Bid Package DKDC 2026 HVAC Upgrades.pdf
PDF 9 MB Posted
- Attached to
- DKDC HVAC Upgrades
- Solicitation number
- RFP CISD 270000000261 1
- Issued by
- Calhoun County, Michigan
About this file
This is a bid package for HVAC system upgrades at Calhoun ISD's Dorris Klaussen Developmental Center located at 408 West Jameson Ave, Battle Creek, Michigan 49014. The project involves installation of a new central chilled glycol cooling system including a chiller, pumps, hydronic accessories, piping, and required electrical upgrades to serve existing rooftop heating and cooling units and new gym and cafeteria air handling units. The scope includes direct-exchange to glycol conversion and casing improvements for two existing classroom rooftop units, installation of new cafeteria and gym air handling units with chilled glycol cooling, and test and balance services. Sealed bids are due by 2:00 PM local time on December 1, 2026, at the Calhoun ISD Administration Building, 17111 G-Drive North, Marshall, Michigan 49068, addressed to Kori Rafferty, Assistant Superintendent of Finance. A mandatory pre-bid meeting is scheduled for Wednesday, November 18, 2026, at 3:00 PM at the project site. Bids will be read aloud at approximately 2:05 PM on December 1, 2026. The project construction period runs from January 2 through April 30, 2027, with project subcontract award notification expected by December 18, 2026. The Owner has elected to pre-purchase certain equipment including the chiller, gym and cafeteria AHUs, glycol cooling coils, test and balance services, and building management system upgrades, which contractors will not include in their bids.
Bids must be submitted on a stipulated price basis with two signed originals in sealed envelopes. Prevailing wage labor rates under the Federal Davis-Bacon Act are required. Contractors must include costs for performance, labor, and material bonds at 100 percent of the bid sum and must provide a 5 percent bid bond. The project requires a 1-year warranty on all workmanship, equipment, and parts provided by the contractor, commencing from the date of substantial completion, with the contractor not responsible for warranty on owner pre-purchased equipment. All work must comply with the 2021 Michigan Mechanical Code, ASHRAE 90.1-2019, 2023 National Electric Code, and applicable local codes. Contractors are responsible for securing all necessary permits and fees and for arranging inspections by governing authorities. Progress payments will be made monthly with 10 percent retainage withheld until project completion. Applications for payment must include partial lien releases from subcontractors and vendors, with final payment contingent on completion of all closeout procedures including submission of as-built drawings, operations and maintenance manuals in two sets, and project record documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL FOR
Calhoun ISD Dorris Klaussen
408 West Jameson Ave Battle Creek, MI 49014
HVAC Upgrades Project
November 9, 2026
Issued for Bids & Permits
Trane Project No. M598694 TABLE OF CONTENTS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 000010 - 1 HVAC Upgrades
TABLE OF CONTENTS
ADMINISTRATIVE REQUIREMENTS
000010 Table of Contents 000015 Listing of Drawings 001113 Invitation to Bid 004100 Bid Form and Affidavits 005000 Contracting Forms and Supplements 011000 Summary 012000 Price and Payment Procedures 013000 Administrative Requirements 017800 Closeout Documents and Warranties
Trane Project No. M598694 LIST OF DRAWINGS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 000015 - 1 HVAC Upgrades
LISTING OF DRAWINGS
M-0.1 MECHANICAL GENERAL INFORMATION
M-1.1A MECHANICAL ROOF PLAN ZONE A
M-1.1D MECHANICAL ROOF PLAN ZONE D
M-2.1 ENLARGED PARTIAL AREA MECHANICAL PLANS
M-3.1 MECHANICAL SCHEMATICS & DETAILS
S-1.1 STRUCTURAL PLAN AND DETAILS
E-1.1A ELECTRICAL ROOF PLAN ZONE A
E-2.1 ENLARGED ELECTRICAL PLANS
E-3.1 ELECTRICAL DETAILS & ONE-LINE DIAGRAM
M-0.1
MECHANICAL GENERAL
INFORMATION
MECHANICAL (DIVISION 23) SPECIFICATION:
PROVIDE EQUIPMENT AND COMPONENTS INDICATED ON THE DRAWINGS, AND AS
REQUIRED FOR A COMPLETE FUNCTIONING SYSTEM. CONTRACTOR WILL BE
RESPONSIBLE FOR RECEIVING, RIGGING AND INSTALLING ALL EQUIPMENT
PROVIDED PART OF THEIR WORK CATEGORY.
DEFINITIONS: FURNISH MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY
FOR INSTALLATION. INSTALL MEANS TO PLACE IN POSITION AND MAKE
CONNECTIONS FOR SERVICE OR USE. PROVIDE MEANS TO FURNISH AND INSTALL,
COMPLETE AND READY FOR INTENDED USE. RECEIVE MEANS TO COORDINATE
AND ACCEPT DELIVERY OF EQUIPMENT AT JOBSITE.
1.
2.
4.
5.
GENERAL NOTES:
COMPLETED INSTALLATIONS SHALL CONFORM TO ALL
APPLICABLE LOCAL, STATE, AND FEDERAL CODES AND
ORDINANCES INCLUDING, BUT NOT LIMITED TO THE LATEST
EDITIONS OF THE FOLLOWING: STATE BUILDING CODE,
NFPA-90A, NFPA-96 AND NFPA-101.
TRANE TO PROVIDE A COMPLETE WATERSIDE BALANCE OF
THE NEW CHILLED WATER SYSTEM.
CONTRACTOR RESPONSIBLE FOR CREATING ANY NEW
PIPE OPENINGS THRU EXISTING WALLS, FLOOR OR ROOF
REQUIRED FOR THE NEW PIPING - REUSE EXISTING
PENETRATIONS WHERE POSSIBLE.
CONTRACTOR RESPONSIBLE FOR ALL REQUIRED PERMITS
AND FEES RELATIVE TO THEIR WORK SCOPE.
6. PROVIDE 1 YEAR WARRANTY ON WORKMANSHIP,
EQUIPMENT AND PARTS.
MECH CODE COMPLIANCE NOTES:
3. CONTRACTOR TO VISIT THE SITE PRIOR TO BID AND
VERIFY ALL PERTINENT EXISTING CONDITIONS.
1. CONTRACTOR SHALL BE RESPONSIBLE FOR INSTALLATION
OF SYSTEM IN COMPLIANCE WITH 2021 MICHIGAN
MECHANICAL CODE (MMC), ASHRAE 90.1-2019, AND ALL
OTHER APPLICABLE STATE AND LOCAL CODES.
2. SYSTEMS AS DESIGNED AND EQUIPMENT AS SPECIFIED
MEET OR EXCEED THE MINIMUM PRESCRIPTIVE
REQUIREMETNS OF THE MICHIGAN ENERGY CODE ASHRAE
90.1-2019.
3. CONTRACTOR SHALL PROVIDE CLOSE-OUT DOCUMENTS TO
OWNER THAT INCLUDE AS-BUILT DRAWING MARK-UPS.
TESTING AND BALANCING: TEXTING & BALANCING WILL BE PROVIDED BY TRANE.
TEST AND ADJUST ALL MECHANICAL SYSTEMS AND EQUIPMENT TO ASSURE
PROPER BALANCE AND OPERATION. PERFORM TESTS IN ACCORDANCE WITH THE
MOST CURRENT NEBB OR AABC, AND ASHRAE STANDARDS. ELIMINATE
OBJECTIONABLE NOISE AND VIBRATION, AND ASSURE PROPER FUNCTION OF
CONTROLS. BALANCING CONTRACTOR SHALL BE AN INDEPENDENT CERTIFIED
TEST AND BALANCE CONTRACTOR, WITH NEBB OR AABC CERTIFICATION. SUBMIT
COMPLETED AND CERTIFIED TEST AND BALANCE REPORT TO OWNER'S
REPRESENTATIVE. BALANCE ALL SYSTEMS TO WITHIN 5% OF AIR FLOWS AND
WATER FLOWS INDICATED ON THE DRAWINGS.
