This is a Bid Form for the City of Scranton's Debris Removal Project #9, specifically for the Leach Creek Culvert site. The project involves debris removal activities at various locations within Scranton, with a focused scope at Site #19C. The bid package outlines three primary work items: (1) mobilization and demobilization, including traffic control, water diversion, access road preparation, and environmental/safety measures, (2) removal of debris during dry weather to the water line, involving rock, stone, gravel, and concrete debris disposal, and (3) selective tree and vegetative debris removal within the channel, with specific considerations for protecting stream bank vegetation and accounting for northern long-eared bat habitat staging areas.

The bid is structured as a lump sum pricing model with three distinct line items, each with an estimated quantity of 1. The maximum debris removal dimensions are specified as 690' x 8' x 3' for sand/soil/mud debris. Bidders are required to submit pricing through the City of Scranton's e-Procurement Portal, with bids due by 10:00 am on Thursday, May 16, 2024. The project includes specific environmental and regulatory compliance requirements, such as obtaining necessary permits, following local and federal regulations, and adhering to environmental protection guidelines. Notably, the project dimensions and quantities are based on a 2018 post-stormwater event inspection and represent maximum allowable amounts that cannot be exceeded.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form Page 00410-i

BID FORM

PROJECT

DEBRIS REMOVAL - 9

LOCATION

VARIOUS LOCATIONS CITY OF SCRANTON

OWNER

CITY OF SCRANTON

340 N WASHINGTON AVE, SCRANTON PA 18503

BIDDER

NAME: _________________________________________

Page 00410-1

ARTICLE 1 – BASIS OF BID

1.01 Bidder will complete the Work in accordance with the Contract Documents for the following Lump Sum price(s):

SUMMARY OF PRICES:

SITE / PROJECT PRICE (MUST EQUAL ATTACHED SHEETS)

Site #19C: Leach Creek Culvert

TOTAL BID PRICE (SUM PRICES) $

1.02 Dimensions/quan66es on plans represent the scope of the work to be bid and shall govern.

Dimensions/quan66es on the plans are based on recent observa6ons of exis6ng condi6ons. Dimensions on the bid form were provided during a 2018 post-stormwater event inspec6on and represent the maximum amount which cannot be exceeded.

Page 00410-2

Project Site/Name: Site #19C

Loca6on: Leach Creek Culvert

SCHEDULE OF PRICES:

ITEM

NO.

DESCRIPTION UNIT ESTIMATED

QUANTITY

BID PRICE

1 Mobiliza6on and demobiliza6on, traffic control, diversion and control of water, temporary water pumping and water bypassing facili6es, install and remove access road(s), E&S measures, clearing and grubbing, removal of brush, temporarily remove and reinstall access gates and similar devices, protect exis6ng facili6es and restora6on of all disturbed areas as required to complete all the work as shown on the contract drawings. Cost includes costs for all bonds, permits, insurances, shops, storage areas, sanitary facili6es, contractor’s offices, and costs related to compliance with local state and federal regula6ons for the work.

LUMP SUM 1 $

2 Removal of debris during dry weather to the water line as shown on the drawings. Dispose of debris at permiCed site. Rock debris is generally composed of natural, stone, rock, gravel, boulders, rip rap, concrete pieces that have been displaced and deposited in the channel as indicated on the drawings. Work includes hauling of the removed material to an approved disposal site. Maximum removal dimensions not to exceed 690’ x 8’ x 3’ Sand/Soil/Mud Debris.

LUMP SUM 1 $

3 Removal of trees. The exis6ng vegeta6on and trees located along the stream banks at the project loca6on shall be protected and maintained to all prac6cable extents. However, vegeta6ve debris within the channel in the project area and/or trees leaning over the channel within a 35-degree angle off the water surface shall be removed. This project is located in the vicinity of northern long-eared bat spring staging/fall swarming habitat. See specifica6on sec6on 99001.

LUMP SUM 1 $

TOTAL $