Bid Package - 2026 Digester Cleaning.pdf

PDF 4 MB Posted

Attached to
Digester Cleaning Project
Solicitation number
MMSD, 2026, Digester Cleaning Project
Issued by
Dane County, Madison City, Wisconsin

About this file

Summary: 2026 Digester Cleaning Project

This is a Request for Bids issued by the Madison Metropolitan Sewerage District (MMSD) for the 2026 Digester Cleaning Project at the Nine Springs Wastewater Treatment Facility in Madison, Wisconsin. The project involves the removal and legal disposal of approximately 105,000 gallons (180 dry tons) of anaerobically digested sludge from each of three anaerobic digesters, along with cleaning of all interior tank surfaces and removal of inorganic waste and debris. Sealed bids are due by 1:00 p.m. CST on Wednesday, March 4, 2026, at MMSD's office located at 1610 Moorland Road, Madison, Wisconsin 53713. All prospective prime bidders must submit prequalification applications by 4:00 p.m. on Wednesday, February 25, 2026, to prequalifications@madsewer.org, and contractors must demonstrate at least three years of active experience in digester cleaning or similar confined space work. Bidders will be notified of disqualifications by 4:00 p.m. on Friday, February 27, 2026. The Notice to Proceed is anticipated for April 27, 2026, with final completion required within 180 calendar days from that date, or October 30, 2026, whichever comes first, and contractors must complete work within 130 days of starting on site.

Pricing shall be submitted as a lump sum bid based on estimated volumes and a 41.1% solids concentration, with payment made on actual dry tons processed at the unit bid price specified by the contractor per dry ton, plus separate lump sum amounts for interior cleaning of each digester. The contractor is responsible for obtaining all necessary permits and providing all labor, materials, equipment, transportation, and disposal services compliant with OSHA, RCRA, EPA, and applicable local, state, and federal regulations. The contractor must obtain and maintain comprehensive general liability insurance with a $2,000,000 general aggregate limit and $1,000,000 each occurrence limit, business automobile liability of $1,000,000, umbrella liability of $2,000,000, and worker's compensation insurance. The District reserves the right to reject any or all proposals and will award to the lowest qualified, responsive, and responsible bidder within 30 days of bid opening. Liquidated damages are assessed at $500 per day for delays beyond the 180-calendar-day completion period or October 30, 2026, whichever comes first.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Bids

2026 Digester Cleaning Project

Madison, Wisconsin

February 2026

ADVERTISEMENT FOR BIDS

MADISON METROPOLITAN SEWERAGE DISTRICT

2026 DIGESTER CLEANING PROJECT

The Madison Metropolitan Sewerage District (The District) will receive sealed proposals for the 2026 Digester Cleaning Project. Bids will be received at the office of the District, 1610 Moorland Road, Madison, Wisconsin 53713 until 1:00 p.m., CST, Wednesday, March 04, 2026, at which time and place all proposals will be publicly opened and read aloud.

Project Location

Digesters 1, 2 and 3 are located at the Nine Springs WWTF, 1610 Moorland Road, Madison, Wisconsin.

Project Description and Scope of Work

The 2026 Digester Cleaning Project will include removal and legal disposal of anaerobically digested sludge from three anaerobic digesters at the District’s Nine Springs Wastewater Treatment Facility. The total volume of sludge to be removed, processed, and disposed of is approximately 105,000 gallons (180 tons on a dry weight basis) from each of the digesters. Once emptied, the interior of all tanks will be cleaned of all residual material and inorganic waste to the extent practicable. Nine Springs Wastewater Treatment Facility is located at 1610 Moorland Road, Madison, Wisconsin. See attached excerpts from construction drawings for reference.

Conduct of Work and Use of Site

Contractor must conduct work in manner that will not hinder District personnel's access. Adequate equipment must be provided by the Contractor to ensure a minimum negative impact on the surrounding property during the work. The Contractor is responsible for determining the suitability of access points to the site. These access routes and any proposed storage areas must be approved by MMSD before beginning work.

The Contractor shall conform to all local, state, and federal regulations including those set forth by OSHA, RCRA and the EPA and any other applicable authorities.

Typical District working hours are 7 am to 3:30 pm, Monday through Friday. Work outside of these hours may be permitted with advance written approval by the District.

The Contractor shall ensure that all sludge, organic and inorganic material, equipment processing water, etc.

are contained in the Contractor’s working area. Discharges to soil and storm sewer are not permitted.

Any damage done by the Contractor to any property shall be repaired to a condition equal to or better than what existed prior to the damage. Any damage repairs shall be considered as incidental to the Contract.

