Bid Package - Saline Middle School Roof-Integrated Solar Array Installation 2 of 2.pdf
PDF 5 MB Posted
- Attached to
- ROOF-INTEGRATED SOLAR ARRAY INSTALLATION
- Solicitation number
- RFP - SAL - 240000001748
- Issued by
- Washtenaw County, St. Louis City, Michigan
About this file
This document contains information related to the Roof-Integrated Solar Array Installation project in Michigan, involving Washtenaw County and St. Louis City. The project requires the installation of a 540 kW AC (757.35 kW DC) solar array integrated into the roof of the Saline Middle School, including equipment such as photovoltaic modules, inverters, monitoring systems, and switchgear. The project must adhere to NEC 2023 code requirements and includes IEEE 1547-2018 compliant inverter protection settings. The project timeline is estimated at 6-12 months following receipt of full payment.
The pricing terms are not provided, but the document indicates that the project may require a System Impact Study due to the size and location of the system, as well as coordination with existing affected systems. The project is funded by local sources, and any set-asides or incumbent contractors are not specified. The document provides detailed technical requirements, interconnection procedures, and contact information for the utility (DTE Electric) throughout the project lifecycle.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DTE Electric: Interconnection Agreement: Attachment A: Construction Agreement
EXAMPLE SCOPE
Appendix A: Scope and Estimate
Industrial/Generation Relaying:
To meet the Level # requirements, both an interconnection protective relay must be used and an anti-islanding scheme must be provided.
The relay must be selected from our approved list of relays for interconnection protection, though a SEL 751 is recommended. It must provide three phase over/under voltage and over/under frequency protection for the installation and be separate from dedicated generator protection relays. The relay must have dc power from a separate reliable source; such as a battery or UPS. DTE Electric Relay Engineering will develop the settings for the functions described above.
The customer will be responsible for the purchase, installation, calibration and testing of this new relay and any desired backup relays.
This relay must trip a device open, thus breaking parallel operation of the generators with the DTE Electric system, for adverse conditions or relay failure. It is at the customer’s discretion which device they intend to trip.
Anti-islanding protection must be provided, as required from XXXX to XXXX and from XXXX to XXXX Provision of Communications modules at each location; XXXX, XXXX and XXXX.
These devices will communicate over either a fiber, microwave, radio or Ethernet private communications network.
Customer will install all equipment at the customer owned XXXX end, including all tie ins and conduit routing.
The customer must provide DTE with drawings showing the new relay installation; including One lines, three-lines and schematics to show the complete end to end installation including trips.
These drawings must be approved, prior to any construction. Customer must closely coordinate with DTE for the installation of the DTE equipment required for anti-islanding protection, network communications and SCADA.
An on-site witness test by DTE technicians will need to be accomplished, prior to final operation to ensure protection operates as designed.
Customer will be responsible for configuring the connection to the DTE Interconnection Gateway on site as per DTE provided standards and point mappings
DTE will provide an indoor enclosure containing the following equipment:
XXXXX
Developer will then be responsible to install this enclosure and to provide all auxiliary power, control and communication connections to this enclosure, including connections to the new communications enclosure.
Note: the trip connection must be installed in parallel to the existing trip locations and the old transfer trip scheme can NOT be decommissioned until the new scheme has been installed and fully tested, if applicable. Upon completion of installation of both this box at the customer location and the work at XXXXX and XXXX, DTE Personnel will work with XXXXX to supervise, troubleshoot and commission the new transfer trip scheme.
SCADA:
A DTE SCADA technician will need to visit the site to configure communications and point configurations in the RTU, terminate any new data points, and check in locally and with SOC. For this location where SCADA communications with SOC will be via IP based communications through a medium selected from the telecommunications section below.
Estimated Cost for equipment and configuration at XXXXX site = $$$$$
Substations:
DTE Substation Work:
DTE will remove XXXXX and install XXXXXX at XXXXX and XXXX. DTE will test equipment and commission at XXXXX and XXX.
Estimated Cost for the above DTE Substation work = $$$$$.
Telecommunication
DTE will install and configure one of the following options
• Option 1: Interconnect XXXX to XXXX via XXXXX. ~## mi @ $$$k per mile in accordance with DTE Communications Design.
Cost of Option 1: $$$$
• Option 2: Install XXXXXX. Customer coordination to locate XXXX at XXXXX site will be required.
Cost of Option 2: $$$$ plus $$/year O&M for XXXXX
Total Project Estimate:
Option 1: (Description) $$$$K
Option 2: (Description) $$$$K
Communication Diagram: EXAMPLE
Primary Services / Pert / Commissioning:
Site visits, Functional Testing verifications, and Commission Testing with DTE field service personnel will need to be coordinated.
Additional Configuration, Communications, Protection Settings:
27 - x2 59 - x2 32 – x1 81o – x1 81u – x1
Undervoltage Elements 27 element (3 phase)
Pick Up = 0.88 x Vnm Delay = 2000 ms or 2s This is intending to trip when export voltage falls below 88% Nominal Voltage Per IEEE 1547 Section 4.2.3
27 element (3 phase) Pick Up = 0.5 x Vnm Delay = 167 ms or 10 cycles This is intending to trip when export voltage falls below 50% Nominal Voltage Per IEEE 1547 Section 4.2.3
Overvoltage Elements
59 element (3 phase) Pickup = 1.1 x Vnm Delay = 1000 ms or 1s This is intending to trip when export voltage rises above 110% Nominal Voltage Per IEEE 1547 Section 4.2.3
59 element (3 phase) Pickup = 1.2 x Vnm Delay = 167 ms or 10 cycles This is intending to trip when export voltage rises above 120% Nominal Voltage Per IEEE 1547 Section 4.2.3
Under Frequency
81 element (3 phase) Pickup = 57 Delay = 167 ms or 10 cycles This is intending to trip when export frequency drops below 57 Hz Per IEEE 1547 Section 4.2.4
Over Frequency 81 element (3 phase)
Pickup = 60.5 Delay = 167 ms or 10 cycles This is intending to trip when export frequency rises above 60.5 Hz Per IEEE 1547 Section 4.2.4
Additional Notes:
The trip actuation should include the power element, all over/undervoltage elements, all over/under frequency elements and RELAY FAIL with a logical OR for all of the elements.
Customer should consider the use of an inhibit input for the trip. This could be based on a generator running signal or on the position of the isolating 52 Breaker’s. This would disable the protection in the event that the generator is not in use. **THIS IS NOT A
REQUIREMENT, BUT A RECOMMENDATION. **
All other elements may be set freely by customer for their needs. Please forward a copy of the final settings file for the relay after programming, testing, and verification is complete.
DTE requires trips (27,32,59,81ou) shall be programmed to one dedicated Trip
OUTPUT with a note stating that “DTE Required Output for Limited Sell Back”
Appendix B: Project Schedule
Interconnection Project:
____ DE-####/DE-#### – XXXXXXXXXXX_______
Project Schedule:
All activities will begin after the Fully Executed Construction Agreement and all monies have been received.
## (XXXX) months estimated
Coordination required with Affected systems that may affect schedule:
Operation and coordination with ITC at shared station sites
SCADA – Approximately ## months from receipt of order per the manufacturer. This time includes XXXXXX
Telecom – ## months to design and build XXXXXX.
Substation Design - ## months to XXXXXX.
This estimate timeline will be updated at the completion of design activities.
Commissioning timeline will be dependent on required shutdowns at each site and the coordination required to complete the work. Coordination with customer site will be required for final commissioning and will be scheduled at a mutually agreed upon time after construction completion.
Total time line is ## months following receipt of payment.
________XXXXXXX__________________, (Project Developer), and The DTE Electric Company, as required by the DTE Electric [Project] Construction Agreement for Generator Interconnection To DTE Electric’s Distribution System dated MM/DD/YYYY agree to the above stated Project Schedule for the Interconnection Project.
ATTACHMENT B: COMMISSIONING CHECKLIST
DE-XXXX Project Name Non-Export Test Plan
Project Address
Name of testing organization: __________________________________________________________
Name of Tester: _____________________________________________________________________
Test Date: __________________________________________________________________________
CUSTOMER SCOPE OF WORK TO BE TESTED
• Install SEL-751 relay to implement reverse power (32) function and breaker fail
• Implement inverter protection settings IEEE1547-2018, Including MISO ride through
TESTING
Instruction to tester: Clearly Indicate initials in each PASS/FAIL box
SEL 751 Relay Fail Test:
• Simulate failure of SEL 751 relay
*Customer is recommended to integrate relay fail alarm into internal site alarming.
Comments
SEL 751 Loss of Potential Test
• Simulate loss of potential sensing to SEL-751 relay
PASS FAIL
SEL 751 Fail Alarm Status
SEL 751 Relay trips and locks out Breaker XXXX (Tested breaker name as in drawings)
On loss A phase PT input SEL 751 Relay trips and locks out Breaker XXXX
On loss B phase PT input SEL 751 Relay trips and locks out Breaker XXXX
On loss C phase PT input SEL 751 Relay trips and locks out Breaker XXXX
SEL 751 Relay 32 Function Test:
• Inject current into SEL 751 relay to simulate reverse power condition
SEL 751 Breaker Failure Function Test:
• Inhibit Breaker XXXX status verification back to SEL 751. Initiate trip from SEL 751 to Breaker
XXXX verify ESTOP of all Inverters
Inverter settings verification functionality
• Open Breaker XXXX, Verify Open, Close Breaker XXXX
SEL 751 Relay trips and locks out Breaker XXXX when there is reverse power
All inverters execute ESTOP on breaker fail from SEL 751
When Breaker XXXX Open, verify 0 Voltage on all phases after 2 seconds
On Breaker XXXX close verify inverter Synchronization check
On Breaker XXXX close verify that inverter system does not re-energize prior to 300 seconds
On Breaker XXXX close, and after 300 seconds of de-energization, verify that the inverter system output linearly ramps for no less than 300 seconds before reaching rated output
• Verify the following inverter settings are applied
Voltage Relay Settings
Shall Trip Function Allowable Setting
Voltage (per unit of nominal voltage)
Clearing Time (Seconds)
Overvoltage 1 1.20 0.16
Overvoltage 2 1.10 2.0
Undervoltage 1 0.70 2.0
Undervoltage 2 0.45 0.32
Frequency Relay Settings
Shall Trip Function Allowable Setting
Frequency (Hz) Clearing Time (Seconds)
Overfrequency 1 62.0 0.16
Overfrequency 2 61.2 2.0
Underfrequency 1 58.5 2.0
Underfrequency 2 56.5 0.16
Enter Service Criteria Default Settings
Permit Service Enabled
Applicable Voltage Within Range
Min. Value 0.917 p.u.
Max. Value 1.05 p.u.
Frequency Within Range
Min. Value 59.5 Hz
Max. Value 60.1 Hz
Tester Signature
Date
DE-#### XXXXX Test Plan
XXXXX
Name of testing organization: __________________________________________________________
Name of Tester: _____________________________________________________________________
Test Date: __________________________________________________________________________
CUSTOMER SCOPE OF WORK TO BE TESTED
• Install SEL-751 relay to implement reverse power (32) function and breaker fail
• Implement inverter protection settings IEEE1547-2018, Including MISO ride through
TESTING
Instruction to tester: Clearly Indicate initials in each PASS/FAIL box
SEL 751 Relay Fail Test:
• Simulate failure of SEL 751 relay
*Customer is recommended to integrate relay fail alarm into internal site alarming.
SEL 751 Loss of Potential Test
• Simulate loss of potential sensing to SEL-751 relay
SEL 751 Fail Alarm Status
SEL 751 Relay trips and locks out PB1 breaker
On loss A phase PT input SEL 751 Relay trips and locks out PB1 breaker
On loss B phase PT input SEL 751 Relay trips and locks out PB1 breaker
On loss C phase PT input SEL 751 Relay trips and locks out PB1 breaker
SEL 751 Relay 32 Function Test:
• Inject current into SEL 751 relay to simulate reverse power condition
SEL 751 Breaker Failure Function Test:
• Inhibit PB1 breaker status verification back to SEL 751. Initiate trip from SEL 751 to PB1 Breaker verify ESTOP of all Inverters
Inverter settings verification functionality
• Open PB1 breaker, Verify Open, Close PB1 breaker
SEL 751 Relay trips and locks out PB1 breaker when there is reverse power
All inverters execute ESTOP on breaker fail from SEL 751
When PB1 breaker Open, verify 0 Voltage on all phases after 2 seconds
On PB1 breaker close verify inverter Synchronization check
On PB1 breaker close verify that inverter system does not re-energize prior to 300 seconds
On PB1 breaker close, and after 300 seconds of de-energization, verify that the inverter system output linearly ramps for no less than 300 seconds before reaching rated output
• Verify the following inverter settings are applied
Voltage Relay Settings
Shall Trip Function Allowable Setting
Voltage (per unit of nominal voltage)
Clearing Time (Seconds)
Overvoltage 1 1.20 0.16
Overvoltage 2 1.10 2.0
Undervoltage 1 0.70 2.0
Undervoltage 2 0.45 0.32
Frequency Relay Settings
Shall Trip Function Allowable Setting
Frequency (Hz) Clearing Time (Seconds)
Overfrequency 1 62.0 0.16
Overfrequency 2 61.2 2.0
Underfrequency 1 58.5 2.0
Underfrequency 2 56.5 0.16
Enter Service Criteria Default Settings
Permit Service Enabled
Applicable Voltage Within Range
Min. Value 0.917 p.u.
Max. Value 1.05 p.u.
