Bid Package_37.pdf

PDF 4 MB Posted

Attached to
Rose Hill Park Hardscape & Landscape Improvements
Solicitation number
P26-054
Issued by
Jefferson County, Texas

About this file

This is a Bid Package document issued by the City of Port Arthur, Texas, for the Rose Hill Park Hardscape & Landscape Improvements project. The scope of work encompasses hardscape and landscape construction including concrete structures, ADA-compliant routes, site demolition and clearing, grading and drainage infrastructure, pedestrian and vehicular paving, site lighting and electrical systems, structures including pavilions and fencing, site furnishings, outdoor play area equipment, and softscape elements including planting and irrigation systems. The project involves extensive itemization across eleven major work categories with unit prices and lump sum pricing for General Conditions, ADA routes, demolition/preservation, grading/drainage/utilities, pedestrian paving, vehicular paving, site lighting and electrical, structures, site furnishings, outdoor play area furnishings, and softscape work. A non-mandatory pre-bid conference was scheduled for August 20, 2026, at 10:00 a.m. at City Hall, 5th Floor Council Chambers, 444 4th Street, Port Arthur, Texas. Sealed bids are due by 3:00 p.m. Central Standard Time on Wednesday, September 2, 2026, with bid opening and reading at 3:15 p.m. the same day in the City Council Chambers. Bidders must submit one original and one copy of their bid to the City Secretary's office.

Bid security of not less than five percent (5%) in the form of a check, cashier's check, or bid bond with corporate surety authorized to conduct business in Texas is required. For contracts exceeding fifty thousand dollars ($50,000), a Payment Bond is required, and for contracts exceeding one hundred thousand dollars ($100,000), a Performance Bond is also required, each in the amount of one hundred percent (100%) of the contract price. Comprehensive insurance requirements include standard workers' compensation insurance with waiver of subrogation, commercial general liability with minimum limits of $500,000 to $1,000,000 depending on contract size, comprehensive automobile liability with minimum combined single limits of $500,000 per occurrence, and contractual liability insurance. The contractor must obtain all necessary certificates of coverage and maintain them for the duration of the project plus one year thereafter, with strict compliance required under Texas Labor Code Section 406.096 and Texas Workers' Compensation Commission Rule 110.110. The project is non-federally funded, and the City of Port Arthur qualifies for sales tax exemption on non-consumable materials and equipment permanently incorporated into the work. The contractor shall complete the work within a specified number of consecutive calendar days as noted in the Notice to Proceed, with ten percent (10%) retainage on all periodic progress payments until final completion and acceptance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rose Hill Park

Hardscape & Landscape Improvements

City of Port Arthur

PORT ARTHUR, TEXAS

PROJECT MANUAL

Specifications

Burditt Land / Place.

310 Longmire Road Conroe, Texas 77304

July 2026 dlestage 00 Titleblock.dgn dlestage Text Box dlestage Text Box 07/14/2026

Purchasing Division/Finance Department | Purchasing Manager, Clifton Williams P.O. Box 1089|444 4th Street| Port Arthur, Texas 77641| 409.983.8160 |Fax 409.983.8291

RONALD BURTON, CPM

CITY MANAGER

CHRISTE WHITLEY NED, TRMC

CITY SECRETARY

ROXANN PAIS COTRONEO

CITY ATTORNEY

CHARLOTTE M. MOSES, MAYOR

THOMAS KINLAW, III

MAYOR PRO TEM

COUNCIL MEMBERS:

WILLIE BAE LEWIS, JR.

CAL J. JONES

DONEANE BECKCOM

HAROLD L. DOUCET, SR.,

DONALD FRANK, SR.

AUGUST 16, 2026

INVITATION TO BID

ROSE HILL PARK HARDSCAPE & LANDSCAPE IMPROVEMENTS

DEADLINE: Sealed Bid submittal must be received and time stamped by 3:00 p.m., Central Standard Time, Wednesday, September 2, 2026. (The clock located in the City Secretary’s office will be the official time.) All bids received will be read aloud at 3:15 p.m. on Wednesday, September 2, 2026 in the City Council Chambers, City Hall, 5th Floor, Port Arthur, TX. You are invited to attend.

MARK ENVELOPE: P26-054

DELIVERY ADDRESS: Please submit one (1) original and one (1) copy of your bid to:

CITY OF PORT ARTHUR CITY OF PORT ARTHUR

CITY SECRETARY or CITY SECRETARY P.O. BOX 1089 444 4TH STREET, 4th Floor

PORT ARTHUR, TEXAS 77641 PORT ARTHUR, TEXAS 77640

POINTS OF CONTACT:

Questions concerning the Invitation to Bid or Scope of Work should be directed in writing to:

City of Port Arthur, TX Clifton Williams, Purchasing Manager P.O. Box 1089 Port Arthur, TX 77641 clifton.williams@portarthurtx.gov mailto:clifton.williams@portarthurtx.gov

The enclosed Invitation to Bid (ITB) and accompanying General Instructions, Conditions and Specifications are for your convenience in submitting bids for the enclosed referenced services for the City of Port Arthur.