GENERAL REQUIREMENTS
DESCRIPTIONSHEET
M-0.1
M-1.1A MECHANICAL ROOF PLAN - ZONE A
MECHANICAL SCHEMATICS & DETAILSM-3.1
ELECTRICAL (DIVISION 26) SPECIFICATION:
COMPLETED INSTALLATION SHALL CONFORM TO ALL STATE,
LOCAL AND FEDERAL CONDES AND ORDINANCES
INCLUDING, BUT NOT LIMITED TO 2023 NATIONAL ELECTRIC
CODE (NFPA 70) AND 2023 MICHIGAN ELECTRICAL CODE
PART 8 RULES.
ELECT CODE COMPLIANCE NOTES:
1.
PROVIDE COMPONENTS INDICATED ON THE DRAWINGS, AND AS REQUIRED FOR A
COMPLETE FUNCTIONING SYSTEM.
DEFINITIONS: FURNISH MEANS TO SUPPLY AND DELIVER TO PROJECT SITE, READY
FOR INSTALLATION. INSTALL MEANS TO PLACE IN POSITION AND MAKE
CONNECTIONS FOR SERVICE OR USE. PROVIDE MEANS TO FURNISH AND INSTALL,
COMPLETE AND READY FOR INTENDED USE. RECEIVE MEANS TO COORDINATE
AND ACCEPT DELIVERY OF EQUIPMENT AT JOBSITE.
COORDINATION: COORDINATE WITH THE WORK OF OTHER TRADES, EQUIPMENT
FURNISHED BY OTHERS, REQUIREMENTS OF THE OWNER, AND WITH THE
CONSTRAINTS OF THE EXISTING CONDITIONS OF THE PROJECT SITE.ENSURE PROPER CLEARANCE IS MAINTAINED FOR ALL
ELECTRICAL DISCONNECTS AND PANELS.
3.
PROVIDE CERTIFICATE OF INSPECTION TO OWNER AND
ENGINEER AS EVIDENCE THAT INSTALLATION HAS BEEN
INSPECTED AND APPROVED BY LOCAL AUTHORITY.
4.
BUILDING WIRE AND CABLE:
A. DRY INTERIOR LOCATIONS: TYPE THHN/THWN INSULATION IN RACEWAY.
B. EXTERIOR LOCATIONS: TYPE THHN/THWN INSULATION IN RACEWAY.
C. USE CONDUCTORS NOT SMALLER THAN 12 AWG FOR POWER CIRCUITS.
D. CONDUCTOR SIZES ARE BASED ON COPPER UNLESS INDICATED AS
ALUMINUM "AL".
E. METAL CLAD CABLE, TYPE MC (NFPA 70) CAN BE USED CONNECTION RUN TO
END DEVICE (5 FT MAX LENGTH)
ALL ELECTRICAL MATERIAL, EQUIPMENT AND ACCESSORIES
SHALL BE NEW AND CONFORM TO ALL APPLICABLE
STANDARDS AND CODE REQUIREMENTS.
2.
COORDINATE CLOSEOUT OPERATIONS WITH THE CLOSEOUT OF MECHANICAL
SYSTEMS. CLOSEOUT REQUIREMENTS INCLUDE TEST RUNNING ALL NEW POWER
EQUIPMENT UNDER LOAD, INSTRUCTING OWNER'S OPERATING PERSONNEL IN THE
OPERATION, MAINTENANCE AND SAFETY OF NEW ELECTRICAL SYSTEMS, AND
TURN OVER OF OPERATION & MAINTENANCE MANUALS TO OWNER.
CONDUIT:
A. DRY INTERIOR LOCATIONS: EMT (ANSI C80.3 GALVANIZED TUBING)
B. EXTERIOR LOCATIONS: RIGID STEEL CONDUIT (ANSI C80.1).
JUNCTION BOXES: SHEET METAL,NEMA OS 1, GALVANIZED STEEL.
HANGERS AND SUPPORTS:
A. STEEL STRUCTURAL ELEMENTS: BEAM CLAMPS OR STEEL SPRING CLIPS.
B. CONCRETE SURFACES: SELF-DRILLING ANCHORS OR EXPANSION ANCHORS.
C. HOLLOW MASONRY, PLASTER AND GYPSUM BOARD PARTITIONS: TOGGLE
BOLTS OF HOLLOW WALL FASTENERS.
D. SOLID MASONRY WALLS: EXPANSION ANCHORS OR PRESET INSERTS.
PIPE INSULATION:
OUTDOOR CHILLED WATER PIPING: 1" THICK PRE-FORMED MINERAL-FIBER PIPE
INSULATION (TYPE I) FOR PIPE SIZES, WITH WHITE ASJ INSULATION JACKETING.
PROVIDE EMBOSSED ALUMINUM WEATHERPROOF JACKETING FOR ALL OUTDOOR
EXPOSED PIPE INSULATION (3M VENTURE-CLAD 1577CW-E OR EQUAL); OVERLAP
AND SEAL ALL JOINTS AND SEAMS TO MAKE WEATHERTIGHT
PIPE HANGERS: PROVIDE ADJUSTABLE CLEVIS STYLE PIPE HANGERS FOR NEW
PIPING WITH 1/4" TREADED HANGER RODS FOR PIPE SIZES UP TO 1-1/4" NPS AND
3/8" THREADED HANGER RODS FOR PIPE SIZE ABOVE 1-1/4" NPS. PROVIDE RIGID
UNISTRUT PIPE CLAMP (GALVANIZED) FOR SUPPORT OF GAS PIPING FROM WALL &
CONCRETE PAD.
METERS & GAUGES:
LIQUID IN GLASS THERMOMETER - METAL CASE 9" GLASS W/ BLUE OR RED LIQUID,
GLASS WINDOW, ALUMINUM OR BRASS STEM FOR THERMOWELL INSTALLATION.
PRESSURE GAUGES - DIRECT MOUNT, METAL CASE DIAL TYPE PRESSURE GAUGE,
6" DIAL, SEALED CASE, BOURBON TUBE PRESURE ELEMENT, GLASS WINDOW W/
METAL RING, PIPE THREADED BOTTOM OUTLET.
INDOOR CHILLED WATER PIPING: 1" THICK PRE-FORMED MINERAL-FIBER PIPE
INSULATION (TYPE I) FOR ALL PIPE SIZES, WITH WHITE ASJ INSULATION
JACKETING; PROVIDE WHITE PVC JACKETING FOR ALL PIPE ELBOWS
PIPING REQUIREMENTS
CHILLED WATER GLYCOL PIPING:
2" AND SMALLER: SCH 40 STEEL PIPE, ASTM A53, WITH SCREWED JOINTS AND 150
LB MALLEABLE IRON FITTINGS OR TYPE L COPPER TUBE WITH SOLDERED OR
BRAZED JOINTS AND FITTINGS. RIGID VIEGA PRO-PRESS APPROVED AS EQUAL TO
SOLDERED JOINTS AND FITTINGS.
FOR NPS 2-1/2" AND LARGER: SCH 40 WELDED JOINTS AND FITTINGS OR
MECHANICAL ROLL GROOVED JOINTS AND FITTINGS. WHERE MECHANICAL
COUPLINGS ARE UTILIZED, PROVIDE FLEXIBLE STYLE COUPLINGS AT 90 DEGREE
ELBOWS AND 2ND JOINT FROM ELBOW TO ACCOMMODATE THERMAL EXPANSION;
PROVIDE RIGID COUPLINGS AT ALL OTHER LOCATIONS .
