new 1’-2” thick cantilever concrete slab in its place as detailed on the plans.
3. Repair the damaged ends of the concrete wing walls using compatible concrete patching materials installed in accordance with manufacturer’s instructions.
4. Repair and/or replace all damaged steel plate and tube frame push wall members as necessary.
5. Remove existing steel plate tapered chute from top of steel push walls and replace with new tube framing and steel plate as detailed on the plans.
6. All construction and material specifications are provided as General Notes on the drawings.
Project Description
Phase 2: Project Overview
This project consists of repairs to the Transfer Station Loading Area at the Colquitt County Landfill, 1816 Shade Murphy Road, Moultrie, Georgia, in accordance with the following Innovate Engineering & Surveying, P.C. drawings for Project No. 1889:
Sheets 1 – 3 of 3, “COLQUITT COUNTY TRANSFER STATION”, dated 07/03/2024
Background
The Transfer Station was originally constructed as shown on Tucker and Associates drawings No. S-1 through S-3, dated 01-17-94. In 2016, the Transfer Building was demolished and replaced with a new building including new foundations and floor slab. The original Loading Area, including the cantilever slab and concrete wing walls, was retained.
Scope of Work
This project consists of the following repairs to the Loading Area:
1. Remove 2,897 sq.ft. of concrete paving and steel rails
2. Remove concrete pad and existing tank
3. Install 2,947 sq.ft. concrete paving with a drop inlet
4. Install 16 feet of 4” HDPE pipe to a 300-gallon concrete tank with access port
I:\ Pr oj ec ts \1
9-
C ol qu itt
T ra ns fe r St at io n D ra in ag e\
C iv il\
C
.d w g
- C O
V
ER
7/
3/
:3
PM
C
O
PY
R
IG
H T
TH
IS
D R
A W
IN
G
IS
T
H E
PR
O
PE
R
TY
O
F
IN
N O
V A
TE
E
N G
IN
EE
R
IN
G
S U
R V
EY
IN
G
LL
C
. A N
D M
A Y
N O
T
BE
R
EP
R O
D U
C
ED
W
IT
H O
U T
W R
IT
TE
N P
ER
M
IS
SI
O N
D
O C
U M
EN
TS
O F
PU
BL
IC
R
EC
O
R D
M A
Y
BE
C O
PI
ED
B U
T N
O T
A
LT
ER
ED
PROJECT NUMBER
Engineering & Surveying
I !NNOVATE
PHONE:229-249-9113 - www.innovatees.com 2214 N. Patterson Street, Valdosta, GA 31602
PREPARED BY:
LOCATION MAP
N.T.S.
SITE
GENERAL CONSTRUCTION NOTES:
1. UTILITIES SHOWN HEREON ARE BASED UPON ABOVE GROUND APPURTENANCES ONLY. UNDERGROUND WATER AND GAS MAIN
SIZES AND LOCATIONS BASED ON GIS MAPPING PROVIDED BY THE CITY OF MOULTRIE UTILITY DEPARTMENT. UTILITY FACILITIES
ARE SHOWN SCHEMATICALLY ON THE PLANS AND ARE NOT NECESSARILY ACCURATE AS TO DESCRIPTION, LOCATION, OR
ELEVATION. UTILITY FACILITIES, SUCH AS SERVICE LINES OR UNKNOWN FACILITIES, NOT SHOWN ON THE PLANS WILL NOT
RELIEVE THE CONTRACTOR OF HIS/HER RESPONSIBILITY UNDER TITLE 25, CHAPTER 9, OFFICIAL CODE OF GEORGIA ANNOTATED.
VERIFY THE ELEVATIONS OF EXISTING PIPING, UTILITIES, AND ANY TYPE OF UNDERGROUND OR ENCASED OBSTRUCTION, NOT
SPECIFICALLY INDICATED TO BE REMOVED, AS INDICATED OR DISCOVERED IN LOCATIONS TO BE TRAVERSED BY PIPING, DUCTS, AND OTHER WORK TO BE CONDUCTED OR INSTALLED.
2. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING ALL UTILITY COMPANIES REGARDING LOCATION OF EXISTING
UTILITIES AND SHALL BE RESPONSIBLE FOR THE COORDINATION OF WORK WHILE UTILITIES ARE BEING RELOCATED. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY DAMAGE TO UTILITIES RESULTING FROM WORK PERFORMED BY
THE CONTRACTOR. THE CONTRACTOR SHALL TAKE THE NECESSARY STEPS TO MINIMIZE ANY INTERRUPTION OF UTILITY SERVICE
TO THE SURROUNDING RESIDENTS. CALL TOLL-FREE 1-800-282-7411, 72 HOURS PRIOR TO THE START OF WORK SO THAT
EXISTING UNDERGROUND UTILITIES MAY BE LOCATED.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY LAND OR PROPERTY BEYOND THE PROJECT CONSTRUCTION AREA, WHICH
MAY BE SUBJECT TO ANY EFFECTS OR BY-PRODUCTS OF HIS CONSTRUCTION EFFORTS.
4. DEMOLITION SHOWN IS A MINIMUM REQUIREMENT. ADDITIONAL DEMOLITION MAY BE REQUIRED TO ACCOMMODATE
CONSTRUCTION. THE CONTRACTOR SHALL REPAIR AND REPLACE ALL DAMAGED AND DISTURBED AREAS TO
PRE-CONSTRUCTION CONDITIONS, OR BETTER, INCLUDING ALL PAVING, STABILIZED EARTH, SOD, DRIVEWAYS, TREES, SIDEWALKS, CURBS, STORM SEWERS, ETC. WHERE APPLICABLE, THE SAME TYPE OF MATERIAL THAT WAS REMOVED OR
DAMAGED DURING CONSTRUCTION SHALL BE USED. IN AREAS OF SIDEWALK AND CURB REMOVAL, REMOVE TO NEAREST JOINT.
ALL WORK SHALL BE IN ACCORDANCE WITH ALL APPLICABLE RULES, REGULATIONS, CODES, ETC. CONTRACTOR MUST DISPOSE
OF MATERIALS AT A DESTINATION APPROVED BY THE CONTRACTING OFFICER. NO CONSTRUCTION WASTE SHALL BE BURIED ON
SITE.
5. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY WHEN CONFLICT BETWEEN THE DRAWINGS AND ACTUAL
CONDITIONS ARE DISCOVERED DURING THE COURSE OF CONSTRUCTION.
6. NO CONSTRUCTION SHALL COMMENCE UNTIL ALL APPLICABLE PERMITS AND REQUIRED EASEMENTS HAVE BEEN OBTAINED.
7. CONTRACTOR SHALL PROVIDE ACCURATE UTILITY AS-BUILTS AS REQUIRED BY THE CITY OF MOULTRIE UTILITY DEPARTMENT.
8. STORM PIPES SHALL BE INSTALLED WITH A MINIMUM OF 18” VERTICAL DISTANCE TO UTILITY CROSSINGS. CONTRACTOR SHALL
ENSURE A MINIMUM HORIZONTAL DISTANCE OF 5' BETWEEN STORM PIPES AND UTILITIES TO SIGNIFICANT ABOVE GROUND
APPURTENANCES; E.G. BUILDINGS, POWER / UTILITY POLES, TREES, ETC.
9. UTILITY WORK MUST BE COMPLETED BY A GA LICENSED UTILITIES CONTRACTOR.
10. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, SUPERVISING AND MAINTAINING ALL SAFETY PROGRAMS
THROUGHOUT THE DURATION OF CONSTRUCTION. ALL BARRICADES, SUFFICIENT LIGHTS, SIGNS AND OTHER TRAFFIC CONTROL
METHODS AS NECESSARY FOR THE PROTECTION AND SAFETY OF THE PUBLIC SHALL BE PROVIDED AND MAINTAINED BY THE
CONTRACTOR THROUGHOUT THE DURATION OF CONSTRUCTION. TRAFFIC CONTROL METHODS SHALL CONFORM TO THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
11. SAFE TRENCH CONSTRUCTION IS MANDATORY. ALL SLOPES SHALL BE LAID BACK OR SHORED AS NECESSARY.
12. THE CONTRACTOR SHALL KEEP RECORDS OF WORK PERFORMED ON A DAILY BASIS. THE CONTRACTOR SHALL PROVIDE
ADEQUATE OVERSIGHT AND MANAGEMENT FOR HIS CONSTRUCTION EFFORTS.