Bids must be signed by a person having authority to bind the firm in a contract. Bids shall be placed in a sealed envelope, with the Vendor’s name and address in the upper left-hand corner of the envelope.

ALL BIDS MUST BE RECEIVED IN THE CITY SECRETARY’S OFFICE BEFORE OPENING DATE AND

TIME. It is the sole responsibility of the firm to ensure that the sealed ITB submittal arrives at the above location by specified deadline regardless of delivery method chosen by the firm. Faxed or electronically transmitted ITB submittals will not be accepted.

Clifton Williams, CPPB Purchasing Manager

NON-MANDATORY

PRE-BID CONFERENCE

A Non-Mandatory Pre-Bid Conference between Representatives of the City of Port Arthur, Texas and prospective bidders for Rose Hill Park Hardscape & Landscape Improvements will be held on Thursday, August 20, 2026 at 10:00 a.m. at City Hall 5th Floor Council Chamber located at 444 4th Street, Port Arthur, Texas.

The purpose of the Non-Mandatory Pre-Bid Conference is to make certain that the scope of work is fully understood, to answer any questions, to clarify the intent of the Contract Documents, and to resolve any problems that may affect the project construction. No addendum will be issued at this meeting, but subsequent thereto, the Purchasing Manager, if necessary, will issue an addendum(s) to clarify the intent of the Contract Documents.

CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS

For Construction of

ROSE HILL PARK HARDSCAPE & LANDSCAPE

IMPROVEMENTS To Serve

The CITY OF PORT ARTHUR

PORT ARTHUR, TEXAS

P26-054

(Non-Federally Funded Project)

TABLE OF CONTENTS

A. CONSTRUCTION CONTRACT

AGREEMENT

B. ADVERTISEMENT FOR BIDS

C. INFORMATION TO BIDDERS

D. BID

E. BID BOND

F. GENERAL CONDITIONS

G. SUPPLEMENTAL GENERAL CONDITIONS

H. PAYMENT BOND

I. PERFORMANCE BOND

J. NOTICE OF AWARD

K. NOTICE TO PROCEED

L. INSURANCE

M. QUALIFICATION STATEMENT

N. NON-COLLUSION AFFIDAVIT

O. AFFIDAVIT

P. CONFLICT OF INTEREST

Q. SB 252 CHAPTER 2252 CERTIFICATION

R. HOUSE BILL 89 VERIFICATION

S. TECHNICAL SPECIFICATIONS

SECTION A

CONSTRUCTION CONTRACT AGREEMENT

A-1

CONSTRUCTION CONTRACT

AGREEMENT

[Non-Federally Funded Projects]

THIS AGREEMENT, made this __ day of __ , _ , by and between the CITY OF PORT ARTHUR, a municipal corporation organized under the laws of the State of Texas, hereinafter called “OWNER”, and _______, herein acting by and ______, hereinafter called “CONTRACTOR”.

WITNESSETH: That for and in consideration of the payments, terms, conditions, and agreements set forth herein, OWNER and CONTRACTOR agree as follows:

1. The CONTRACTOR will commence and complete the construction of Rose Hill Park Hardscape & Landscape Improvements

2. The CONTRACTOR will furnish at his own expense all the materials, supplies, tools, equipment, labor and other services necessary for the construction and completion of the Project described herein.

3. The CONTRACTOR will commence the work required by the Contract Documents on or before a date to be specified in the Notice to Proceed and will complete the same within consecutive calendar days as specified in the Notice to Proceed , including, but not limited to, all Saturdays, Sundays and Federal, State, and City holidays unless the period for completion is extended otherwise by the Contract Documents.

4. The CONTRACTOR agrees to perform all the Work described in the Contract Documents and comply with the terms therein for the sum of $______________, or as shown in the Bid Schedule.

5. The term "CONTRACT DOCUMENTS" means and includes the following:

(A) Agreement

(B) Advertisement for BIDS

(C) Information to BIDDERS

(D) BID

(E) BID BOND

(F) General Conditions

(G) Supplemental General Conditions

(H) Payment Bond

(I) Performance Bond

(J) Notice of Award

(K) Notice to Proceed

(L) Insurance

(M) Qualification Statement

(N) Non-Collusion Affidavit

(O) Affidavit

A-2

(N) Scope of Work prepared or issued by BRW Architects

(O)

Preliminary Engineering Report prepared by Burditt Land Place dated 2026 Addenda:

, 20_____. No.__________, dated No.__________, dated , 20_____.