Frequency Within Range
Min. Value 59.5 Hz
Max. Value 60.1 Hz
Power limiting setting: ## KW
Tester Signature
Date
DTE Electric: Parallel Operating Authorization Page 1 of 3
PARALLEL OPERATING AUTHORIZATION
This Parallel Operation Authorization (“Authorization”) is entered into on _{CurrentDate) by _DTE Electric Company_(the “Utility”), _{full_name: Customer Contact Information}_ (the “Applicant”), and (if applicable under Paragraph 5) _{full_name: Customer Contact Information}_ (the “Property Owner”) with project number {ProjectNumber} assigned by Utility.
I. RECITALS
A. Applicant has completed all of the requirements of the Interconnection Agreement entered into on _{InterconnectionAgreeementDate) and is subject to all operating requirements incorporated into the Interconnection Agreement and in R460.958 and subject to R460.978.
B. The Utility has successfully commissioned the Project on {projectCommissioningDate}
C. For purposes of this Authorization, “interconnect” means establishing a connection between a non-utility generating resource (in this case, the “Applicant Facility”) and Utility’s distribution system. “Operate in parallel” means generating electricity from a non-utility resource (in this case, the Applicant Facility) that is connected to Utility’s system. In all cases, terms shall have the meaning as defined in the Standards.
D. Interconnection of the Applicant Facility with Utility’s distribution system is subject to this Authorization, the Application, the Interconnection Procedures, the Standards and utility tariffs approved by the MPSC, as applicable.
E. This Authorization does not address any purchase or sale of electricity between Utility and Applicant nor does it create any agency, partnership, joint venture or other business arrangement between or among Utility, Applicant and/or Property Owner.
DTE Electric: Parallel Operating Authorization Page 2 of 3
II. AGREEMENT
NOW THEREFORE, in consideration of the above recitals, the mutual covenants contained herein and for good and valuable consideration, the Parties agree as follows:
1. Description of Applicant Facility
1.1 The Facility is Authorized to operate under the following ratings, which shall not be changed without a new Interconnection Application:
Approved System Output: {data: Approved Capacity field 2}
(AC) kW
Total DC Nameplate Output: {data: DC Total Nameplate} (DC) kW Total AC Nameplate Output: {data: AC Total Nameplate} (AC) kW Inverter Power Limited Output/Export Capacity:
{data: Inverter Power Limited Output Formula field}
(AC) kW
Photovoltaic/Solar (“PV”) Array Rating: {data: PV System Nameplate Rating Output Formula field}
(DC) kW
Photovoltaic/Solar (“PV”) CEC Rating: {data: PV System CEC Rating Output Formula field}
(AC) kW
Wind Turbine (WT) Rating: {data: "System Rating, Wind field"}
(AC) kW
Hydroelectric Turbine (HT) Rating: {data: "System Rating, Hydro field"}
(AC) kW
Fuel Cell (FC) Rating: {data: "System Rating, Fuel Cell field"}
(AC) kW
Other (specify type and rating): {data: "System Rating, Other field"}
(AC) kW
Storage System DC Output: {data: Storage System DC Rating field}
(DC) kW
Storage System AC Output: {data: Storage Inverter AC Capacity field}
(AC) kW
Stored Energy: {data: Stored Energy Formula field} kWh
Storage System Modes: {data: Storage Backup AND Export field}
Service Type: {data: Electric Service Wiring Configuration} Voltage Level: {data: Generator AC Output Voltage} Equipment Specifications:
PV System: {pv_system_equipment: PV System, minimal}{data: Generator Type Describe- Combo} {data: Generator Type Describe-Other}{data: Inverter not Listed - Number of Modules} {data: Inverter not Listed - Module Manufacturer} {data: Module Model Name} {data: Number of Inverters} {data: Manufacturer} {data: Model Name}
DTE Electric: Parallel Operating Authorization Page 3 of 3
Solar & Storage System Inverters: {data: Are solar and storage system connected behind a single inverter or separate inverters} Energy Storage System: {energy_storage_system_equipment: Energy Storage System, minimal} Battery: {data: Energy Storage System Quantity (units)} {data: Energy Storage System Manufacturer} {data: Energy Storage System Model 2} Inverter: {data: Storage System Inverter Quantity} {data: Storage System Inverter Manufacturer} {data: Storage System Inverter Model}
1.2 Applicant Facility Location:
{address_multiline: Physical Site Service Adress}
1.3 Applicant’s Utility service account number: _{data: DTE Service Account}_
Property Owner’s Utility service account number (if applicable): ____________
UTILITY
By: {Manager Sign} (Duly Authorized Signature)
{full_name: Manager Name} (Print or Type Name)
Title: {data: Manager Title}
Date: {CurrentDate}
APPENDIX G: CONTACT LIST
[PROJECT NAME]
CONTACT LIST
Normal Operations and Emergency Switching
GENERAL
Switching and clearance procedures for DTE Energy Company (‘DTE”) and the Company Name provide important documentation to ensure safe working conditions and orderly and reliable service when work is required on the Interconnection Facilities.
PROCEDURE
1. Emergency Switching Procedure:
Operating Authority for the Company Name will be handled by the following "Priority Contact List."
NAC Contact List Name Facility Contact Number
a. Contact Name 1 (Work) (XXX) XXX-XXXX
b. Contact Name 1 (Cell) (XXX) XXX-XXXX
c. Contact Name 2 (Work) (XXX) XXX-XXXX
d. Contact Name 2 (Cell) (XXX) XXX-XXXX
Operating Authority for DTE will be the System Controller located in Detroit, Michigan.
Contact the DTE Energy SCC Outage Scheduler at [email].
2. Tag Points:
Normal points of separation between the DTE and Systems will be the DTE 277/480 Volt Metering Potential Secondary fuses or knife switch and the Substation Name, high side switching device.
NOTE: DTE work may require the use of DTE Energy Workers Protection Tags and DTE locks on points of separation tag points as can be installed.
3. Scheduled Outage Procedure:
Request initiated by the
Personnel from the Contact List will contact the DTE System Control Scheduler to make the necessary arrangements and to agree on the switching procedures.
Request initiated by DTE.
Scheduling Authority for DTE will be the System Control Scheduler located in Detroit, Michigan.
Contact numbers are either (XXX) XXX - XXXX or (XXX) XXX - XXXX.
The DTE System Control Scheduler will contact the Contact List Personnel to make necessary arrangements and to agree on switching procedures.
NOTE: Each authority will attempt to provide a minimum of 10 workday’s notice on scheduled outage requests. Emergent or imminent equipment failure outages will be handled on an as needed basis.
4. Connection/Reconnect Procedure
Personnel from the Contact List shall contact the DTE Control Center to receive permission prior to connecting generation with DTE Energy system. Generation facilities may not be permitted to connect when the DTE Energy system is in an abnormal condition due to unscheduled outages.
IN WITNESS WHEREOF, the Parties hereto have executed this Agreement as of the Effective Date identified below.
OFFICIAL COMPANY NAME DTE ENERGY COMPANY
By: ___________________________________ By: __________________________
Title: __________________________________ Title: _________________________
Effective Date:
APPENDIX H: INITIAL REVIEW SCREENS
Application Review Screens will be utilized during the application process and are used to inform applicants of an application deficiency or inconsistency or may indicate a critical issue that would prevent compatibility with the DTE Electrical System These screens include review of the one-line and three-line diagrams for compliance with DTE’s SIM and consistency between the site plan, equipment information and application submission materials and a review of the customer information and contact information for accuracy
Design and Safety Screens will be utilized throughout the process if conditions are noted that will introduce safety or design incompatibilities or if other process such as method of service are required before the interconnection can continue.
Additional screens for specific program participation will be contained in program specific procedures.
The initial review screens are all of the following:
i. The entire proposed DER, including all aggregated site generation and point or points of interconnection, must be located within the electric utility’s service territory.
ii. For interconnection of a proposed DER to a radial distribution circuit, the aggregated generation, including the proposed DER, on the circuit may not exceed 15% of the line section annual peak load as most recently measured or calculated if measured data is not available. A line section is that portion DTE’s distribution system connected to a customer bounded by automatic sectionalizing devices or the end of the distribution line. The electric utility shall consider 100% of applicable loading, if available, instead of 15% of line section peak load for level 1 and 2 DER, except in situations where the distribution circuit has high penetration of DER and where addition of the DER creates voltage or operability issues. This screen does not apply to level 1 and level 2 non-export DER applications, except in situations where the distribution circuit has high penetration of DER and addition of the non-export DER creates voltage or operability issues.
iii. For interconnection of a proposed DER to the load side of network protectors, the proposed DER must utilize an inverter-based equipment package and, together with the aggregated other inverter-based DERs, may not exceed the smaller of 5% of a network’s maximum load or 50 kWac. The DER must not provide reverse power flow into the network protector under any conditions.
iv. The proposed DER, in aggregation with other DERs on the distribution circuit, may not contribute more than 10% to the distribution circuit’s maximum fault current at the point on the primary voltage nearest the proposed point of common coupling. This screen does not apply to level 1 applications, except in situations where the addition of the DER would render the protection scheme inoperable and to be modified to be able to continue to operate as designed.
v. The proposed DER, in aggregate with other DERs on the distribution circuit, may not cause any distribution protective devices and equipment or interconnection customer equipment on the system to exceed 87.5% of the short circuit interrupting capability. An interconnection may not be proposed for a circuit that already exceeds 87.5% of the short circuit interrupting capability. Distribution protective devices and equipment include, but are not limited to, substation breakers, fuse cutouts, and line reclosers. This screen does not apply to level 1 applications except in situations where the addition of the DER would require the interrupting equipment to be modified to not improperly operate.
vi. If the type of electrical service provided to the applicant, including line configuration and the transformer winding and connection limits the potential of the DER creating over-voltages on the electric utility’s distribution system due to a loss of ground during the operating time of any anti-islanding function or during any fault condition. Projects implementing 3 phase ganged isolation that operate on ground detection, loss of phase detection, open phase detection or 3V0 protection and isolating may be reviewed to determine if they pass the screening.
Primary Distribution Line Type
Type of Interconnection to Primary Distribution Line
Result
3-phase, 3 wire 3-phase or single phase, phase-to-phase
Pass screen
3-phase, 4 wire 3-phase or single-phase, line-to-neutral
Pass screen
3-phase, 4 wire
3-phase or single phase, phase-to-phase
Fail screen
vii. If the proposed DER is to be interconnected on single-phase shared secondary, the aggregate generation capacity on the shared secondary, including the proposed DER, may not exceed 20 kWac or 65% of the transformer nameplate rating.
viii. If the proposed DER is single-phase and is to be interconnected on a center tap neutral of a 240 volt service, its addition may not create an imbalance between the 2 sides of the 240 volt service of more than 20% of the nameplate rating of the service transformer.
ix. If the proposed DER is single-phase and is to be interconnected to a 3-phase service, its nameplate rating may not exceed 10% of the service transformer nameplate rating.
x. If the proposed DER’s point of common coupling is behind a line voltage regulator, the aggregate DER on the line section plus the proposed DER’s nameplate rating must be less than 250 kWac or the regulator rating, whichever is less. This screen does not include substation voltage regulators.
xi. The total aggregate nameplate of generation at the site including the proposed project shall not exceed 5 MWac on 13.2KV and 1MWac on 4.8KV
xii. The aggregate DER on the line section plus the proposed DER nameplate shall not exceed the day to day thermal limit of any distribution system component that serves the project or exceed the rated fault current limit of DTE equipment.
xiii. The project follows the DTE Service Installation Manual (SIM), Primary Service, Method Of Service (MOS) requirements and meets all requirements of electrical service.
xiv. High voltage resonance screen. If the project is located on a delta ungrounded line, there must not be a single phase protective device upstream of the DER and any capacitors on the same line section.
xv. A three phase project must not have a single phase operating and isolation device at the
POC/PCC
xvi. If the project intends to operate as an islanded microgrid, it must implement a single open break isolation wholly contained within the Applicant’s service, such as an Auto Transfer Switch, implement mechanical interlocks that do not allow parallel operation or implement a hardware breaker controlled by DTE approved relaying. The microgrid must not rely on software based controls to manage power flow at the Point of Common Coupling during island operation. The microgrid must also implement open transition return to grid and follow return to service criteria or have appropriate synchronization relaying and controls approved by DTE for closed transition and provide SCADA points to DTE for required relaying.
xvii. If the application is a subdivided premise in a master planned clustered development where the aggregate DER Capacity of the clustered development exceeds the interconnection level the application has applied for, the application will be evaluated with the context of the development’s aggregate planned DER capacity.
xviii. If the project is located within a section of a circuit that is identified as an area that has an operational jumpering or loop scheme, the addition of the DER does not render the jumpering or loop scheme inoperable due to loading or voltage violations.
APPENDIX I: SUPPLEMENTAL REVIEW SCREENS
The supplemental review screens are all of the following:
Minimum load screen. Where 12 months of line section minimum load data, including onsite load but not station service load served by the proposed DER, are available, can be calculated, can be estimated from existing data, or can be determined from a power flow model, the aggregate DER capacity on the line section must be less than 100% of the minimum load for all line sections bounded by automatic sectionalizing devices upstream of the proposed DER. If minimum load data are not available, or cannot be calculated, estimated, or determined, DTE shall include the reason or reasons that it is unable to calculate, estimate, or determine minimum load in its supplemental review results notification. All of the following must be applied:
(i) The type of generation used by the proposed DER will be considered when calculating, estimating, or determining circuit or line section minimum load relevant for the application of the minimum load screen specified in this subdivision. Solar photovoltaic generation systems with no energy storage must use daytime minimum load. All other generation must use absolute minimum load unless an operating schedule is provided.
(ii) When this screen is being applied to a DER that serves some station service load, only the net injection of electric energy into the electric utility’s distribution system may be considered as part of the aggregate generation.
(iii) The electric utility shall not consider as part of the aggregate generation, for purposes of this supplemental screen, DER capacity known to be already reflected in the minimum load data.
Voltage and power quality screen. In aggregate with existing generation on the line section, all of the following conditions must be met:
(i) The voltage regulation on the line section can be maintained in compliance with relevant requirements under all system conditions.
(ii) The voltage fluctuation is within acceptable limits as defined by the IEEE Standard 1453-
2015, IEEE Recommended Practice for the Analysis of Fluctuating Installations on Power Systems.
ii.
Safety and reliability screen. The location of the proposed DER and the DER capacity on the line section may not create impacts to safety or reliability that require application of the study track to address. DTE shall consider all of the following when determining potential impacts to safety and reliability in applying this screen:
(i) Whether the line section has significant minimum loading levels dominated by a small number of customers, such as several large commercial customers.
(ii) Whether the loading along the line section is uniform.
(iii) Whether the proposed DER is located less than 0.5 electrical circuit miles for less than 5 kV or less than 2.5 electrical circuit miles for greater than 5 kV from the substation. In addition, the day to day rating of the line section from the substation to the point of common coupling.
(iv) If the proposed interconnection will connect to a power line or feeder cable
(v) Whether the proposed DER incorporates a time delay function to prevent reconnection of the DER to the distribution system until distribution system voltage and frequency are within normal limits for a prescribed time.
(vi) Whether operational flexibility is reduced by the proposed DER, such that transfer of the line section or sections of the DER to a neighboring distribution circuit or substation may trigger overloads, power quality issues, or voltage issues.
(vii) Whether the proposed DER employs equipment or systems certified by a recognized standards organization to address technical issues including, but not limited to, islanding, reverse power flow, or voltage quality.
(viii) Whether the proposed project will increase existing power quality issues on the circuit.
(ix) Whether voltage regulators, or load tap changers are adversely impacted or risk being damaged by reverse power flow from over excitation, excessive operation or improper regulation behavior leading to their failure or power quality and voltage impacts to other customers.
(x) Whether the service at the premise is able to operate safely with the additional generation provided by the project.
(xi) Whether the service or transformer could experience a overload or out of range voltage when there are other existing projects on the same service transformer.
(xii) Whether there is a risk of islanding screen to determine if additional protection, communications or operating devices are required to prevent unintentional islanding
APPENDIX J: PRE-APPLICATION REPORT FORM
PRE-APPLICATION REPORT
Date of Assessment XX/XX/XXXX
DISCLAIMER: The information in this report is based on existing data lookups and correlation of that data. No System Impact studies, or detailed engineering analysis have been done to create this report. This report does not guarantee the accuracy of any of the information provided herein. Identification by DTE Electric of substation and feeder does not guarantee, after application of the relevant review process, that DTE Electric will use the distribution facilities identified in the application report to connect to the project. An application report request does not obligate DTE Electric to conduct a study or other analysis of the proposed generator in the event that data is not readily available. If DTE Electric cannot complete some, or all, of the report due to lack of available data, DTE
Electric shall provide the applicant with this report that includes the data that is available. The provision of information on capacity does not imply that an interconnection may be completed with or without impacts since there are many variables studied as part of the interconnection review process, and data provided in the application report may become outdated at the time of the submission of the complete application for System Impact and/or Facilities studies. Notwithstanding the foregoing, DTE Electric shall, in good faith, include data in the application report that represents the best available information at the time of reporting.
Project Information
Known issues in the area
Will this site initially require a System Impact Study for subtransmission based on size and location and existing system configuration?
(Y/N/NA)
Has this area been identified as having a prior affected system?
(Y/N/NA)
Power quality Issue on the proposed PCC (Y/N/NA)
Developer Name Project Name Application Number
Developer Provided Site Address Developer Provided Coordinates
Generator KW / KVA Prime Mover / Energy Source
System Information
Label, name, or identifier of the distribution circuit on which the proposed point of common coupling is located
Feeder Voltage
(kV)
Distance to Station or Total Circuit Length for network circuits (miles)
Voltage at POI (kV)
Number of sources Substation nominal distribution voltage
Nominal distribution circuit voltage at PCC
Is the proposed generator expected to exceed minimum load on the circuit?
Is the PCC behind Voltage Regulator or Substation Transformer LTC?
Number of phases available at the primary voltage level at the proposed point of common coupling (if a single phase, distance from the 3-phase circuit)
The point of common coupling is located on a (spot network, area network, grid network, radial supply, or secondary network)
With the proposed project, does the existing and applied generation exceed the nameplate of the substation or station transformer?
Distance to three phase of appropriate voltage (Gen to POI) (miles)
Source Type Serving POI
(radial/network)
Existing and in progress MW
Total capacity of substation bus, bank or circuit Applicable Minimum load (MW)
Limiting Line rating (A)
Available capacity of substation bus, bank or circuit
(MW)
Number of industrial substations coincident
Existing generation on Circuit (MW) Applied for but not yet constructed MW Source (MW)
Pending Interconnection that may impact this project
APPENDIX K: VOLTAGE RANGES
Voltage Class Nominal Voltage (V) Secondary 120/240
120/208
277/480
Distribution
4,800 8,320
13,200
Sub transmission
24,000
41,570 (40KV)
APPENDIX L: INSURANCE REQUIREMENTS
APPENDIX M: COMPANY HOLIDAYS
New Year’s Day (observed)
Martin Luther King Day
Good Friday
Memorial Day
Independence Day
Labor Day
Thanksgiving
Day after Thanksgiving
Christmas Eve (observed)
Christmas Day (observed)
New Year’s Eve (observed)
Drain 12H
RTU 26H
Drain 12H
Drain 12H
Drain 5H
Drain 5H
Vent 37H
Drain 12H
Vent 13H
Vent 16H
Pipe 8H
Pipe 7H
Vent 10H
Drain 5H
RTU 55H
P5 8H
Vent 10H
Vent 9H
Vent 38H
Drain 10H
Vent 10H
Vent 10H Vent 10H
Vent 35H
Vent 46H
Vent 10H
Vent 10H
Vent 30H
Vent 30H
Pipes 8H
Vent 31H
Vent 36H
Vent 10H
Electrical 52H
Vent 20H
Drain 5H
Vent 10H
Vent 8H
Satellite H
Vent 36H Vent 16H
Vent 50H Vent 10H
Vent 9H
Vent 9H
Drain 11H
Vent 10H
Drain 12H
Drain 12H
Drain 12H
Edges 13H
Edges 13H Edges 20H
Edges 15H
Edges 15H
Edges 15H
Vent 10H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Electrical 50H
Vent 10H
Vent 10H
Vent 10H
Vent 26H
Vent 30H
Vent 36H
Vent 10H
Vent 25H
Vent 8H
Vent 10H
Vent 10H
Drain 11H
Vent 44H
Vent 10H
Vent 33H
Drain 11H
Vent 35H
Drain 11H Vent 18H
Drain 5H
Vent 26H
Vent 18H
Vent 18H
Vent 35H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Electrical 53H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Vent 37H
Vent 10H
Drain 11H
Drain 5H
Drain 11H
Vent 10H
RTU 33H
Drain 11H Drain 5H
Drain 11H
Vent 10H
RTU 65H
Drain 5H
Drain 5H
Vent 15H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 11H
Drain 11H
Vent 36H
Vent 11H Vent 11H
Vent 8H
Vent 8H
Vent 10H
Vent 10H
Drain 11H
Vent 35H
Vent 39H
Vent 10H
Drain 11H
Drain 5H
RTU 32H
Vent 26H
Electrical 50H Vent 33H
Drain 5H
Drain 11H
Vent 35H
Drain 11H
Drain 11HVent 8H
Drain 10H
Vent 40H
Vent 38H
Drain 11H
Vent 10H
Vent 27H
Vent 35H
Vent 35H
Vent 8H
Drain 11H
RTU 150H
Edges 22H
Edges 15H
Edges 21H
Edges 21H
Edges 12H
Edges 12H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 34H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Edges 10H
Edges 10H
Edges 10H
Edges 10H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 15H
Edges 15H
Edges 21H
Edges 21H
Edges 21H
Edges 15H
Edges 15H
Edges 19H Edges 21H
Edges 20H
Edges 19H
Edges 16H
Edges 15H
Edges 21H
Edges 21H
Edges 21HEdges 15H
Edges 15H
Edges 20H
Edges 20H Edges 15H
Edges 15H Edges 20H
Edges 20H
Edges 22H
Vent 28H
Vent 28H
Vent 28H
Vent 36H
Vent 37H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 12H
Vent 17H
RTU 53H
RTU 53H
RTU 40H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 42H
RTU 44H
RTU 44H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Edges 3H Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 174H
Edges 174H
Edges 174H
Edges 174H
Edges 180H
Edges 256H
Edges 256H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Edges 9H
Edges 9H
Edges 2H
Edges 2H
Vent 26H
Vent 35H
Vent 36H
Vent 35H
Vent 35H
Electrical 50H
Drain 11H
Vent 35H
Vent 35H
Vent 44H
Vent 30H
Vent 30H
Drain 11H
Vent 11H
Electrical 25H
RTU 33H
Electrical 20H
Edges 40H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Vent 10H
Vent 35H
Vent 35H Vent 30H
Vent 44H
Vent 27H
Vent 34H
Edges 42H
RTU 72H
RTU 48H
Vent 44H
Vent 40H
Vent 35H
Vent 35H
Vent 10H
Drain 11H
Vent 41H
Vent 41H
Vent 10H
Vent 10H
Vent 30H
Drain 11H
Vent 40H
Vent 35H
Vent 10H
Vent 34H
Vent 35H
Vent 35H
Vent 43H
Vent 30H
Vent 36H
Vent 30H
Drain 12H
Vent 45H
Vent 30H
Vent 51H
Vent 27H
RTU 114H
RTU 21H
RTU 28H
Electrical 9H
Electrical 9H
Edges 84H
Edges 84H
Edges 86H
Edges 86H
Edges 86H
Edges 86H
Edges 84H
Pipe 7H
Pipe 7H
Pipe 7H Pipe 7H
Pipe 7H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3HEdges 19H
Edges 19H
Edges 20H
Edges 20H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Drain 5H
Vent 10H
Vent 30H
Vent 86H
Vent 86H
Vent 86H
Vent 86H
Vent 80H
Vent 80H
Jvent 40H
Jvent 40H
Jvent 40H Jvent 40H
Jvent 40H
Jvent 40H
Jvent 67H
RTU 75H
RTU 75H
RTU 17H
Access Egress 15H
RTU 75H
Pipes 8H
Pipes 17H
Edges 77H
Edges 79H
Edges 79H
Vent 14H
Electrical 15H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Access 40H
Vent 32H
COLE MCEKNZIE
2024-03-15
ARCH Expand D (36.00 X 24.00 Inches)
E-101
SALINE MIDDLE
SCHOOL
SHEET NAME
BASE PROJECT
METER SITE PLAN
SHEET NUMBER
REVDATEDESCRIPTION
REVISIONS
RIGHTS RESERVED.
EOR:
SHEET SIZE:
DATE:
DRAWN BY:
DEVELOPED BY:
PROJECT
CUSTOMER
SALINE
SCHOOLS
LOCATION
7190 N MAPLE RD,
SALINE, MI 48176
SEAL AND SIGNATURE:
PRELIMINARY DESIGN 10/26/2023 0
COPYRIGHT 2020 DGEN ENERGY PARTNERS, LLC. ALL RIGHTS RESERVED.
#1"=40'-0"
SCALE:
(OR)
1"=20'-0"20'10'020'SCOPE OF WORK
SITE DETAILS
AC RATING (kW) 540kW DC RATING (kW) 757.35kW
STRING QUANTITY 81
POWER FACTOR 1.00
INTERCONNECT VOLTAGE 480V
UTILITY DTE
SERVICE NUMBER
ACCOUNT NUMBER
METER NUMBER
CODE EDITION NEC 2023
ESTIMATED ANNUAL
PRODUCTION
EQUIPMENT LIST
ITEM MAKE/MODEL/SPEC QUANTITY
MODULES ZNSHINE ZXM7-SHDB144-550 1377
INVERTERS CPS SCA60KTL 9
MONITORING CPS 1
METER SPECIFIED BY DTE 1
PANELBOARD (1) 1000A MLO 3P, 4W, W/ (9) 100ACB (1) 15A CBS 1
DISCONNECT 480/277V 3Ø 4W, 1000 AF, 1000AT
NEMA 3R ,22kA
BOS WIRE, CONDUIT, TERMINATIONS, GROUNDING MATERIALS --
WITH
LEGEND
INVERTER
CIRCUIT
BREAKER
FUSE
GROUND
AC CONDCTOR
COMMUNICATIONS
DEMARCATION
PV MODULE 1. ALL EQUIPMENT SHALL BE PROPERLY BONDED AND GROUNDED AS REQUIRED BY NEC AND MANUFACTURER SPECIFICATIONS.
2. MAIN DISCONNECT SWITCH SHALL BE 24/7 UTILITY ACCESSIBLE.
SITE DETAILS
AC RATING (kW) 540kW DC RATING (kW) 757.35kW
STRING QUANTITY 81
POWER FACTOR 1.00
INTERCONNECT VOLTAGE 480V
UTILITY DTE
SERVICE NUMBER
ACCOUNT NUMBER
METER NUMBER
CODE EDITION NEC 2023
ESTIMATED ANNUAL
PRODUCTION
INVERTER TRIP SETTINGS (IEEE1547)
DEVICE PICKUP DESCRIPTION NOTE(S)
27-1 139V UNDERVOLTAGE
RELAY27-2 244V
59-1 304V OVERVOLTAGE
RELAY59-2 332V
81U-1 56.5HZ
OVER/UNDER
FREQUENCY
81U-2 58.5HZ
810-1 61.0HZ
810 62.0HZ
MONITORING
ENCLOSURE
DC CONDUCTOR
SWITCH
TRANSFORMER
NOTES
EXISTING EQUIPMENT
CURRENT
TRANSFORMER
M METER SOCKET
GROUND
9 STRINGS
INVERTER 1
CPS 60kW
9 STRINGS
INVERTER 2
CPS 60kW
CB2 - 100A
480V, 3P
CB1 - 100A
480V, 3P
CPS FLEX
GATEWAY DATA
CARD INSTALLED
INSIDE INVERTER
4 WIRING BOX.
WITH CELL MODEM
AC DISCONNECT 1
480/277V 3Ø 4W, 1000 AF, 1000 AT
NEMA 3R ,22kA
COLLECTION PANELBOARD
480/277V 3Ø 3W, 1000A BUS, MAIN LUG
NEMA 3R ,22kA
TO PANEL
TO PANEL
EXISTING SWITCHGEAR
480/277V 3Ø 3W, 1600A BUS, NEMA 3R ,22kA
M
EXISTING METER
UTILITY OWNED
GRID CONNECTION
9 STRINGS
INVERTER 3
CPS 60kW
9 STRINGS
INVERTER 4
CPS 60kW
CB4 - 100A
480V, 3P
CB3 - 100A
480V, 3P
TO PANEL
TO PANEL
N G
EXISTING UTILITY
OWNED TRANSFORMER
9 STRINGS
INVERTER 5
CPS 60kW
CB5 - 100A
480V, 3P
TO PANEL
9 STRINGS
INVERTER 6
CPS 60kW
9 STRINGS
INVERTER 7
CPS 60kW
CB7 - 100A
480V, 3P
CB6 - 100A
480V, 3P
TO PANEL
TO PANEL
9 STRINGS
INVERTER 8
CPS 60kW
CB8 - 100A
480V, 3P
TO PANEL
9 STRINGS
PV ARRAY 9 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
INVERTER 9
CPS 60kW
CB9 - 100A
480V, 3P
TO PANEL
POCC
NEC COMPLIANT LINE
SIDE TAP
G
FLA = 649.8A
FAULT CURRENT FROM
INVERTER = 779.76A
TO
EXISTING
LOADS
1600A MAIN
BREAKER
PV ARRAY 8 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 7 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 6 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 5 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 4 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 3 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 2 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
PV ARRAY 1 - 84.15kW
(153) ZNSHINE 550W
(9) STRINGS OF 17
EQUIPMENT LIST
ITEM MAKE/MODEL/SPEC QUANTITY
MODULES ZNSHINE ZXM7-SHDB144-550 1377
INVERTERS CPS SCA60KTL 9
MONITORING CPS 1
METER SPECIFIED BY DTE 1
PANELBOARD (1) 1000A MLO 3P, 4W, W/ (9) 100ACB (1) 15A CBS 1
DISCONNECT 480/277V 3Ø 4W, 1000 AF, 1000AT
NEMA 3R ,22kA
BOS WIRE, CONDUIT, TERMINATIONS, GROUNDING MATERIALS --
M
NEW DG METER
UTILITY OWNED
BASE PROJECT
SINGLE LINE
DIAGRAM
COLE MCEKNZIE
2024-03-15
ARCH Expand D (36.00 X 24.00 Inches)
E-601
SALINE MIDDLE
SCHOOL
7190 N MAPLE RD,
SALINE, MI 48176
SHEET NAME
SHEET NUMBER
CUSTOMER
REVDATEDESCRIPTION
REVISIONS
EOR:
LOCATION
SHEET SIZE:
DATE:
DRAWN BY:
DEVELOPED BY:
PROJECT
SEAL AND SIGNATURE:
PRELIMINARY DESIGN 10/26/2023 0
COPYRIGHT 2020 DGEN ENERGY PARTNERS, LLC. ALL RIGHTS RESERVED.
AMERESCO
RIGHTS RESERVED.
Drain 12H
RTU 26H
Drain 12H
Drain 12H
Drain 5H
Drain 5H
Vent 37H
Drain 12H
Vent 13H
Vent 16H
Pipe 8H
Pipe 7H
Vent 10H
Drain 5H
RTU 55H
P5 8H
Vent 10H
Vent 9H
Vent 38H
Drain 10H
Vent 10H
Vent 10H Vent 10H
Vent 35H
Vent 46H
Vent 10H
Vent 10H
Vent 30H
Vent 30H
Pipes 8H
Vent 31H
Vent 36H
Vent 10H
Electrical 52H
Vent 20H
Drain 5H
Vent 10H
Vent 8H
Satellite H
Vent 36H Vent 16H
Vent 50H Vent 10H
Vent 9H
Vent 9H
Drain 11H
Vent 10H
Drain 12H
Drain 12H
Drain 12H
Edges 13H
Edges 13H Edges 20H
Edges 15H
Edges 15H
Edges 15H
Vent 10H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Electrical 50H
Vent 10H
Vent 10H
Vent 10H
Vent 26H
Vent 30H
Vent 36H
Vent 10H
Vent 25H
Vent 8H
Vent 10H
Vent 10H
Drain 11H
Vent 44H
Vent 10H
Vent 33H
Drain 11H
Vent 35H
Drain 11H Vent 18H
Drain 5H
Vent 26H
Vent 18H
Vent 18H
Vent 35H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Electrical 53H
Vent 10H
Vent 10H
Vent 10H
Drain 11H
Vent 37H
Vent 10H
Drain 11H
Drain 5H
Drain 11H
Vent 10H
RTU 33H
Drain 11H Drain 5H
Drain 11H
Vent 10H
RTU 65H
Drain 5H
Drain 5H
Vent 15H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Drain 11H
Drain 11H
Vent 36H
Vent 11H Vent 11H
Vent 8H
Vent 8H
Vent 10H
Vent 10H
Drain 11H
Vent 35H
Vent 39H
Vent 10H
Drain 11H
Drain 5H
RTU 32H
Vent 26H
Electrical 50H Vent 33H
Drain 5H
Drain 11H
Vent 35H
Drain 11H
Drain 11HVent 8H
Drain 10H
Vent 40H
Vent 38H
Drain 11H
Vent 10H
Vent 27H
Vent 35H
Vent 35H
Vent 8H
Drain 11H
RTU 150H
Edges 22H
Edges 15H
Edges 21H
Edges 21H
Edges 12H
Edges 12H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 34H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Vent 32H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 5H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Edges 8H
Drain 6H
Drain 6H
Drain 6H
Drain 6H
Edges 10H
Edges 10H
Edges 10H
Edges 10H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 15H
Edges 15H
Edges 21H
Edges 21H
Edges 21H
Edges 15H
Edges 15H
Edges 19H Edges 21H
Edges 20H
Edges 19H
Edges 16H
Edges 15H
Edges 21H
Edges 21H
Edges 21HEdges 15H
Edges 15H
Edges 20H
Edges 20H Edges 15H
Edges 15H Edges 20H
Edges 20H
Edges 22H
Vent 28H
Vent 28H
Vent 28H
Vent 36H
Vent 37H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 28H
Vent 12H
Vent 17H
RTU 53H
RTU 53H
RTU 40H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 44H
RTU 42H
RTU 44H
RTU 44H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Electrical 20H
Edges 3H Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 174H
Edges 174H
Edges 174H
Edges 174H
Edges 180H
Edges 256H
Edges 256H
Drain 5H
Drain 5H
Drain 5H
Drain 5H
Edges 9H
Edges 9H
Edges 2H
Edges 2H
Vent 26H
Vent 35H
Vent 36H
Vent 35H
Vent 35H
Electrical 50H
Drain 11H
Vent 35H
Vent 35H
Vent 44H
Vent 30H
Vent 30H
Drain 11H
Vent 11H
Electrical 25H
RTU 33H
Electrical 20H
Edges 40H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Edges 41H
Vent 10H
Vent 35H
Vent 35H Vent 30H
Vent 44H
Vent 27H
Vent 34H
Edges 42H
RTU 72H
RTU 48H
Vent 44H
Vent 40H
Vent 35H
Vent 35H
Vent 10H
Drain 11H
Vent 41H
Vent 41H
Vent 10H
Vent 10H
Vent 30H
Drain 11H
Vent 40H
Vent 35H
Vent 10H
Vent 34H
Vent 35H
Vent 35H
Vent 43H
Vent 30H
Vent 36H
Vent 30H
Drain 12H
Vent 45H
Vent 30H
Vent 51H
Vent 27H
RTU 114H
RTU 21H
RTU 28H
Electrical 9H
Electrical 9H
Edges 84H
Edges 84H
Edges 86H
Edges 86H
Edges 86H
Edges 86H
Edges 84H
Pipe 7H
Pipe 7H
Pipe 7H Pipe 7H
Pipe 7H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3HEdges 19H
Edges 19H
Edges 20H
Edges 20H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Drain 5H
Vent 10H
Vent 30H
Vent 86H
Vent 86H
Vent 86H
Vent 86H
Vent 80H
Vent 80H
Jvent 40H
Jvent 40H
Jvent 40H Jvent 40H
Jvent 40H
Jvent 40H
Jvent 67H
RTU 75H
RTU 75H
RTU 17H
Access Egress 15H
RTU 75H
Pipes 8H
Pipes 17H
Edges 77H
Edges 79H
Edges 79H
Vent 14H
Electrical 15H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Edges 3H
Access 40H
Vent 32H
COLE MCEKNZIE
2024-03-15
ARCH Expand D (36.00 X 24.00 Inches)
E-102
SALINE MIDDLE
SCHOOL
SHEET NAME
ALT 1 SITE
PLAN
SHEET NUMBER
REVDATEDESCRIPTION
REVISIONS
RIGHTS RESERVED.
EOR:
SHEET SIZE:
DATE:
DRAWN BY:
DEVELOPED BY:
PROJECT
CUSTOMER
SALINE
SCHOOLS
LOCATION
7190 N MAPLE RD,
SALINE, MI 48176
SEAL AND SIGNATURE:
PRELIMINARY DESIGN 10/26/2023 0
COPYRIGHT 2020 DGEN ENERGY PARTNERS, LLC. ALL RIGHTS RESERVED.
#1"=40'-0"
SCALE:
(OR)
1"=20'-0"20'10'020'SCOPE OF WORK
SITE DETAILS
AC RATING (kW) 480kW DC RATING (kW) 673.2kW
STRING QUANTITY 72
POWER FACTOR 1.00
INTERCONNECT VOLTAGE 480V
UTILITY DTE
SERVICE NUMBER
ACCOUNT NUMBER
METER NUMBER
CODE EDITION NEC 2023
ESTIMATED ANNUAL
PRODUCTION
EQUIPMENT LIST
ITEM MAKE/MODEL/SPEC QUANTITY
MODULES ZNSHINE ZXM7-SHDB144-550 1224
INVERTERS CPS SCA60KTL 8
PLANT CONTOLLER COMP-AP 1
PT CABINET AS NEEDED BY COMP-AP SPECS 1
PANELBOARD (1) 800A 480/277V MLO 3P, 4W W/ (8) 100A CBs 1
DISCONNECT 480/277V 3Ø 4W, 800 AF, 800AT
NEMA 3R ,22kA
BOS WIRE, CONDUIT, TERMINATIONS, GROUNDING MATERIALS --
LEGEND
INVERTER
CIRCUIT
BREAKER
FUSE
GROUND
AC CONDCTOR
COMMUNICATIONS
DEMARCATION
PV MODULE 1. ALL EQUIPMENT SHALL BE PROPERLY BONDED AND GROUNDED AS REQUIRED BY NEC AND MANUFACTURER SPECIFICATIONS.
2. MAIN DISCONNECT SWITCH SHALL BE 24/7 UTILITY ACCESSIBLE.
SITE DETAILS
AC RATING (kW) 480kW DC RATING (kW) 673.2kW
STRING QUANTITY 72
POWER FACTOR 1.00
INTERCONNECT VOLTAGE 480V
UTILITY DTE
SERVICE NUMBER
ACCOUNT NUMBER
METER NUMBER
CODE EDITION NEC 2023
ESTIMATED ANNUAL
PRODUCTION
INVERTER TRIP SETTINGS (IEEE1547)
DEVICE PICKUP DESCRIPTION NOTE(S)
27-1 139V UNDERVOLTAGE
RELAY27-2 244V
59-1 304V OVERVOLTAGE
RELAY59-2 332V
81U-1 56.5HZ
OVER/UNDER
FREQUENCY
81U-2 58.5HZ
810-1 61.0HZ
810 62.0HZ
MONITORING
ENCLOSURE
DC CONDUCTOR
SWITCH
TRANSFORMER
NOTES
EXISTING EQUIPMENT
CURRENT
TRANSFORMER
M METER SOCKET
GROUND
9 STRINGS
INVERTER 1
CPS 60kW
9 STRINGS
INVERTER 2
CPS 60kW
CB2 - 100A
480V, 3P
CB1 - 100A
480V, 3P
COMP-AP PLANT
CONTROLLER TO THROTTLE
INVERTERS TO ENSURE NO
ENERGY IS EXPORTED TO
GRID
AC DISCONNECT 1
480/277V 3Ø 4W, 800 AF, 800 AT
NEMA 3R ,22kA
COLLECTION PANELBOARD
480/277V 3Ø 3W, 800A BUS, MAIN LUG
NEMA 3R ,22kA
TO PANEL
TO PANEL
EXISTING SWITCHGEAR
480/277V 3Ø 3W, 1600A BUS, NEMA 3R ,22kA
M
EXISTING METER
UTILITY OWNED
GRID CONNECTION
9 STRINGS
INVERTER 3
CPS 60kW
9 STRINGS
INVERTER 4
CPS 60kW
CB4 - 100A
480V, 3P
CB3 - 100A
480V, 3P