13. COOPERATION AND COORDINATION BETWEEN ALL CONTRACTORS, UTILITY COMPANIES AND SUBCONTRACTORS ENGAGED IN
THE WORK WITHIN AND ADJACENT TO THE CONSTRUCTION IS IMPORTANT FOR THE COMPLETION OF THIS PROJECT IN A TIMELY
MANNER. IN THE CASE OF INTERFERENCE BETWEEN THE OPERATIONS OF THE DIFFERENT CONTRACTORS, UTILITY COMPANIES
AND SUBCONTRACTORS, THE OWNER WILL BE THE SOLE JUDGE OF THE RIGHTS OF EACH AND THE SEQUENCE OF THE WORK
NECESSARY TO EXPEDITE THE COMPLETION OF THIS PROJECT.
14. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE CODES, ORDINANCES, RULES, REGULATIONS, AND LAWS OF LOCAL, MUNICIPAL, STATE OR FEDERAL AUTHORITIES HAVING JURISDICTION OVER THIS PROJECT. ALL PERMITS REQUIRED FOR
CONSTRUCTION OPERATIONS SHALL BE OBTAINED BY THE CONTRACTOR.
15. THE CONTRACTOR SHALL SAW CUT EXISTING ASPHALT PAVEMENT AS REQUIRED TO PRODUCE A SMOOTH JOINT WITH NEW
PAVEMENT.
16. MAGNETIC DETECTION TAPE AND TRACER WIRE SHALL BE INSTALLED WITH THE PVC PIPE FOR EASE OF FUTURE LOCATION.
ALL TRACER WIRE SHALL BE 14 GAUGE OR AS REQUIRED BY LOCAL CODE.
17. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION STAKING.
18. THE CONTRACTOR IS TO NOTIFY THE ENGINEER AT LEAST 24 HOURS PRIOR TO THE BEGINNING OF EACH PHASE OF
CONSTRUCTION. THE CONTRACTOR SHALL ALSO NOTIFY APPLICABLE UTILITY PROVIDERS AT LEAST 24 HOURS PRIOR TO ANY
CONSTRUCTION THAT MY AFFECT THEM.
19. THE CONTRACTOR SHALL MAINTAIN, AT ALL TIMES, ADEQUATE AND SAFE ACCESS FOR ALL RESIDENTS AND/OR ADJOINING
PROPERTY OWNERS DURING CONSTRUCTION.
20. ALL CONCRETE WASHOUT SHALL BE COLLECTED BY THE CONTRACTOR ONSITE AT AN AREA DESIGNATED BY THE OWNER
FOR OFFSITE DISPOSAL BY THE CONTRACTOR. WASHOUT SHALL BE MAINTAINED EITHER BY BERM OR BY WASHOUT PIT.
21. ALL HAZARDOUS MATERIALS / WASTE SHALL BE DISPOSED OF IN THE MANNER SPECIFIED BY LOCAL OR STATE REGULATIONS
OR BY THE MANUFACTURER.
22. SANITARY WASTE GENERATED FROM PORTABLE UNITS SHALL BE EMPTIED AS REQUIRED TO PROVIDE SANITARY CONDITIONS.
ALL SANITARY WASTE DISPOSAL PRACTICES SHALL BE CONDUCTED IN ACCORDANCE WITH STATE AND LOCAL WASTE DISPOSAL
REGULATIONS.
23. CONTRACTOR SHALL REVIEW, PLAN AND SEQUENCE SITE GRADING AND THE INSTALLATION OF UNDERGROUND UTILITIES TO
ENSURE PROPER INSTALLATION AND ELIMINATE POTENTIAL CONFLICTS.