6. The OWNER will pay to the CONTRACTOR in the manner and at such times as set forth in the General Conditions such amounts as required by the Contract Documents.

7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators, successors, and assigns.

IN WITNESS WHEREOF, the Parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two (2) copies, each of which shall be deemed an original on the date first above written.

APPROVED IN FORM: OWNER:

CONTRACTOR: OWNER:

CITY OF PORT ARTHUR

BY BY

NAME NAME

ADDRESS

TITLE

[CORPORATE SEAL] [SEAL]

ATTEST: ATTEST:

NAME: NAME:

(P) Conflict of Interest

(Q) SB 252 Chapter 2252 Certification

(R) House Bill 89 Verification

SECTION B

ADVERTISEMENT FOR BIDS

CITY OF PORT ARTHUR, TEXAS

INVITATION TO BID

NOTICE IS HEREBY GIVEN THAT sealed Bids, addressed to the City of Port Arthur, will be received at the Office of the City Secretary, City Hall 444 4th Street or P.O. Box 1089, Port Arthur, Texas 77641 no later than 3:00 P. M., Wednesday, September 2, 2026. Applicant names will be read aloud beginning at 3:15 P.M., Wednesday, September 2, 2026 on this date in the City Council Chambers, City Hall, 5th Floor for certain services briefly described as:

ROSE HILL PARK

HARDSCAPE & LANDSCAPE IMPROVEMENTS

Bids received after the deadline stated above, regardless of method of delivery, will not be considered and returned unopened.

Copies of the Specifications and other Contract Documents are on file in the Purchasing Office, 444 4th Street, City of Port Arthur, and are open for public inspection without charge. They can also be retrieved from the City’s website at www.portarthurtx.gov/bids.aspx or www.publicpurchase.com.

NON-MANDATORY PRE-BID MEETING IS SCHEDULED FOR 10:00 A.M. ON

THURSDAY, AUGUST 20, 2026, AT CITY HALL 5TH FLOOR COUNCIL CHAMBERS

LOCATED AT 444 4T STREET, PORT ARTHUR, TEXAS.

The City of Port Arthur reserves the right to reject any and all bids and to waive informalities.

Per Chapter 2 Article VI Sec. 2-262(C) of the City’s Code of Ordinance, the City Council shall not award a contract to a company that is in arrears in its obligations to the City.

Clifton Williams Purchasing Manager

FIRST PUBLICATION: AUGUST 12, 2026

SECOND PUBLICATION: AUGUST 19, 2026

http://www.publicpurchase.com/

SECTION C

INFORMATION TO BIDDERS

C-1

INFORMATION TO BIDDERS

The following instructions are applicable to the Contract, in addition to the requirements set forth in the ADVERTISEMENT FOR BIDS.

1. BID PROCEDURE

Bids must be submitted in DUPLICATE upon the prescribed forms, or copies thereof, in sealed envelopes plainly marked. Bids shall be prepared in compliance with the requirements of the ADVERTISEMENT FOR BIDS, these instructions and the instructions printed on the prescribed forms. All blank places on the Proposal form must be filled in as noted, in ink, in both words and figures, with amounts extended and totaled, and no changes shall be made in the phraseology of the forms or of the items mentioned therein. In case of any discrepancy between the written amounts and the figures, the written amounts shall govern. If the Bidder does not bid on optional items (if shown in the Proposal form), "No Bid" shall be entered in the blank spaces therefore. Any bid may be deemed irregular which contains any omission, erasure, alteration, addition, irregularity of any kind or item not called for, or which does not contain prices set opposite to each of the several items in the Proposal form, or in which any of the prices are obviously unbalanced, or which shall in any manner fail to conform to the conditions of the published ADVERTISEMENT FOR BID. The Bidder shall sign his Proposal in the blank area provided therefore. If the bid is made by a partnership or corporation, the name and address of the partnership or corporation shall be shown, together with the name and address of the partners or officers. If the bid is made by a partnership, it must be acknowledged by one of the partners; if made by a corporation, by one of the officers thereof accompanied by Corporate Seal. In order to ensure consideration, the Proposal must be enclosed in a sealed envelope plainly identified by the name of the project and the Contract number, and addressed to the OWNER as prescribed in the Invitation to Bidders.

Withdrawal or modifications to bids are effective only if written notice thereof is filed prior to time of bid opening and at the place specified in the Notice to Bidders. A notice of withdrawal or modifications to a bid must be signed by the CONTRACTOR or his designated representative. No withdrawal or modifications shall be accepted after the time for opening of proposals.