CLEAN AND FLUSH ALL NEW PIPE, REMOVE AND CLEAN ALL STRAINERS BEFORE
PLACING INTO SERVICE. PRESSURE TEST ALL NEW PIPING WITH WATER AT 1.5
TIMES SYSTEM PRESSURE WITH NO LOSS OF PRESSURE FOR 24 HOURS BEFORE
PLACING INTO SERVICE. VENT PIPING SYSTEM AS NECESSARY TO REMOVE AIR
BEFORE TURNING OVER TO OWNER.
ISOLATION VALES: CWP RATED 125 PSIG BRONZE BODY BALL VALVES FOR 2" AND
SMALLER; DUCTILE IRON LUG STYLE BUTTERFLY VALVES BETWEEN WELD
FLANGES FOR 2-1/2" AND LARGER WITH LEVEL HANDLE, STAINLESS STEEL STEM
AND BUNA-N OR EPDM SEAT.
E-1.1A
MECHANICAL GENERAL INFORMATION & SCHEDULES
STRUCTURAL PLAN & DETAILSS-1.1
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
M-1.1D MECHANICAL ROOF PLAN - ZONE D
M-2.1 ENLARGED PARTIAL AREA MECHANICAL PLANS
E-2.1
ELECTRICAL DETAILS AND ONE-LINE DIAGRAME-3.1
ELECTRICAL ROOF PLAN - ZONE A
ENLARGED PARTIAL AREA ELECTRICAL PLANS
Date: 11/9/2026
M-1.1A
MECHANICAL
ROOF PLAN
ZONE A
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
M-1.1D
ROOF PLAN
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
NORMAL VENTILATION MODE - GYM (PLAY AREA) OCCULANCY CLASSIFICATION
· EXIST GYM TOTAL AREA = 5900 SF
· NORMAL ROOM CONDITION: GYM (PLAY AREA) - 2021 MMC TABLE 403.3.1.1
Rp = (7 PPL/1000 SF) x (5900 SF) x (20 CFM/EA) = 826 CFM Ra = (5900 SF) X (0.18 CFM/SF) = 1062 CFM TOTAL REQUIRED VENTILATION = Rp + Ra = 826 + 1062 = 1888 CFM
· DESIGN VENTILATION RATE (1900 CFM OA / 8000 CFM SA) = 24% OA
DESIGN VENTILATION EXCEEDS 2021 MMC TABLE 403.3.1.1
REQUIREMENTS FOR
HIGH OCCUPANCY VENTILATION MODE - MULTIPURPOSE ASSEMBLY
OCCUPANCY CLASSIFICATION
· GYM AREA NEW AHU PROVIDED WITH CO2 BASED DEMAND CONTROLLED
VENTILATION (DCV) RESET; CONTROL SHALL MONITOR ROOM CO2 LEVELS
AT AHU RETURN DUCT, AND SHALL MODULATE OA DAMPER BETWEEN
MINIMUM (24%) AND MAXIMUM 50% OPEN (4000 CFM OA / 8000 CFM SA) TO
MAINTAIN ROOM CO2 LEVELS BELOW 850 PPM THRESHOLD.
DESIGN DCV CONTROLS MEET VENTILATION REQUIREMENTS FOR
PERIODS WHEN GYM IS USED AS 'MULTIPURPOSE ASSEMBLY'
OCCUPANCY
GYM
ROOF
M-2.1
ENLARGED
PARTIAL AREA
MECHANICAL
PLANS
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
NORMAL VENTILATION MODE - CAFETERIA OCCULANCY CLASSIFICATION
· CAFETERIA TOTAL AREA = 1600 SF
· NORMAL ROOM CONDITION: CAFETERIA - 2021 MMC TABLE 403.3.1.1
Rp = (100 PPL/1000 SF) x (1600 SF) x (7.5 CFM/EA) = 1200 CFM Ra = (1600 SF) X (0.18 CFM/SF) = 288 CFM TOTAL REQUIRED VENTILATION = Rp + Ra = 1200 + 288 = 1488 CFM
· DESIGN VENTILATION RATE (1500 CFM OA / 3000 CFM SA) =50% OA
DESIGN VENTILATION EXCEEDS 2021 MMC TABLE 403.3.1.1 REQUIREMENTS FOR
· CAFETERIA AREA NEW BLOWER COIL UNIT BCU-1 PROVIDED WITH CO2 BASED DEMAND CONTROLLED VENTILATION (DCV) RESET; CONTROL SHALL MONITOR ROOM CO2 LEVELS AT BCU RETURN DUCT, AND SHALL MODULATE OA DAMPER BETWEEN MINIMUM (15%) AND MAXIMUM 50% OPEN (1500 CFM OA / 3000 CFM SA) TO MAINTAIN ROOM CO2
LEVELS BELOW 850 PPM THRESHOLD.
DESIGN DCV CONTROLS MEET ASHRAE 90.1-2019 VENTILATION CONTROLS FOR HIGH-OCCUPANCY AREAS (6.4.3.8)
REFER TO SHEET M-1.1D FOR GYM AREA VENTILATION CALCUALTIONS
M-3.1
SCHEMATICS
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
CHILLER GRADE
BOILER ROOM
BOILER ROOM ROOF
S-1.1
STRUCUTRAL
PLAN AND
DETAILS
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
MECHANICAL
MEZZANINE
(ABOVE LOCKERS)
E-1.1A
ELECTRICAL
ROOF PLAN
ZONE A
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
E-2.1
ENLARGED
ELECTRICAL
PLANS
H
H
XXX
FEEDER SCHEDULE
3 PHASE-4 WIRE WITH GROUND3 PHASE-3 WIRE WITH GROUND
TAG
25G 35G 50G 65G 85G 100G 115G 130G 150G 175G 200G 230G 255G
NOTES:
1. AMPACITY: THHN/THWN, 75 DEG. RATING NEC: 2023
2. CONDUIT SIZE BASED ON EMT. E.C. RESPONSIBLE FOR SIZE CHANGES WHEN DIFFERENT TYPE OF CONDUIT
3. NOTATION WITH "NN" (Ex. 200NNG) SHALL BE THE REQUIRED "N" WITH DOUBLE NEUTRAL.
CONDUIT FILL
(3)-#12+(1)-#10 GND, IN 3/4"C
(3)-#10+(1)-#10 GND, IN 3/4"C
(3)-#8+(1)-#10 GND, IN 3/4"C
(3)-#6+(1)-#8 GND, IN 1"C
(3)-#4+(1)-#8 GND, IN 1-1/4"C
(3)-#3+(1)-#8 GND, IN 1-1/4"C
(3)-#2+(1)-#6 GND, IN 1-1/4"C
(3)-#1+(1)-#6 GND, IN 1-1/2"C
(3)-#1/0+(1)-#6 GND, IN 1-1/2"C
(3)-#2/0+(1)-#6 GND, IN 2"C
(3)-#3/0+(1)-#6 GND, IN 2"C
(3)-#4/0+(1)-#4 GND, IN 2"C
(3)-250MCM+(1)-#4 GND, IN 2"C
(4)-#12+(1)-#10 GND, IN 3/4"C
(4)-#10+(1)-#10 GND, IN 3/4"C
(4)-#8+(1)-#10 GND, IN 1"C
(4)-#6+(1)-#8 GND, IN 1-1/4"C
(4)-#4+(1)-#8 GND, IN 1-1/4"C
(4)-#3+(1)-#8 GND, IN 1-1/4"C
(4)-#2+(1)-#6 GND, IN 1-1/2"C
(4)-#1+(1)-#6 GND, IN 2"C
(4)-#1/0+(1)-#6 GND, IN 2"C
(4)-#2/0+(1)-#6 GND, IN 2"C
(4)-#3/0+(1)-#6 GND, IN 2-1/2"C
(4)-#4/0+(1)-#4 GND, IN 2-1/2"C
(4)-250MCM+(1)-#4 GND, IN 2-1/2"C
TAG
25NG
35NG
50NG
65NG
85NG
100NG
115NG
130NG
150NG
175NG
200NG
230NG
255NG
CONDUIT FILL
MATERIAL IS USED.