Upon acceptance of the work and inspection, the Contractor shall restore the project area affected by the operations to a condition at least equal to that existing prior to the work. Clean up includes, but is not limited to removing rubbish, debris, dirt, equipment and excess material from the site. The Contractor shall clean adjacent surfaces soiled by and during the course of work.

Project Sequence and Schedule

Notice to Proceed is anticipated to be issued by April 27, 2026. Final completion shall be within one hundred eighty eight (180) calendar days from the Notice to Proceed or October 30, 2026 whichever comes first. After starting work on site Contractor shall have 130 days to complete. Contractor shall give written notice (email or letter) to the District at least twenty (20) calendar days in advance of anticipated start of work.

Quality Assurance

District representatives and the District’s inspector shall have access to the site and the work at reasonable times for their observation, inspection, and testing. Contractor shall provide proper and safe conditions for such access and advise them of Contractor’s site safety procedures and programs so that they may comply therewith as applicable. The interpretation of this shall mean, but not be limited to mean, that the Contractor shall provide the District’s inspector with access and proper safety equipment at appropriate times to perform inspection and testing.

Safety The contractor agrees to perform all work under this contract in accordance with local, state, and federal safety regulations. The Contractor is specifically notified that wastewater treatment plants, pumping stations and sewer systems contain confined space work areas which may be susceptible to accumulation of hazardous gases or depletion of oxygen levels.

Handling of hazardous materials, machinery operations, worker protection, and control of airborne dust and fumes shall comply with all applicable facility, local, state, and federal health and safety regulations.

Contractor's Insurance

The Contractor shall not commence work under this Contract until all insurance required hereunder has been obtained and such insurance certification has been reviewed and approved by the Owner. The Contractor shall not allow any Subcontractor to commence work on their Subcontract until certification for all similar insurance required for that portion of the Work has been reviewed by the Owner. Review of the insurance certification by the Owner shall not relieve or decrease the liability of the Contractor hereunder. The insurance certification shall name as Additional Insureds the Madison Metropolitan Sewerage District.

The Contractor shall obtain, pay for, and maintain during the life of this Contract such Worker's Compensation and Employer's Liability, Comprehensive General Liability, Business Automobile Liability, and Umbrella Liability Insurance to protect the Contractor performing work covered by this Contract from claims for damages for bodily injury, including accidental death, as well as for claims for property damage which may arise from operations under this Contract whether such operations be by the Contractor or any Subcontractor, or by anyone directly or indirectly employed by either of them, on the forms, and with limits not less than set forth below:

a) General Liability

• Comprehensive general liability coverage shall include, but not be limited to, Products and Completed

Operations, Independent Contractors, Contractual Liability, Broad Form Property Damage, Personal Injury, Premises and Operations, and Explosion, Collapse and Underground.

• General aggregate limit shall be at least $2,000,000. Policy shall be endorsed such that this full limit is reserved specifically for the named Madison Metropolitan Sewerage District project.

• Products-Completed Operations Aggregate limit shall be at least $2,000,000.

• Each Occurrence limit shall be at least $1,000,000.

b) Automobile Liability

• Auto liability policy shall cover all autos, whether owned, non-owned, or hired.

• Bodily injury and property damage limits shall be at least $1,000,000 each, or

• Combined single limit shall be at least $1,000,000.

c) Excess Liability Umbrella Form

• Umbrella limits shall be at least $2,000,000 aggregate/$2,000,000 each occurrence.

d) Worker’s Compensation and Employer’s Liability

• Worker’s Compensation limits shall be in accordance with all applicable state and federal statutes.

• Employer’s Liability limits shall be at least $100,000 each accident, $500,000 disease policy limit, and

$100,000 disease-each employee.

Equal Employment Opportunity Requirements

In connection with the performance of work for this project and under the related contract, the Proposer agrees not to discriminate against any employee or applicant for employment because of age, race, religion, color, disability, sex, national origin, sexual orientation, gender identity, or other status protected by law. This provision shall include, but not be limited to, the following: employment, upgrading, demotion or transfer;

recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship.

Proposal Requirements

All proposals must be made on the forms provided herein and shall be addressed to the Madison Metropolitan Sewerage District; Aaron Dose, Process and Project Specialist; 1610 Moorland Road, Madison, Wisconsin 53713 (or emailed to rfp@madsewer.org); and shall be marked "Sealed Proposal, 2026 Digester Cleaning Project."

All prospective prime bidders must submit qualifications for review and approval by the District.

Prequalification applications will be distributed with the Contract Documents upon request of the District.