2. BID SECURITY AND LIQUIDATED DAMAGES

Bids shall be accompanied by a bid guarantee of not less than five percent ( 5%) Check or Cashier's Check payable without recourse to the CITY OF PORT ARTHUR, or a bid bond with corporate surety authorized to conduct business in Texas. Said security shall be submitted with the understanding that it shall guarantee that the Bidder will not withdraw his bid within sixty (60) days after the date of the opening of the bids; that if a bid is accepted, the Bidder will enter into a formal Contract with the OWNER, furnish bonds and insurance as may be required and commence work at the specified time, and that in the event of the withdrawal of said bid within said period, or the failure to enter into said Contract, furnish said bonds and insurance and commence work within the time specified, the Bidder shall be liable to the OWNER for the difference

C-2 between the amount specified in the bid in the amount for which the OWNER may otherwise procure the required work. Checks of all except the three lowest responsible Bidders will be returned when award is made; when the Contract is executed, the checks of the two (2) remaining unsuccessful Bidders will be returned; that of the successful Bidder will be returned when formal Contract, bonds and insurance are approved, and work has commenced within the time specified.

The Bidder to whom the award is made shall execute and return the formal Contract with the OWNER and furnish Performance and Payment Bonds and required insurance Documents within ten (10) days after the prescribed forms are presented to him for signature. Said period will be extended only upon written presentation to the OWNER, within said period, of reasons which, in the sole discretion of the OWNER, justify an extension. If said Contract, bonds and insurance Documents are not received by the OWNER within said period or if work has not been commenced within the time specified, the OWNER may proceed to have the work required by the Plans and Specifications performed by any means at its command, and the Bidder shall be liable to the CITY OF PORT ARTHUR, for any excess cost to the OWNER over his bid amount. Further, the bid guarantee shall be forfeited to the CITY OF PORT ARTHUR, as liquidated damages and Bidder shall be liable to the CITY OF PORT ARTHUR, for an additional amount of five percent (5%) of the bid amount as liquidated damages without limitation.

The OWNER, within ten (10) days of receipt of acceptable Performance and Payment Bonds, Insurance Documents and Contract signed by Bidder to whom Contract was awarded, shall sign and return executed duplicate of the Contract to said party. Should OWNER not execute the Contract within such period, the Bidder may, by written Notice to OWNER, withdraw his signed Agreement.

3. BONDS

The following bonds, each in the amount of one hundred percent (100%) of the Contract price, will be required in accordance with State law as follows: a (1) PAYMENT BOND for any contract in excess of Fifty Thousand Dollars ($50,000.00); and (2) a PERFORMANCE BOND for any contract in excess of One Hundred Thousand Dollars ($100,000.00).

4. NOTICE TO PROCEED

Notice to Proceed shall be issued within ten (10) days of the execution of the Contract by OWNER. Should there be any reason(s) why Notice to Proceed cannot be issued within such period, the time may be extended by mutual agreement between OWNER and CONTRACTOR. If Notice to Proceed has not been issued within the ten (10) day period or a period mutually agreed upon, CONTRACTOR may terminate the Contract without liability on the part of either party.

C-3

5. INSURANCE

All insurance must be written by an insurer licensed to conduct business in the State of Texas, unless otherwise permitted by OWNER. The CONTRACTOR shall, at his own expense, purchase, maintain and keep in force insurance that will protect against injury and/or damages which may arise out of or result from operations under this Contract, whether the operations be himself or by any Subcontractor or by anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable of the following types and limits (No insurance policy or Certificate of Insurance required below shall contain any aggregate policy year limit unless a specific dollar amount[or specific formula for determining a specific dollar amount] aggregate policy year limit is expressly provided in the specification below which covers the particular insurance policy or Certificate of Insurance).

1. Standard Worker’s Compensation Insurance (with waiver of subrogation in favor of the CITY OF PORT ARTHUR, Arceneaux Wilson & Cole LLC, its Officers, Agents & Employees). (City and Contractor and all persons providing services shall comply with the workers compensation insurance requirements of Section

406.096 of the Texas Labor Code and 28 TAC Section 110.110, a copy of which is attached hereto and is hereby incorporated by reference.)

2. Commercial General Liability occurrence type insurance. No.

“XCU” RESTRICTIONS SHALL BE APPLICABLE.