285G 310G 335G 380G 420G 500G
(3)-300MCM+(1)-#4 GND, IN 3"C
(3)-350MCM+(1)-#4 GND, IN 3"C
(3)-400MCM+(1)-#4 GND, IN 3"C
(3)-500MCM+(1)-#3 GND, IN 3"C
(3)-600MCM+(1)-#3 GND, IN 3"C
(2) PARALLEL RUNS (3)-250MCM+(1)-#1 GND, IN 2"C
(4)-300MCM+(1)-#4 GND, IN 3"C
(4)-350MCM+(1)-#4 GND, IN 3"C
(4)-400MCM+(1)-#4 GND, IN 3-1/2"C
(4)-500MCM+(1)-#3 GND, IN 3-1/2"C
(4)-600MCM+(1)-#3 GND, IN 3-1/2"C
(2) PARALLEL RUNS (4)-250MCM+(1)-#1 GND, IN 2-1/2"C
285NG
310NG
335NG
380NG
420NG
500NG
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
AHU-2
20 HP
CP-1
1/3 HP
AHU-2
20 HP
CP-2
1/12 HP
CH-1
262 MCA
GMU-1
WP
EVAP
HEATER
E-3.1
ELECTRICAL
DETAILS &
ONE-LINE
DIAGRAM
TITLE:
SHEET NO:
PROJECT NO:
260505
SHEET SIZE: 24"x36"
CHRISTOPHER j. nOLAN, P.E.
MI - REGISTRATION# 6201043863
EXP. DATE# 4/14/2027
DO
RI
S-
KL
AU
SS
EN
DE
VE
LO
PM
EN
T
CE
N
TE
R
M
EC
HA
N
IC
AL
U
PG
RA
DE
S
Ja m es on
S t, Ba tt le C re ek
, M I 4
BIDS &
PERMITS
ISSUED:
11-09-2026
DUCT
DETECTOR.
(TYPICAL)
2#14 & 1#18 TWISTED
SHIELDED PAIR TO FIRE
ALARM PANEL.
REMOTE DUCT
DETECTOR
TEST SWITCH
(TYPICAL)
AHU
CONTROL
PANEL
SUPPLY
AIR
DUCT
9#16 LOW VOLTAGE IN
1/2" CONDUIT.
7#18,1/2"C.
(TYPICAL)
RETURN
AIR
DUCT
4#12,1/2"C.
(TYPICAL)
NEMA 3R FUSED
DISC. SW. BY mfgr
AHU
W.P.
ROOF MOUNTED OUTLET
AS REQUIRED BY CODE.
CIRCUIT TO NEAREST
AVAILABLE CIRCUIT.
T
NOTES:
1. FOR BIDDING ONLY. ACTUAL WIRING PER APPROVED MANUFACTURER'S SHOP
DRAWINGS.
2. REFER TO ELECTRICAL PLANS AND MECHANICAL SCHEDULES FOR DUCT
DETECTOR REQUIREMENTS.
RT RT
DSDDSD
CONCRETE-ENCASED
ELECTRODE
NO. 6 COPPER
MINIMUM
BUILDING
STEEL
NEUTRAL BUSS
BONDING JUMPER PROVIDED BY
E.C. IF NOT PROVIDED WITH
EQUIPMENT
EQUIPMENT GROUNDING BUS
UNDERGROUND WATER PIPE. PROVIDE
FULL SIZE JUMPER AROUND WATER
METER AS REQUIRED.
#4 BARE
COPPER
MINIMUM
GROUND RING.
MINIMUM OF 20' OF #2
BARE COPPER.
NOT LARGER THAN
CONDUCTOR USED FOR
GROUND RING
SERVICE DISCONNECT OR
SERVICE EQUIPMENT
NOTES:
1. REFER TO NATIONAL ELECTRIC CODE FOR ALL REQUIREMENTS FOR A PROPERLY GROUNDED
SYSTEM.
2. ALL GROUND CONDUCTORS TO BE SIZED ACCORDING TO ART. 250 OF THE NATIONAL ELECTRIC
CODE.
GROUND ROD
5/8"x8' MINIMUM
NEW MAIN SERVICE SWITCHBOARD 'SWBD'
480Y/277V, 3PH-4W, 1200 AMP
SQUARE D I-LINE SERIES
35 KAIC SCCR
H
H
XXX
FEEDER SCHEDULE
3 PHASE-4 WIRE WITH GROUND3 PHASE-3 WIRE WITH GROUND
TAG
25G 35G 50G 65G 85G
100G 115G 130G 150G 175G 200G 230G 255G
NOTES:
1. AMPACITY: THHN/THWN, 75 DEG. RATING NEC: 2023
2. CONDUIT SIZE BASED ON EMT. E.C. RESPONSIBLE FOR SIZE CHANGES WHEN DIFFERENT TYPE OF CONDUIT
3. NOTATION WITH "NN" (Ex. 200NNG) SHALL BE THE REQUIRED "N" WITH DOUBLE NEUTRAL.
CONDUIT FILL
(3)-#12+(1)-#10 GND, IN 3/4"C
(3)-#10+(1)-#10 GND, IN 3/4"C
(3)-#8+(1)-#10 GND, IN 3/4"C
(3)-#6+(1)-#8 GND, IN 1"C
(3)-#4+(1)-#8 GND, IN 1-1/4"C
(3)-#3+(1)-#8 GND, IN 1-1/4"C
(3)-#2+(1)-#6 GND, IN 1-1/4"C
(3)-#1+(1)-#6 GND, IN 1-1/2"C
(3)-#1/0+(1)-#6 GND, IN 1-1/2"C
(3)-#2/0+(1)-#6 GND, IN 2"C
(3)-#3/0+(1)-#6 GND, IN 2"C
(3)-#4/0+(1)-#4 GND, IN 2"C
(3)-250MCM+(1)-#4 GND, IN 2"C
(4)-#12+(1)-#10 GND, IN 3/4"C
(4)-#10+(1)-#10 GND, IN 3/4"C
(4)-#8+(1)-#10 GND, IN 1"C
(4)-#6+(1)-#8 GND, IN 1-1/4"C
(4)-#4+(1)-#8 GND, IN 1-1/4"C
(4)-#3+(1)-#8 GND, IN 1-1/4"C
(4)-#2+(1)-#6 GND, IN 1-1/2"C
(4)-#1+(1)-#6 GND, IN 2"C
(4)-#1/0+(1)-#6 GND, IN 2"C
(4)-#2/0+(1)-#6 GND, IN 2"C
(4)-#3/0+(1)-#6 GND, IN 2-1/2"C
(4)-#4/0+(1)-#4 GND, IN 2-1/2"C
(4)-250MCM+(1)-#4 GND, IN 2-1/2"C
TAG
25NG
35NG
50NG
65NG
85NG
100NG
115NG
130NG
150NG
175NG
200NG
230NG
255NG
CONDUIT FILL
MATERIAL IS USED.
285G 310G 335G 380G 420G 500G
(3)-300MCM+(1)-#4 GND, IN 3"C
(3)-350MCM+(1)-#4 GND, IN 3"C
(3)-400MCM+(1)-#4 GND, IN 3"C
(3)-500MCM+(1)-#3 GND, IN 3"C
(3)-600MCM+(1)-#3 GND, IN 3"C
(2) PARALLEL RUNS (3)-250MCM+(1)-#1 GND, IN 2"C
(4)-300MCM+(1)-#4 GND, IN 3"C
(4)-350MCM+(1)-#4 GND, IN 3"C
(4)-400MCM+(1)-#4 GND, IN 3-1/2"C
(4)-500MCM+(1)-#3 GND, IN 3-1/2"C
(4)-600MCM+(1)-#3 GND, IN 3-1/2"C
(2) PARALLEL RUNS (4)-250MCM+(1)-#1 GND, IN 2-1/2"C
285NG
310NG
335NG
380NG
420NG
500NG
285G
Trane Project No. M598694 INVITATION TO BID Calhoun ISD Dorris Klaussen Issued for Bids & Construction 001113 - 1 HVAC Upgrades
SECTION 001113 – INVITATION TO BID
FROM:
1.1 The Owner:
Calhoun ISD 17111 G-Drive North Marshall, MI 49068
1.2 And The Owner’s Representative
Trane West Michigan 5030 Corporate Exchange Blvd.
Grand Rapids, MI 49512
1.3 Date: November 9, 2026
1.4 TO: POTENTIAL BIDDERS
A. Your firm is invited to submit an offer to Owner for HVAC systems upgrades to the Calhoun ISD
Dorris Klaussen Developmental Center. Bids are due before 2:00 PM local time on Tuesday December 1st, 2026, for the following project:
Dorris Klaussen HVAC Upgrades
Dorris Klaussen Developmental Center
B. Bids shall be submitted in a sealed, opaque envelope identifying the bidder and the Project
Title. Sealed bids shall be addressed to Kori Rafferty, and delivered to Calhoun ISD Administration Building, 17111 G-Drive North, Marshall, MI 49068. Include two, signed originals of your bid. Bids must include a completed bid form and all required bid attachments as noted on the bid form. Bids submitted without the completed bid attachments may be considered non-responsive. Bidders may supplement this form as appropriate. Faxed, emailed, and electronic bids will not be accepted.
C. Project Description: The Dorris Klaussen Development Center HVAC Upgrades project in Battle Creek, MI, for Calhoun ISD, is primarily the installation of a new central, chilled glycol cooling system including chiller, pumps, hydronic accessories, piping, and required electrical upgrades.
This system will provide cooling for (2) large, existing rooftop heating and cooling units serving classrooms as well as new gym and cafeteria air handling units installed as part of this project. DX to glycol conversion and casing improvements for the 2 existing classroom rooftop units are included as part of this project. The new Cafeteria AHU (previously DX cooling) will also utilize chilled glycol for increased capacity and enhanced control, while the new Gym AHU includes chilled glycol cooling for the gym (previously heated only). Project construction will run from January to May of 2027.
D. Bid Documents: electronic bid packets may be obtained from the Owner Representative, Trane; E-mail: jknibbe@trane.com or 616-240-8314.
E. Your offer will be required to be submitted under a condition of irrevocability for a period of thirty
(30) days after submission.
F. Prevailing wage labor rates are required for this project.
G. This is a public project; bids offers will be read aloud or disclosed to all bidders and interested parties, and a bid tabulation summary will be made available to all bidders not present at the bid reading that request such information by email to the owner representative. Bids will be read aloud at approximately 2:05 PM on Tuesday, December 1st, at Calhoun ISD Administration Building 17111 G-Drive North Marshall, MI 49068.
H. The Owner reserves the rights to reject all bids, reject individual non-responsive bids, or award to any bidder that will serve the Owner’s best interest as deemed in their opinion.
I. A mandatory pre-bid meeting will be held on Wednesday, November 18, 2026 at 3:00 PM local time at the Dorris Klaussen Development Center located at 408 West Jameson Ave Battle Creek, MI 49014. The owner representative and owner will be in attendance and will attempt to answer contractor questions.
END OF SECTION
mailto:jknibbe@trane.com
Trane Project No. M598694 BID FORM Calhoun ISD Dorris Klaussen Issued for Bids & Construction 004100 - 1 HVAC Upgrades
SECTION 004100 – BID FORM AND AFFIDAVITS
1.1 TO:
The Owner (hereinafter referred to as Owner):
Calhoun ISD 17111 G-Drive North Marshall, MI 49068
1.2 FOR:
Dorris Klaussen HVAC Upgrades Dorris Klaussen Development Center
1.3 DATE: (Bidder to enter Date). Sealed bids must be received no later than 2:00 PM local time on December 1st, 2026, at Calhoun ISD Administration Building, 17111 G-Drive North, Marshall, MI 49068. Bids shall be submitted in a sealed, opaque envelope identifying the bidder and the Project Title, and shall be addressed to Kori Rafferty, Calhoun ISD Assistant Superintendent of Finance.
1.4 SUBMITTED BY:
A. Bidder’s Full Name
1. Address
2. Contract Time
3. Phone Number
4. E-mail Address
1.5 OFFER:
A. Bid Category (mechanical or electrical)
B. Having examined the Place of The Work and all matters referred to in the Project Manual and the
Contract Documents prepared by the owner(or owner’s representative) for the above mentioned project, we, the undersigned, hereby offer to enter into a Contract to perform The Work and furnish all labor, materials, equipment, and methods necessary for and reasonable incidental to the proper execution in a workman like manner, of the complete implementation of the project for the owner for the sum of:
Dollars
($ ), in lawful money of the United States of America
C. Prevailing wages under the Federal Davis-Bacon Act and regulations for projects funded through federal programs are included.
D. Costs for a performance, labor, and material bonds in the amount of 100% of the bid sum are included in the bid sum.
E. List names of any subcontractors carried in bid offer (if applicable):
1. Subcontractor: ____________________________________________________
2. Subcontractor: ____________________________________________________
3. Subcontractor: ____________________________________________________
4. Subcontractor: ____________________________________________________
Trane Project No. M598694 BID FORM Calhoun ISD Dorris Klaussen Issued for Bids & Construction 004100 - 2 HVAC Upgrades
1.6 ACCEPTANCE
A. This offer shall be open to acceptance and is irrevocable for thirty (30) days from the bid due date.
B. If this bid is accepted by Owner within the time period stated above, we will:
1. Execute the agreement within seven days of receipt of acceptance to this bid.
2. Commence work promptly in accordance with construction schedule established in consultation with Owner and owner representative.
1.7 CONTRACT TIME
A. If this Bid is accepted, we will:
1. Complete the Work prior to (list date) based on commencement of work on or after January 1st, 2026 as coordinated with the owner and the owner representative.
Project subcontract award notification is expected by December 18th.
1.8 REQUIRED BID ATTACHMENTS
A. The following bid attachments must be completed and submitted with the bid.
1. Familial Disclosure Affidavit – Sample attached following this section
2. Iran Sanctions Affidavit – Sample attached following this section
3. Bid Bond in the amount of 5% of the contractor’s bid – bidder to provide form
1.9 BID FORM SIGNATURES
A. Name of person, partnership, or corporation submitting bid (check one)
( ) An Individual ( ) A Partnership ( ) A Corporation organized and existing under the laws of the State of Michigan
(Bidder – print the full name of your firm) Was hereunto affixed in the presence of:
(Authorizing signing officer, Title)
(Authorizing signing officer, Title)
If the Bid is a joint venture or partnership, add additional forms of execution for each member of the joint venture in the appropriate form or forms as above.
CALHOUN ISD
AFFIDAVIT OF BIDDER
The undersigned, the owner or authorized agent of (the bidder) pursuant to the familial disclosure requirement provided in Sec. 1267 of the Revised School Code, as amended, hereby represents and warrants, except as provided below, that no familial relationship exists between the owner(s) or any employees of:
and any member of the District’s Board of Education or the Superintendent of the District.
List and Describe Any Familial Relationships:
Bidder:
By:
Its:
STATE OF MICHIGAN
COUNTY OF
Subscribed and sworn to before me on the day of (Year), by
Notary Public
County, Michigan
My Commission Expires
Acting in the County of
CALHOUN ISD
IRAN BUSINESS RELATIONSHIP AFFIDAVIT
Effective April 1, 2013 all bids, proposals and/or qualification statements received in the state of Michigan must comply with the “Iran Economic Sanctions Acts”. The following certification is to be signed and included at the time of submittal.