Bidders who have already submitted prequalification documentation to the District within last calendar year of the bid date need not resubmit but must notify the District in writing by the due date (using the form provided) of their desire to prequalify for this specific work. Prequalification applications must be completed and submitted to the District office no later than 4:00 p.m., Wednesday, February 25, 2026. Bidders will be notified only of disqualification no later than 4:00 p.m., Friday, February 27, 2026. If a Bidder has not filed the prequalification application, their bid shall not be opened. For the cleaning contractor to be qualified, they must have at least 3 years of active experience in this type of work.

For bidding purposes, proposals are requested in terms of a lump sum bid based on an estimated volume of sludge and an approximate solids concentration of 41.1% for Digesters 1, 2 & 3. At the conclusion of the project, payment will be made on the actual dry tons processed at the unit bid price.

Proposals shall include all labor, materials, equipment, tools, power, utilities, transportation, and all other services or items necessary to perform and complete in a workmanlike manner, the Digester Cleaning Project.

Contractor is responsible for obtaining all necessary permits at the Contractor's expense.

This project is exempt from State of Wisconsin sales and use taxes in accordance with Wisconsin Administrative Rule Tax 11.11 pursuant to Section 77.54(26) of the Wisconsin Statutes.

The bidders are required to carefully review all the Contract Documents and to inform themselves of the conditions under which the work is to be performed. The Bidder, if awarded the Contract, shall not be allowed any extra compensation by reason of their failure to have fully informed themselves prior to the bidding of any matter or thing which such Bidder might have fully informed them.

If the Bidder is in doubt as to the true meaning of any part of the Contract Documents, the Bidder may submit to the District a written request for an interpretation thereof. Any interpretation of the Contract Documents will be made only by an addendum duly issued.

A bidder may withdraw their proposal, providing such a written request is in the hands of the District by the time set for opening proposals. When such a proposal is reached, it will be returned unopened to the Bidder.

No proposal shall be withdrawn after the opening of proposals for a period of thirty (30) calendar days after the scheduled time of receiving proposals without the consent of the District.

Terms

The District reserves the right to reject any or all proposals or to waive any irregularities in any proposal or to accept any proposal which will be in the best interests of the District.

Within thirty (30) calendar days after the opening of proposals, the Owner will accept one of the Proposals or will act as stated herein. The acceptance of the Proposal will be by written Notice of Award, mailed or delivered to the office designated in the Proposal.

Before award of any Contract can be approved, MMSD shall be satisfied that the Bidder involved maintains a permanent place of business, has adequate plant and equipment to do the work properly and expeditiously, has a suitable financial status to meet obligations incident to the work, has appropriate technical experience, and has a satisfactory performance record. The award, if made, will be made to the lowest, qualified, responsive, responsible bidder.

Within ten (10) calendar days after receiving the Notice of Award, the successful Bidder shall sign the Contract hereto attached, and submit to the District acceptable certificates of insurance required under the Contract Documents. Within fifteen (15) calendar days after receiving the signed Contract from the successful Bidder, the Owner’s authorized agent will sign the Contract. Three executed counterparts of the Contract and certificates of insurance will be required.

The Contractor shall not begin work until written Notice to Proceed has been issued by MMSD. The Contractor shall abide by any special instructions which may be stated in the Notice to Proceed.

Payment will be made to the Contractor within 45 days of written request for payment after completion of the work per tank. Contract letting is subject to the provisions of Section 66.0901, Wisconsin Statutes.

If the Contractor is delayed in the completion of the work by causes beyond the control of the Contractor, then the time of completion may be extended for a reasonable time as determined by MMSD. The Contractor shall notify MMSD in writing of the cause of such delay within five (5) business days from the beginning of any such delay. The Contractor shall hold MMSD harmless for any such delay and shall not be entitled to any additional compensation from the Owner.

The Contractor must recognize that time is of the essence and the delays, expense, and difficulties involved in a legal or arbitration proceeding if the work is not completed on time. Accordingly, instead of requiring any such proof, MMSD and Contractor agree that as liquidated damages for delay (but not as a penalty), Contractor shall pay MMSD five hundred dollars ($500.00) for each day that expires after one hundred eighty (180) calendar days from the Notice to Proceed or October 30, 2026 whichever comes first plus any extension previously agreed upon.