COLQUITT COUNTY
TRANSFER STATION
COLQUITT COUNTY, GEORGIA
DATE: 07/03/2024
CONSTRUCTION PLANS
FOR
Sheet List Table Sheet Number Sheet Title
-- COVER
1 EXISTING CONDITIONS & DEMO PLAN
2 SITE LAYOUT PLAN
3 GRADING AND DRAINAGE PLAN
S H
A D
Y
M
U R
P H
Y
R
D
COLQUITT COUNTY
TRANSFER STATION
AutoCAD SHX Text SITE CONSTRUCTION SHALL BE IN ACCORDANCE WITH COLQUITT COUNTY STANDARDS AND SPECIFICATIONS. UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH CITY OF MOULTRIE STANDARDS AND SPECIFICATIONS
TOP RAIL:247.55
BOTTOM BEAM:261.73
EXISTING BUILDING
~EXISTING CONCRETE~
~EXISTING CONCRETE~
En gi ne er in g
S ur ve yi ng
I
N N
O V
A
TE
DATE:
DRAWN BY:
CHECKED BY:
B. KENT
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O N
PH
O
N E:
9-
9-w w w
.in no va te es .co m
N
. P at te rs on S tr ee t, V al do st a, G A
M. WILSON
C
O
PY
R
IG
H T
TH
IS
D R
A W
IN
G
IS
T
H E
PR
O
PE
R
TY
O
F
IN
N O
V A
TE
E
N G
IN
EE
R
IN
G
S U
R V
EY
IN
G
LL
C
. A N
D M
A Y
N O
T
BE
R
EP
R O
D U
C
ED
W
IT
H O
U T
W R
IT
TE
N P
ER
M
IS
SI
O N
D
O C
U M
EN
TS
O F
PU
BL
IC
R
EC
O
R D
M A
Y
BE
C O
PI
ED
B U
T N
O T
A
LT
ER
ED
LEVEL II CERT. 8141
G
E
O
R G
I
A
W
I
L
L
I
A
M D
K
E
N
T
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
No. 22564
PROFESSIONAL
I:\ Pr oj ec ts \1
9-
C ol qu itt
T ra ns fe r St at io n D ra in ag e\
C iv il\
C
.d w g
- 1 E
X
IS
TI
N
G C
O N
D
IT
IO
N
S
D
EM
O P
LA
N
7/
3/
:3
PM
SHEET
PROJECT NUMBER
07/03/2024
EXISTING CONDITIONS & DEMO PLAN
C O
LQ
U
IT
T
C O
U N
TY
T
R A
N
SF
ER
S
TA
TI
O N
C O
LQ
U
IT
T
C O
U N
TY
, G
EO
R
G
IA
SYMBOL LEGEND
FIRE HYDRANT
LIGHT POLE
SANITARY SEWER MANHOLE
UTILITY POLE
WATER METER
BACK FLOW PREVENTER
MONITORING WELL
MAIL BOX
WATER VALVE
CABLE TELEVISION PEDESTAL
TELEPHONE PEDESTAL
FENCE LINE
GAS LINE
UNDERGROUND TELEPHONE
UNDERGROUND ELECTRIC
OVERHEAD UTILITIES
SANITARY SEWER LINE
WATER LINE
X
G
UT
UE
OU
SS
W
BENCHMARK
FIBER OPTIC PEDESTAL
SANITARY CLEAN OUT
ELECTRIC METER
ELECTRIC TRANSFORMER
GUY WIRE
TRAFFIC SIGN
WELL
AIR CONDITIONER UNIT
DRAINAGE MANHOLE
FLARED END SECTION
POST INDICATOR VALVE
GAS VALVE
GAS METER
5/8" REBAR FOUND
CONCRETE MARKER FOUND
DEED BOOK
PAGE NUMBER
BACK FLOW PREVENTER
DROP INLET
IRRIGATION CONTROL VALVE
DB
PI
IC
G
W
E
G
BFP
FDC
W
CO
S
M
D
AC
MB
FO
C
T
PG
1/2" REBAR FOUND
1.5" OPEN TOP PIPE FOUND
DEMOLITION NOTES:
1. THE LIMITS OF DEMOLITION SHOWN IS A MINIMUM
REQUIREMENT. ADDITIONAL DEMOLITION MAY BE REQUIRED
TO ACCOMMODATE CONSTRUCTION.
2. REMOVE EXISTING ASPHALT, CONCRETE, CURBING, TREES
AND OTHER ABOVEGROUND APPURTENANCES WITHIN THE
OUTLINED AREAS UNLESS OTHERWISE NOTED.
3. ASPHALT, CONCRETE AND CURBING SHALL BE SAWCUT TO
PROVIDE A SMOOTH TRANSITION. FOR SIDEWALK AND CURB
REMOVAL, REMOVE TO THE NEAREST JOINT.
