This is a Bid Packet and Advertisement for Bids issued by the Rabun County Board of Commissioners in Georgia for a comprehensive road resurfacing and paving project. The project, designated as CR-58-01-26(241), encompasses a total of 23.61 miles of deep mill patching, leveling/topping, and new paving work across twenty-four separate county roads and seven city streets. Specific roads include Eastman Mountain Road (2.3 miles), Screamer Mountain Drive (1.45 miles), Crusher Run Road (1.4 miles), and multiple other county and city streets with varying lengths and work specifications. Sealed proposals will be received until 9:00 a.m. on March 16, 2026, at the Rabun County Commission Conference Room located on the 2nd floor of the County Courthouse in Clayton, Georgia, at which time bids will be publicly opened and read aloud. The contract completion date is November 6, 2026. All work shall be performed in accordance with the 2001 edition of the Georgia Department of Transportation Standard Specifications and applicable supplemental specifications. No bid proposals may be withdrawn for thirty days following the bid opening date.
Bidders are required to submit a proposal guaranty (bid bond) equal to five percent (5%) of the total bid amount, and upon contract award, the successful bidder must provide performance and payment bonds each equal to the full contract amount, as well as proof of liability insurance and workers' compensation insurance meeting specified minimum limits. Payment will be made monthly based on estimated work completed in place, with retainage withheld at five percent (5%) until the project reaches fifty percent complete, after which retainage may be reduced to two and one-half percent (2.5%) if work status is satisfactory. The county reserves the right to reject any and all bids, waive minor informalities, modify the project, or re-advertise. The county also reserves preference for local bidders, defined as individuals or businesses maintaining a place of business or inventory in Rabun County, licensed by the county and/or state, and subject to Rabun County real estate or personal property taxes, with a preference amount not to exceed five percent (5%) of the bid or fifty thousand dollars ($50,000), whichever is less. Recycled asphalt product (RAP) generated during the project must be directed to either the Rabun County Road Department or the City of Clayton as directed by the Road Director, and all work must be performed during daylight working hours with tripod or post-mounted traffic control signs.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT FOR BIDS
RABUN COUNTY STATE OF GEORGIA
Sealed proposals for furnishing all labor, materials, equipment, permits and other things necessary for the construction of the following project will be received by the Rabun County Board of Commissioners in the County Commission Conference Room located on the 2nd floor of the County Courthouse, Clayton, Georgia 9:00 am on March 16, 2026 at which time all bids received by the prescribed time and date will be publicly opened and read aloud. Any bids proposals received after the time shown above will not be accepted.
In addition, the Board of Commissioners of Rabun County reserves the right to show preference to local bidders in the purchase of supplies, equipment and services. The amount shall not exceed five (5%) of the amount bid or quoted and I or fifty thousand dollars ($50,000), whichever is less.
A "local bidder" is defined as an individual or business that maintains a place of business or maintains an inventory of merchandise and I or equipment in Rabun County is licensed by Rabun County and I or the State of Georgia, if required, and is subject to Rabun County real estate and or personal property taxes. Any local bidder in default on payment of any County or State tax license shall not be eligible to receive preference until all taxes or licenses due are paid. Notice of preference availability shall be included in the invitation to bid and in all advertisements.
PROJECT NO. CR-58-01-26(241) RABUN COUNTY
PROJECT DESCRIPTION:
A total of 23.61 miles of Deep Mill Patching, Leveling/Topping and new paving to be on twenty four separate County roads and seven City Streets.
Eastman Mtn. road: A total of 2.3 miles. To start at the intersection of Boggs Mtn. Road. and end at Wolfcreek Road. Leveling/Topping.
Screamer Mtn. drive: A total of 1.45 miles. To start at the intersection of Warwoman Road. and end at The Private entrance. Leveling/Topping.
Curt Dotson road: A total of .35 miles. To start at the intersection of Screamer Mtn. drive. and end at the .35 mile mark. Leveling/Topping.
Saddle Gap: A total of 1.35 miles. To start at the intersection of Warwoman Road and end at Screamer Mtn. drive. Leveling/Topping.
Crusher Run Road: A total of 1.4 miles. To start at Kelly’s Creek Road and end at the1.4 mile mark.
Levelling/Topping.
Ponderosa Road: A total of 1.1 miles. To start at Kelly’s Creek Road and end at Crusher Run Road.
Leveling/Topping.
Wayfarer Road: A total of .3 miles of new paving. To start at Hwy 246 and end at the dead end Of the road. New Paving; binder and topping.
Height’s lane: A total of .42 Miles. To start at Pinnacle Rd. and end at the .42 mile mark.
Leveling/Topping.
Blanche Place Road: A total of .15 miles. To start at Pinnacle Road and end at the .15 mile mark.
Levelling/Topping.
Timberlane Road: A total of .7 miles. To Start at Hwy 28 and end at the .7 mile mark.
Levelling/Topping.
Crowe Creek Road: A total of 2.1 miles. To start at Low Gap Road and end at the start of the Gravel road. Levelling/Topping
Ramey Road: A total of 1.15 Miles. To start at old Hwy 441 and end at The columns at Lakemont Highlands. Leveling/Topping.
Scott’s Creek Road: A total of .2 miles. To start at the .2 mile mark and end at Old Mill Road.
Leveling/Topping.
Old Mill Road: A total of .2 miles. To start at Scott’s Creek Road. and end at Hwy 76.
Leveling/Topping.
Rainwater Trail: A total of 1.15 miles. To start at Murray’s Cove Road and end at the dead-end sign.
Leveling/Topping
OV Jstus Road: A total of .55 miles. To Start at Betty’s Creek Road and end at the start of the gravel Road. Leveling/Topping
Talullah river Road: A total of .86 miles. To start at Persimmon Road and end at the .86 mile mark.
Leveling/Topping
FT Black Circle: A total of .4 miles. To start at State Line Road and end at State Line Road.
Leveling/Topping
Wolffork Church Road: A total of 1.0 miles. To start at North Wolffork Road and end at South Wolffork Road. Levelling/Topping.
Taylors Chappel Road: A total of 1.05 miles; .9 resurface and .15 new paving. To start at Wolffork Road and end just past the lake parking access. Resurface consisting of levelling and topping. New paving consisting of Binder and topping.
North Germany Mountan Road: A total of 1.05 miles, to start at Blackrock Mtn. Parkway and end At the gravel road. Consisting of deep mill patching, Levelling and topping.
John Beck Dockins Road: A total of .875 miles, to start at Hwy 441 and end at the .875 mile mark.
Consisting of Deep mill patching, Levelling and Topping.
Boggs Mountain Road: A total of 1.0 miles, to start at the intersection of Eastman Mtn Road and End at the intersection of Rickman Airfield Road, Consisting of levelling and Topping.
Leaning Chimney Drive: A total of .55 miles, to start at Old 441 and end at old 441, consisting of Levelling and topping.
Chechero Street: A total of 385 feet, to start at the intersection of Savanah Street and end at Wall Street, consisting of milling out to a depth of three inches and going back with two inches of 19 mm and one inch of 9.5 mm.
Toole Street: A total of .68 miles, to start at old 441 and end at the Toole Street intersection, Consisting of Levelling and Topping.
Rickman Street: A total of .39 miles, to start at new asphalt joint by Rabun County Bank and end at Warwoman road, consisting of milling out to a depth of three inches and going back with two inches of 19 mm and one inch of 9.5 mm.
Valley Street: A total of .25 miles, to start at the intersection of North Valley Street and end at Stornawy, consisting of deep mill patching, levelling and topping.
Warwoman Road: A total of .4 miles, to start at Hwy 441 and end at .4 mile mark, consisting of Deep mill patching, levelling and topping.
Clayburne Street: A total of .22 miles, to start at old 441 and end at the intersection of Smith Street, tying in all roads at the intersection, consisting of deep mill patching, levelling and topping.
CONTRACT TIME: November 6, 2026
Plans (if any) and Specifications for this work will be available for inspection by all interested parties at the Rabun County Commission office during regular office hours.
All work shall be performed in accordance with Plans, if any, Project Special Provisions and the 2001 edition of the Georgia Department of Transportation Standard Specifications and applicable Supplemental Specifications.
No bid proposals shall be withdrawn for a period of 30 days.
Payment will be made to the Contractor each calendar month based on the estimated work complete in place as prescribed by the Georgia Department of Transportation Standard Specifications. Retainage will be withheld as prescribed by the Project Special Provisions. Final payment of the amounts withheld will not be made until the project has been satisfactorily completed and accepted by the county.
A bid bond in an equal to five percent (5%) of the total bid will be required. Also, performance and payment bonds each in a sum equal to the full amount of the contract will be required.
The county reserves the right to reject any and all bids, to wave minor informalities, modify or re advertise the project.
RABUN COUNTY BOARD OF COMMISSIONERS
NOTE: There will be no requirement for a shuttle buggy. All notifications will be taken care of by Rabun County
NOTE: All Recycled Asphalt Product (RAP) will be taken to the Rabun County Road Department or the City of Clayton as directed by the Road Director .
*Daylight Working hours.
*Tripod or post mounted signs
BID PROPOSAL
THE RABUN COUNTY BOARD OF COMMISSIONERS WILL RECEIVE SEALED BIDS FOR FURNISHING ALL LABOR, EQUIPMENT, AND MATERIALS, UNLESS OTHERWISE SPECIFIED, NECESSARY FOR THE CONSTRUCTION OF THE FOLLOWING PROJECT. ALL WORK SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE 2001 EDITION OF THE GEORGIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND APPLICABLE SUPPLEMENTAL SPECIFICATIONS.
PROJECT NO. CR-58-01-26 (241)
DATE OF BID OPENING: March 16, 2 0 2 6
LOCATION: COUNTY COMMISSION MEETING ROOM, LOCATED ON THE SECOND FLOOR OF THE COUNTY COURTHOUSE, 25 COURTHOUSE SQUARE, SUITE 201, CLAYTON GA. 30525
BID PROPOSALS ISSUED TO:
ADDRESS:
SEALED PROPOSALS ONLY WILL BE ACCEPTED, AND PROJECT NUMBER SHOWN ABOVE SHOULD BE PLACED ON THE OUTSIDE OF THE ENVELOPE. BIDS WILL BE ACCEPTED UNTIL THE DATE AND TIME OF OPENING. THE COUNTY RESERVES THE RIGHT TO ACCEPT OR REJECT ANY OR ALL BIDS, DELETE INDIVIDUAL ITEMS, AND READVERTISE AND TO WAVE MINOR INFORMALITIES. NOTE: PERFORMANCE AND PAYMENT BONDS WILL BE REQUIRED FOR THIS PROJECT. ALSO, A PROPOSAL OF GUARANTY IN THE AMOUNT OF (5%) OF THE TOTAL BID WILL BE REQUIRED. · DO NOT UNSTAPLE THIS BOOKLET...ENTER ALL REQUIRED INFO EITHER BY HAND OR BY STAMP.
A bid bond in an equal to five percent (5%) of the total bid will be required. Also, performance and payment bonds each in a sum equal to the full amount of the contract will be required.
The county reserves the right to reject any and all bids, to wave minor informalities, modify or re advertise the project.
RABUN COUNTY BOARD OF COMMISSIONERS
NOTE: There will be no requirement for a shuttle buggy. All signs and notifications will be taken care of by Rabun County.
NOTE: Milling widths maximum 10 ft and minimum of 5 ft widths.
PROPOSAL GUARANTY: FIVE PERCENT (5%) OF TOTAL BID
PERFORMANCE AND PAYMENT BONDS EACH IN A SUM EQUAL TO THE FULL AMOUNT OF THE CONTRACT WILL BE REQUIRED FOR THIS PROJECT.
NO PROPOSAL SHALL BE WITHDRAWN FOR A PERIOD OF THIRTY (30) DAYS FROM DATE OF BID OPENING.
BIDDERS SHALL ENTER ALL UNIT PRICES, MAKE ALL EXTENSIONS AND TOTAL BID.
COMPLETION DATE: November 06, 2 0 2 6
NOTE ALL WORK ON THIS PROJECT SHALL BE IN ACCORDANCE WITH PLANS, SPECIAL PROVISIONS, AND THE 2001 EDITION OF THE GEORGIA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND APPLICABLE SUPPLEMENTAL SPECIFICATIONS.