CERTIFICATION
Pursuant to the Michigan Iran Economic Sanctions Act, 2012 P.A. 517, by submitting a bid, proposal or response. Respondent certifies, under civil penalty for false certification, that it is fully eligible to do so under law and that it is not an “Iran linked business”, as that term is defined in the Act.
Signature Title
Company Date
Trane Project No. M598694 SUMMARY Calhoun ISD Dorris Klaussen Issued for Bids & Construction 005110 - 1 HVAC Upgrades
SECTION 011000 – SUMMARY
PART 1 GENERAL
1.1 PROJECT
A. Project Name: Dorris Klaussen HVAC Upgrades B. Owner’s Name: Calhoun ISD C. Owner Point of Contact: Kori Rafferty, Assistant Superintendent of Finance, (269) 789-2437, raffertk@calhounisd.org D. Owner Representative: Trane, 5030 Corporate Exchange Blvd., Grand Rapids, MI 49512.
E. Owner Representative Contact: Joel Knibbe, Project Developer, (616) 240-8314, jknibbe@trane.com F. The project consists of work as described in these drawings and specifications.
1.2 CONTRACT DESCRIPTION
A. Contract Type: A single contract based on a Stipulated Price as described in section 005000 –
Contracting Forms and Supplements.
1. Owner has elected to pre-purchase and contract directly for the following:
a. New air-cooled chiller with integral hydronics package (CH-1)
b. New Gym AHU with heating coil pump
c. New Cafeteria AHU with heating coil pump
d. New glycol cooling coils for existing packaged multizone RTUs-1 and 2.
e. Test & balance of new equipment
f. Building Management System upgrades
2. Contractors will not include use tax for any of the above equipment.
1.3 OWNER OCCUPANCY / SCHEDULE / SHUTDOWNS
A. Building will be occupied during normal school hours. Contractors will be allowed full access to unoccupied areas of the building (boiler room/electrical room) and the rear staging area and building roof during normal working hours throughout the installation period (refer to attached Site Plan View Sketch). Installation period will be from January 2nd through April 30th, 2027. Installation must be complete, operational, and fully commissioned prior to the end of April 2027. Any work requiring indoor access in addiction to the rear electrical and boiler rooms will need to be coordinated with the owner outside normal occupancy hours (Mon-Fri 7:30AM-3PM).
B. Contractors shall be required to install plastic screening and temporary walls as needed to contain dust to the work areas.
C. Contractors shall include cleaning to remove construction debris and dust after work is completed in each construction area.
D. Required crane lifts over occupied spaces or any work which requires blocking access to the building will be required to occur after-hours or during a weekend.
E. Indoor equipment replacement and shutdown (coordinate with owner and other contractors to prevent overlap and impact on operations and events).
1. RTU Cooling Coils (x2) (weekend shutdowns)
2. Cafeteria AHU (weekend shutdown after unit delivers in early February)
3. Gym AHU (during spring break - 1st week in April)
4. Electrical Service Replacement (weekend shutdown)
F. All times subject to change based on owner direction.
1.4 CONTRACTOR USE OF SITE AND PREMESIS
A. Non-smoking building: Smoking is not permitted on this property.
B. Contractor shall be responsible for daily housekeeping and shall maintain site in a clean state.
C. Equipment and materials shall be contained in fenced in staging area (refer to attached Site Plan
View Sketch).
1.5 DEFINITIONS
A. Furnish or Supply: To supply and deliver, unload, inspect for damage.
B. Install: To unpack, assemble, erect, apply, place, finish, protect, clean, and ready for use.
C. Provide: To Furnish or Supply, plus Install.
mailto:raffertk@calhounisd.org mailto:jknibbe@trane.com
Trane Project No. M598694 SUMMARY Calhoun ISD Dorris Klaussen Issued for Bids & Construction 005110 - 2 HVAC Upgrades
1.6 REGULATORY REQUIREMENTS
A. Refer to applicable codes referenced in the specifications schedule of the project drawings.
B. Code Listing: Any referenced standard by the codes; this project shall comply with the edition date published in listed code.
C. Permits, Fees and Notices: Contractor shall secure and pay for all necessary permits, fees and inspections necessary for the proper execution and completion of work under the project Contract.
1. Include costs of all above named items in proposal amount and if required, submit copies of all permits, licenses, and similar permissions obtained and receipts for fee paid to the Owner directly.
2. Inspections of installed work shall be performed by the governing authority as arranged for by the Contractor. Work shall not be covered until approved.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION – NOT USED
Trane Project No. M598694 PRICE AND PAYMENT PROCEDURES Calhoun ISD Dorris Klaussen Issued for Bids & Construction 012000 - 1 HVAC Upgrades
SECTION 012000 – PRICE AND PAYMENT PROCEDURES
PART 1 - GENERAL
1.1 SECTION INCLUDES
A. Procedures for preparation and submittal of applications for progress payments.
B. Documentation for changes to Contract Sum and Contract Time.
C. Change procedures.
D. Correlation of Contractor submittals based on changes.
E. Procedures for preparation and submittal of application for final payment.
1.2 RELATED REQUIREMENTS
A. Section 005000 – Contracting Forms and Supplements: Forms to be used.
1.3 DEFINITIONS
A. Final Completion: This time at which incomplete and incorrect work has been complete or corrected in accordance with the contract documents.
B. List of Incomplete Work: Comprehensive list of items to be completed or corrected prepared by the contractor for the purpose of obtaining certification of substantial completion. Also referred to as “Completion Checklist”.
C. Time and Material Work: Work which will be paid for on the basis of the actual cost of the work, including materials, labor, equipment, and other costs as defined elsewhere, and documented by detailed records.
1.4 APPLICATION FOR FIRST PROGRESS PAYMENT
A. The first application for payment will not be reviewed until the following submittals have been received:
1. Certificate of insurance.
2. Contractor’s construction schedule.
3. Name of Contractor’s principal staff assigned to the project.
4. Copies of building permit and other authorizations from governing authorities.
5. All submittals specified to occur prior to first payment.
1.5 APPLICATIONS FOR PROGRESS PAYMENTS
1. Payment Period: Submit at intervals stipulated in the Agreement.
2. Present required information and payment application in either typewritten or electronic form.
3. Form: AIA G702 Application and Certificate for Payment and AIA G703 – Continuation sheet.
4. Execute certification by signature of authorized officer.
5. List each authorized Change Order as a separate line item, listing Change Order number and dollar amount as for an original item of work.
6. Submit electronic of each Application of Payment.
7. Include the following with the application:
a. Transmittal letter.
b. Partial release of liens from major subcontractors and vendors.
8. Retainage: 10 percent, withheld until project completion.
9. Construction Liens – Michigan
a. Sworn Statement of Partial Unconditional Waivers of Lien: submit updated forms for payments made on previous applications.
b. Final Unconditional Waivers: submit as subcontractors or suppliers complete their work and are paid in full during the course of the project.
c. Waivers of Lien Forms: Use forms acceptable to the Owner, downloadable from State of Michigan LARA website.
d. If a lien of sworn statement of account of lien under procedures of Construction Lien Law is filed, all amounts due the subcontractor or supplier as disclosed by sworn statements, whether due or to become due, shall be withheld from Contractor’s monthly payment until such time as matter has been clarified or resolved with that party.
Trane Project No. M598694 PRICE AND PAYMENT PROCEDURES Calhoun ISD Dorris Klaussen Issued for Bids & Construction 012000 - 2 HVAC Upgrades
1.6 MODIFICATION PROCEDURES
A. Submit name of the individual authorized to receive change documents and who will be responsible for informing others in Contractor’s employ or subcontractors of changes to the Contract Documents.
B. For minor changes not involving and adjustment to the Contract Sum or Contract Time, the Owner Representative will issue instruction directly to Contractor.
C. For other required changes, the Owner Representative will issue a document signed by owner instructing Contractor to proceed with the change, for subsequent inclusion in a change order.
1. The document will describe the required changes and will designate method of determining any change in the Contract Sum or Contract Time.
2. Promptly execute the change.
D. Proposal Request (Bulletin): The Owner Representative may issue a document which includes a detailed description of a proposed change with supplementary or revised drawings and specification, a change in Contract Time for executing the change. Contractor shall prepare and submit a fixed price quotation within 14 days.
1. Bulletin is not an authorization to make any changes in the work. After evaluation of the
Bulletin, approved items will be documented in a Change Order.
2. Complete and itemized cost breakdown for each of the items listed, including units of labor and materials, overhead and profit.
E. Computation of Change in Contract Amount: As specified in the Agreement and Conditions of the
Contract.
1. For change requested by the Owner Representative for work falling under a fixed price contract, the amount will be based on the Contractor’s price quotation.
2. For change ordered by the Owner Representative without a quotation from the
Contractor, the amount will be determined by the Owner Representative based on the Contractor’s substantiation of costs as specified for the Time and Material work.
F. Substantiation of Costs: Provide full information required for evaluation, including breakout of following data:
1. Quantities for products, labor and equipment.
2. Taxes, insurance, and bonds.
3. Overhead and Profit.
4. Justification for any change in Contract Time.
5. Credit for deletions from Contract, similarly documented.
G. Support each claim for additional costs with additional information:
1. Origin and date of claim.
2. Dates and times work was performed, and by whom.
3. Time records and wage rates paid.
4. Invoices and receipts for products, equipment and subcontracts, similarly documented.
H. For Time and Material work, submit itemized account and supporting data after completion of change, within time limits indicated in the Conditions of the Contract.
1.7 APPLICATION FOR FINAL PAYMENT
A. Prepare Application for Final Payment as specified for progress payments, identifying total adjusted Contract Sum, previous payments, and sum remaining due.
B. Application for Final Payment will not be considered until the following have been accomplished:
1. All closeout procedures specified in Section 017800.
PART 2 PRODUCTS – NOT USED
Trane Project No. M598694 ADMINISTRATIVE REQUIREMENTS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 013000 - 1 HVAC Upgrades
SECTION 013000 – ADMINISTRATIVE REQUIREMENTS
1.1 SECTION INCLUDES
A. Preconstruction meeting.
B. Submittals for review, information, and project closeout.
C. Submittal Procedures.
1.2 RELATED REQUIREMENTS
A. Section 017800 – Closeout Submittals: project record documents.
1.3 PROJECT COORDINATION
A. Project Coordinator: Trane Project Manager B. During construction, coordinate use of site and facilities through the Project Coordinator.
C. Make the following types of submittals to the Owner Representative through the Project Coordinator.
1. Shop drawings.
2. Test & inspection reports.
3. Applications for payment and change order requests.
4. Closeout submittals.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION
3.1 PRECONSTRUCTION MEETING
A. Owner representative will schedule a meeting within 1 week prior to commencement of Construction, time and location to be determined.
B. Attendance required:
1. Owner.
2. Owner’s Representative.
3. Contractor.
C. Agenda:
1. Execution of Owner-Contractor Agreement.
2. Distribution of Contract Documents.
3. Designation of personnel representing the parties for the Owner, Contractor and Owner’s
Representative.
4. Procedures for processing of field decisions, submittals, applications for payments, proposal requests, change orders, and contract closeout procedures.
5. Project schedule.
6. Use of premises by Owner and Contractor.
7. Security and Housekeeping Procedures.
8. Record Document maintaining requirements.
9. Startup requirements
10. Inspection and acceptance testing of equipment put into service during construction period.
3.2 SECURITY PROCEDURES
A. Limit access to the site to persons involved in the work.
B. Provide security for all tools, equipment, and devices required or otherwise used for construction of this project, and for all materials which have been paid for by the Owner but not yet incorporated.
3.3 SUBMITTALS FOR REVIEW
A. When the following are specified in individual sections, submit them for review:
1. Product Data and Shop Drawings.
a. Submit manufacturer’s standard printed data sheets
b. Identify product being used.
c. Identify applicable options and accessories.
d. Identify dimensions which have been verified by field measurement.
Trane Project No. M598694 ADMINISTRATIVE REQUIREMENTS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 013000 - 2 HVAC Upgrades
e. Electronic submittals are preferred, but if hard copies are used, provide two (2) copies for review by the Owner Representative.
B. Submit to the Owner Representative for review for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.
C. After review, provide copies and distribute in accordance with SUBMITTAL PROCEDURES article below and for record documents purposes described in section 017800 – CLOSEOUT SUBMITTALS.
3.4 SUBMITTAL PROCEDURES
A. Transmit each submittal with the following information:
1. Include referenced specification number.
2. Submit specification sections independently of each other; do not bind multiple sections together into a single submittal.
B. Sequentially number the submittal form.
C. Identify Project, Contractor, Subcontractor or supplier, pertinent drawing and detail number, and specification section number as appropriate on each copy.
D. Apply contractor’s stamp, signed or initialed, certifying that review, approval, verification of Products required, field dimensions, and coordination of information is in accordance with the requirements of the Work and Contract Documents.
E. Submit electronically to Owner Representative by email and attachment.
F. Schedule submittals to expedite the project, and coordinate submission of related items.
1. For each submittal for review, allow 15 days excluding delivery time to and from the Contractor.
2. Allow a minimum of 7 days for processing of re-submittals.
3. Submittals to be processed within a certain time in order to maintain the progress of the work, state so clearly on the submittal.
4. Clearly identify variations from Contract Documents and Product or system limitations that may be detrimental to successful performance of the completed Work.
5. Provide space for Contractor and Owner Representative review stamps.
6. When revised for submission, identify all changes made since previous submission.
7. Submittals not requested will not be recognized or processed.
G. Submittals will be reviewed, marked with appropriate action, and returned.
1. Owner Representative will review submittals for general layout and design conformance only.
Materials, quantities, shop lengths, shop tolerances, and fabrication details are not certified by the Owner Representative.
Trane Project No. M598694 CLOSEOUT SUBMITTALS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 017800 - 1 HVAC Upgrades
SECTION 017800 – CLOSEOUT DOCUMENTS AND WARRANTIES
1.1 SUMMARY
A. This Section includes administrative and procedural requirements for Project Record Documents, including the following:
1. Record Documents.
2. Operations & Maintenance Data.
3. Warranties.
1.2 SUBMITTALS
A. Record Documents: Submit documents to the Owner Representative with claim for final Application for
Payment:
1. Number of Copies: Submit one (1) set of marked-up Record Drawings.
B. Operation and Maintenance Data:
1. Number of Copies: submit two (2) sets of Operation & Maintenance Manuals.
C. Warranties and Bonds:
1. For equipment put into service, submit within 10 days after acceptance.
PART 2 PRODUCTS – NOT USED
3.1 PROJECT RECORD DOCUMENTS
A. Maintain one set of the following record documents; record actual revisions to the work:
1. Drawings.
2. Specifications.
3. Addenda.
4. Change Orders and other modifications to the Contract.
5. Reviewed shop drawings.
6. Manufacturer’s Installation & Maintenance instructions.
3.2 OPERATIONS AND MAINTENANCE DATA
A. For each Product: List names, addresses and telephone numbers of Subcontractors and suppliers, including local source of supplies and replacement parts.
B. Product Data: Manufacturer provided information and drawings specific to the product and application used.
3.3 OPERATIONS AND MAINTENANCE MANUALS
A. Binders: Compile and bind all information in commercial quality 8.5X11 inch three ring binder with durable plastic cover.