4. THE CONTRACTOR SHALL REMOVE ONLY THOSE TREES
DEEMED NECESSARY FOR CONSTRUCTION. THE CONTRACTOR
SHALL MINIMIZE DAMAGE AND/OR REMOVAL OF THE ROOT
SYSTEM FOR ANY REMAINING TREES /SHRUBS WITHIN OR
ADJACENT TO THE CONSTRUCTION AREA.
5. THE CONTRACTOR SHALL REPAIR/REPLACE ANY DAMAGED
OR DISTURBED AREAS TO PRECONSTRUCTION CONDITIONS
OR BETTER.
6. COORDINATE WITH APPROPRIATE UTILITY PROVIDERS
REGARDING ALL UTILITY REMOVAL, RELOCATION OR
CONSTRUCTION.
INNOVATE ENGINEERING & SURVEYING DOES NOT
G U A R A N T E E N O R W A R R A N T T H A T T H E
UNDERGROUND CONDIT IONS SHOWN ARE
ACCURATE OR COMPLETE. THE CONTRACTOR
SHALL MAKE THEMSELVES FAMILIAR WITH THE
SITE AND NOTIFY THE ENGINEER IMMEDIATELY IF
ACTUAL CONDITIONS DIFFER THAT MAY AFFECT
SUCCESSFUL CONSTRUCTION OF IMPROVEMENTS.
SCALE 1"=10'
HALF SCALE 1"=20'
2010 0 105
VERTICAL SCALE 1"=1'
SAWCUT AND REMOVE
±80 S.F. OF CONCRETE
AND TANK
SAWCUT AND REMOVE
±2897 S.F. OF
CONCRETE PAVING
RETAINING WALL TO
REMAIN
REMOVE EXISTING
STEEL RAILS
EXISTING BUILDING
~EXISTING CONCRETE~
~EXISTING CONCRETE~
En gi ne er in g
S ur ve yi ng
I
N N
O V
A
TE
DATE:
DRAWN BY:
CHECKED BY:
B. KENT
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O N
PH
O
N E:
9-
9-w w w
.in no va te es .co m
N
. P at te rs on S tr ee t, V al do st a, G A
M. WILSON
C
O
PY
R
IG
H T
TH
IS
D R
A W
IN
G
IS
T
H E
PR
O
PE
R
TY
O
F
IN
N O
V A
TE
E
N G
IN
EE
R
IN
G
S U
R V
EY
IN
G
LL
C
. A N
D M
A Y
N O
T
BE
R
EP
R O
D U
C
ED
W
IT
H O
U T
W R
IT
TE
N P
ER
M
IS
SI
O N
D
O C
U M
EN
TS
O F
PU
BL
IC
R
EC
O
R D
M A
Y
BE
C O
PI
ED
B U
T N
O T
A
LT
ER
ED
LEVEL II CERT. 8141
G
E
O
R G
I
A
W
I
L
L
I
A
N
T
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
No. 22564
PROFESSIONAL
I:\ Pr oj ec ts \1
9-
C ol qu itt
T ra ns fe r St at io n D ra in ag e\
C iv il\
C
.d w g
- 2 S
IT
E
LA
YO
U T
PL
A
N
7/ 3/
:3
PM
SHEET
PROJECT NUMBER
07/03/2024
SITE LAYOUT PLAN
C O
LQ
U
IT
T
C O
U N
TY
T
R A
N
SF
ER
S
TA
TI
O N
C O
LQ
U
IT
T
C O
U N
TY
, G
EO
R
G
IA
SYMBOL LEGEND
FIRE HYDRANT
LIGHT POLE
SANITARY SEWER MANHOLE
UTILITY POLE
WATER METER
BACK FLOW PREVENTER
MONITORING WELL
MAIL BOX
WATER VALVE
CABLE TELEVISION PEDESTAL
TELEPHONE PEDESTAL
FENCE LINE
GAS LINE
UNDERGROUND TELEPHONE
UNDERGROUND ELECTRIC
OVERHEAD UTILITIES
SANITARY SEWER LINE
WATER LINE
X
G
UT
UE
OU
SS
W
BENCHMARK
FIBER OPTIC PEDESTAL
SANITARY CLEAN OUT
ELECTRIC METER
ELECTRIC TRANSFORMER
GUY WIRE
TRAFFIC SIGN
WELL
AIR CONDITIONER UNIT
DRAINAGE MANHOLE
FLARED END SECTION
POST INDICATOR VALVE
GAS VALVE
GAS METER
5/8" REBAR FOUND
CONCRETE MARKER FOUND
DEED BOOK
PAGE NUMBER
BACK FLOW PREVENTER
DROP INLET
IRRIGATION CONTROL VALVE
DB
PI
IC
G
W
E
G
BFP
FDC
W
CO
S
M
D
AC
MB
FO
C
T
PG
1/2" REBAR FOUND
1.5" OPEN TOP PIPE FOUND
INNOVATE ENGINEERING & SURVEYING DOES NOT
G U A R A N T E E N O R W A R R A N T T H A T T H E
UNDERGROUND CONDIT IONS SHOWN ARE
ACCURATE OR COMPLETE. THE CONTRACTOR
SHALL MAKE THEMSELVES FAMILIAR WITH THE
SITE AND NOTIFY THE ENGINEER IMMEDIATELY IF
ACTUAL CONDITIONS DIFFER THAT MAY AFFECT
SUCCESSFUL CONSTRUCTION OF IMPROVEMENTS.
SCALE 1"=10'
HALF SCALE 1"=20'
2010 0 105
VERTICAL SCALE 1"=1'
±2947 S.F. NEW
CONCRETE PAVING
TIE TO EXISTING
TIE TO EXISTING
185.4'
54.8'
55.3'
16.0'
15.8'
15.9'
15.8'
RETAINING WALL
TO REMAIN
±15.8'
EXISTING GROUND
COMPACTED
SUBGRADE
TURNDOWN CONCRETE SLAB
8" -3,000 P.S.I CONCRETE
8"
SLOPE
AutoCAD SHX Text N.T.S.
247.81
247.75
247.09
247.17
247.36
247.08
247.16
247.74
247.85
247.55
247.55
247.55
247.55
EXISTING BUILDING
~EXISTING CONCRETE~
~EXISTING CONCRETE~
En gi ne er in g
S ur ve yi ng
I
N N
O V
A
TE
DATE:
DRAWN BY:
CHECKED BY:
B. KENT
R
EV
IS
IO
N S
D A
TE
D
ES
C R
IP
TI
O N
PH
O
N E:
9-
9-w w w
.in no va te es .co m
N
. P at te rs on S tr ee t, V al do st a, G A
SHEET
PROJECT NUMBER
07/03/2024
GRADING AND DRAINAGE PLAN
M. WILSON
C
O
PY
R
IG
H T
TH
IS
D R
A W
IN
G
IS
T
H E
PR
O
PE
R
TY
O
F
IN
N O
V A
TE
E
N G
IN
EE
R
IN
G
S U
R V
EY
IN
G
LL
C
. A N
D M
A Y
N O
T
BE
R
EP
R O
D U
C
ED
W
IT
H O
U T
W R
IT
TE
N P
ER
M
IS
SI
O N
D
O C
U M
EN
TS
O F
PU
BL
IC
R
EC
O
R D
M A
Y
BE
C O
PI
ED
B U
T N
O T
A
LT
ER
ED
LEVEL II CERT. 8141
G
E
O
R G
I
A
W
I
L
L
I
A
N
T
R
E
G
I S
T E
R
E
D
E
N
G
I N E
E
R
No. 22564
PROFESSIONAL
SCALE 1"=10'
HALF SCALE 1"=20'
2010 0 105
VERTICAL SCALE 1"=1'
C O
LQ
U
IT
T
C O
U N
TY
T
R A
N
SF
ER
S
TA
TI
O N
C O
LQ
U
IT
T
C O
U N
TY
, G
EO
R
G
IA
I:\ Pr oj ec ts \1
9-
C ol qu itt
T ra ns fe r St at io n D ra in ag e\
C iv il\
C
.d w g
- 3 G
R A
D
IN
G A
N D
D R
A
IN
A G
E
PL
A N
7/
3/
:3
PM
GRADING NOTES:
1. CONTRACTOR SHALL VERIFY EXISTING
ELEVATIONS PRIOR TO CONSTRUCTION AND
NOTIFY ENGINEER IF ANY ACTUAL CONDITIONS
DIFFER THAT MAY AFFECT SUCCESSFUL
COMPLETION OF IMPROVEMENTS.
2. THE CONTRACTOR SHALL VERIFY ALL
PROPOSED ELEVATIONS SHOWN TO ENSURE
POSITIVE DRAINAGE.
GRADE LEGEND
000.00 TOP/BACK OF CURB
000.00 GROUND/PAVEMENT ELEVATION
STORM WATER FLOW DIRECTION
SYMBOL LEGEND
FIRE HYDRANT
LIGHT POLE
SANITARY SEWER MANHOLE
UTILITY POLE
WATER METER
BACK FLOW PREVENTER
MONITORING WELL
MAIL BOX
WATER VALVE
CABLE TELEVISION PEDESTAL
TELEPHONE PEDESTAL
FENCE LINE
GAS LINE
UNDERGROUND TELEPHONE
UNDERGROUND ELECTRIC
OVERHEAD UTILITIES
SANITARY SEWER LINE
WATER LINE
X
G
UT
UE
OU
SS
W
BENCHMARK
FIBER OPTIC PEDESTAL
SANITARY CLEAN OUT
ELECTRIC METER
ELECTRIC TRANSFORMER
GUY WIRE
TRAFFIC SIGN
WELL
AIR CONDITIONER UNIT
DRAINAGE MANHOLE
FLARED END SECTION
POST INDICATOR VALVE
GAS VALVE
GAS METER
5/8" REBAR FOUND
CONCRETE MARKER FOUND
DEED BOOK
PAGE NUMBER
BACK FLOW PREVENTER
DROP INLET
IRRIGATION CONTROL VALVE
DB
PI
IC
G
W
E
G
BFP
FDC
W
CO
S
M
D
AC
MB
FO
C
T
PG
1/2" REBAR FOUND
1.5" OPEN TOP PIPE FOUND
INNOVATE ENGINEERING & SURVEYING DOES NOT
G U A R A N T E E N O R W A R R A N T T H A T T H E
UNDERGROUND CONDIT IONS SHOWN ARE
ACCURATE OR COMPLETE. THE CONTRACTOR
SHALL MAKE THEMSELVES FAMILIAR WITH THE
SITE AND NOTIFY THE ENGINEER IMMEDIATELY IF
ACTUAL CONDITIONS DIFFER THAT MAY AFFECT
SUCCESSFUL CONSTRUCTION OF IMPROVEMENTS.
GDOT STD. 1019A
DROP INLET
TOP: 247.36
INV: 245.36
±16 L.F. OF 4"
HDPE @ 1.00%
SLOPE
300 GAL
CONCRETE TANK
W/ ACCESS PORT
& NO OUTLET
REGRADE DITCH
TO DRAIN.
REGRADE DITCH
TO DRAIN.
LANDFILL TRANSFER STATION REPAIRS
TERMS OF BID / CONTRACT
The undersigned affirms that they are duly authorized to execute this contract, that this bid has been prepared with full knowledge, understanding and meets all requirements of the contents therein. By signing below, Colquitt County Board of Commissioners agrees that this bid for Transfer station repairs, will be awarded to the lowest responsible bidder as dictated in this contract, to the vendor whose name appears below and both parties agree to the terms and conditions contained herein.
Phase 1: Transfer Station concrete repair $________________________________
Phase 2: Loading area - concrete repair $ ___________________________
COMPANY NAME:
MAILING ADDRESS:
PRINTED NAME:
Date:
Bidders Signature
Date:
Colquitt County Board of Commissioners
| Phase 2 - Innovate Engineering Project Description with plans.pdf |
| Colquitt Transfer Station Plans 07032024.pdf |
| Sheets and Views |
| COVER |
| 1 EXISTING CONDITIONS & DEMO PLAN |
| 2 SITE LAYOUT PLAN |
| 3 GRADING AND DRAINAGE PLAN |
| Transfer Station Repairs 2024 bid page.pdf |
| LANDFILL TRANSFER STATION REPAIRS |
| BID & CONTRACT |
| The undersigned affirms that they are duly authorized to execute this contract, that this bid has been prepared with full knowledge, understanding and meets all requirements of the contents therein. By signing below, Colquitt County Board of Commissio... |
| Transfer Station Repairs 2024 bid page.pdf |
| LANDFILL TRANSFER STATION REPAIRS |
| The undersigned affirms that they are duly authorized to execute this contract, that this bid has been prepared with full knowledge, understanding and meets all requirements of the contents therein. By signing below, Colquitt County Board of Commissio... |