Products/completed operations coverage must be included, and CITY OF PORT ARTHUR and Arceneaux Wilson & Cole LLC, its Officers, Agents, and Employees must be named as an additional Insured.

a. Bodily Injury $500,000 single limit per occurrence, or $500,000 each person/$500,000 per occurrence for contracts of $100,000 or less; or,

b. Bodily Injury $1,000,000 single limit per occurrence or $1,000,000 each person/$1,000,000 per occurrence for contracts in excess of $100,000; and,

c. Property Damage $100,000 per occurrence regardless of Contract amount; and,

d. Minimum aggregate policy year limit of $1,000,000 for contracts of $100,000 or less; or,

e. Minimum aggregate policy year limit of $2,000,000 for contracts in excess of $100,000.

3. Comprehensive Automobile Liability (including owned, non-owned and hired vehicles coverage).

a. Minimum combined single limit of $500,000 per occurrence for bodily injury and property damage.

C-4

b. If individual limits are provided, minimum limits are $300,000 per person, $500,000 per occurrence for bodily injury, and $100,000 per occurrence for property damage.

C-5

PREAMBLE TO RULE 110.110

The Texas Worker's Compensation Commission adopts new § 110.10, concerning requirements for governmental entities awarding a contract for a building or construction project, and for persons providing services on a building or construction project for a governmental entity. The new rule is adopted with changes to the proposed text published in the April 26, 1994 issue of the Texas Register (19 TexReg 3131).

Subsection (a)(7) and (c)(7) were amended by adding language to further clarify who is covered by the rule. Subsections (c)(7)(F) and (c)(3) were added to clarify that a contractor or subcontractor is representing to the governmental entity that workers' compensation coverage is provided. Subsections (d)(8)(C) and (c)(8)(C) were added to require specific language regarding representations of coverage to be added to contracts to provide services on the project. Subsections (c)(7)(F), and (c)(7)(I)(5), (d)(5), (d)(8)(F), (c)(6), and (c)(8)(F) were amended to reduce the retention period for contractors and other persons providing services on the project from three years to one year. Subsection (g) was changed to state that this rule applies to contract advertised for bid after September 1, 1994, rather than awarded after September 1, 1994.

The Texas Labor Code, §406.096, requires workers' compensation insurance coverage for all persons providing services on a building or construction project for a governmental entity. The commission is aware that this statutory requirement is not being met, and this rule is designed to achieve compliance and to implement a record keeping process which will enable oversight of compliance. The rule does this by placing requirements on the governmental entity and on contractors and other persons providing services on a project. These requirements include coverage, certificates of coverage, posted notices of coverage, and notification of changes in coverage status. The rule does not create any duty or burden on anyone which the law does not establish.

The rules defines terms which apply to governmental entity building or construction projects and sets up a clear procedure for governmental entities and contractors that bid for building land construction projects to follow in complying with the requirements of the Texas Labor Code, §406.096. It also defines persons who provide services on a project who are subject to the statutory requirement of coverage, and sets forth their requirements to comply with the statute and the rule. It specifically excludes persons such as food/beverage vendors whose deliveries and labor are not permanently incorporated into the project. The rule puts persons on notice that providing false or misleading certificates of coverage, or failing to provide or maintain required coverage, or failing to report any change that materially affects the provision of coverage may subject the contractor or other persons providing services on the project to administrative penalties, civil penalties, or other civil actions.

The rule requires a governmental entity to timely obtain certificates of coverage, retain them for the duration of the project plus three years, and provide them to the commission upon request and to others entitled to them by law. It also requires the governmental entity as a prerequisite to awarding a contract, and as part of the contract, to require that the contractor provide coverage and certificates of coverage for the contractor's employees; timely obtain and provide the governmental entity all required certificates of coverage for all persons providing services on the project; retain certificates of coverage on file for the duration of the project and for one year thereafter;

notify the governmental entity in writing by certified mail or personal delivery, within 10

C-6 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; post notices on each project site; and contractually require persons with whom it contracts to do the same, with the certificates of coverage to be provided to the person for whom they are providing services. The rule also sets out the language to be included in bid specifications and in contracts awarded by a governmental entity and the information required to be in the posted notice to employees. It further establishes a method for obtaining the certificates from persons providing services on the project and providing them to the governmental entity.

It requires a contractor awarded a building or construction contract to provide workers' compensation coverage to the contractor's employees for the duration of the project; file a certificate of coverage of the contractor's employees with the governmental entity prior to being awarded a contract; obtain and provide to the governmental entity, certificates of coverage from each other person with whom it has contract to provide services on the project, prior to that person beginning work on the project; obtain and provide new certificates of coverage shown on the current certificate ends during the duration of the project; retain all certificates of coverage for the duration of the project and for one year thereafter, notify the governmental entity of material changes in coverage; contractually require each other person with whom it contracts to provide a certificate of coverage; and post notices on each project site.

All other persons providing services on a project have the same requirements as a contractor, with the exception of posting notices and with the exception that the certificate of coverage is given to the person for whom they contracted to provide services on the project. The rule uses the term "persons providing services on the project;

in lieu of the statutory term "subcontractor because the term "subcontractor" as used in the statue (§406.096) and in this rule is broader than standard industry usage. The use of the different terminology will prevent confusion.

The rule does not create any duty or burden on anyone which the law does not establish.

The new rule is adopted under the Texas Labor Code, §402.061, which authorizes the commission to adopt rules necessary to administer the Act, and Texas Labor Code, §406.096, which establishes requirements for governmental entities, contractors, and subcontractors ("persons providing services on the project") regarding workers' compensation coverage for workers on public building or construction projects.

Rule 110.110 Reporting Requirements for Building or Construction Projects for Governmental Entities.

(a) The following words and terms, when used in this rule, shall have the following meanings, unless the context clearly indicates otherwise. Terms not defined in this rule shall have the meaning defined the Texas Labor Code, if so defined.

(1) Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure statutory workers' compensation insurance coverage for the person's or entity's employees (including those subject to a coverage agreement) providing services on a project, for the duration of the project.

C-7

(2) Building or construction - has the meaning defined in the Texas Labor Code, §406.096(e)(l).

(3) Contractor - A person bidding for or awarded a building or construction project by a governmental entity.

(4) Coverage - Worker's compensation insurance meeting the statutory requirements of the Texas Labor Code, §401.011(44).

(5) Coverage agreement - A written agreement on form TWCC-81, form TWCC-82, form TWCC083, or form TWCC-84, filed with the Texas Workers' Compensation Commission with establishes a relationship between the parties for purposes of the Workers' Compensation Act, pursuant to the Texas Labor Code, Chapter 406, Subchapters F and G as one of employer/employee and establishes who will be responsible for providing workers' compensation coverage for persons providing services on the project.

(6) Duration of the project - Includes the time from the beginning of work on the project until the work on the project has been completed and accepted by the governmental entity.

(7) Persons providing services on the project ("subcontractor" In §406.096 of the Act) - Includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes but is not limited to independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity furnishing persons to perform services on the project. "Services" includes but is not to providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets.

(8) Project - Includes the provision of all services related to a building or construction contract for a governmental entity.

(b) Providing or causing to be provided a certificate of coverage pursuant to this rule is a representation by the insured that all employees of the Insured who are providing services on the project are covered by workers' compensation coverage, that the coverage if based on proper reporting of classification codes and payroll amounts, and that all coverage agreements have been filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading certificates of coverage, or failing to provide or maintain required coverage, or failing to report any change that materially affects the provision of coverage may subject the contractor or other person providing services on the project to administrative penalties, criminal penalties, civil penalties, or other civil actions.

C-8

(c) A governmental entity that enters into a building or construction contract on a project shall:

(1) Include in the bid specifications, all the provisions of subsection (d) of this rule, using the language required by paragraph (7) of this subsection;

(2) As part of the contracts, using the language required by paragraph (7) of this subsection, require the contractor to perform as required in subsection

(d) of this rule;

(3) Obtain from the contractor a certificate of coverage for each person providing services of the project, prior to that person beginning work on the project;

(4) Obtain from the contractor a new certificate of coverage showing extension of coverage;

(A) Before the end of the current coverage period, if the contractor's current certificate of coverage shows that the coverage period ends during the duration of the project, and

(B) No later than seven days after the expiration of the coverage for each other person providing services on the project whose current certificate shows that the coverage period ends during the duration of the project;

(5) Retain certificates of coverage on file for the duration of the project and for three years thereafter;

(6) Provide a copy of the certificates of coverage to the commission upon request and to any person entitle to them by law; and,

(7) Use the following language for bid specifications and contracts, without any additional works or changes, except those required to accommodate the specific document in which they are contained or to impose stricter standards of documentation in Figure 1:

(Figures 1)

Article . Worker's Compensation Insurance Coverage.

A. Definitions:

Certificate of coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC- 83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the project.

C-9

Duration of the project - includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity.

Persons providing services on the project ("subcontractor" in §406.095) includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person contracted directly with the contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators employees of any such entity, or employees of any entity which furnishes persons to provide services on the project.

"Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets.

B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401,011(44) for all employees of the contractor providing services on the project, for the duration of the project.

C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract.

D. If the coverage period shown on the contractor’s current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended.

E. The contractor shall obtain from each person providing services on a project, and provide to the governmental entity:

(1) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the project; and,

(2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage (if the coverage period shown on the current certificate of coverage ends during the duration of the project.

C-10

F. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.

G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project.

H. The contractor shall post on each project site a notice, in the text form and manner prescribed by the Texas Worker's Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage.

I. The contractor shall contractually required each person with whom it contracts to provide services on a project, to:

(1) Provide coverage, based on proper reporting of classification codes and payroll amounts and filling of any coverage agreements, which means the statutory requirements of Texas Labor Code, Section 401.011 (44) for all of its employees providing services on the project, for the duration of the project;

(2) Provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for they duration of the project;

(3) Provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage,(if the coverage period shown on the current certificate of coverage and during the duration of the project:

(4) Obtain from each other person with whom it contracts, and provide to the contractor:

(a) a certificate of coverage, prior to the other person beginning work on the project; and

(b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period. If the coverage period shown on the current certificate of coverage ends during the duration of the project;

(5) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter;

C-11

(6) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and

(7) Contractually require each person with whom it contracts, to perform as required by paragraphs (1) – (7), with the certificates of coverage to be provided to the person for whom they are providing services.

J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by worker’s compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission’s Division of Self-Insurance Regulation.

Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions.

K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the governmental entity to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental

(d) A contractor shall:

(1) Provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements;

(2) Provide a certificate of coverage showing workers' compensation coverage to the governmental entity prior to beginning work on the project;

(3) Provide the governmental entity, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project;

(4) Obtain from each person providing services on a project, and provide to the governmental entity:

(A) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity will have on file certificates of

C-12 coverage showing coverage for all persons providing services on the project; and,

(B) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage code during the duration of the project;

(5) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter;

(6) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project;

(7) Post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage.

This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text in Figure 2 provided by the commission on the sample notice, without any additional works or changes:

(Figure 2)

REQUIRED WORKER'S COMPENSATION COVERAGE

"The law requires that each person working on this site or providing services related to this construction project must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identify of their employer or status as an employee."

"Call the Texas Worker's Compensation Commission at 512-440-3789 to received information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." and

(8) Contractually require each person with whom it contracts to provide services on a project, to:

(A) Provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project;

C-13

(B) Provide a certificate of coverage to the contractor prior to that person beginning work on the project;

(C) Include in all contracts to provide services on the project the language in subsection (o) (3) of this rule;

(D) Provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;

(E) Obtain from each other person with whom it contracts, and provide to the contractor;

(I) a certificate of coverage, prior to the other person beginning work on the project; and

(II) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project:

(F) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter;

(G) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and,

(H) Contractually require each person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to be provided to the person for whom they are providing services.

(e) A person providing services on a project, other than a contractor, shall:

(1) Provide coverage for its employees providing services on a project, for the duration of the project based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements;

(2) Provide a certificate of coverage as required by its contract to provide services on the project, prior to beginning work on the project;

(3) Have the following language in its contract to provide services on the project:

"By signing this contract or providing or causing to be provided a certificate of coverage, the person signing this contract is representing to the

C-14 governmental entity that all employees of the person signing this contract who will provide services on the project will be covered by workers' compensation coverage for the duration of the project that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions.

(4) Provide the person for whom it is providing services on the project, prior to the end of the coverage period shown on its current certificate of coverage, a new certificate showing extension of coverage, if the coverage period shown on the certificate of coverage ends during the duration of the project:

(5) Obtain from each person providing services on a project under contract to it, and provide as required by its contract:

(A) A certificate of coverage, prior to the other person beginning work on the project; and

(B) Prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project;

(6) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter;

(7) Notify the governmental entity in writing by certified mail or personal delivery, of any change that materially affects the provisions of coverage of any person providing services on the project and sent the notice within 10 days after the person knew or should have known of the change; and

(8) Contractually require each other person with whom it contracts to:

(A) Provide coverage based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements for all of its employees providing services on the project, for the duration of the project;

(B) Provide a certificate of coverage to it prior to that other person beginning work on the project;

(C) Include in all contracts to provide services on the project the language in subsection (e)(3) of this rule;

(D) Provide, prior to the end of coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage

C-15 period shown on the current certificate of coverage ends during the duration of the project

(E) Obtain from each other person under contract to it to provide services on the project, and provide as required by its contract:

(i) a certificate of coverage, prior to the other person beginning work on the project; and

(ii) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the contract;

(F) Retain all required certificates of coverage on file for the duration of the project and for one year thereafter;

(G) Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project; and

(H) Contractually require each person with whom it contracts, to perform as required by paragraphs (A) - (H), with the certificate of coverage to the provided to the person for whom they are providing services.

(f) If any provision of this rule or its application to any person or circumstance is held invalid, the invalidity does not affect other provisions or applications of this rule that can be given effect without the invalid provision or application, and to this end the provisions of this rule are declared to be sever able.

(g) This rule is applicable for building or construction contracts advertised for bid by a governmental entity on or after September 1, 1994.

Effective Date: September 1, 1994

C-16

4. Contractual Liability Insurance covering the indemnity provision of this Contract in the same amount and coverage as provided for Commercial General Liability Policy, specifically referring to this Contract by date, job number and location;

5. All-Risk Builder's Risk of the non-reporting type (NOT REQUIRED for paving projects, water and sewer line projects or projects involving lump sum payments).

CONTRACTOR shall cause CONTRACTOR'S insurance company or insurance agent to fill in all information required (including names of insurance agency, CONTRACTOR and insurance companies, and policy numbers, effective dates and expiration dates) and to date and sign and do all other things necessary to complete and make into a valid Certificate of Insurance the CERTIFICATE OF INSURANCE form attached to and made a part of the Information To Bidders, and pertaining to the above listed Items 1, 2, 3 and 4; and before commencing any of the work and within the time otherwise specified. CONTRACTOR shall file said completed form with the OWNER. None of the provisions in said Form shall be altered or modified in any respect except as herein expressly authorized. Said CERTIFICATE OF INSURANCE Form contains a provision that coverages afforded under the policies will not be altered, modified or cancelled unless at least fifteen

(15) days prior written notice has been given to the OWNER. CONTRACTOR shall also file with the OWNER valid CERTIFICATE(s) OF INSURANCE on like form from or for all Subcontractors and showing the Subcontractor(s) as the Insured. Said completed CERTIFICATE OF INSURANCE Form(s) shall in any event be filed with OWNER not more than ten (10) days after execution of this Contract.

The original Builder's Risk policy (if required) shall provide for fifteen (15) days written notice of alteration, modification or cancellation and shall be furnished to OWNER. Provided, however, until the Original Policy is issued and furnished to the OWNER a Certified Insurance Binder with the identical notice will be acceptable in place of the original policy, which original policy must be received by the OWNER not later than thirty (30) days after issuance of the Notice to Proceed for the project. Notwithstanding any other provision in the Contract Documents, it is further mutually understood and agreed that no payment will be due and owing or made to the CONTRACTOR for any work performed under the Contract until all of the required insurance documentation, including the original policy specified above, are received by the OWNER.

6. JOB EXAMINATION

Bidder should carefully examine and be familiar with the Plans, Specifications and other Documents and other conditions and matters which can in any way affect the work or the cost thereof. By submitting a bid, the CONTRACTOR acknowledges that he or his qualified representative has visited the job site and investigated and satisfied himself as to: (a) the conditions affecting the work including but not limited of the physical conditions of the site which may bear upon site access, handling and storage of tools and materials, access to water, electric or other utilities or otherwise affect performance of required activities;

C-17

(b) the character and quantity of all surface and subsurface materials or obstacles to be encountered in so far as this information is reasonably ascertainable from inspection of the site, including exploratory work done by the OWNER or a designated consultant. Failure to do all of he above will not relieve a successful Bidder of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract Documents and to complete the contemplated work for the considerations set forth in the bid. Any information shown in the specifications or on the Plans in regard to subsurface data, test borings and similar conditions is to be considered approximate and does not relive the Bidder of the responsibility for its verification. OWNER is not responsible for any failure by the CONTRACTOR to acquaint himself with available information for estimating properly the difficulty or cost of successfully performing the work. The OWNER is not responsible for any conclusions or interpretations made by the CONTRACTOR on the basis of the information made available by the OWNER. In conformity with applicable statutes, the OWNER has adopted a labor classification and a minimum wage scale, which is included preceding the Specifications.

7. SALES TAX

This Contract is issued by an organization which qualifies for exemption pursuant to the provisions of Section 151.209 of the Texas Limited Sales, Excise and Use Tax Act as codified in Chapter 151 of the Texas Tax Code.

The CONTRACTOR'S attention is directed to the State of Texas Comptroller of Public Accounts Limited Sales, Excise and Use Tax rules and regulations Rulings regarding Repairmen and Contractors - Reference: Section 151.056 Texas Tax Code which, upon compliance with certain conditions, provides for exemption from this tax of non-consumable materials and equipment permanently incorporated into work done for an exempt organization, and to House Bill 11 amendments to Section 151.311 of the Tax Code (Vernon Supp. 1992) as they relate to separated contracts/bids in order for non-consumable materials and equipment to qualify for resale to the CITY OF PORT ARTHUR, and be exempt from sales tax.

Any Bidder may elect to exclude this sales tax from his bid.

This is the start of the file's text. The full file is on GovTribe.