This bid package is issued by Colorado Parks and Wildlife (CPW), a division of the State of Colorado Department of Natural Resources, for the Watson Lake SFU - Enclose Porches project (No. S25WAQ-9772). The project involves enclosing covered porches on two residences at Watson Fish Hatchery located at 4936 W County Road 52 E, Bellvue, Colorado 80512, in Larimer County. Work includes demolition of existing walls, windows, and doors; installation of exterior siding with trim, soffits, and fascia; replacement of sliding windows (6 each per building), fixed windows (2 each), and storm doors (2 each); installation of interior paneling and insulation; and electrical fixture replacement. The bid schedule includes 16 line items with quantities specified in linear feet, square feet, or each, including mobilization and removal/replacement of concrete flooring for the north house. The mandatory pre-bid conference is scheduled for November 12, 2026, at 1:00 p.m. at the project site, with written questions due by November 13, 2026, at 5:00 p.m. Bid opening is November 17, 2026, at 1:00 p.m., with a Notice to Proceed tentatively scheduled for November 31, 2026, and substantial completion by January 14, 2027. Work must be completed within 45 calendar days from the date of Notice to Proceed.
Bidders shall submit completed bid schedules, SDVOSB certification documentation (if applicable), and contractor qualifications and references statements via email to peggy.silcox@state.co.us or by mail to CPW Northeast Region, 6060 Broadway, Denver, CO 80216. The award will be made to the lowest acceptable and responsive bidder, contingent upon available funds. Contractors must be registered with the Colorado Secretary of State and provide proof of insurance at contract execution, including workers' compensation, commercial general liability with minimum $1,000,000 combined single limit, and automobile liability coverage with $1,000,000 each accident limit. Service Disabled Veteran Owned Small Businesses (SDVOSBs) officially registered and verified by the U.S. Small Business Administration's Center for Veteran Enterprise and operating in Colorado may receive a 5% bid preference. The State of Colorado is exempt from sales tax, and contractors must obtain exemption numbers from the Colorado Department of Revenue. Contractors must comply with all applicable provisions of Colorado Revised Statutes 24-85-101 et seq. regarding accessibility standards and technology accessibility requirements per Level AA WCAG standards. No additional compensation will be considered for existing site conditions discovered during bidding, and work must be completed within the designated construction area at the hatchery site.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Version April 2026
DQ1: 2027*0159
WATSON LAKE SFU - Enclose Porches
Project No. S25WAQ-9772
Mandatory Pre-Bid Conference: November 12, 2026 at 1:00 pm
Bid Opening: November 17, 2026 at 1:00 pm
Accommodation Statement: The State of Colorado is committed to providing equitable access to our services to all Coloradans. Please contact our AccessDNR team by email
(accessdnr@state.co.us) or Lauren Beecher by phone (720-682-8330) for personalized accessibility assistance using this document. We will contact you directly within three business days. Visit our accessibility web page for more information and services, including AIRA, our free service for blind and low-vision users.
Version April 2026
Table of Contents
S25WAQ-9772
Table of Contents Documented Quote (DQ) Bid Schedule Vendor Response Signature Page
Corporate Signature Block Partnership Signature Block Sole Proprietorship Signature Block Bid Item 1 – Mobilization
Instructions to Bidders
1. Review of Solicitation Documents:
2. General Conditions for Capital Construction:
3. Inquiries:
4. Bid Schedule:
7. Service Disabled Veteran Owned Small Businesses (SDVOSB’s):
9. Accessibility Requirements:
10. Submittal of Bid:
11. Method of Award:
12. Unit Cost:
13. Colorado Purchase Order:
14. State Terms and Conditions
15. Single Contract:
16. Insurance:
18. Execution of Contractual Documents:
19. Notice of Confidentiality in Proposals:
20. Services Outside of Colorado:
21. Sales Tax:
22. Quantities:
23. Work Stoppage:
24. Construction Schedule:
26. Schedule of Subcontractors, Major Equipment And Materials Suppliers:
29. Stormwater Management Plan
30. Incurring Costs:
31. Binding Offer:
32. Rejection of Bids:
33. Protested Solicitations and Awards:
34. ACH/EFT Payments:
36. Alternative Products:
38. Work Hours On Project Site:
41. Performance Monitoring CRS §§ 24-106-107
Contractor’s Qualifications and References WATSON LAKE SFU - Enclose Porches Table of Contents Division 1 - General Requirements
General Condition:
Section 01010 - Summary of Work Section 01200 - Construction Meetings Section 01300 - Submittals Section 01710 - Project Cleaning
WATSON LAKE SFU - Enclose Porches Table of Contents ........................................................ Error! Bookmark not defined.
WATSON LAKE SFU - Enclose Porches Table of Contents ........................................................ Error! Bookmark not defined.
Appendix A Reports ............................................... Error! Bookmark not defined.
Appendix B Permits ............................................... Error! Bookmark not defined.
Appendix C General Conditions for Capital Construction
End of Table of Contents
Documented Quote (DQ)
Colorado Parks and Wildlife is accepting bids for Enclosing Covered Porches on two residences.
Bids shall be received by Colorado Parks and Wildlife (CPW) via email (preferred), mail, or hand delivered to, 6060 Broadway, Denver, CO 80216 until November 17, 2026 at 1:00 pm, after which the bids will then be made public. Bids shall be submitted using the form provided in the project specifications.
Mandatory Pre-bid conference: November 12, 2026 at 1:00 pm at the project site.
Project Address: Watson Fish Hatchery
4936 W County Rd 52 E Bellvue, CO 80512 Larimer County
View Google Map Location – Watson Hatchery Porches
Contractor Questions: All questions related to the project shall be submitted via e-mail to the solicitation Single Point of Contact, Peggy Silcox at peggy.silcox@state.co.us. Unauthorized contact with any Agency/Institution personnel other than the Single Point of Contact regarding this solicitation is prohibited and may result in disqualification. The deadline for questions is Nov 13, 2026 at 5:00 pm. Questions submitted after the deadline will not be addressed. All questions and answers will be posted as solicitation amendments on the Vendor Self
Service (VSS) website. Bidders may not automatically be notified of the existence of a modification or addendum. It is the responsibility of the bidder to check the VSS website periodically to see if any modifications have been issued. Failure to retrieve such modifications and include their provisions in your bid response may result in your bid being deemed non-responsive.
Plans and specifications are available for all bidders on the web at:
www.colorado.gov/vss
The following is a tentative project schedule, which will be revised and expanded by the selected Contractor and submitted to the Project Manager for review:
1. Mandatory Pre-Bid Conference
November 12, 2026 at 1:00 pm
2. Written Questions Due
Nov 13, 2026 at 1:00 pm
3. Bid Opening
November 17, 2026 at 1:00 pm
4. Notice to Proceed
November 31, 2026 (Tentative)
5. Substantial Completion
January 14, 2027 (Tentative)
End of Documented Quote Section
Bid Schedule
Department of Natural Resources
Colorado Parks and Wildlife
State of Colorado
By way of this Documented Quote submission, Bidder shall furnish all labor, equipment, materials, and incidentals needed to complete
WATSON LAKE SFU - Enclose Porches. The work shall be completed in 45 calendar days from the date of the Notice to Proceed. We have read and made the
“Instructions to Bidders”, the “General Conditions for Capital Construction”, the
Written Specifications, and the Construction Drawings included in this solicitation.
Units: LF= linear foot, SF= square foot, LS= lump sum, EA = each, SY= square yard, Service Disabled Veteran Owned Small Business Statement (SDVOSB): The undersigned bidder shall certify by checking below that the corporation, partnership, or sole proprietorship IS or IS NOT claiming a 5% bid preference in accordance with
C.R.S. 24-103-211. SDVOSB certification must be included with your bid.
o Is o Is Not
Addendum Inclusion Statement: The undersigned bidder shall certify by listing below that all Addendums have been considered and included as part of the Contractor’s proposal. The Addendum numbers that the Contractor has included as part of his proposal shall be listed in the space provided. ___________________________
Base Bid: Furnish and install all materials and labor for the completion of the Base
Bid Improvements per the Construction Drawings and Specifications.
Base Bid: Furnish and install all materials and labor for the completion of the Base Bid Improvements per the Construction Drawings and Specifications Base Bid Items: Quantity Unit Unit Cost Total Item Cost
1. Mobilization 1 LS
Building No. GH102, north house
2. Remove and replace concrete floor 160 SF
3. Demolish existing walls, windows and doors 1 LS
4. Exterior Siding 1 LS
5. Sliding Windows 6 EA
6. Fixed Windows 2 EA
7. Storm Doors 2 EA
8. Interior Panelling and Insulation 1 LS
9. Electrical Fixtures 1 LS
Building No. GH103, south house
10. Demolish existing walls, windows and doors 1 LS
11. Exterior Siding 1 LS
12. Sliding Windows 6 EA
13. Fixed Windows 2 EA
14. Storm Doors 2 EA
15. Interior Panelling and Insulation 1 LS
16. Electrical Fixtures 1 LS
Base Bid AMOUNT $
Base Bid AMOUNT (PLEASE WRITE OUT)
DOLLARS
Vendor Response Signature Page
Bidders must complete this form and return it with their Bid Schedule
Corporate Signature Block
Company Name______________________________________________________
A ____________________________________________ Corporation
By: ________________________________________________________________
President date
Attested to by: _______________________________________________________
Secretary date
Partnership Signature Block
A limited partnership of _________________________________________________ doing business as (dba) __________________________________________________ by: ___________________________________________________________________
General Partner date
Sole Proprietorship Signature Block
A Sole Proprietorship of ________________________________________________
Doing business as (dba) _________________________________________________ by____________________________________________________________________
Owner date
Colorado VSS Vendor ID# (optional) ____________________
End of Bid Schedule Section
Bid Item Descriptions
The following descriptions describe the Work, for each bid item in the Bid Schedule.
The Bidder is to read these definitions and price their proposal accordingly.
Bid Item 1 – Mobilization
This bid item includes the mobilization of personnel, equipment and supplies at the project site in preparation for the Work, as well as the establishment and maintenance for the duration of the Contract of the Contractor’s sanitary facilities, protective fencing and barricades not included elsewhere, necessary facilities, and all other costs incurred or labor and operations which must be performed prior to beginning the other items under the Contract. This item shall also include marshalling, disassembly and security of all items indicated on the Construction
Drawings or Specifications or installed as part of mobilization and demobilization from the site. Payment will be made in two installments: the first 60% will be paid on the first month’s pay estimate, and the remaining 40% after the final cleanup has been completed and approved and warrantees have been submitted.
Bid Item 2 – Remove and Replace Concrete Floor, North House
This bid item includes removal and replacement of the concrete slab in the North
House. This includes demolition and disposal of existing concrete, replacing subgrade as needed and placing a new 6” reinforced concrete slab. See Section 3302, Cast-In-
Place Concrete Patio.
Bid Items 3 and 11 - Demolish existing walls, windows and doors
This bid item includes removal and disposal of existing wall materials, windows, and doors. It includes any work needed to temporarily support the roof.
Bid Items 4 and 10 – Exterior Siding
This bid item includes all materials and labor to install siding as described in Section
07457 – Siding. It also includes trim, soffits and fascia and house wrap.
Bid Items 5 and 12– Sliding Windows
This bid item includes all materials and labor to replace windows as shown in Section
08530 – Vinyl (PVC) Windows. The windows will be the same size as the windows removed in Items 3 and 11. It includes modifying framing as needed, caulk and trim.
Bid Items 6 and 13 – Fixed Windows
This bid item includes all materials and labor to replace windows as shown in Section
08530 – Vinyl (PVC) Windows. The windows will be the same size as the windows removed in Items 3 and 11. It includes modifying framing as needed, caulk and trim.
Bid Items 7 and 14 - Storm Doors
This bid item includes all materials and labor to replace windows as shown in Section
08390 – Storm Doors. The doors will be the same size as the doors removed in Items 3 and 11. It includes modifying framing as needed, caulk and trim.
Bid Items 8 and 15 – Interior Paneling and Insulation
This bid item includes all materials and labor to install paneling on walls and ceilings, as shown in Section 09970 – Prefinished Wall Panels. It also includes insulation as shown in Section 07200 – Insulation. It includes trim, caulk and minor adjustment of electrical fixtures.
Bid Items 9 and 16 – Light Fixtures
This bid item includes all materials and labor to replace the existing lighting fixtures, as shown in Section 16500 – Lighting. It includes trim, caulk and minor adjustment of electrical fixtures.
This concludes the bid items listed in the proposal. The only payments made under this contract are for the bid items listed herein, and no additional payments will be made to the Contractor for work specified or shown in these Contract Documents. If any discrepancies exist, the Contractor shall notify the Project Manager in writing, requesting clarification.
Bid Item Descriptions
Instructions to Bidders
Project: WATSON LAKE SFU - Enclose Porches
Project No: S25WAQ-9772
1. Review of Solicitation Documents:
Bidders must review the plans and specifications, construction site and conditions in their entirety, and determine the problems that may be encountered in performing the work. The bidder shall include any costs associated with his/her findings in the prices quoted in the proposal. Documents will be available on the State of Colorado
VSS website www.colorado.gov/vss. No additional copies of the drawings and specifications will be provided by the CPW at any time before or after the bid opening.
Contractors must monitor the amendment history in ColoradoVSS for any updates or modifications. In the event that it becomes necessary to modify the DQ, the modification will be made in ColoradoVSS. It is very important that vendors check
ColoradoVSS on a regular basis, as this is the sole method for communicating any modifications. Modifications included in amendments published on ColoradoVSS take precedence over information in the Documented Quote.
The ColoradoVSS Help Desk is available Monday through Friday 8:00 a.m. to 5:00 p.m.
MT and can be reached by emailing vsshelp@state.co.us.
2. General Conditions for Capital Construction:
All work must conform to the requirements stated in the “General Conditions for
Capital Construction”.
3. Inquiries:
All questions concerning this project shall be in writing directed to the Single Point of
Contact identified in the Documented Quote section of the solicitation. The
Documented Quote section also identifies important dates and deadlines for this project.
4. Bid Schedule:
A. The bidder shall include on the signature page, their Vendor ID (if available) obtained from registration on the Colorado VSS website.
B. The bidder shall complete the Minority Business and Service Disabled
Veteran Owned Small Business statements as well as acknowledge addendum(s) on the first page of the Bid Schedule.
C. All bid items shall include a unit and extended price or the bid may be disqualified. The bidder shall write in words and numerically the total base bid and add/alternate (if applicable) amounts on the included Bid Schedule.
If conflicts exist between the written words and the numerical amount, the actual line item unit cost shall take precedence.
D. The Bid Schedule “Vendor Response Signature Page” shall be signed manually in ink or bear an electronic signature, as electronic signature is defined in the "Uniform Electronic Transactions Act", section 24-71.3-102
(8), evincing an intent by the vendor to be bound by its response. Failure to do so may disqualify the vendor response.
1) If the bidder is a corporation, use the corporate signature block, insert the name of the state in which the company was incorporated, and include the Employer Identification Number (E.I.N.) in the appropriate spaces. The bid must be signed by an officer (President or Vice
President), and the title indicated. The signature of the officer shall be attested to by the Secretary and properly sealed. Cross out incorrect titles and insert correct ones, if necessary.
2) If the bidder is a partnership, use the partnership signature block. Cross out the word "Limited" if the partnership is a general one. Print each partner's name and note the proportion of the partnership that each partner has. The majority or general partner must sign the proposal.
The same person must sign the contract, if awarded. Print the company name in the appropriate space.
3) If the bidder is a proprietorship, use the sole proprietorship signature block, print in the owner's name, Social Security number, and the business name in the blanks provided, and the owner signs the owner blank.
7. Service Disabled Veteran Owned Small Businesses (SDVOSB’s):
SDVOSBs, who are incorporated or organized in Colorado or maintain a place of business or have an office in Colorado and who are officially registered and verified as a SDVOSB by the Center for Veteran Enterprise within the U.S. Small Business
Administration (https://veterans.certify.sba.gov), may receive a 5% preference on their bid. This preference applies only to the price, and the SDVOSBs must still meet all other qualifications required in the bid. SDVOSBs claiming this preference shall submit documentation of SDVOSB certification Issued through the Center for Veteran
Enterprise within the U.S. Small Business Administration in their response to the solicitation. Bid submissions without this documentation will not be given a preference
9. Accessibility Requirements:
All work performed as a result of this solicitation must comply with all applicable provisions of §§24-85-101, C.R.S., et seq., and the Accessibility Standards for
Individuals with a Disability, as established by the Office Of Information Technology pursuant to §24-85-103 (2.5), C.R.S. and 3) all State of Colorado technology standards related to technology accessibility and with Level AA of the most current version of the Web Content Accessibility Guidelines (WCAG), incorporated in the State of
Colorado technology standards.
10. Submittal of Bid:
The completed Bid must be received by the deadline identified in the Invitation for
Bid. Bidders must include the following items with their bid package:
A. Completed Bid Schedule as described above.
B. SDVOSB certification issued through the U.S Department of Veterans Affairs
(if applicable).
C. Contractor’s Qualifications and References Statement.
If submitting via email: peggy.silcox@state.co.us
If submitting a hard copy, the envelope shall be addressed to:
Colorado Parks And Wildlife
Northeast Region
6060 Broadway
Denver, CO 80216
ATTN: Peggy Silcox
Bidder’s name and address shall appear in the upper left corner of the envelope.
11. Method of Award:
The award will be made to the low acceptable quote and a purchase order or contract will be issued, to the extent that the total dollar amount is within available funds to finance the construction. If all bids exceed such an amount, CPW reserves to reject all bids. CPW reserves the right to reject any or all proposals, to waive informalities, and to accept any proposal deemed desirable.
The bidder must be registered to do business in the State of Colorado with the
Secretary of State www.sos.state.co.us. A Certificate of Good Standing will be required to process the Agreement.
12. Unit Cost:
The price quoted in the proposal shall include the costs of labor, materials, equipment, and incidentals required to provide a fully complete and functioning unit as shown and described in the plans and specifications. The price stated in the proposal shall be complete and represent total payment for each item in the proposal. No additional payment will be made for the work presented in the proposal.
13. Colorado Purchase Order:
A Purchase Order may be issued to the awarded Offeror. The Purchase Order will include all documents associated with the bid including these Special Conditions, the
Offeror’s response and the Colorado Purchase Order Terms and Conditions. Please use the following link to access the Colorado Purchase Order Terms and Conditions:
State of Colorado Purchase Order Terms and Conditions.
14. State Terms and Conditions
A submission in response to the solicitation acknowledges acceptance by the proposer of all unaltered terms and conditions, as set forth herein. Any proposed exception taken to the State’s Terms and Conditions must be clearly and thoroughly identified and supported and acceptable alternatives must be proposed. Failure to do so shall be deemed a waiver of any rights to subsequently raise exception and/or request modification, except as outlined or specified in this solicitation. Submission of exceptions does not guarantee their acceptance, however, and such submittal will be taken into consideration during proposal review and scoring by the evaluation team.
The State reserves the right to reject any changes suggested to the Purchase Order or
Contract Terms and Conditions and award to the next most advantageous qualified responsive Contractor.
15. Single Contract:
DNR will enter into a single contract. Any partnerships between firms specializing must be managed in a Prime Contractor/Subcontractor approach. All references to
“contractor” or “offeror” throughout this DQ document shall be interpreted to mean the prime responding vendor, except where specifically noted otherwise. Any/all forms signed and submitted by this defined prime contractor shall be interpreted as acknowledgement of terms and conditions and assumed responsibilities on behalf of all partnered entities (if applicable). The selected contractor will be required to assume responsibility for all goods and services offered in its proposal, and DNR will consider the selected contractor to be the sole point of contact with regard to all contractual matters and responsibilities. The Prime Contractor shall not enter into any subcontract in connection with its obligations under the contract without the prior, written approval of the State. Contractor shall submit to the State a copy of each such subcontract upon request by the State. All subcontracts entered into by
Contractor in connection with this Contract shall comply with all applicable federal and state laws and regulations, shall provide that they are governed by the laws of the State of Colorado, and shall be subject to all provisions of this Contract.
16. Insurance:
The successful bidder will be required to submit proof of insurance at the time of executing the agreement. Proof of insurance must be submitted on certificates showing the minimum coverage amounts.
A. The Contractor is required to procure and maintain at all times during the term of this contract the insurance coverage listed below:
1) Workers’ Compensation and Employer’s Liability Insurance, as required by state statute, including occupational disease, covering all of contractor or subcontractor employees acting within the course and scope of their employment.
2) Commercial General Liability Insurance written on ISO occurrence form CG 00 01 10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows:
a. $1,000,000 combined single limit written on an occurrence basis;
b. $1,000,000 general aggregate;
c. $1,000,000 products and completed operations aggregate; and
d. $50,000 any one fire.
e. If any aggregate limit is reduced below $1,000,000 because of claims made or paid, the contractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to the State a certificate or other document satisfactory to the
State showing compliance with this provision.
3) Automobile Liability Insurance covering any auto (including owned, hired and non-owned autos) with a minimum limit as follows:
$1,000,000 each accident combined single limit.
B. The State of Colorado shall be named as an Additional Insured on the
Commercial General Liability and Automobile Liability policy insurance certificates and CPW must be named as the certificate holder for all coverages noted above (leases and construction contracts will require the additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037, or equivalent). Coverage required of the contract will be primary over any insurance or self-insurance program carried by the State of Colorado.
C. The Insurance shall include provisions preventing cancellation or non-renewal without at least 45 days prior notice to the State by certified mail.
D. The Insurance shall include a waiver of subrogation for all coverages.
E. The contractor will require all insurance policies in any way related to the contract and secured and maintained by the contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees and volunteers.
F. All policies evidencing the insurance coverage required hereunder shall be issued by insurance companies satisfactory to the State. No later than 15 days prior to the expiration date of any such coverage, the contractor shall deliver the State certificates of insurance evidencing renewals thereof.
18. Execution of Contractual Documents:
If the successful bidder, upon acceptance of an award by the Owner, fails to execute such further contractual documents, and give such bond(s) (including any necessary coinsurance or reinsurance agreements) as may be required within ten (10) days after receipt of the Notice of Award, the contract may be terminated for default. In such an event the Contractor shall be liable for any cost of procuring the work which exceeds the amount of his bid, and the bid guarantee shall be available toward offsetting such difference.
19. Notice of Confidentiality in Proposals:
The bidder is not to give any information concerning his proposal to any other bidder or receive any information concerning another proposal.
20. Services Outside of Colorado:
Vendors must disclose services performed outside of Colorado as required by C.R.S. 24-
102-206.
21. Sales Tax:
The State of Colorado is exempt from paying Colorado sales tax. Any materials and supplies purchased for this contract are exempt. The Contractor will need to obtain an exemption number from the Department of Revenue for this project and each subcontractor is required to obtain one under the general contractor.
22. Quantities:
Quantities stated in the bid schedule and construction documents are estimates only and may increase or decrease during construction. The contractor will perform the required quantity of work based on the unit prices stated in the Bid Schedule except as provided in Section 4.2 of the "General Conditions for Capital Construction."
23. Work Stoppage:
Work stoppage is a possibility. The contractor must request all shutdowns or stoppages in writing. If a shutdown is granted, the Division will pay for only work that has been totally completed. No advanced payment of mobilization will be made.
24. Construction Schedule:
The Contractor shall submit a written project schedule and supporting data to the
Project Manager as soon as possible after the receipt of the Notice of Award. The schedule shall describe key milestones and duration of project activities. The supporting data for the schedule shall include a complete list of anticipated submittals and due dates, and the key ordering and delivery lead times. The
Contractor shall schedule the sequence of construction to consider the delivery of long lead-time items. It shall be the Contractor's responsibility to notify the Project
Manager of any problem in conforming to the Contract Documents, Specifications, and
Construction Drawings for any element of the proposed improvements prior to its construction.
26. Schedule of Subcontractors, Major Equipment And Materials Suppliers:
The Contractor shall provide the Owner, prior to the commencement of any Work, a detailed listing of subcontractors and major equipment and materials suppliers indicating their name, address, description of service or equipment and materials being provided, if they are a woman owned or minority owned business enterprise
(WBE/MBE), and their vested monetary interest in the contract. The Contractor shall not award any Work to a subcontractor, transfer or assign any portion of the Contract
Work, without the written approval of the Owner. Records shall be maintained throughout the duration of the Contract and periodically submitted at the time the
Contractor submits progress payment applications. The Owner will use these records to verify the Contractor’s level of indebtedness prior to making final payment.
29. Stormwater Management Plan
This project will not disturb more than 1 acre of ground, so a State stormwater control permit is not required
30. Incurring Costs:
CPW shall not be obligated or liable for any cost incurred by any company or individual reviewing this proposed project or prior to the issuance of a PO/contract approved by the Controller of the State of Colorado or such assistant as they may designate. Any and all costs to review the project, inspect the proposed construction site, prepare and or submit bids will be the sole responsibility of the bidder.
31. Binding Offer:
A quote submitted in response to this solicitation shall constitute a binding offer and acknowledgment that all terms and conditions of this solicitation are accepted.
Vendors must identify any variations between its quote and the solicitation. Failure to do so shall be deemed a waiver of any rights to subsequently modify the terms of performance. Submission of exceptions does not guarantee their acceptance, however, any such submission will be taken into consideration. The State reserves the right to reject any changes suggested to PO or Contact terms and conditions and award to the next most advantageous qualified responsive vendor.
32. Rejection of Bids:
Pursuant to C.R.S. 24-103-301, the State of Colorado reserves the right to reject any or all Bids received in response to this DQ, or to cancel this DQ if it is in the best interest of the State to do so. Failure to furnish all information, or to follow the Bid format set forth in this DQ, may act to disqualify the proposal. It is the sole responsibility of the Offeror to ensure that the proposal is signed and all required information is included. In the event the CPW elects to not award any Offeror, or the
DQ solicitation is canceled, all received bids must be retained as confidential and will not be subject to public inspection. The purpose for this condition is to prevent any future potential offerors an opportunity to review other offerors’ proposals and thereby gain any unfair advantage in submitting future bids.
33. Protested Solicitations and Awards:
An aggrieved party may file a protest concerning a material issue(s), at any phase of solicitation, including but not limited to, specifications, award or a disclosure of information marked confidential in the bid. The protest shall be submitted via email to the DNR Procurement Official as noted below within three (3) business days after such aggrieved person knows, or should have known, of the facts giving rise thereto.
Reference CRS 24-109-102, as amended, and Procurement Rule R-24-109-102-01, et seq.
DNR Procurement Official: Ion Cotsapas, ion.cotsapas@state.co.us
The written protest shall include, as a minimum, the following:
1. The name and address of the protestor;
2. Appropriate identification of the procurement by bid or award number;
3. A statement of the reasons for the protest, and any available exhibits, evidence, or documents substantiating the protest.
34. ACH/EFT Payments:
Contractors are highly encouraged to consider signing up for ACH/EFT payments. ACH/EFT payments provide the advantage of ensuring quick and secure payments for the goods and services that vendors provide to the State. ACH/EFT payments help avoid the unnecessary, and sometimes inevitable delays in mail, and the possibility of lost warrants which will further delay vendor payment. DNR’s goal is to pay vendors as soon as possible - signing up for the ACH/EFT is an important step in making this happen. For additional information about signing up for ACH/EFT payments, please contact the Project Manager identified in the DQ.
36. Alternative Products:
Certain materials and equipment have been specified by manufacturers’ trade names.
This was done to establish the minimum quality and type of product desired.
Alternatives to the manufacturers’ products may be used if the Project Manager determines they are equal. The Award will be based on the products identified in the plans.
38. Work Hours On Project Site:
All work on this project site will be allowed as follows: 8am to 6pm or otherwise approved by the Project Manager.
41. Performance Monitoring CRS §§ 24-106-107
A. Performance Measures And Standards: Performance measures and Standards as defined in the General Conditions for Capital Construction shall be the basis for this Contract. This includes but is not limited to the following:
i. The Contractor shall prepare a project schedule at project startup and continue to update the schedule throughout construction providing detailed justifications for construction delays and schedule changes.
ii. The Contractor shall submit all required product information as defined in the Construction Drawings & Specifications. In turn, the State’s Project
Manager shall review and comment within 10 days of receipt.
iii. The State’s Project Manager and the Contractor shall conduct Construction
Progress Meetings and Quantity Verification Inspections at least monthly or as otherwise determined necessary during Construction activities.
B. Accountability: Project and Contract administration will provide accountability by documenting and evaluating the progression of construction and the ability to follow the agreed upon construction schedule. The Contractor shall report regularly on achievement of the performance measures and standards specified above and failure to do so allows the governmental body to withhold payment until successful completion of all or part of the contract and the achievement of established performance standards. Payment by the State to the Contractor shall be made without delay upon successful completion of all or any part of the contract in accordance with the payment schedule specified in the contract or as otherwise agreed upon by the parties.
C. Monitoring Requirements: The State will evaluate the Contractor’s performance by reviewing the monthly progress reports and monthly construction schedule updates provided by the Contractor as well as performing site visits to verify quantities based on the Bid Schedule, inspections to verify quality of work, and reviews of performance data as construction progresses to ensure that the results, objectives and obligations of the contract are met.
D. Noncompliance Resolution: Methods and mechanisms as defined in the General
Conditions for Capital Construction shall be used to resolve any situation in which the State's monitoring assessment determines noncompliance, including termination of the contract.
End of Instructions to Bidders Section
Contractor’s Qualifications and References
Interested firms shall submit as an attachment to the bid proposal one (1) copy of the following document. Failure to provide a completed Contractor’s Qualification
Statement with the bid proposal may result in disqualification. This format can be expanded up to five (5) total pages maximum.
1. Provide summaries of three (3) similar construction projects in the past five (5) years that include materials, trades, and sitework of similar scope. Include the project name, contract value, and a brief description of the project.
Project #1:
Project #2:
Project #3:
2. Provide reference information for the example projects. Include the owner’s name, the reference point of contact, and their phone number.
Project #1:
Project #2:
Project #3:
End of Qualifications and References Section
Specifications
Project NO. S25WAQ-9772
Mandatory Pre-Bid Conference: November 12, 2026 at 1:00 pm
Table of Contents
Division 1 - General Requirements
● Section 01010 - Summary Of Work
● Section 01200 - Construction Meetings
● Section 01300 - Submittals
● Section 01310 - Construction Schedules
● Section 01500 - Temporary Facilities and Controls
● Section 01710 - Project Cleaning
Division 2 - Site Work
● Section 02050 - Mobilization
Division 3 – Concrete
● Section 03302 - Cast-In-Place Concrete Patio
Division 7 - Thermal And Moisture Protection
● Section 07200 - Insulation
● Section 07467 - Siding
Division 8 - Doors And Windows
● Section 08390 - Storm Doors
● Section 08530 - Vinyl Windows
Division 9 – Finishes
● Section 09970 - Prefinished Wall Panels
Division 16 – Electrical
● Section 16500 - Lighting Fixtures
Division 1 - General Requirements
General Condition:
Please read the most current "General Conditions for Capital Construction" in your possession. They apply to all Divisions of these specifications, accompanying drawings and to this proposed project.
Section 01010 - Summary of Work
1. Location:
Watson Fish Hatchery
4936 W County Rd 52 E Bellvue, CO 80512 Larimer County
2. Description of the Work:
The project consists of Enclosing Covered Porches on two residences. All work shall be in compliance with these specifications and construction drawings.
3. Construction Commencement:
The Contractor may not begin construction prior to the issuing of the Purchase Order.
Upon commencement of the work on site contract time will begin in accordance with
Section 8.2 of the General Conditions for Capital Construction.
4. Additional Provisions:
The work and the compensation, therefore, shall be as covered by these specifications consisting of furnishing all plant, labor, equipment and materials required to perform the work shown on the drawings and listed in the bid schedule, unless otherwise stipulated or approved in writing by the Project Manager.
Division field engineering personnel are authorized to supervise the construction of this project in accordance with the previously approved plans and specifications and change orders. All changes in the work shall be approved in writing by the Project
Manager before being activated in accordance with Section 4, Item 4.2 of the General
Conditions for Capital Construction.
The specifications included herein are the Specifications for this project. If there should be a difference between the Specifications and the drawings, the
Specifications shall govern.
5. Contractor Responsibility:
Visit the site and determine to your own satisfaction the amount and type of work to be performed to complete the project in accordance with the drawings, specifications and Contract Documents before submitting your bid.
Before final payment will be made on the completed contract, submit to the Owner all specified warranties and other product warranties.
6. Subcontracted Work:
Contractor shall not subcontract any portion of the work without written consent of the Project Manager, which consent shall not unreasonably be withheld. In cases where such consent is given, the Contractor shall perform with his own organization work amounting to not less than 50 percent of the total contract cost, as determined by the Project Manager, except that any items agreed to by the Project Manager as
“specialty items” may be performed by subcontract and the cost of any such specialty items so performed by subcontractor may be deducted from the total cost before computing the amount of work required to be performed by the Contractor with his own organization. However, under no circumstances shall less than 20 percent of the total contract cost be performed by the Contractor’s organization after deduction of specialty items.
7. Site Layout and Staking:
Work will be done within the footprint of the existing structures.
8. Construction Limits:
At the commencement of construction, the Project Manager will designate the area allowed for the construction process. Restrict work to that designated area. Any changes deemed necessary shall be discussed with and approved by the Project
Manager.
9. Marshalling and Access:
Limits and access to the site for use: before taking possession and use of the site, meet with the Project Manager to determine the marshalling area(s) and access points to be used to execute the work. Limit access and marshalling areas agreed to at that meeting. Obtain written permission from the Division of any changes other than first agreed upon. Upon completion of all work, restore all areas to original or improved conditions.
10. Job Conditions:
Examine the site, determine the nature of conditions to be encountered and accept the site as found upon the examination. Examination must be made prior to bidding as no additional compensation will be considered after receipt of bids for existing conditions which are required to be worked, adapted, or modified to these specifications.
11. Building Codes:
A building permit will not be required.
12. Protection and Safety Practice:
I. General: All work shall be carried out in a safe manner in accordance with local codes and the safety requirements of the Colorado State Division of Labor.
II. Contractor shall be required to conform to all industry standard safety requirements as well as OSHA requirements (i.e. Confined Space Entry, etc.) in effect at the time of construction.
III. Existing Utilities: Colorado SB 93-155 requires that anyone that engages in any type of excavation must provide advance notice to the underground facility owners. Prior to any moving or excavating of earth, the Contractor shall call the Utility Notification Center of Colorado (UNCC) or “Common Ground
Alliance” (CGA) – the “Call Before You Dig” number – at 811. Utility owners have three business days to perform locates. If facilities are not marked within the three business days, you are required to call back to UNCC and process a
Second Notice Request. UNCC encourages both Contractors and Sub-Contractors to obtain a locate ticket. A “no response” from the utility owner does not allow the Contractor to start digging. Notify the Project Manager when working near utility lines or appurtenances.
IV. Aquatic Concerns and Equipment Cleaning: Contractor is required to take special care to not allow any personnel, equipment, materials or any other items to contact adjacent waterways.
V. Surface Drainage: Provide for surface drainage during the construction period in a manner to avoid creating a nuisance to adjacent properties.
VI. Location Markers: Carefully maintain and protect all bench marks, corner monuments and other points. If disturbed or destroyed, replace at no cost to the Owner as directed by the Project Manager.
VII. Owner Furnished Materials: No owner furnished material will be provided
Section 01200 - Construction Meetings
1. Preconstruction Conference: The Contractor or his representative after award of the contract shall attend a preconstruction conference to be held at the CPW regional office, Denver office or other office in proximity to the project as designated by the Project Manager.
Section 01300 - Submittals
1. Provide the manufacturer's literature for products specified or approved equal products as stated in Section 6 of the General Conditions for Capital Construction.
2. Provide warrantees for all installed materials.
Section 1500 - Temporary Facilities and Controls:
1. Fire control
I. Maintain, at least, two all purpose 10 lb. fire extinguishers at each work zone at the construction site. Maintain the site in an orderly condition to prevent fire hazards.
II. The Contractor shall do everything reasonable within its power and shall require its employees, subcontractors and employees of subcontractors to do everything reasonable within their power to prevent and suppress fires on or near the lands to be occupied under this project The Contractor is responsible for all suppression costs and resource damage for any fire resulting from its operations and practices.
III. The Contractor is responsible to insure that each employee, subcontractor, or any other individual or company working on the project site is aware of the provisions of this fire plan, is familiar with the location and proper use of firefighting equipment, and conducts themselves in a fire safe manner.
IV. No material shall be disposed of by burning in open fires.
V. Exhaust systems of vehicles and engine generators shall have an acceptable muffler and shall be in proper working condition. All motorized equipment and machinery shall be equipped with the spark arresters.