B. Cover: Identify each binder with printed title “OPERATIONS AND MAINTENANCE INSTRUCTIONS”.
Identify title and date of project.
C. Contents:
1. Part 1: Directory, listing names, addresses and telephone numbers of Contractor, Subcontractors, Owner Representative, and Major Equipment Suppliers.
2. Part 2: Operations and maintenance instructions, including:
a. List of Equipment.
b. Parts list for each component, with ordering data.
c. Product data.
d. Product Installation and Maintenance Instructions.
e. Recommended list of replacement parts.
3. Part 3: Product Documents and Certificates, including:
a. Shop drawings and product data.
b. Certificates.
c. Photocopies of Warranties.
Trane Project No. M598694 CLOSEOUT SUBMITTALS Calhoun ISD Dorris Klaussen Issued for Bids & Construction 017800 - 2 HVAC Upgrades
3.4 WARRANTIES
1. Contractor is not responsible for warranty on owner pre-purchased equipment.
2. Contractor shall provide parts and labor warranty on all material and workmanship provided by the contractor.
3. Warranty period shall be period of one (1) years and shall start on date on Certificate of
Substantial Completion.
4. Warranty Obligations: Restore or remove and replace warranted work to it’s originally specified condition at such time within the warranty period that it does not comply with or fulfill the terms of the warranty. Restore, or remove and replace other work which has been damaged by failure of warranted work.
5. Reinstatement of Warranty: Upon restoration or removal and replacement of warranted work which has failed, reinstate the warranty by issuing newly executed form for at least the remaining period of time of the original warranty but not for less than half the original warranty period.
6. Owner’s Resource: Warranties and warranty periods do not diminish implied warranties and do not deprive owner of actions, rights or remedies otherwise available for Contractor failure to fulfill requirements of Contract Documents.
tsgdr224 Polygon tsgdr224 PolyLine tsgdr224 Callout
6' TEMPORARY FENCE WITH VEHICLE SIZED ENTRANCE GATE
(PROVIDED BY MECHANICAL CONTRACTOR)
tsgdr224 Callout
ROOF ACCESS POINT & EQUIPMENT AND MATERIALS STAGING AREA
tsgdr224 Callout
PARKING AREA
(LOCKED VEHICLES)
tsgdr224 Polygon tsgdr224 Text Box
SITE PLAN VIEW SKETCH
DORRIS KLAUSSEN HVAC UPGRADES PROJECT
11/9/26 (JTK)
| 000001-Project-Title-Cover |
| 000010-Table-of-Contents |
| 000015-Listing-of-Drawings |
| 001113-Invitation-to-Bid |
| FROM: |
| 1.1 The Owner: |
| Calhoun ISD |
| 17111 G-Drive North |
| Marshall, MI 49068 |
| 1.2 And The Owner’s Representative |
| Trane West Michigan |
| 5030 Corporate Exchange Blvd. |
| Grand Rapids, MI 49512 |
| 1.3 Date: November 9, 2026 |
| 1.4 TO: POTENTIAL BIDDERS |
| A. Your firm is invited to submit an offer to Owner for HVAC systems upgrades to the Calhoun ISD Dorris Klaussen Developmental Center. Bids are due before 2:00 PM local time on Tuesday December 1st, 2026, for the following project: |
| Dorris Klaussen HVAC Upgrades |
| Dorris Klaussen Developmental Center |
| 408 West Jameson Ave |
| Battle Creek, MI 49014 |
| B. Bids shall be submitted in a sealed, opaque envelope identifying the bidder and the Project Title. Sealed bids shall be addressed to Kori Rafferty, and delivered to Calhoun ISD Administration Building, 17111 G-Drive North, Marshall, MI 49068. Inclu... |
| C. Project Description: The Dorris Klaussen Development Center HVAC Upgrades project in Battle Creek, MI, for Calhoun ISD, is primarily the installation of a new central, chilled glycol cooling system including chiller, pumps, hydronic accessories, p... |
| D. Bid Documents: electronic bid packets may be obtained from the Owner Representative, Trane; E-mail: jknibbe@trane.com or 616-240-8314. |
| E. Your offer will be required to be submitted under a condition of irrevocability for a period of thirty (30) days after submission. |
| F. Prevailing wage labor rates are required for this project. |
| G. This is a public project; bids offers will be read aloud or disclosed to all bidders and interested parties, and a bid tabulation summary will be made available to all bidders not present at the bid reading that request such information by email to... |
| H. The Owner reserves the rights to reject all bids, reject individual non-responsive bids, or award to any bidder that will serve the Owner’s best interest as deemed in their opinion. |
| I. A mandatory pre-bid meeting will be held on Wednesday, November 18, 2026 at 3:00 PM local time at the Dorris Klaussen Development Center located at 408 West Jameson Ave Battle Creek, MI 49014. The owner representative and owner will be in attendan... |
| END OF SECTION |
| 004100-Bid_Form |
| 1.1 TO: |
| The Owner (hereinafter referred to as Owner): |
| Calhoun ISD |
| 17111 G-Drive North |
| Marshall, MI 49068 |
| 1.2 FOR: |
| Dorris Klaussen HVAC Upgrades |
| Dorris Klaussen Development Center |
| 408 West Jameson Ave |
| Battle Creek, MI 49014 |
| 1.3 DATE: (Bidder to enter Date). Sealed bids must be received no later than 2:00 PM local time on December 1st, 2026, at Calhoun ISD Administration Building, 17111 G-Drive North, Marshall, MI 49068. Bids shall be submitted in a sealed, opaque en... |
| 1.4 SUBMITTED BY: |
| A. Bidder’s Full Name |
| 1. Address |
| 2. Contract Time |
| 3. Phone Number |
| 4. E-mail Address |
| 1.5 OFFER: |
| A. Bid Category (mechanical or electrical) |
| B. Having examined the Place of The Work and all matters referred to in the Project Manual and the Contract Documents prepared by the owner(or owner’s representative) for the above mentioned project, we, the undersigned, hereby offer to enter into a C... |
| Dollars |
| ($ ), in lawful money of the United States of America |
| C. Prevailing wages under the Federal Davis-Bacon Act and regulations for projects funded through federal programs are included. |
| D. Costs for a performance, labor, and material bonds in the amount of 100% of the bid sum are included in the bid sum. |
| E. List names of any subcontractors carried in bid offer (if applicable): |
| 1. Subcontractor: ____________________________________________________ |
| 2. Subcontractor: ____________________________________________________ |
| 3. Subcontractor: ____________________________________________________ |
| 4. Subcontractor: ____________________________________________________ |
| 1.6 ACCEPTANCE |
| A. This offer shall be open to acceptance and is irrevocable for thirty (30) days from the bid due date. |
| B. If this bid is accepted by Owner within the time period stated above, we will: |
| 1. Execute the agreement within seven days of receipt of acceptance to this bid. |
| 2. Commence work promptly in accordance with construction schedule established in consultation with Owner and owner representative. |
| 1.7 CONTRACT TIME |
| A. If this Bid is accepted, we will: |
| 1. Complete the Work prior to (list date) based on commencement of work on or after January 1st, 2026 as coordinated with the owner and the owner representative. Project subcontract award notification is expected by December 18th. |
| 1.8 REQUIRED BID ATTACHMENTS |
| A. The following bid attachments must be completed and submitted with the bid. |
| 1. Familial Disclosure Affidavit – Sample attached following this section |
| 2. Iran Sanctions Affidavit – Sample attached following this section |
| 3. Bid Bond in the amount of 5% of the contractor’s bid – bidder to provide form |
| 1.9 BID FORM SIGNATURES |
| A. Name of person, partnership, or corporation submitting bid (check one) |
| ( ) An Individual |
| ( ) A Partnership |
This is the start of the file's text. The full file is on GovTribe.