CR-58-01-26(241)
Schedule Of Items for Eastman Mountain Road
| Item # |
| Description |
| Approx. Quant. |
And units
| Unit Price |
| Amount |
| Traffic Control to conform to MUTCD |
| 1 LS |
| 402 |
| Recycled asph cone. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width lOft max width |
0 tons
| 402 |
| 2.0 inch Recycled asphalt cone. 19 mm including bitum and H-Lime |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. |
And H-lime
1575 tons
| 402-3102 |
| .5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend l incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend l include bitum. Matl. And H lime |
2300 tons
| 413-1000 |
| Bituminous tack coat |
| 3500 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
| 4.6 miles |
| 652-2501 |
| 5 inch solid stripe, white |
| 4.6 miles |
Total Project Cost.................................$ _
CR-173-01-26(241)
Schedule Of Items for Screamer Mtn. Drive
| Item # |
| Description |
| Approx. Quant. |
And units
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1LS
| 402 |
| Recycled asph cone. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width Oft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm 0.G.I leveling without fiber incl. Bitum. Matl. |
And H-lime
850 tons
| 402-3102 |
| .5 inch recycled asphalt 9.5 mm superpave, Type II, Blend1 |
include bitum. Matl. And H Lime lime
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1900 tons
2.0 inch recycled asphalt 19mm include bitum. Matl. And H lime
Motorgrade, Water and Compact existing G.A.B
0 Miles
| 413-1000 |
| Bituminous tack coat |
| 2600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
| .0 miles |
652-2501
| 5 inch solid stripe, white |
| .0 miles |
Total Project Cost.................................$ _
CR-175-01-26(241)
Schedule Of Items for Curt Dotson Road
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
235 tons
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
340 tons
402-3102
2.0 inch recycled asphalt 19mm incl. Bitum Mtl. And H-lime
0 Tons
Motorgrade, Compact and water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 700 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
Total Project Cost……………………………$___________________
CR-200-01-26(241)
Schedule Of Items for Saddle Gap Rd.
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
700 tons
| 402-3102 |
| 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1060 tons
| 413-1000 |
| Bituminous tack coat |
| 2000 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-183-01-26(241)
Schedule Of Items for Crusher run Rd.
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
900 tons
| 402-3102 |
| .5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1375 tons
| 413-1000 |
| Bituminous tack coat |
| 1900 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
2.8 miles
| 652-2501 |
| 5 inch solid stripe, white |
.0 miles
CR-93-01-26(241)
Schedule Of Items for Ponderossa rd.
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 402-3102 |
| .5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1000 tons
| 413-1000 |
| Bituminous tack coat |
| 1600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
2.2 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-92-01-26(241)
Schedule Of Items for Wayfarer Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
155 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
225 tons
Motorgrade, Compact, and Water existing G.A.B
0 miles
| 413-1000 |
| Bituminous tack coat |
| 300 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-244-01-26(241)
Schedule Of Items for Heights ln.
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
270 tons
| 402-3102 |
| 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
400 tons
| 413-1000 |
| Bituminous tack coat |
| 1000 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-50-01-26(241)
Schedule Of Items for Blanche Place Rd
| Item |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inchRecycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
95 tons
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
1.5 inch recycled ashalt 9.5 mm superpave, Type II, Blend 1, Incl. Bitum Mtl, H-lime
145 tons
| 402-3102 |
| 1.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 413-1000 |
| Bituminous tack coat |
| 300 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-120-01-26(241)
Schedule Of Items for Timberlane Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
450 tons
| 402-3102 |
| 1.0 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl Bitum Mtl. And H-lime
675 tons
| 402-3102 |
| 2.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 413-1000 |
| Bituminous tack coat |
| 1250 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-80-01-26(241)
Schedule Of Items for Crow Creek Road
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 1295 tons |
| 402-3102 |
| 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1830 tons
| 413-1000 |
| Bituminous tack coat |
| 3000 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-209-01-26(241)
Schedule Of Items for Ramey Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inchRecycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
800 tons
| 402-3102 |
| 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl. Bitum Mtl. And H-Lime
1200 tons
| 402-3102 |
| 2.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
tons
| 413-1000 |
| Bituminous tack coat |
| 2700 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
2.3 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-195-01-26(241)
Schedule of Items for Scott’s Creek Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
80 tons
| 402-3102 |
| 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl Bitum Mtl. And H-Lime |
125 tons
| 402-3102 |
| 2.0 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 413-1000 |
| Bituminous tack coat |
| 200 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-195-01-26(241)
Schedule Of Items For Old Mill Road
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
100 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
150 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 200 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-00-01-26(241)
Schedule Of Items for Rainwater Trail
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1050 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1700 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-09-01-26(241)
Schedule Of Items OV Justus Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
375 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
430 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1500 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-231-01-26(241)
Schedule Of Items for Tallulah River Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
550 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
800 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1200 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-02-01-26(241)
Schedule Of Items for FT Black Circle
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| milling out existing asphalt 0 inch depth |
0 sq. yds.
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
225 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
335 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B miles
| 413-1000 |
| Bituminous tack coat |
| 600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-3-01-26(241)
Schedule Of Items for Wolffork Church Rd
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
575 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-42-01-26(241)
Schedule Of Items for Taylors Chapel
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
500 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
910 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
200 tons
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1800 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
CR-41-01-26(241)
Schedule Of Items for North Germany (on the Blackrock Mtn. side)
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
350 tons
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
360 tons
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1050 tons
2.0 inch recycled asphalt 19mm incl. Bitum Mtl. And H-lime
Motorgrade, Compact and water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1480 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
2.1 miles
| 652-2501 |
| 5 inch solid stripe, white |
2.1 miles
CR-2-01-26(241)
Schedule Of Items for John Beck Dockins
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
300 tons
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
375 tons
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
1015 tons
2.0 inch recycled asphalt 19mm incl. Bitum Mtl. And H-lime
Motorgrade, Compact and water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1450 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
1.75 miles
| 652-2501 |
| 5 inch solid stripe, white |
1.75 miles
Schedule Of Items for Boggs Mountain Road
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
565 tons
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
2.0 inch recycled asphalt 19mm incl. Bitum Mtl. And H-lime
Motorgrade, Compact and water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 1200 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
1 miles
| 652-2501 |
| 5 inch solid stripe, white |
1 miles
CR-211-01-26(241)
Schedule Of Items for Leaning Chimney Road (60%- County and 40% City)
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl. And H-lime |
280 tons
| 402-3102 |
| ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
400 tons
2.0 inch recycled asphalt 19mm incl. Bitum Mtl. And H-lime
Motorgrade, Compact and water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
City Street -01-26(241) Schedule Of Items for Chechero Street
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Mill to a depth of 3 inches. Go back with quantities listed below. |
1370 YDS2
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
95 tons
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
175 tons
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 175 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
.15 miles
| 652-2501 |
| 5 inch solid stripe, white |
.15 miles
City Street-02-26(241) Schedule Of Items for Toole Street
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
395 tons
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
575 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 780 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
City Street-03-01-26(241) Schedule Of Items for Rickman Street
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Mill to a depth of 3 inches. Go back with quantities listed below. |
5000 YDS-2
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
300 tons
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
600 tons
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 600 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
.8 miles
| 652-2501 |
| 5 inch solid stripe, white |
.8 miles
City Street-04-01-26(241) Schedule Of Items for Valley Street
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
70 tons
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
235 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 310 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
0 miles
| 652-2501 |
| 5 inch solid stripe, white |
0 miles
City Street-05-01-26(241) Schedule Of Items for Waroman Road
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
200 tons
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
160 tons
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
465 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 625 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
.8 miles
| 652-2501 |
| 5 inch solid stripe, white |
.8 miles
City Street-92-01-26(241) Schedule Of Items for Clayburne Street
| Item # |
| Description |
| Approx. Quant. And units |
| Unit Price |
| Amount |
Traffic Control to conform to MUTCD
1 LS
| 402 |
| Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width |
| 402 |
| 1.0 inch Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime |
| 0 tons |
| 402-3102 |
| 0.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
| 402-3102 |
| 1 inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H lime |
| 402-3102 |
| 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1 include bitum. Matl. And H lime |
265 tons
2.0inch recycled asphalt 19mm incl. Bitum Mtl, and H-lime
Motorgrade, Compact, and Water existing G.A.B
| 413-1000 |
| Bituminous tack coat |
| 350 Gal |
| 652-2502 |
| 5 inch solid stripe, yellow |
.45 miles
| 652-2501 |
| 5 inch solid stripe, white |
.45 miles
PROJECT NO. CR-58-01-26 (241)
CONTRACT EXECUTED ON BEHALF OF THE CONTRACTOR
THIS THE DAY OF YEAR OF _
BY: _ PRINTED NAME OF OFFICAL SIGNING THE CONTRACT _
CONTRACT EXECUTED ON BEHALF OF RABUN COUNTY COMMISIONERS:
| THIS THE | DAY OF | YEAR OF | BY:_____________________________________________________ | COMMISSION CHAIRMAN |
| WITNESS FOR THE COUNTY: | _ |
DATE CONTRACT ACCEPTED BY RABUN COUNTY BOC: _
ATTEST: County Administrator
PROJECT NO. RD-58-01-26(241)
BID PROPOSAL AND CONTRACT FORM
TO:
RABUN COUNTY BOARD OF COMMISIONERS 25 COURTHOUSE SQUARE SUITE 201
CLAYTON< GA 30525
I HAVE RECEIVED CONTRACT DOCUMENTS FOR WORK DESCRIBED IN THE FOLLOWING, AND I UNDERSTAND THAT THE QUANTITIES ARE APPROXIMATE ONLY AND ARE SUBJECT TO EITHER INCREASE OR DECREASE AND HEREBY PROPOSE TO PER FORM ANY INCREASE OR DECREASE IN THE QUANTITIES OF WORK OR EXTRA WORK ON THE BASIS PROVIDED FOR IN THE 2001 EDITION OF THE STANDARD SPECIFICATION OF THE GEORGIA DEPARTMENT OF TRANSPORTATION AND ANY APPLICABLE SUPPLEMENTAL SPECIFICATIONS.
THIS PROPOSAL, WHEN EXECUTED BY THE BIDDER AND ACEPTED BY THE CITY SHALL BECOME THE CONTRACT BETWEEN THE PARTIES TO PERFORM THE WORK SPECIFIED FOR THE AMOUNTS STATED, TAKING INTO CONSIDERATION ANY INCREASE OR DECREASE IN SPECIFIED QUANTITIES.
I PROPOSE TO FURNISH ALL MATERIAL, LABOR AND EQUIPMENT NECESSARY TO PERFORM THE FOLLOWING ITEMS OF WORK FOR THE UNIT PRICE INDICATED.
SPECIAL PROVISION
RABUN COUNTY
STATE OF GEORGIA
SUBSECTION 102.08 – PROPOSAL GUARANTY: No proposal will be considered unless it is accompanied by a Proposal Guaranty (Bid Bond) in the amount of five percent (5%) of the total bid. Each bid submitted must be accompanied by a separate Proposal Guaranty.
SUBSECTION 102.09 – DELIVERY OF PROPOSALS: Each proposal together with the Proposal Guaranty shall be in a sealed envelope so marked as to identify its contents without being opened. Proposals will be received until the time and date set in the Notice to Contractors for the opening and must be in the hands of the officials indicated by that time. Proposals received after the time established for opening of bids will be returned unopened to the Bidder.
SUBSECTION 103.02- AWARD OF CONTRACT: If a contract is awarded, it will be awarded to the lowest reliable bidder whose Proposal shall have met all the prescribed requirements. The Contract will be awarded, if at all, with 30 calendar days after the opening of the Proposals.
SUBSECTION 103.03- CANCELLATION OF AWARD: The County reserves the right to cancel the Award of any Contract at any time before the execution of said Contract by all parties without any liability against the county.
SUBSECTION 103.04- RETURN OF PROPOSAL GUARANTY: All Proposal Guaranties except that of the low Bidder will be returned immediately following the Award of the Contract. The Guaranty of the successful Bidder to whom the Award is made will be retained until the Contract and the Contract Bond has been signed and approved.
SUBSECTION 103.05- REQUIREMENTS OF PERFORMANCE AND PAYMENT BONDS: At the time of the Execution of the Contract, and as part thereof, the successful Bidder shall furnish Performance and Payment Bonds Each in a sum equal to the full amount of the Contract. The Bonds shall be executed by the Contractor and a Surety Company acceptable to the County and authorized to do business in the State of Georgia. In the event the Bond is made by an out-of-state agent, it shall be countersigned by a Georgia resident agent in accordance with the laws of Georgia.
ALL BIDDERS MUST FURNISH PROOF OF LIABILITY INSURANCE AS WELL AS WORKERS COMPENSATION
AS REQUIRED BY STATE STATUTES.
Rabun County will finance the project as follows: Payment will be made to the contractor each calendar month Based on the estimated amount of work complete in place as prescribed by the current edition of the Georgia Dept Of Transportation Standard Specifications.
SUBSECTION 108.02 – NOTICE TO PROCEED: The work shall begin within ten (10) days after notification to begin work by the County and shall be carried through to completion without unreasonable delays and without supervision of the work unless authorized in writing by the County. If there are unreasonable delays or unauthorized suspensions of work, the County reserves the right to charge the Contractor, not as a penalty, but as liquidated damages, as prescribed by the current edition of the GDOT Standard Specifications.
LIABILITY INSURANCE
The limits of liability for the Insurance required by the General Conditions shall not be less than the following amounts:
1. Workers Compensation:
· State Statutory
· Applicable Federal Statutory
· Employer’s Liability $1 Million
1. Comprehensive General Liability (including contractual Liability, Premises-Operations;
Independent Contractor’s Protective; Products Liability – Completed Operation; Broad Form Property Damage):
· General Aggregate (Except Products-Completed Operations) $2 Million
· Products – Completed Operations Aggregate $1 Million
· Personal and Advertising Injury (per Person/Organization) $1 Million
· Each Occurrence (Bodily Injury) $25,000
· Each Occurrence (Property Damage) $50,000
· Excess or Umbrella Liability $3 Million
· General Aggregate $3 Million
· Each Occurrence $3 Million
NOTICE TO BIDDER: Certificates of Insurance shall be submitted with the Contractor’s Bid.
SECTION 107 LEGAL REGULATIONS AND RESPONSIBILITY TO THE PUBLIC
Delete Sub-Section 107.15 and Substitute the following:
107.15 RESPONSIBILITY FOR DAMAGE CLAIMS: The Contractor shall indemnify and save harmless to the County, its officers and employees, from all suits, actions, or claims of any character brought because of any injuries or damage received or sustained by any person, persons, or property on account of the operations of the said Contractor; or on account of or in consequence of any neglect in safe-guarding The WORK; or through use of unacceptable materials in construction The Work; or because of any act of omission, neglect or misconduct of said Contractor; or because of any claims or amount recovered from any infringements of patent, trademark, or copyright; or from any claims or amounts arising or recovered under the “Workmen’s Compensation Act “, or any other law, ordinance, order or decree; and so much of the money due the said Contractor under and by virtue of his Contract as maybe considered necessary by the County for such Purpose may be withheld for use of the County; or, in case no money is due, his surety may be held until such suit or suits, action or actions, claim or claims for injuries or damages as aforesaid shall have been settled and suitable evidence to that effect furnished to the County; except that money due the Contractor will not be withheld when the Contractor produces satisfactory evidence that he is adequately protected by public liability and property damage insurance.
RETAINAGE:
Retainage will be withheld at the rate of five percent (5%) of the monetary value of the work completed Until the project has reached fifty percent (50%) complete. At that time the retainage may be reduced to two- and one-half percent (2 ½%) if the status of the work completed is satisfactory and approved by the Engineer.
Final Payment of the amounts withheld will not be made until the project has been satisfactorily completed and accepted by the County.
SECTION 150 - Traffic Control during Construction:
Traffic Control during Construction shall be the sole responsibility of the Contractor:
All Traffic Control Devices used during construction shall be in full compliance with the current edition of the Manual for Uniform Traffic Control Devices (MUTCD)
Pilot Vehicles shall be used to control traffic through the construction area at all times unless other methods are approved by the Engineer.
All Construction Signage as required by the MUTCD shall be in place before any work that might interfere with the movement of traffic is started.
Tripod or post mounted signs
TYPICAL RESURFACING SECTION
REQUIRED:
RESURFACE ROADWAY WITH:165LBS/SQYD OF 9.5MM SP.
RESURFACE DRIVEWAYS AND INTERSECTIONS WITH OTHER
ROADWAYS WITH: 55 LBS/SQYD OF 9.5MM SP.
AFTER RESURFACING IS COMPLETE THE CONTRACTOR SHALL BE REQUIRED TO PROVIDE A SMOOTH, SAFE AND WELL DRAINED TRANSITION TO AND FROM PUBLIC ROADS AND DRIVEWAYS. THIS TRANSITION SHALL BE A MINIMUM OF THREE (3) FEET, HOWEVER ADDITIONAL WIDTH MAY BE NECESSARY IN SOME INSTANCES.
NO CHANGES SHALL BE MADE TO PAVEMENT MARKING CURRENTLY ON ROADWAY DURING APPLICATION OF PAINT.
Section 402- Hot Mix Recycled Asphaltic Concrete
402.1 General Description
This work includes producing and placing hot mix recycled asphaltic concrete that incorporates reclaimed Asphalt pavement (RAP), reclaimed asphalt shingles (RAS), virgin aggregate, hydrated lime and neat Asphalt cement.
402.1.01 Definitions
General Provisions 101 through 150
402.1.02 Related References
A. Standard Specifications Section 400 – Hot Mix Asphaltic Concrete Construction
Section 800- - Coarse Aggregate
Section 828- - Hot Mix Asphaltic Concrete Mixtures
B. Referenced Documents
Guidelines for RAP Stockpile Approval
402.1.03 Submittals
A. Certified Weight Tickets
Notify the Engineer before removing RAP from a stockpile that belongs to the Department. Submit to the Engineer the certified weight tickets of materials removed from the stockpile.
B. Affidavit
Submit to the laboratory an affidavit stating the sources of stockpiled materials to be used on a State Project. Include the following information in the letter:
· State project number
· Location from which the material was removed
· Approximate removal dates
· Mix types removed and the estimated quantity of each type in the stockpiles
· Other available information about the stockpiled material such as percentage of local sand in the RAP.
Obtain specific approval from the laboratory to use RAP or RAS stockpiles.
Adhere to Guidelines for RAP Stockpile Approval
402.2 Materials
A. RAP Material Composition Note: The location of Department RAP material stockpiles will be given on the Plans.
Do not use RAP materials that contain alluvial gravel or local sand in any mixture placed on interstate projects except for mixtures used in shoulder construction. When used in shoulder construction, limit RAP containing local sand or alluvial gravel so that the sand or gravel contributes no more than 20% of the total aggregate portion of the mix.
1. RAP Percentage For non-interstate projects, limit the percentage of RAP allowed in recycled mixes so that the overall amount of alluvial gravel, local sand, and Group I material in the RAP will be determined through petrographic analysis or available records.
Rap furnished to the Contractor but not used in the work remains the Contractor’s property.
Section 402—Hot Mix Recycled Asphaltic Concrete
Rap used in the recycled mixtures for mainline or ramps (if applicable) may make up from 0 to 40 percent of the mixture depending on the amount of RAP available, the production facilities, and whether the mixture meets the requirements in Section 828.
The maximum ration of RAP material to the recycled mixture is 40 percent for continuous mix type plants and 25 percent for batch type plants
1. Process RAP Material
Process RAP material to be used in the recycled mixture so that 100 percent will pass the 2in (50mm) sieve. Additional crushing and sizing may be required if the RAP aggregate exceeds the maximum sieve size for the mix type as shown in Section 828. Obtain representative materials from the RAP stockpile for the mix design.
B. RAS Material
RAS materials are produced as a by-product of manufacturing roofing shingles and/or discarded shingle scrap from the reroofing of buildings.
1. Limit the amount of RAS material used in the recycled mixture to no greater than 5 percent of the total mixture weight.
2. Shred the RAS material before incorporating it into the mix to ensure that 100 percent of the shredded pieces are less than ½ in (12.5 mm) in any dimension.
3. Remove all foreign materials such as paper, roofing nails, wood or metal flashing.
4. Provide test results for Bulk Sample Analysis, known as Polarized Light Microscopy, if post-consumer shingles are used to certify the RAS material is free of asbestos. Test stockpiles at the rate of one test per 1000 tons (megagrams) prior to processing.
Other than as specifically stated in this Subsection, ensure that RAS material is used according to the same requirements as described for RAP material.
C. Asphaltic Concrete Removed from an Existing Roadway
Asphaltic concrete removed from an existing roadway becomes the Contractor’s property unless specified otherwise on the Plans. RAP material retained by the Department is designated on the Plans, and the RAP shall be stockpiled at the location specified on the Plans.
D. Local Sand and Group I Material in RAP
Use of local sand in recycled mixes is restricted as stipulated in Section 828 for the Project. However, RAP which contains local sand may be used in surface and intermediate layers of non-
E. Asphalt Cement
Using laboratory evaluations, the Department will determine the asphalt cement grade to be used in the recycled mixture. The asphalt cement shall meet the requirements of Section 820.
When the asphalt cement is blended with asphalt cement recovered from the RAP material and after tests on residue form thin film oven tests, the asphalt cement shall have a viscosity of 6000 to 16,000 poises (600 to 1600 Pa) or as approved by the Engineer. Recover asphalt cement from the recycled mixture to verify that the specified viscosity is being met.
If the Engineer determines during construction that the selected asphalt cement grade is not performing satisfactorily, the Department may change the asphalt cement grade in the mixture, with no change in the Contract Unit Price.
F. Recycled Mixture
The recycled mixture shall be a homogenous mixture of RAP or RAS material, virgin aggregate, hydrated lime, and neat asphalt cement. Ensure that the mixture conforms to an approved mixture design outlined in Section 828.
402.2.01 Delivery, Storage, and Handling
Separate the stockpiles by Project sources and by Group I and Group II aggregate types.
Erect a slope on each stockpile to identify the source(s).
If RAP material from different project sources becomes intermixed in a stockpile, only use those materials when approved by the laboratory.
The Department may reject by visual inspection stockpiles that are not clean and free of foreign materials.
402.3 Construction Requirements
402.3.01 Personnel
General Provisions 101 through 150
402.3.02 Equipment
A. Hot Mix Plant
Use a hot mix plant for the recycling process with necessary modifications approved by the Engineer to process recycled material. Design, equip, and operate the plant so that the proportioning, heating, and mixing yields a uniform final mixture within the job…