VII. Vehicles shall be parked only in cleared, approved areas.
VIII. All smoking shall be done only inside of vehicles or in areas cleared of flammable material.
IX. Welding: No welding shall be conducted on site.
X. Blasting: Use of explosives is not authorized.
XI. Refueling: No refueling shall be conducted on site.
XII. Burning of material is not permitted.
2. Heritage Resources: All persons associated with operations under this authorization must be informed that any objects or sites of cultural, paleontological, or scientific value such as historic or prehistoric resources, graves or grave markers, human remains, ruins, cabins, rock art, fossils, or artifacts shall not be damaged, destroyed, removed, moved, or disturbed. If in connection with operations under this authorization any of the above resources are encountered, the proponent shall immediately suspend all activities in the immediate vicinity of the discovery that might further disturb such materials and notify the Project
Manager of the findings. The discovery must be protected until notified in writing to proceed by the Project Manager. (36 CFR 800.110 &112, 43 CFR 10.4)
3. Temporary Sanitary Facilities: Contractor shall provide adequate temporary sanitary conveniences for the use of all employees and persons engaged on the work, as required by law, ordinances, or regulations of public authorities having jurisdiction.
4. Temporary Water: Potable water is available on the site.
5. Temporary Heat: Contractor shall provide, at his own expense, all temporary heat as necessary for the proper installation of all work, equipment, and materials and for the protection of all work and materials against injury from dampness, cold, and freezing. Fuel, equipment, and methods of heating shall be in accordance with federal, state, and local regulations.
6. Exterior Storage: All operations of the Contractor, including storage of materials, shall be confined to areas approved by the Project Manager. Contractor shall be liable for any and all damage caused by him during such use by him of property of the Owner or other parties. Contractor shall save the Owner, its officers and agents, and the Project Manager and his employees free and harmless from liability of any nature or kind arising from any use, trespass, or damage occasioned by his operations on premises of third persons or parties.
7. First Aid Facilities: A first aid kit shall be provided to serve all personnel at the work site.
8. Security: The Contractor shall make all necessary provisions and be responsible for the security of the contract work and the work site until final inspection and acceptance of the contract work.
Section 01710 - Project Cleaning
All areas shall be cleared and cleaned upon completion of work at all construction site locations. All debris and construction materials scattered and blown about the site shall be gathered, returned and secured to their proper location or disposed of during the construction process and upon completion.
SECTION 03302 - CAST-IN-PLACE CONCRETE PATIO
1. SCOPE OF WORK:
Furnish all labor, materials and equipment required to complete the work of the noted Sections of this Division described herein and on the drawings.
2. WORK INCLUDED:
The work shall include, but is not necessarily limited to, the construction of a concrete patio.
3. MEASUREMENTS:
I. The patio shall be measured by the square foot as shown in the Bid Schedule.
II. Quantities shall not be measured for formwork, reinforcing steel, installation of various inserts and required earthwork, but shall be included in the related construction.
4. PRODUCTS:
I. Portland Cement:
Type II, low to moderate alkali, shall conform to CDOT 701.01 (ASTM C 150).
II. Aggregate:
A. Fine Aggregate:
Shall conform to CDOT 703.01 (AASHTO M 6).
B. Coarse Aggregate:
Shall conform to CDIT 703.02 (AASHTO M 80), except crushed hydraulic-cement concrete shall not be allowed.
Regular, CDOT Class D, concrete shall be made with ¾ inch (19.0 mm) nominal sized course aggregate.
III. Reinforcing steel:
No 4 rebars.
IV. Isolation Joints:
Isolation joint expansion filler shall be closed cell grade polyethylene or non-extruding PVC such as Nomaco “Fastflex”, or approved equivalent.
V. Water Quality:
Mixing water shall be clean and free of oil, acid and injurious amounts of vegetable matter, alkalies and other impurities.
VI. Mix Proportioning:
Concrete materials shall conform to the requirements of the Section 600 of the latest version of the Colorado Department of Transportation (CDOT) Standard Specifications for Road and Bridge Construction, and subsequent revisions thereto.
CDOT Class D - Except as otherwise specified, concrete shall have a 28 day compressive strength of 4,500 psi, minimum.
5. INSTALLATION:
VII. Dimensions:
The patio shall be formed and placed to replace the existing concrete. Isolation joint material shall be placed where concrete is adjacent to buildings.
VIII. Reinforcing Steel bars:
No 4 bars shall be placed on 12 inch centers.
IX. Placing Concrete:
Notify the Project Manager prior to scheduled concrete pours. The subgrade shall be inspected and approved by the Project Manager prior to placing of concrete.
Concrete placement will not be permitted in adverse conditions such as heavy rain or freezing conditions. Concrete shall not be placed on frozen subgrade.
Care shall be taken to prevent the discharge of wet concrete into any stream or lake.
X. Consolidating Concrete:
Use mechanical vibrating equipment for consolidation.
XI. Control Joints:
Tooled control joints shall be placed every 5 to 6 feet. The joints shall be cut once the concrete has reached its initial cure.
XII. Finishing:
The walking surface shall be a broom finish.
XIII. Curing:
Concrete shall be cured with plastic covers for 3 days minimum.
XIV. Patching Formed Surfaces of New Concrete:
After the forms have been removed, all concrete surfaces shall be inspected. Patch joints, voids, stone pockets or other defective areas as directed by the Project Manager.
End of Section
SECTION 07200 – INSULATION
6. SCOPE OF WORK:
Furnish all labor, materials and equipment required to complete the work of the noted Sections of this Division described herein and on the drawings.
7. WORK INCLUDED:
The work shall include, but is not necessarily limited to furnishing, installation and application of insulation materials.
8. MEASUREMENTS:
Quantities shall not be measured for the installation of the insulation but be paid as a lump sum as shown in the bid schedule.
9. PRODUCT DELIVERY, STORAGE AND HANDLING:
XV. Delivery:
Deliver material to the site in unopened packages, with identification labels intact.
Identify contents, manufacturer, brand name, thermal values and applicable standards.
Use all means necessary to protect insulation…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .