Bid Packet 2025 CR_217_01_25.pdf
PDF 587 KB Posted
- Attached to
- Roads Project CR-217-01-25(241)
- Solicitation number
- PE-77100-NONST-2025-000000003
- Issued by
- Pickens County, Georgia
About this file
This is a bid solicitation packet from Rabun County, Georgia for Project No. CR-217-01-25(241) seeking contractors for road construction work including deep mill patching, leveling/topping and new paving on fourteen county roads and four city streets totaling 16.195 miles. Sealed bids are due April 1, 2025 at 9:00am at the County Commission Conference Room in Clayton, Georgia. The project completion date is November 7, 2025. The work includes asphalt patching, leveling and topping on various roads including Bridgecreek Road (3.6 miles), Patterson Gap Road (2.2 miles), Big Creek Road (0.3 miles), Plum Orchard Road (1.1 miles), Cross Street (0.5 miles), Pinnacle Road (2.4 miles) and others as specified.
The county will provide a 5% local bidder preference up to $50,000 for qualified bidders who maintain a place of business or inventory in Rabun County. A bid bond of 5% of the total bid is required, along with performance and payment bonds equal to the full contract amount. Contractors must provide proof of liability insurance including workers compensation, with specified minimum coverage amounts. Retainage will be withheld at 5% until the project reaches 50% completion, then may be reduced to 2.5% if work is satisfactory. The project must follow Georgia Department of Transportation 2001 Standard Specifications and applicable supplemental specifications. All recycled asphalt product (RAP) must be delivered to the Rabun County Road Department or City of Clayton as directed.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADVERTISEMENT FOR BIDS
RABUN COUNTY
STATE OF GEORGIA
Sealed proposals for furnishing all labor, materials, equipment, permits and other things necessary for the construction of the following project will be received by the Rabun County Board of Commissioners in the County Commission Conference Room located on the 2nd floor of the County Courthouse, Clayton, Georgia 9:00 am on April 01, 2025 at which time all bids received by the prescribed time and date will be publicly opened and read aloud. Any bids proposals received after the time shown above will not be accepted.
In addition, the Board of Commissioners of Rabun County reserves the right to show preference to local bidders in the purchase of supplies, equipment and services. The amount shall not exceed five (5%) of the amount bid or quoted and I or fifty thousand dollars ($50,000), whichever is less.
A "local bidder" is defined as an individual or business that maintains a place of business or maintains an inventory of merchandise and I or equipment in Rabun County is licensed by Rabun County and I or the State of Georgia, if required, and is subject to Rabun County real estate and or personal property taxes. Any local bidder in default on payment of any County or State tax license shall not be eligible to receive preference until all taxes or licenses due are paid. Notice of preference availability shall be included in the invitation to bid and in all advertisements.
PROJECT NO. CR-217-01-25(241) RABUN COUNTY
PROJECT DESCRIPTION:
A total of 16.195 miles of Deep Mill Patching, Leveling/Topping and new paving to be on fourteen separate County roads and four City Streets.
Bridgecreek road: A total of 3.6 miles. To start at the intersection of Davis Gap Rd. and end at Covecrest Rd. Deep Mill Patching, Leveling/Topping.
Patterson Gap road: A total of 2.2 miles. To start at the intersection of Persimmon Rd. and end at The Forest Service Rd. Deep Mill Patching, Leveling/Topping.
Big Creek Road: A total of .3 miles. To start at the intersection of Betty’s Creek Rd. and end at the North Carolina State Line. Leveling/Topping.
Plum Orchard Rd: A total of 1.1 miles. To start at the intersection of Persimmon Road and end at the 1.1 mile mark, at the big bridge. Deep Mill Patching, Leveling/Topping.
Cross Street: A total of .5 miles. To start at Down Home Lane and end at existing asphalt, just below Foxfire. New Paving, Binder and Topping.
Pinnacle Road: A total of 2.4 miles. To start at Hwy 441 and end at Warwoman Rd. Deep Mill Patching, Leveling/Topping
Kelcy Mtn. Road: A total of .2 miles. To start at Bald Mtn Rd. and end at the dead end of the road.
Leveling/Topping.
Hale Ridge Road: A total of .8 Miles. To start at Bald Mtn Rd. and end at the start of the Gravel Road. Leveling/Topping.
Meeting House Mtn. Road: A total of .4 miles of new paving. To start at existing asphalt just before 911 #3142, and end just past 911 #2806. New paving, Binder and Topping
Blalock Goldmine Road: A total of .6 miles of new paving. To Start at 911 #2755 and end at the .6 mile mark. New Paving, Binder and Topping.
Stekoa Falls Road: A total of 1.1 miles. To start at Hwy 441 and end at Hwy 76 east. Leveling/Topping.
Clois Road: A total of .525 Miles. To start at Stekoa Falls Rd. and end at the .525 mile mark.
Leveling/Topping.
Holcomb Lane: A total of .25 miles. To start at Stekoa Falls Rd. and end at Clois Rd. Leveling/Topping.
Luther Watts Road: A total of .6 miles. To start at Stekoa Falls Rd. and end at the .6 mile mark, existing gravel Driveways. Leveling/Topping.
Forester Street: A total of .27 miles. Starting a Marsengill Drive and ending at Dunlap Street.
Deep Mill Patching, Leveling/Topping
Valley Street: A total of .5 miles. To Start at Main Street and end at the intersection of North Valley street. Deep Mill Patching, Leveling/Topping
Marsengill Drive: A total of .65 miles. To start at Shady Side Drive and end at Number 10 lane.
Deep Mill Patching, Leveling/Topping
Hiawassee Street: A total of .2 miles. To start at Main Street and end at Hwy 76 West.
Deep Mill Patching, Leveling/Topping
CONTRACT TIME: November 7, 2025
Plans (if any) and Specifications for this work will be available for inspection by all interested parties at the Rabun County Commission office during regular office hours.
All work shall be performed in accordance with Plans, if any, Project Special Provisions and the 2001 edition of the Georgia Department of Transportation Standard Specifications and applicable Supplemental Specifications.
No bid proposals shall be withdrawn for a period of 30 days.
Payment will be made to the Contractor each calendar month based on the estimated work complete in place as prescribed by the Georgia Department of Transportation Standard Specifications. Retainage will be withheld as prescribed by the Project Special Provisions. Final payment of the amounts withheld will not be made until the project has been satisfactorily completed and accepted by the county.
A bid bond in an equal to five percent (5%) of the total bid will be required. Also, performance and payment bonds each in a sum equal to the full amount of the contract will be required.
The county reserves the right to reject any and all bids, to wave minor informalities, modify or re advertise the project.
RABUN COUNTY BOARD OF COMMISSIONERS
NOTE: There will be no requirement for a shuttle buggy. All signs and notifications will be taken care of by Rabun County
NOTE: All Recycled Asphalt Product (RAP) will be taken to the Rabun County Road Department or the City of Clayton as directed by the Road Director .
BID PROPOSAL
THE RABUN COUNTY BOARD OF COMMISSIONERS WILL RECEIVE
SEALED BIDS FOR FURNISHING ALL LABOR, EQUIPMENT, AND
MATERIALS, UNLESS OTHERWISE SPECIFIED, NECESSARY FOR
THE CONSTRUCTION OF THE FOLLOWING PROJECT. ALL WORK
SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THE 2001
EDITION OF THE GEORGIA DEPARTMENT OF TRANSPORTATION
STANDARD SPECIFICATIONS AND APPLICABLE SUPPLEMENTAL
SPECIFICATIONS.
PROJECT NO. CR-217-01-25(241)
DATE OF BID OPENING: April 01, 2 0 2 5
LOCATION: COUNTY COMMISSION MEETING ROOM, LOCATED ON THE SECOND
FLOOR OF THE COUNTY COURTHOUSE, 25 COURTHOUSE SQUARE, SUITE 201,
CLAYTON GA. 30525
BID PROPOSALS ISSUED TO:
ADDRESS:
SEALED PROPOSALS ONLY WILL BE ACCEPTED, AND PROJECT
NUMBER SHOWN ABOVE SHOULD BE PLACED ON THE OUTSIDE
OF THE ENVELOPE. BIDS WILL BE ACCEPTED UNTIL THE DATE
AND TIME OF OPENING. THE COUNTY RESERVES THE RIGHT TO
ACCEPT OR REJECT ANY OR ALL BIDS, DELETE INDIVIDUAL
ITEMS, AND READVERTISE AND TO WAVE MINOR INFORMALITIES.
NOTE: PERFORMANCE AND PAYMENT BONDS WILL BE REQUIRED FOR THIS
PROJECT. ALSO, A PROPOSAL OF GUARANTY IN THE AMOUNT OF (5%) OF THE
TOTAL BID WILL BE REQUIRED. ·
DO NOT UNSTAPLE THIS BOOKLET...ENTER ALL REQUIRED INFO EITHER BY HAND
OR BY STAMP.
A bid bond in an equal to five percent (5%) of the total bid will be required. Also, performance and payment bonds each in a sum equal to the full amount of the contract will be required.
The county reserves the right to reject any and all bids, to wave minor informalities, modify or re advertise the project.
RABUN COUNTY BOARD OF COMMISSIONERS
NOTE: There will be no requirement for a shuttle buggy. All signs and notifications will be taken care of by Rabun County.
NOTE: Milling widths maximum 10 f t and minimum of 5 ft widths.
PROPOSAL GUARANTY: FIVE PERCENT (5%) OF TOTAL BID
PERFORMANCE AND PAYMENT BONDS EACH IN A SUM EQUAL TO
THE FULL AMOUNT OF THE CONTRACT WILL BE REQUIRED FOR THIS
PROJECT.
NO PROPOSAL SHALL BE WITHDRAWN FOR A PERIOD OF THIRTY (30)
DAYS FROM DATE OF BID OPENING.
BIDDERS SHALL ENTER ALL UNIT PRICES, MAKE ALL EXTENSIONS AND
TOTAL BID.
COMPLETION DATE: November 07, 2 0 2 5
NOTE ALL WORK ON THIS PROJECT SHALL BE IN ACCORDANCE WITH
PLANS, SPECIAL PROVISIONS, AND THE 2001 EDITION OF THE GEORGIA
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS AND
APPLICABLE SUPPLEMENTAL SPECIFICATIONS.
CR-217-01-25(241)
Schedule Of Items for Bridge creek Road
Item # Description Approx. Quant.
And units
Unit Price Amount
Traffic Control to conform to
MUTCD
1 LS
402 Recycled asph cone. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width lOft max width
750 tons
402 2.0 inch Recycled asphalt cone. 19.5 mm including bitum and H-Lime
0 tons
402 1.0 inch Recycled Asphalt
Concrete 12.5mm O.G.I leveling without fiber incl.
Bitum. Matl.
And H-lime
402-3102 .5 inch 9.5 mm superpave
Recycled asphalt leveling, Type
I Blend l incl. bitum. matl. and
H lime
1400 tons
402-3102 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend l include bitum. Matl. And H lime
4200 tons
413-1000 Bituminous tack coat 5250 Gal
652-2502 5 inch solid stripe, yellow 7.2 miles
652-2501 5 inch solid stripe, white 7.2 miles
Total Project Cost.................................$ _
CR-100-01-25(241)
Schedule Of Items for Meeting House Mtn.
Unit Price Amount
Traffic Control to conform to
MUTCD
1LS
402 Recycled asph cone. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width Oft max width
Concrete 12.5mm 0.G.I leveling without fiber incl.
Bitum. Matl.
402-3102 .5 inch recycled asphalt 9.5 mm superpave, Type II, Blend1 include bitum. Matl. And H
Lime lime mm superpave, Type II, Blend 1
350 tons
2.0 inch recycled asphalt 19.5 mm include bitum. Matl. And H
475 tons
Motorgrade, Water and
Compact existing G.A.B
.4 Miles
413-1000 Bituminous tack coat 800 Gal
652-2502 5 inch solid stripe, yellow .4 miles
652-2501 5 inch solid stripe, white .0 miles
Total Project Cost.................................$ _
CR-102-01-25(241)
Schedule Of Items for Blalock Goldmine Road
Unit Price Amount
1 LS
402 Recycled asph conc. 19mm patching incl bitum and H-lime and milling 3 inch depth 4-5 foot min width 10ft max width
Concrete 12.5mm O.G.I leveling without fiber incl. Bitum. Matl.
402-3102 ½ inch 9.5 mm superpave Recycled asphalt leveling, Type I Blend 1 incl. bitum. matl. and H
650 tons
402-3102
2.0 inch recycled asphalt 19.5 mm incl. Bitum Mtl. And H-lime
850 Tons
Motorgrade, Compact and water existing G.A.B
.6 Miles
413-1000 Bituminous tack coat 1000 Gal
652-2502 5 inch solid stripe, yellow
1.2 miles
652-2501 5 inch solid stripe, white
0 miles
Total Project Cost……………………………$___________________
CR-222-01-25(241)
Schedule Of Items for Patterson Gap Rd.
Unit Price Amount patching incl bitum and H-lime
402-3102 0.5 inch 9.5 mm superpave
725 tons
402-3102 1.0 inch recycled asphalt 9.5
2200 tons
413-1000 Bituminous tack coat 3300 Gal
4.4 miles
CR-34-01-25(241)
Schedule Of Items for Big Creek Rd.
Unit Price Amount patching incl bitum and H-lime
225 tons
340 tons
413-1000 Bituminous tack coat 325 Gal
.6 miles
.0 miles
CR-86-01-25(241)
Schedule Of Items For Plum Orchard
Unit Price Amount patching incl bitum and H-lime
250 tons
Concrete 12.5mm O.G.I. leveling
450 tons
1150 tons
413-1000 Bituminous tack coat 1500 Gal
2.2 miles
CR-41-01-25(241)
Schedule Of Items For Cross Street
Unit Price Amount patching incl bitum and H-lime without fiber incl. Bitum. Matl.
And H-lime
0 tons
402-3102 0.5 inch recycled asphalt 9.5
402-3102 1 inch 9.5 mm superpave
2.0inch recycled asphalt 19.5 mm incl. Bitum Mtl, and H-lime
625 tons
Motorgrade, Compact, and Water existing G.A.B
.5 miles
413-1000 Bituminous tack coat 750 Gal
1.0 miles
CR-49-01-25(241)
Schedule Of Items For Pinnacle Road
Unit Price Amount patching incl bitum and H-lime
800 tons
2400 tons
413-1000 Bituminous tack coat 3500 Gal
4.8 miles
CR-222-01-25(241)
Schedule Of Items For Kelsey Mtn. Road:
Unit Price Amount patching incl bitum and H-lime
402 1.0 inchRecycled Asphalt
45 tons
402-3102 ½ inch 9.5 mm superpave
1.5 inch recycled ashalt 9.5 mm superpave, Type II, Blend 1, Incl.
Bitum Mtl, H-lime
65 tons
413-1000 Bituminous tack coat 0 Gal
CR-227-01-25(241)
Schedule Of Items For Hale Ridge Road:
Unit Price Amount patching incl bitum and H-lime
430 tons
402-3102 1.0 inch 9.5 mm superpave
1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl
Bitum Mtl. And H-lime
640 tons
402-3102 2.0 inch recycled asphalt 9.5
413-1000 Bituminous tack coat 1100 Gal
CR-25-01-25(241)
Schedule Of Items For Stekoa Falls Road
Unit Price Amount
LS
patching incl bitum and H-lime
402 Recycled Asphalt Concrete 12.5mm O.G.I. leveling without fiber incl. Bitum. Matl. And H-lime
0 tons
402-3102 0.5 inch 9.5 mm superpave Recycled asphalt leveling, Type I
375 tons
1100 tons
413-1000 Bituminous tack coat 1600 Gal
2.2 miles
CR-168-01-25(241)
Schedule Of Items For Clois Road:
Unit Price Amount patching incl bitum and H-lime
402 1.0 inchRecycled Asphalt
270 tons
1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl.
Bitum Mtl. And H-Lime
400 tons tons
CR-32-01-25(241)
Schedule of Items for Holcomb lane:
Unit Price Amount patching incl bitum and H-lime
120 tons
402-3102 1.5 inch recycled asphalt 9.5 mm superpave, Type II, Blend 1, Incl
Bitum Mtl. And H-Lime
170 tons
413-1000 Bituminous tack coat 300 Gal
CR-33-01-25(241)
Schedule Of Items For Luther Watts Road
Unit Price Amount patching incl bitum and H-lime
260 tons
402-3102 0.5 inch recycled asphalt 9.5
375 tons
413-1000 Bituminous tack coat 700 Gal
City of Clayton Schedule Of Items For Forester Street
Unit Price Amount patching incl bitum and H-lime
85 tons
402-3102 0.5 inch recycled asphalt 9.5
90 tons
260 tons
413-1000 Bituminous tack coat 350 Gal
Schedule Of Items Valley Street
Unit Price Amount patching incl bitum and H-lime
200 tons without fiber incl. Bitum. Matl.
And H-lime
0 tons
402-3102 0.5 inch recycled asphalt 9.5
175 tons
1.0 miles
Schedule Of Items For Marsengill Street
Unit Price Amount patching incl bitum and H-lime
200 tons without fiber incl. Bitum. Matl.
And H-lime
0 tons
402-3102 0.5 inch recycled asphalt 9.5
215 tons
575 tons
413-1000 Bituminous tack coat 1000 Gal
1.3 miles
Schedule Of Items For Hiawasee Street
Unit Price Amount
402 milling out existing asphalt 5 inch depth
3055 sq. yds.
without fiber incl. Bitum. Matl.
And H-lime
0 tons
402-3102 0.5 inch recycled asphalt 9.5
180 tons miles
0.4 miles
0.4 miles
**** You will be Milling out 5 inches and putting back 3 inches****
CR-217-01-25(241)
PROJECT NO. CR-217-01-25 (241)
CONTRACT EXECUTED ON BEHALF OF THE CONTRACTOR
THIS THE DAY OF YEAR OF _
BY: _
PRINTED NAME OF OFFICAL SIGNING THE CONTRACT
CONTRACT EXECUTED ON BEHALF OF RABUN COUNTY COMMISIONERS:
THIS THE DAY OF YEAR OF
BY:_____________________________________________________ COMMISSION CHAIRMAN
WITNESS FOR THE COUNTY: _
DATE CONTRACT ACCEPTED BY RABUN COUNTY BOC: _
ATTEST: County Administrator
PROJECT NO. RD-217-01-25(241)
BID PROPOSAL AND CONTRACT FORM
TO:
RABUN COUNTY BOARD OF COMMISIONERS
25 COURTHOUSE SQUARE SUITE 201
CLAYTON< GA 30525
I HAVE RECEIVED CONTRACT DOCUMENTS FOR WORK DESCRIBED IN THE
FOLLOWING, AND I UNDERSTAND THAT THE QUANTITIES ARE APPROXIMATE
ONLY AND ARE SUBJECT TO EITHER INCREASE OR DECREASE AND HEREBY
PROPOSE TO PER FORM ANY INCREASE OR DECREASE IN THE QUANTITIES OF
WORK OR EXTRA WORK ON THE BASIS PROVIDED FOR IN THE 2001 EDITION OF
THE STANDARD SPECIFICATION OF THE GEORGIA DEPARTMENT OF
TRANSPORTATION AND ANY APPLICABLE SUPPLEMENTAL SPECIFICATIONS.
THIS PROPOSAL, WHEN EXECUTED BY THE BIDDER AND ACEPTED BY THE
CITY SHALL BECOME THE CONTRACT BETWEEN THE PARTIES TO PERFORM
THE WORK SPECIFIED FOR THE AMOUNTS STATED, TAKING INTO
CONSIDERATION ANY INCREASE OR DECREASE IN SPECIFIED QUANTITIES.
I PROPOSE TO FURNISH ALL MATERIAL, LABOR AND EQUIPMENT NECESSARY
TO PERFORM THE FOLLOWING ITEMS OF WORK FOR THE UNIT PRICE
INDICATED.
SPECIAL PROVISION
SUBSECTION 102.08 – PROPOSAL GUARANTY: No proposal will be considered unless it is accompanied by a Proposal Guaranty (Bid Bond) in the amount of five percent (5%) of the total bid. Each bid submitted must be accompanied by a separate Proposal Guaranty.
SUBSECTION 102.09 – DELIVERY OF PROPOSALS: Each proposal together with the Proposal Guaranty shall be in a sealed envelope so marked as to identify its contents without being opened. Proposals will be received until the time and date set in the Notice to Contractors for the opening and must be in the hands of the officials indicated by that time. Proposals received after the time established for opening of bids will be returned unopened to the Bidder.
SUBSECTION 103.02- AWARD OF CONTRACT: If a contract is awarded, it will be awarded to the lowest reliable bidder whose Proposal shall have met all the prescribed requirements. The Contract will be awarded, if at all, with 30 calendar days after the opening of the Proposals.
SUBSECTION 103.03- CANCELLATION OF AWARD: The County reserves the right to cancel the Award of any Contract at any time before the execution of said Contract by all parties without any liability against the county.
SUBSECTION 103.04- RETURN OF PROPOSAL GUARANTY: All Proposal Guaranties except that of the low Bidder will be returned immediately following the Award of the Contract. The Guaranty of the successful Bidder to whom the Award is made will be retained until the Contract and the Contract Bond has been signed and approved.
SUBSECTION 103.05- REQUIREMENTS OF PERFORMANCE AND PAYMENT BONDS: At the time of the Execution of the Contract, and as part thereof, the successful Bidder shall furnish Performance and Payment Bonds Each in a sum equal to the full amount of the Contract. The Bonds shall be executed by the Contractor and a Surety Company acceptable to the County and authorized to do business in the State of Georgia. In the event the Bond is made by an out-of-state agent, it shall be countersigned by a Georgia resident agent in accordance with the laws of Georgia.
ALL BIDDERS MUST FURNISH PROOF OF LIABILITY INSURANCE AS WELL AS WORKERS COMPENSATION
AS REQUIRED BY STATE STATUTES.
Rabun County will finance the project as follows: Payment will be made to the contractor each calendar month Based on the estimated amount of work complete in place as prescribed by the current edition of the Georgia Dept Of Transportation Standard Specifications.
SUBSECTION 108.02 – NOTICE TO PROCEED: The work shall begin within ten (10) days after notification to begin work by the County and shall be carried through to completion without unreasonable delays and without supervision of the work unless authorized in writing by the County. If there are unreasonable delays or unauthorized suspensions of work, the County reserves the right to charge the Contractor, not as a penalty, but as liquidated damages, as prescribed by the current edition of the GDOT Standard Specifications.
LIABILITY INSURANCE
The limits of liability for the Insurance required by the General Conditions shall not be less than the following amounts:
A. Workers Compensation:
• State Statutory
• Applicable Federal Statutory
• Employer’s Liability $1 Million
B. Comprehensive General Liability (including contractual Liability, Premises-Operations;
Independent Contractor’s Protective; Products Liability – Completed Operation; Broad Form Property Damage):
• General Aggregate (Except Products-Completed Operations) $2 Million
• Products – Completed Operations Aggregate $1 Million
• Personal and Advertising Injury (per Person/Organization) $1 Million
• Each Occurrence (Bodily Injury) $25,000
• Each Occurrence (Property Damage) $50,000
• Excess or Umbrella Liability $3 Million o General Aggregate $3 Million o Each Occurrence $3 Million
NOTICE TO BIDDER: Certificates of Insurance shall be submitted with the Contractor’s Bid.
SECTION 107 LEGAL REGULATIONS AND RESPONSIBILITY TO THE PUBLIC
Delete Sub-Section 107.15 and Substitute the following:
107.15 RESPONSIBILITY FOR DAMAGE CLAIMS: The Contractor shall indemnify and save harmless to the County, its officers and employees, from all suits, actions, or claims of any character brought because of any injuries or damage received or sustained by any person, persons, or property on account of the operations of the said Contractor; or on account of or in consequence of any neglect in safe-guarding The WORK; or through use of unacceptable materials in construction The Work; or because of any act of omission, neglect or misconduct of said Contractor; or because of any claims or amount recovered from any infringements of patent, trademark, or copyright; or from any claims or amounts arising or recovered under the “Workmen’s Compensation Act “, or any other law, ordinance, order or decree; and so much of the money due the said Contractor under and by virtue of his Contract as maybe considered necessary by the County for such Purpose may be withheld for use of the County; or, in case no money is due, his surety may be held until such suit or suits, action or actions, claim or claims for injuries or damages as aforesaid shall have been settled and suitable evidence to that effect furnished to the County; except that money due the Contractor will not be withheld when the Contractor produces satisfactory evidence that he is adequately protected by public liability and property damage insurance.
RETAINAGE:
Retainage will be withheld at the rate of five percent (5%) of the monetary value of the work completed Until the project has reached fifty percent (50%) complete. At that time the retainage may be reduced to two- and one-half percent (2 ½%) if the status of the work completed is satisfactory and approved by the Engineer.
Final Payment of the amounts withheld will not be made until the project has been satisfactorily completed and accepted by the County.
: 1 1
SECTION 150 - Traffic Control during Construction:
Traffic Control during Construction shall be the sole responsibility of the Contractor:
All Traffic Control Devices used during construction shall be in full compliance with the current edition of the Manual for Uniform Traffic Control Devices (MUTCD)
Pilot Vehicles shall be used to control traffic through the construction area at all times unless other methods are approved by the Engineer.
All Construction Signage as required by the MUTCD shall be in place before any work that might interfere with the movement of traffic is started.
TYPICAL RESURFACING SECTION
REQUIRED:
RESURFACE ROADWAY WITH:165LBS/SQYD OF 9.5MM SP.
RESURFACE DRIVEWAYS AND INTERSECTIONS WITH OTHER
ROADWAYS WITH: 55 LBS/SQYD OF 9.5MM SP.
AFTER RESURFACING IS COMPLETE THE
CONTRACTOR SHALL BE REQUIRED TO PROVIDE A
SMOOTH, SAFE AND WELL DRAINED TRANSITION TO
AND FROM PUBLIC ROADS AND DRIVEWAYS. THIS
TRANSITION SHALL BE A MINIMUM OF THREE (3) FEET,
HOWEVER ADDITIONAL WIDTH MAY BE NECESSARY IN
SOME INSTANCES.
NO CHANGES SHALL BE MADE TO PAVEMENT MARKING
CURRENTLY ON ROADWAY DURING APPLICATION OF
PAINT.
Section 402- Hot Mix Recycled Asphaltic Concrete
402.1 General Description
This work includes producing and placing hot mix recycled asphaltic concrete that incorporates reclaimed Asphalt pavement (RAP), reclaimed asphalt shingles (RAS), virgin aggregate, hydrated lime and neat Asphalt cement.
402.1.01 Definitions
General Provisions 101 through 150
402.1.02 Related References
A. Standard Specifications Section 400 – Hot Mix Asphaltic Concrete Construction
Section 800- - Coarse Aggregate
Section 828- - Hot Mix Asphaltic Concrete Mixtures
B. Referenced Documents
Guidelines for RAP Stockpile Approval
402.1.03 Submittals
A. Certified Weight Tickets
Notify the Engineer before removing RAP from a stockpile that belongs to the Department. Submit to the Engineer the certified weight tickets of materials removed from the stockpile.
B. Affidavit
Submit to the laboratory an affidavit stating the sources of stockpiled materials to be used on a State Project. Include the following information in the letter:
• State project number
• Location from which the material was removed
• Approximate removal dates
• Mix types removed and the estimated quantity of each type in the stockpiles
• Other available information about the stockpiled material such as percentage of local sand in the RAP.
Obtain specific approval from the laboratory to use RAP or RAS stockpiles.
Adhere to Guidelines for RAP Stockpile Approval
402.2 Materials
A. RAP Material Composition
Note: The location of Department RAP material stockpiles will be given on the Plans.
Do not use RAP materials that contain alluvial gravel or local sand in any mixture placed on interstate projects except for mixtures used in shoulder construction. When used in shoulder construction, limit RAP containing local sand or alluvial gravel so that the sand or gravel contributes no more than 20% of the total aggregate portion of the mix.
1. RAP Percentage For non-interstate projects, limit the percentage of RAP allowed in recycled mixes so that the overall amount of alluvial gravel, local sand, and Group I material in the RAP will be determined through petrographic analysis or available records.
Rap furnished to the Contractor but not used in the work remains the Contractor’s property.
Section 402—Hot Mix Recycled Asphaltic Concrete
Rap used in the recycled mixtures for mainline or ramps (if applicable) may make up from 0 to 40 percent of the mixture depending on the amount of RAP available, the production facilities, and whether the mixture meets the requirements in Section 828.
The maximum ration of RAP material to the recycled mixture is 40 percent for continuous mix type plants and 25 percent for batch type plants
2. Process RAP Material
Process RAP material to be used in the recycled mixture so that 100 percent will pass the 2in (50mm) sieve.
Additional crushing and sizing may be required if the RAP aggregate exceeds the maximum sieve size for the mix type as shown in Section 828. Obtain representative materials from the RAP stockpile for the mix design.
B. RAS Material
RAS materials are produced as a by-product of manufacturing roofing shingles and/or discarded shingle scrap from the reroofing of buildings.
1. Limit the amount of RAS material used in the recycled mixture to no greater than 5 percent of the total mixture weight.
2. Shred the RAS material before incorporating it into the mix to ensure that 100 percent of the shredded pieces are less than ½ in (12.5 mm) in any dimension.
3. Remove all foreign materials such as paper, roofing nails, wood or metal flashing.
4. Provide test results for Bulk Sample Analysis, known as Polarized Light Microscopy, if post-consumer shingles are used to certify the RAS material is free of asbestos. Test stockpiles at the rate of one test per 1000 tons (megagrams) prior to processing.
Other than as specifically stated in this Subsection, ensure that RAS material is used according to the same requirements as described for RAP material.
C. Asphaltic Concrete Removed from an Existing Roadway
Asphaltic concrete removed from an existing roadway becomes the Contractor’s property unless specified otherwise on the Plans. RAP material retained by the Department is designated on the Plans, and the RAP shall be stockpiled at the location specified on the Plans.
D. Local Sand and Group I Material in RAP
Use of local sand in recycled mixes is restricted as stipulated in Section 828 for the Project. However, RAP which contains local sand may be used in surface and intermediate layers of non-
E. Asphalt Cement
Using laboratory evaluations, the Department will determine the asphalt cement grade to be used in the recycled mixture.
The asphalt cement shall meet the requirements of Section 820.
When the asphalt cement is blended with asphalt cement recovered from the RAP material and after tests on residue form thin film oven tests, the asphalt cement shall have a viscosity of 6000 to 16,000 poises (600 to 1600 Pa) or as approved by the Engineer. Recover asphalt cement from the recycled mixture to verify that the specified viscosity is being met.
If the Engineer determines during construction that the selected asphalt cement grade is not performing satisfactorily, the Department may change the asphalt cement grade in the mixture, with no change in the Contract Unit Price.
F. Recycled Mixture
The recycled mixture shall be a homogenous mixture of RAP or RAS material, virgin aggregate, hydrated lime, and neat asphalt cement. Ensure that the mixture conforms to an approved mixture design outlined in Section 828.
402.2.01 Delivery, Storage, and Handling
Separate the stockpiles by Project sources and by Group I and Group II aggregate types.
Erect a slope on each stockpile to identify the source(s).
If RAP material from different project sources becomes intermixed in a stockpile, only use those materials when approved by the laboratory.
The Department may reject by visual inspection stockpiles that are not clean and free of foreign materials.
402.3 Construction Requirements
402.3.01 Personnel
General Provisions 101 through 150
402.3.02 Equipment
A. Hot Mix Plant
Use a hot mix plant for the recycling process with necessary modifications approved by the Engineer to process recycled material. Design, equip, and operate the plant so that the proportioning, heating, and mixing yields a uniform final mixture within the job mix formula tolerances.
B. Cold Feed Bin
Proportion the RAP or Ras material using a separate cold feed bin. Ensure that the material meets the size requirements in Subsection 402.2 “Materials.” The ratio of the RAP or RAS to virgin aggregate shall be controlled gravimetrically.
C. Electronic Belt Weighing Devices
Use electronic belt weighing devices to monitor the flow of RAP or RAS and the flow of virgin aggregate. For batch type plants, the RAP or RAS portion of the mix may be weighed in
402.3.03 Preparation
402.3.04 Fabrication
402.3.05 Construction
Follow the requirements in Section 400 for hot mix recycled asphaltic concrete production and placement, materials, equipment, and acceptance plans except as noted or modified in this Specification.
402.3.06 Quality Acceptance
The Department may require additional quality control tests to determine the RAP stockpile consistency and the RAP aggregate quality. In this case, conduct at least three extraction/gradation tests from each individual source. Ensure that aggregate meets the quality standards in Section 800.
402.3.07 Contractor Warranty and Maintenance
General Provisions 101 through 150.
402.4 Measurement
Recycled asphaltic concrete mixture, complete in place and accepted, is measured in tons (megagrams). The weight is determined by recorded weights if an approved recording device is used. Or, the weight is determined by weighing each loaded vehicle on an approved motor truck scale as the material is hauled to the roadway.
402.4.01 Limits
402.5 Payment
Item No 402 Recycled asphaltic concrete type group-blend, including bituminous materials per ton (megagram)
Item No 402 Recycled asphaltic concrete type, group-blend, including polymer-modified per ton (megagram)
Item No 402 Bituminous Materials per square yard (meter)
Item No 402 Bituminous Materials and hydrated lime per square yard (meter)
Item No 402 Polymer modified bituminous Materials and hydrated lime per square yard (meter)
Item No 402 Recycled asphaltic concrete patching including bituminous materials per ton (megagram)
Item No 402 Recycled asphaltic concrete leveling including bituminous materials per ton (megagram)
Item No 402 Recycled asphaltic concrete leveling including bituminous materials and hyd lime per ton (megagram)
402.5.01 Adjustments
General Provisions 101 through 150.
Section 413—Bituminous Tack Coat
413.1 General Description
This work includes furnishing and applying a bituminous tack coat on a prepared road surface including cleaning the road surfaces.
413.1.01 Definitions
General Provisions 101 through 150.
413.1.02 Related References
A. Standard Specifications Section 109—Measurement and Payment Section 400—Hot Mix Asphaltic Concrete Construction Section 424—Bituminous Surface Treatment Section 427—Emulsified Asphalt Slurry Seal Section 820—Asphalt Cement Section 824 – Cationic Asphalt Emulsion
B. Referenced Documents General Provisions 101 through 150.
413.1.03 Submittals
General Provisions 101 through 150.0
413.2 Materials
Material Section
Asphalt cement, performance grade PG 58-22 PG 64-22, or PG 67-22 820.2.01
Cationic emulsified asphalt CRS-2h or CRS-3 824.2.01
Asphalt cement of performance grade PG 58-22, PG 64-22 or PG 67-22 is used for bituminous tack coat in work performed in Section 400. Use cationic emulsified asphalt as a special application material only if directed by the Engineer.
The Department may change the grade or type of bituminous materials without a change in the Contract unit price if the Engineer determines that the grade or type selected is not performing satisfactorily.
413.2.01 Delivery, Storage, and Handling
General Provisions 101 through 150
413.3 Construction Requirements
413.3.01 Personnel
General Provisions 101 through 150.
413.3.02 Equipment
Provide equipment in good repair, including the following units that meet the requirements of Subsection 424.3.02 Equipment.
• Power broom and blower
• Pressure distributor
413.3.03 Preparation
413.3.04 Fabrication
413.3.05 Construction
A. Seasonal and Weather Limitation Do not apply tack coat if the existing surface is wet or frozen. Do not place emulsified asphalt if the air temperature in the shade is less than 40 degrees F (4 degrees C).
B. Application Coat the entire areas to be paved with the tack coat unless directed otherwise by the Engineer. Apply tack coat with Distributor spray bars instead of hand hoses, except in small areas that are inaccessible to spray bars.
C. Temperature of Material Apply bituminous materials within the temperature ranges specified below.
Bituminous Materials Temp of Application F (C)
Asphalt cement 350-400 (175-205)
CRS-2h 140-180 (60-80)
CRS-3 140-180 (60-80)
D. Cleaning Immediately before applying the tack coat, clean the entire area free of loose dirt, clay and other foreign materials.
E. Application Rate The Engineer will determine the application rate of the bituminous tack coat.
F. Limitations and Areas Coated Apply only enough tack coat to the prepared road surface that can be covered with the new pavement course the same working day the tack coat is applied.
G. Maintenance and Protection After applying the tack coat material, allow it to break until it is tacky enough to receive the surface course. Do not allow traffic on the tack.
413.3.06 Quality Acceptance
General Provisions 101 through 150.
413.3.07 Contractor Warranty and Maintenance
General Provisions 101 through 150.
413.4 Measurement
Bituminous materials for tack coat applied and accepted are measured as outlined in Subsection 109.02 “Measurement of Bituminous Materials.”
Diluting emulsified tack coat is not ordinarily allowed except when used underneath slurry seal. The composition of diluted emulsified tack coat defined in Subsection 427.3.05 “Construction” is measured by the gallon (liter) of diluted mix.
413.4.01 Limits
General Provisions 101 through 150.
413.5 Payment
The accepted volume of bituminous material will be paid for at the Contract Unit Price per gallon (liter) for bituminous tack coat of the type and grade approved by the Engineer, complete in place. Payment is full compensation for preparing, cleaning, furnishing, hauling, applying material, and providing incidentals to complete the work.
Payment will be made under:
Item No. 413 Bituminous tack coat Per gallon filled
413.5.01 Adjustments
Section 652—Painting Traffic Stripe
652.1 General Description
This work includes furnishing and applying reflectorized traffic line paint according to the Plans and these Specifications.
This Item also includes applying words and symbols according to the Plan details, Specification, and the current Manual on Uniform Traffic Control Devices.
652.1.01 Definitions
Painted stripes: Solid or broken (skip) Lines. The location and color are designated on the Plans.
Skip Traffic Stripes: Painted segments between unpainted gaps as specified on the Plans. The location and color are designated on the Plans.
652.1.02 Related References
A. Standard Specifications Section 656—Removal of Pavement Markings Section 870—Paint
B. Referenced Documents
. QPL 46
AASHTO M 247
652.1.03 Submittals
Material Section
Traffic Line Paint 5A and 5B 81u.2.us.a.2 and
Glass Beads for Use in Luminous Traffic Lines AASHTO M 247 Type 1 *
*In addition, meet the following requirements for glass beads:
• Maximum quantity of angular particles is less than 1 % by weight
• Maximum quantity of particles with milkiness, scoring, or scratching is less than 2% by weight.
• Glass beads do not impart any noticeable hue to the paint film
• Glass beads conforming to the following alternate gradation may be used provided that all other requirements of
Alternate Gradation
Sieve Size Percent Passing
No. 16 (1190 mm) 99-100
No. 20 (0.850 mm) 75-95
No. 30 (0.600 mm) 65-85
No. 50 (0.300 mm) 10-35
No. 100 (0.150 mm) 0-5
652.2.01 Delivery, Storage, and Handling
652.3.02 Equipment
A. Traveling Traffic Stripe Painter Use a traffic stripe painter that can travel at a predetermined speed both uphill and downhill, applying paint uniformly.
Ensure that the painter feeds paint under pressure through nozzles spraying directly onto the pavement.
Use a machine equipped with the following:
1. Three adjacent spray nozzles capable of simultaneously applying separate stripes, either solid or skip, in any pattern.
2. Nozzles equipped with the following:
• Cutoff valves for automatically applying broken or skip lines
• A mechanical bead dispenser that operates simultaneously with the spray nozzle to uniformly distribute beads at the specified rate.
• Line-guides consisting of metallic shrouds or air blasts
3. Tanks with mechanical agitators
4. Small, portable applicators or other special equipment as needed.
B. Hand Painting Equipment Use brushes, templates, and guides when hand painting.
C. Cleaning Equipment Use brushes, brooms, scrapers, grinders, high-pressure water jets, or air blasters to remove dirt, dust, grease, oil, and Other foreign matter from painting surfaces without damaging the underlying pavement.
652.3.03 Preparation
Locate approved paint manufacturers on OPL 46.
Before starting each day’s work, thoroughly clean paint machine tanks, connections, and spray nozzles using the appropriate solvent.
Thoroughly mix traffic stripe paint in the shipping container before putting it into machine tanks.
Before painting, thoroughly clean pavement surfaces of dust, dirt, grease, oil and all other foreign matter.
652.3.04 Fabrication
General Provisions 101 through 150
652.3.05 Construction
A. Alignment Ensure that the traffic stripe is the specified length, width, and placement. On sections where no
NOTE: Change minimum rate proportionately for varying stripe widths.
2. Thickness – maintain a 15 mlls (0.38 mm) minimum wet film thickness for all painted areas.
3. Do not apply paint to areas of pavement when:
• The surface is moist or covered with foreign matter.
• Air temperature in the shade is below 40 degrees F (5 Celsius)
• Wind causes dust to land on prepared areas or blows paint and beads around during application
4. Apply a layer of glass beads immediately after laying the paint. Apply beads at a minimum rate of 6 lbs to each Gallon (700 grams to each liter) of paint.
C. Protective Measures Protect newly applied paint as follows:
1. Traffic Control and protect traffic with warning and directional signs during painting. Set up warning signs before beginning Each operation and place signs well ahead of the painting operation.
2. Fresh Paint Protect the freshly painted stripe using cones or drums. Repair stripe damage or pavement smudges caused by Traffic according to Subsection 652.3.06.
D. Appearance and Tolerance of Variance Continually deviating from stated dimensions is cause for stopping the work and removing the nonconforming stipe.
See Section 656. Adhere to the following measurements:
1. Width Do not lay stripe less than the specified width. Do not lay tripe more than ½ in (13mm) over the specified width.
2. Length Ensure that the 10 ft (3m) painted skip stripe and the 30ft (10mm) gap between painted segments vary no more than plus or minus 1 ft (300mm) each.
3. Alignment Ensure that the stripe does not deviate from the intended alignment by more than 1 in (25m) on langents or curves of 1 degree or less Ensure that the stripe does not deviate by more than 2 in (50mm) on curves exceeding 1 degree
Section 652—Painting Traffic Stripe
652.3.06 Quality Acceptance
Ensure that stripes and segments of stripes are clean-cut and uniform. Markings that do not appear uniform or satisfactory, either during the day or night, or do not meet specifications, will be corrected at the Contractor’s expense.
Work will be subject to application rate checks for both paint and beads.
The following will be accepted:
• Sections of painted stripe, words, and symbols that have dried so that paint will not be picked up or marred by vehicle lines
• Sections placed according to the Plans and Specifications The contractor will be relieved of responsibility for maintenance on accepted sections A
B. Removal of Excess Paint Remove misted, dripped, or spattered paint to the Engineers satisfaction. Do not damage the underlying pavement during removal.
Refer to the applicable portions of Section 656
652.3.07 Measurement
When traffic stripe is paid for by the square yard (meter), the number of square yards (meters) painted is measured and the space between stripes is included in the overall measurement.
Linear measurements are made on the painted surface by an electronic measuring device attached to a vehicle. On curves, chord measurements, not exceeding 100 linear feet (30 linear meters), are used.
Traffic stripe and markings, complete in place, are measured and accepted for payment as follows:
A. Solid Traffic Stripe Solid traffic stripe is measured by the linear foot (meter), linear mile (kilometer), or square yard (meter). Breaks or Omissions in solid lines or stripes at street or road intersections are not measured.
B. Skip Traffic Striped Skip traffic stripe is measured by the gross linear foot (meter) or gross linear mile (kilometer). Unpainted spaces between the stripes are included in the overall measurements if the Plan ratio of 1 to 3 remains uninterrupted.
Measurement begins and ends on a stripe.
C. Pavement Markings Markings are words and symbols completed according to Plan dimensions. Markings are measured by the unit.
652.4.01 Limits
General Provisions 101 through 150.
652.6 Payment
Payment will be full compensation for the work under this Section, including the following:
• Cleaning and preparing surfaces
• Furnishing materials, including paints, beads, and thinners.
652.5.01 Adjustments