If the Contractor shall abandon the work under this Contract, or fail to perform the work of the character and in the time herein specified, or fail financially or for any other cause whatsoever is unable to carry out this Contract and complete the work, or if Contractor assigns the Contract or loses control of the work for any cause whatsoever except by act of God, the United States Government, or the public enemy or if Contractor refuses or neglects to follow instructions of MMSD staff or if in the opinion of MMSD staff any one of the following conditions exists: (1) the Contractor refuses or neglects to use measures to protect the work from damage or

(2) the Contractor is guilty of carelessness or incompetence in the execution of the work or (3) the work has been or is being delayed by the Contractor or (4) the rate of progress is not such as to insure completion of the work within the time specified or (5) the work or any part thereof is unnecessarily or unreasonably delayed or

(6) the Contractor is willfully or persistently violating any of the conditions or covenants of this Contract or (7) the Contractor is not fulfilling the Contract in good faith, then MMSD may proceed to terminate this Contract.

Submittals

The Contractor shall submit the following for review and approval to the MMSD Engineer.

a. Submit prior to the bid:

1. Pre-Qualification form.

b. Submit with the bid:

1. Proof of Insurance.

c. Submit prior to performing any work under this contract:

1. See technical specifications below.

Technical Specifications

Part 1 General:

1.01 Description of Work

A. This specification section includes requirements to remove and legally dispose of approximately 105,000 gallons (180 dry tons) of sludge each from anaerobic digesters 1, 2 &

3. Any debris or other non-biodegradable fractions contained in the tanks shall also be removed for disposal.

B. One digester will be available to clean at a time. The District will continue dewatering another digester after making one available. It takes the District approximately 17 days to dewater a digester.

C. Once tanks have been emptied of their contents, interior surfaces and interior tank appurtenances shall be cleaned of all residual material and inorganic waste to the extent practicable.

D. Contractor shall provide all labor, material, fuel, and equipment necessary to remove material from tanks, process material for disposal, clean interiors, and legally dispose.

E. Contractor shall provide hauling of dewatered biosolids to a legal disposal location. Contractor may use their discretion for disposal location provided all necessary permits are obtained, and methods comply with all local, state, and federal regulations.

1.02 Referenced Documents

A. See drawings attached later in document regarding elevations, access and site location.

1.03 Qualifications of Contractors

A. Contractors performing this type of work must provide written documentation that their personnel have adequate experience and training in the cleaning of anaerobic digesters, sludge storage tanks, or similar confined spaces. Must have at least 3 years of active experience in this type of work.

1.04 Submittals

A. Operating Plan Submit a proposed schedule of work, showing how the work will be completed by the required date.

Plan shall outline the proposed methods and procedures required to complete work.

B. Documentation of Quantity Hauled Provide District with load tickets for each truckload of dewatered biosolids that leaves the plant. Tickets shall include date hauled, destination of hauled material, and an accurate and reliable measurement of weight transported on a wet ton basis. Method to measure wet weight hauled shall be approved by the District prior to the start of work.

District staff will collect sludge samples from each truckload to determine solids content of dewatered material. Load tickets and solids analyses will serve as the basis for determining dry tons hauled.

1.05 Quality Assurance

A. District staff shall serve as the Inspector. The Inspector will observe removal and dewatering operations, cleaning operations, and final cleaning to ensure adherence to the specifications.

B. Contractor shall give District’s representative inspector timely notice of readiness of work for all inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests.

C. District representatives and the District’s Inspector shall have access to the site and the work at reasonable times for their observation, inspection, and testing. Contractor shall provide proper and safe conditions for such access and advise them of Contractor’s site safety procedures and programs so that they may comply therewith as applicable. The interpretation of this shall mean, but not be limited to mean, that the Contractor shall provide the District’s Inspector with access and proper safety equipment to access the digesters at appropriate times to perform inspection and testing.

1.06 Delivery, Storage and Handling

A. N/A

1.07 Use of Site

A. Access Points: The Contractor is responsible for determining the suitability of access points to the digesters. The Contractor shall submit access routes and proposed storage areas. These access routes and any proposed storage areas must be approved by MMSD before beginning work.

B. The Contractor shall conform to all local, state, and federal regulations including those set forth by OSHA, RCRA and the EPA and any other applicable authorities.

C. Typical District working hours are 7 am to 3:30 pm, Monday through Friday. Contractor shall give written notice (letter or email) to MMSD. Contractor must receive approval from MMSD at least 24 hours in advance if they would like extended working hours.

D. Any damage done by the Contractor to any property shall be repaired to a condition equal to or better than what existed prior to the damage. Any damage repairs shall be considered as incidental to the Contract.

1.08 Safety

A. The contractor agrees to perform all work under this contract in accordance with local, state, and federal safety regulations. This includes, but is not limited to: (1) Continual evaluation of the atmosphere to determine the presence of toxic or flammable vapors or lack of oxygen prior to entering confined spaces; and (2) Conformance with confined space procedures and requirements.

B. Disposal of contaminants, debris, and contaminated water shall comply with all applicable facility, local, state, and federal regulations. The discharge of all waste products to the plant drainage system shall be at the discretion of the District Engineer.

C. Handling of hazardous materials, machinery operations, worker protection, and control of airborne dust and fumes shall comply with all applicable facility, local, state, and federal health and safety regulations.

1.09 Clean-Up

A. Contractor shall immediately notify the District of any spills which may violate permit conditions or regulations. Spills shall be cleared away by Contractor in a timely and safe manner consistent with the protection of public, staff, and environmental health and safety.

B. Upon acceptance of the work and inspection, the Contractor shall restore the project area affected by the operations to a condition at least equal to that existing prior to the work. Clean up includes, but is not limited to removing rubbish, debris, dirt, equipment and excess material from the site. The Contractor shall clean adjacent surfaces soiled by and during the course of work.

C. Vehicles shall be properly maintained and cleaned to prevent waste material from being deposited on public roadways.

Part 2 Products:

2.01 N/A

Part 3 Execution:

3.01 Sludge Removal and Cleaning

A. Contractor shall provide ventilation and means required to enter the digesters using existing roof access points. The atmosphere in the digesters while in service and prior to ventilation consists primarily of methane and carbon dioxide gas. The Contractor shall provide all safety equipment necessary to access the digesters and shall operate all ventilation equipment necessary to adequately protect the Contractor's personnel. The Contractor shall provide all gas testing equipment, confined space entry equipment, communications, and trained personnel required to meet all OSHA and State of Wisconsin regulations.

B. Contractor shall remove wastewater residues and solids from interior tank walls, ceilings, appurtenances (mixers, pipes, ladders), and floors. Digester contents will include anaerobic digested sludge, inorganic solids (sand, grit, gravel, struvite particles) and organic debris (hair, rags, stringy materials, plastics). Contractor shall provide means and methods suitable for removal of tank contents, including pumps, hoses, connection to water sources, power, and lighting. Contractor is responsible for conducting a site visit to determine appropriate means and methods.

C. The Contractor shall be responsible for removal, dewatering, and for the final disposition of the materials from the digesters in accordance with all local, state, and federal regulations.

Disposal of residual solids in the plant will not be allowed. Contractor shall provide temporary means of dewatering residual solids from tank cleaning operations. Centrate or filtrate generated during dewatering may be disposed of to a plant drain, at a location, timing, and rate as approved by the Owner. The Owner reserves the right to disallow disposal of any waste stream that may negatively impact or impair plant operations.

D. Before any tank contents are removed from the treatment plant site, documentation shall be submitted demonstrating that the Contractor will comply with all regulations. Landfill manifests shall be provided as verification of disposal at a licensed landfill. The Contractor shall coordinate all hauling activities with the landfill.

E. Existing structures requiring cleaning include the following:

Structure name Diameter (ft.)

Sidewall height above footing

Center cone depth below

Approx.

Volume of residuals

Grade height above footing

(ft.) footing (ft.)

(gallons) (ft.)

Digester 1 & 2 75 20.5 11.8 105,000 10

Digester 3 75 17 11.8 105,000 16.5

3.02 Acceptance and Payment

A. Deliverables

1. Measurement for payment will be made with each load leaving plant grounds. Contractor shall provide documentation of weight hauled on a wet ton basis, in addition to a sample of dewatered material. The District’s state certified lab will conduct a solids analysis for determination of dry tons hauled.

2. The District estimates 105,000 gallons of liquid material in each Digester will be processed at a dry weight basis 180 tons each. These values are used for bidding purposes only. Actual quantities removed, processed, and disposed may vary. Payment will be based on the Contractor’s dollar per ton unit bid amount and actual quantity of sludge processed.

BID FOR

2026 DIGESTER CLEANING PROJECT

MADISON METROPOLITAN SEWERAGE DISTRICT

NOTE: Use black ink or typewriter for completing this bid form

PROJECT: 2026 DIGESTER CLEANING PROJECT

THIS BID IS SUBMITTED TO: Madison Metropolitan Sewerage District 1610 Moorland Road Madison, Wisconsin 53713

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with Owner in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents.

2. Bidder accepts all of the terms and conditions of the Advertisement for Bids and the Request for Proposals. This Bid will remain subject to acceptance for the period of time specified in the Request for Proposals after the day of Bid opening. Bidder will sign and submit the Agreement with other documents required by the Bidding Requirements within 10 days after the date of Owner's Notice of Award.

3. In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:

(a) Bidder has examined copies of all the Bidding Documents and of the following Addenda, receipt of all which is hereby acknowledged:

Addenda Number Date

(b) Bidder has familiarized itself with the nature and extent of the Contract Documents, Work, site, locality, and all local conditions and Laws and Regulations that in any manner may affect cost, progress, performance or furnishing of the Work.

(c) Bidder has given Engineer written notice of all conflicts, errors or discrepancies that it has discovered in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder.

4. Bidder will complete the Work for the following prices:

DIGESTER 1, 2 & 3 BID:

Item and Description

1. To remove liquid anaerobically digested sewage sludge from anaerobic digester (Digester 1) for

180 dry weight tons at $________/dry ton Extended amount $_____________.

2. Clean interior of anaerobic digester (Digester 1), including removal and legal disposal off site of debris in the digester, surface clean interior of the digester, and all other associated work for

Clean interior at $________/ digester Extended amount $_____________.

3. To remove liquid anaerobically digested sewage sludge from anaerobic digester (Digester 2) for

180 dry weight tons at $________/dry ton Extended amount $_____________.

4. Clean interior of anaerobic digester (Digester 2), including removal and legal disposal off site of debris in the digester, surface clean interior of the digester, and all other associated work for

Clean interior at $________/ digester Extended amount $_____________.

5. To remove liquid anaerobically digested sewage sludge from anaerobic digester (Digester 3) for

180 dry weight tons at $________/dry ton Extended amount $_____________.

6. Clean interior of anaerobic digester (Digester 3), including removal and legal disposal off site of debris in the digester, surface clean interior of the digester, and all other associated work for

Clean interior at $________/ digester Extended amount $_____________.

PROJECT TOTAL $ _______________________________________

(Contractor’s Seal) Signature: ____________________________________________

Printed Name of Signer: _________________________________

Title: ________________________________________________

5. Bidder agrees that the Work will be substantially completed as specified in Request for Proposal.

6. Communications concerning this Bid shall be addressed to:

Name: ____________________________________________

Company Name: ___________________________________________

Address: ____________________________________________

Telephone No.: ___________________________________________

SUBMITTED ON ___________________________________, 20______

CONTRACT FOR

MADISON METROPOLITAN SEWERAGE DISTRICT

2026 DIGESTER CLEANING PROJECT

THIS CONTRACT, made this day of _, 20__ between hereinafter called the CONTRACTOR, and the Madison Metropolitan Sewerage District, hereinafter called the OWNER or the District.

WITNESSETH: That the Contractor and the Owner for the consideration stated herein agree as follows:

ARTICLE I, SCOPE OF WORK:

The Contractor shall provide and furnish all labor, materials, equipment, tools, power, utilities, transportation, and all other items and services necessary to perform and complete in a workman like manner the 2026 DIGESTER CLEANING PROJECT, for the Madison Metropolitan Sewerage District, all in accordance with the Contract Documents herein mentioned, including any and all Addenda prepared by the Madison Metropolitan Sewerage District, which Contract Documents are made a part of this Contract; and the Contractor shall do all other things required of the Contractor by said Contract Documents.

ARTICLE II, CONTRACT PRICE:

The Owner shall pay to the Contractor for the performance of this Contract in U.S. dollars, the amount of Dollars and _Cents, ( _), the said amount being computed from the Contractor’s prices stated in the Proposal. Payments are to be made to the Contractor in accordance with and subject to the provisions embodied in the Contract Documents.

ARTICLE III, CONTRACT DOCUMENTS:

This Contract consists of the following Contract Documents, all of which are as fully a part of this Contract as if herein set out verbatim, or if not attached, as if hereto attached.

1. Addenda No. to inclusive

2. Advertisement

3. Request for Proposal

4. Contractor’s Proposal

5. This Instrument

In the event that any provision in any of the above component parts of this Contract conflicts with any provision in any other of the component parts, the provision in the component part first enumerated above shall govern over any other component part which follows it numerically, except as may be otherwise specifically stated.

IN WITNESS WHEREOF, the parties hereto have caused this instrument to be executed in three

(3) original counterparts this day and year first above written.

(Contractor’s Seal) (Contractor)

Attest By

Title Title

(Owner’s Seal) Madison Metropolitan Sewerage District (Owner)

Attest By

Title Title

PRE-QUALIFICATION APPLICATION

THE CONTENTS OF THIS QUESTIONNAIRE SHALL BE CONFIDENTIAL FOR THE EXCLUSIVE USE OF THE

CONTRACTING AGENCY AND SHALL NOT BE MADE PUBLIC EXCEPT BY WRITTEN PERMISSION OF

THE PROSPECTIVE BIDDER.

INFORMATION / INSTRUCTIONS

1) To be submitted by all prime bidders. All others to submit as required by the bidding documents.

2) Must be received by The District prior to deadline stated in bidding documents. Additional information, if necessary, may be requested by the District.

3) Fill out and send questionnaire (IN PDF FORMAT) to: Prequalifications@madsewer.org

4) Bidder’s Statement of Request for Pre-Qualification (Green Sheet) must be filled out for every project.

5) Statement of Qualifications (Blue Sheets) are valid for the current calendar year only.

(EXAMPLE: project bid in June, statement of qualifications valid until 12/31)

6) Submission of the Blue Sheets section of the application does not grant automatic approval for all projects advertised by the District in the current calendar year. Qualifications are still reviewed project to project by project engineer.

PREQUALIFICATION STATEMENT

There is submitted herewith for your consideration, pursuant to Section 66.0901(2), Wisconsin Statutes, a statement of qualifications of the undersigned to furnish the necessary labor, materials, and skills required to enter upon and complete contracts for Madison Metropolitan Sewerage District.

BIDDER’S STATEMENT OF REQUEST FOR PRE-QUALIFICATION

IDENTIFICATION

1. Firm’s Name:_________________________________________________________________

Mailing Address: ______________________________________________________________

Telephone: ____________________________

E-Mail: _____________________________________________________________________

□ Individual Owner

Number of years in business under present name: __________

Is the business a: □ □ Corporation (includes LLC and S) Partnership

If a Corporation: Year incorporated: ______________

State incorporated: ___________________

Contact information regarding questions related to this form:

Name: ______________________________________________

Telephone Number: ____________________________________

Email Address: _______________________________________

2. The above-named Bidder requests to be pre-qualified for construction of the following project/contract:

Prime Contractor Subcontractor Which do you wish to qualify as (select all that apply):

Please specify trade(s) : ______________________________________________

Bidder HAS NOT submitted a Statement of Qualifications within the current calendar year. Documentation is required. Proceed to following page, complete forms and attach documentation.

Bidder HAS submitted a Statement of Qualifications within the current calendar year. A new Statement of Qualifications is not required. Bidder acknowledges his/her intent to be pre-qualified for the above-named project(s) by signing and dating this form below and by returning this form to the District prior to the deadline stated in the bidding documents.

Firm Name

Signature

Title

Date

BIDDER’S STATEMENT OF QUALIFICATIONS

EXPERIENCE

I - PERSONNEL

What is the experience of the principal individuals, including officers, superintendents and/or foremen/women, of your organization? Provide information similar to the table below:

Name Present Position/Title Years of Experience Description of Duties

(1) (3) (3) (4)

Average number of employees during the last 12 months:

Office: Skilled: Unskilled:

II - PROJECTS COMPLETED

Provide a list of work performed on any projects pertinent to the type of work for which pre-qualification is desired.

Provide information similar to the table below. Under "Capacity", state whether the work was as a Prime Contractor, Subcontractor, etc.

Year Finished

Project Name

Type of Work Capacity Contract

Amount ($) Reference

Name Reference City, State

Reference Phone #

Reference Email

(1) (2) (3) (4) (5) (6) (7) (8) (9)

III - CURRENT CONTRACTS

Attach information related to current contracts. Highlight contracts that are for work similar to the type of work for which pre-qualification is desired. Provide information similar to the table below:

Project Name Owner %

Complete Contract

Amount ($) Completion

Date Type of Work

Reference Name

Reference City, State

Reference Phone #

Reference Email

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10)

IV - EQUIPMENT

Provide a list of major pieces of equipment owned and available when needed for proposed work. Provide information similar to the table below:

No. of Each Description Model/Size Capacity Year

(1) (2) (3) (4) (5)

CONTRACTUAL RESPONSIBILITY

Answering "yes" to any of the following questions may not directly disqualify a company from becoming approved to bid by the District. However, failure to answer truthfully will likely result in disqualification.

If response is “Yes”, please attach a description of particulars (date, parties involved, type of work, amount of contract, cause, resolution).

1) Has your firm or any officer or partner of your firm ever been debarred, suspended, disapproved, or not pre-qualified by the State of Wisconsin or any government entity in the past ten (10) years?

[ ] Yes [ ] No

2) Has your firm or any officer or partner of your firm had any type of business, contracting, or trade license, certification, or registration revoked or suspended in the past ten (10) years?

[ ] Yes [ ] No

3) Does your firm or any officer or partner of your firm have an open or ongoing investigation or been cited in a violation of federal, state, or local government safety or environmental laws? This includes, but is not limited to, any OSHA, EPA, or WDNR violations.

[ ] Yes [ ] No

If Yes, include in description the OSHA reportable incidents and citations.

4) Has your firm or any officer or partner of your firm ever declared bankruptcy while performing work on a contract or work awarded to it in the past ten (10) years?

[ ] Yes [ ] No

5) Has your firm ever defaulted on or failed to complete any contract or work awarded to it in the past ten (10) years?

[ ] Yes [ ] No

6) Has your firm or any officer or partner of your firm asked to be relieved from a bid submitted by it to a public awarding authority in the past ten (10) years?

[ ] Yes [ ] No

7) Has your firm or any officer or partner of your firm ever been charged with or convicted of a violation of any Davis Bacon federal wage rates?

[ ] Yes [ ] No

8) Has your firm; any of its owners; a subsidiary or corporate parent; or any officer, director, or partner thereof, been convicted of violating Section 133.03 Wisconsin Statutes (Unlawful Contracts: Conspiracies) in the last ten (10) years?

[ ] Yes [ ] No

2) Attach a dated, recent financial statement, no later than the previous calendar year, showing breakdown of your firm’s assets, liabilities, and net worth.

COMMITMENT TO SAFETY

A safe work environment is always the top priority of the District, and this priority extends to all contractors and subcontractors on work of any capacity. Please attach a description of your company’s commitment to safety (including but not limited to safety programs, safety personnel, and leadership commitment)

BONDING RESPONSIBILITY

Current Bonding Company

Bonding Company Name:________________________________________________________________

Mailing Address: ______________________________________________________________

Telephone: ____________________________ E-Mail:

Firm's current performance and payment bond limit for a single job:

Firm's current performance and payment bond limit for aggregate jobs:

CONTRACTOR’S FINANCIAL STATEMENT

1) Attach a bank letter, no later than the previous calendar year, indicating credit available.

AFFIDAVIT

I certify that all above statements and attachments hereto are true and correct and are made on behalf of

Firm Name

Officer/Owner Name

Signature

Title

Sworn and Subscribed to before me this _____ day of _________________________, 20___.

____________________________________ Notary Public.

My commission expires .

AaronD Line

AaronD Line

Rectangle

D ig es te r 1

A cc es s:

- 3 0"

M an ho le o pe ni ng o n ea ch d ig es te r 1-

' x

' H at ch o pe ni ng o n ea ch d ig es te r

AaronD Rectangle

AaronD Rectangle

AaronD Line

2 Access Manholes, 3'x3' Opening

Rectangle

AaronD Line

Request for Bid - 2026 Digester Cleaning
Project Location
Project Description and Scope of Work
Conduct of Work and Use of Site
Project Sequence and Schedule
Quality Assurance
Safety
Contractor's Insurance
Proposal Requirements
Terms
Submittals
A. See drawings attached later in document regarding elevations, access and site location.
Submit a proposed schedule of work, showing how the work will be completed by the required date. Plan shall outline the proposed methods and procedures required to complete work.
Provide District with load tickets for each truckload of dewatered biosolids that leaves the plant. Tickets shall include date hauled, destination of hauled material, and an accurate and reliable measurement of weight transported on a wet ton basis. M...
District staff will collect sludge samples from each truckload to determine solids content of dewatered material. Load tickets and solids analyses will serve as the basis for determining dry tons hauled.
MMSD Prequalification Forms
Digester 1, 2 & 3 Drawings
Site Location
Digester 1, 2 & 3 Elevations
Digester 1 & 2 Access
Digester 3 Access
Firms Name:
Mailing Address 1:
Mailing Address 2:
Telephone:
EMail:
Years:
Year incorporated:
State incorporated:
Name:
Telephone Number:
Email Address:
Project/Contract:
Firm Name:
Title:
Date:
Group1: Off
Group2: Off
Prime: Off
Sub: Off
Specialty:
Office:
Skilled:
Unskilled:
Q1: Off
Q2: Off
Q3: Choice3
Q4: Choice4
Q5: Off
Q6: Off
Q7: Off
Q8: Off
Bonding Company Name:
Mailing Address 1_2:
Mailing Address 2_2:
Telephone_2:
EMail_2:
Amount:
Amount2:
Firm Name_2:
OfficerOwner Name:
Title_2:
Day:
20:
Notary Public:
Year:
Expiration: