This is a Bid Notice and Contract Documents package for the City of Manteca, California, for the Well 22 Treatment Project (CIP 26033), which involves the installation of an Arsenic and PFAS water treatment system at an existing municipal well site. The project encompasses furnishing all labor, materials, and equipment necessary for drilling, development, and testing of the municipal well, including demolition of existing site improvements, earthwork, concrete work, piping systems, filter vessels, electrical systems, instrumentation and control systems, landscaping, and site restoration. Sealed bids are due by 2:00 p.m. on Thursday, October 15, 2026, at the City Clerk's office located at 1001 West Center Street, Manteca, California 95337. A mandatory pre-bid meeting and job walk will be held on September 30, 2026, at 8:00 a.m. at 364 Victory Ave, Manteca, California 95336. The deadline for submitting written questions and RFIs is September 30, 2026, at 10:00 a.m. PST. Substantial Completion is required within 120 calendar days of the Notice to Proceed, with Final Completion within 150 calendar days thereafter. The successful bidder must enter into a Contract Agreement with the City within ten calendar days of receiving written Notice of Award.
The estimated construction cost is $3,000,000.00, and bids must be submitted on the bound bid forms provided in the contract documents. A bid guarantee bond in an amount not less than 10 percent of the total bid amount is required with each bid submission. The successful bidder must furnish a Faithful Performance Bond and a Payment Bond, each in an amount equal to 100 percent of the contract price, from an admitted surety with a minimum A-Class IV rating with Best's Rating Guide. The bidder must hold a valid California Class A Contractor's license at the time of bid submission and must comply with all prevailing wage requirements as determined by the California Department of Industrial Relations. The contract is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Liquidated damages are set at $2,800.00 per calendar day for delays beyond the specified completion timeframes. The successful bidder must demonstrate at least three substantially completed projects of similar size within the past five years and comply with all state and federal contract language requirements, including equal employment opportunity certifications, labor compliance affidavits, debarment and suspension certifications, and insurance requirements as detailed in Exhibit 1 of the contract documents.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WELL 22 TREATMENT PROJECT
CIP 26033
BID FORM, CONTRACT DOCUMENTS
AND TECHNICAL SPECIFICATIONS
9/23/2026
Approved for Construction Michael Selling Director of Engineering/City Engineer
Kleinfelder, Inc.
Marcell Fard Engineer of Record
Recommended for Approval Somporn Boonsalat Deputy Director of Engineering
BID SET
BID FORM, CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
9/23/2026
Prepared for:
City of Manteca 1001 West Center
Street Manteca, CA 95337
Prepared by:
Kleinfelder, Inc.
TABLE OF CONTENTS
DIVISION 00 - BIDDING AND CONTRACT REQUIREMENTS
00 11 16 Invitation to Bid (00020) 00 21 13 Instructions to Bidders (00100) 00 31 00 Information Available to Bidders (00200) 00 30 00 Bid Form (00300) 00 30 01 Authority to Bid (00301) 00 41 00 Bid Guaranty Bond (00410) 00 43 25 Schedule of Major Equipment and Material Supplies (00450) 00 43 36 Proposed Subcontractors (00430) 00 43 35 Local Business Enterprise (00435) 00 43 38 Caltrans LAPM Disadvantaged Business Enterprise Requirement (00438) 00 43 39 Required State/Federal Contract Language (00439) 00 44 00 Site Visit Affidavit (00440) 00 45 13 Certification of Bidder’s Experience and Qualifications (00420) 00 45 19 Non-Collusion Affidavit (00480) 00 45 25 CA Government Code 14310 Questionnaire (00425) 00 45 31 Equal Employment Opportunity Certification (00431) 00 45 32 Public Contract Code Section 10285.1 Certification (00432) 00 45 33 Public Contract Code Section 10232 Certification (00433) 00 45 34 Debarment and Suspension Certification (00434) 00 45 36 Nonlobbying Certification (00436) 00 45 37 Disclosure of Lobbying Activities (00437) 00 45 46 Department of Industrial Relations Compliance Affidavit (00490) 00 45 47 Statement Acknowledging Penal and Civil Penalties Concerning The
Contractors’ Licensing Laws (00491) 00 45 70 Acknowledgement of Insurance Requirements (00470) 00 50 00 Agreement (00500) 00 61 10 Faithful Performance Bond (00610) 00 61 20 Payment Bond (00620) 00 63 00 Workers Comp (00630) 00 65 00 Workers’ Compensation Insurance (00650) 00 70 00 General Conditions (00700) 00 73 16 Liability and Insurance Requirements (00820) 00 73 19 Environmental Requirements (00810) 00 80 00 Supplementary General Conditions (00800)
DIVISION 01 - GENERAL REQUIREMENTS
01 11 10 Location and Summary of Work (01010) 01 01 50 Contract Time (01015) 01 02 50 Measurement and Payment (01025)
01 06 00 Safety and Health (01060) 01 06 50 Water Pollution Control (01065) 01 07 00 Environmental Stewardship (01070) 01 08 00 Site Protection (01080) 01 20 00 Inspection and Project Meetings (01200) 01 30 00 Submittals (01300) 01 30 10 Contractor’s Construction Schedule (01310) 01 31 14 Facility Services Coordination 01 34 00 Shop Drawings, Product Data, and Samples (01340) 01 35 53 Security Procedures 01 40 00 Quality Requirements 01 40 01 Rejection of Work (01400) 01 42 16 Definitions 01 45 33 Code-Required Special Inspections 01 50 00 Temporary Facilities and Controls 01 51 00 Temporary Utilities 01 55 00 Vehicular Access and Parking 01 58 13 Temporary Project Signage 01 60 00 Product Requirements 01 62 00 Protection of Materials and Equipment (01620) 01 67 00 Operations, Maintenance, and Training Requirements (01670) 01 71 23 Field Engineering 01 74 19 Construction Waste Management and Disposal 01 76 10 Temporary Protective Coverings
DIVISION 02 - EXISTING CONDITIONS
02 41 00 Demolition 02 43 00 Large Equipment Relocation
DIVISION 03 - CONCRETE
03 01 00 Maintenance of Concrete 03 10 00 Concrete Forming and Accessories 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete 03 41 00 Precast Structural Concrete
DIVISION 04 - MASONRY (NOT USED)
DIVISION 05 - METALS
05 12 00 Structural Steel Framing 05 50 00 Metal Fabrications
DIVISION 06 - 08 (NOT USED)
DIVISION 09 - FINISHES
09 96 00 High-Performance Coatings
DIVISION 10 - 25 (NOT USED)
DIVISION 26 - ELECTRICAL
26 05 00 Common Work Results for Electrical 26 05 05 Selective Demolition for Electrical 26 05 13 Wires and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 33 Electrical Raceway Systems 26 05 43 Underground Raceway Systems 26 24 00 Switchboards and Panelboards 26 41 00 Facility Lighting Protection 26 50 00 Lighting Fixtures and Accessories 26 50 05 Lighting 26 56 00 Exterior Lighting
DIVISION 27 - 30 (NOT USED)
DIVISION 31 - EARTHWORK
31 10 00 Site Clearing 31 23 16 Excavation 31 23 16.13 Trenching 31 23 19 Dewatering 31 23 19 Fill
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 16 Flexible Concrete Rehabilitation 32 11 20 Subbase and Aggregate Base Courses 32 13 13 Concrete Paving 32 31 19 Decorative Metal Fences and Gates 32 31 36 Security Gates and Barriers, and Bollards 32 33 00 Site Furnishings 32 39 12 Bollards 32 92 19 Seeding 32 92 23 Sodding
DIVISION 33 - UTILITIES
33 01 10.58 Disinfection of Water Utility Piping Systems 33 05 61 Concrete Manholes 33 16 00 Steel Bolted Tanks 33 31 13 Storm and Sanitary Sewerage Gravity Piping
33 79 00 Site Grounding
DIVISION 34 - 39 (NOT USED)
DIVISION 40 - PROCESS INTEGRATION
40 05 06 Couplings, Adapters, and Specials for Process Piping 40 05 07 Hangers and Supports for Process Piping 40 05 09 Wall Pipes, Floor Pipes, and Pipe Sleeves 40 05 51 Common Requirements for Process Valves 40 05 52 Process Valves 40 05 59 Hydraulic Gates 40 23 40 Sanitary Wastewater Process Piping 40 61 96 Control Strategy 40 67 16 Local Control Stations 40 70 05 General Requirements, Instrumentation 40 70 10 Instrumentation and Control Systems
DIVISION 41 – 42 (NOT USED)
DIVISION 43 - PROCESS GAS AND LIQUID HANDLING, PURIFICATION AND STORAGE
EQUIPMENT
43 01 41 Pressure Vessel Rehabilitation
DIVISION 44 - 45 (NOT USED)
DIVISION 46 - WATER AND WASTEWATER EQUIPMENT
46 61 21 Pressure Filter Systems 46 63 11 PFAS Vessel Media 46 63 12 Arsenic Removal Media
DIVISION 47 - 49 (NOT USED)
APPENDIX
Appendix 1 - Exhibit 1 Insurance Requirements for Construction Contracts Appendix 2 - Notice of Exemption
CITY OF MANTECA
STATE OF CALIFORNIA
DEPARTMENT OF ENGINEERING
DIVISION 00 – BIDDING AND CONTRACT REQUIREMENTS
Section 00 11 16 (00020)
INVITATION TO BID
SECTION 00 11 16 - INVITATION TO BID (00020)
WELL 22 TREATMENT PROJECT CIP 26033
(ESTIMATED CONSTRUCTION COST: $3,000,000.00
SEALED BIDS will be received by the City Clerk of the City of Manteca at 1001 West Center Street, Manteca, California until 2:00 p.m., Thursday, October 15, 2026 for the WELL 22 TREATMENT PROJECT CIP 26033, for the Well 22 Treatment Project CIP 26033 (Project). As soon as practical thereafter, sealed bids for the project will be publicly opened and read for performing work as follows:
Furnishing all labor, materials, and equipment, and performing all work necessary and incidental to the construction of the project known as the Well 22 Treatment Project CIP 26033 according to the plans and specifications as prepared by the City of Manteca and according to the Contract Documents. The Work includes the drilling, development, and testing of a municipal well.
Project shall have Substantial Completion within 120 calendar days and Final Completion within 150 calendar days from the date specified in the Notice to Proceed. Time for commencement and completion of the Work is important and is the essence of the Contract.
A MANDATORY PRE-BID MEETING AND JOB WALK will be held as follows:
1. DATE/TIME: September 30, 2026, at 8:00 a.m.
2. LOCATION: 364 Victory Ave, Manteca, CA 95336
3. GENERAL: No other pre-bid meetings or job site visits will be scheduled.
BIDDERS MUST SUBMIT BIDS ON A HARD COPY OF THE BID PROPOSAL FORMS
PROVIDED IN THE CONTRACT DOCUMENTS.
Questions regarding the contract documents shall be submitted in writing to:
Attn: Gui Chang
Department of Engineering 1001 West Center Street Manteca, CA 95337 Fax: (209) 923-8940 email: gchang@manteca.gov
The City will post all bid-related questions and answers on its web site at:
https://www.manteca.gov/departments/engineering/project-information
Deadline to submit questions and/or RFIs: September 30, 2026 at 10:00 a.m. PST. The questions and answers posted at the web address above shall form part of the Contract Documents.
Bidding procedures are prescribed in the contract documents. Bids shall only be executed upon the bound bid forms provided, which are a part of said contract documents. Bid guarantee in an amount not less than ten percent (10%) of the total bid dollar amount and conforming to the prescribed bidding procedures is required to be submitted with each bid, as a guaranty to be forfeited should the bidder, if awarded the contract, fail to enter into the same, or fails to furnish in a timely manner the bonds and/or proof of insurance.
Pursuant to the provisions of California Labor Code Section 6707, each bid submitted in response to this Invitation to Bid shall contain, as a bid item, adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders. By listing this sum, the bidder warrants that its actions pursuant to this bid item shall not impose tort liability on the City, the Engineer, the Construction Manager, and their employees, agents, and subconsultants.
Pursuant to Section 1770, et. seq., of the California Labor Code, the successful bidder shall pay not less than the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations. Copies of such prevailing rate of per diem wages are on file at the City of Manteca Engineering Department, 1001 West Center Street, Manteca, CA which copies will be made available to any interested party on request.
Pursuant to Public Contract Code Section 22300, for moneys earned by the Contractor and withheld by the City of Manteca to ensure the performance of the Contract, the Contractor may, at its option, choose to substitute securities meeting the requirements of said Public Contract Code Section 22300.
All bidders shall be licensed under the provisions of Chapter 9, Division 3 of the Business and Professions Code of the State of California to do the type of work contemplated in the project. In accordance with provisions of California Public Contract Code Section 3300, the City has determined that the Contractor shall possess a valid Class A license at the time that the bid is submitted. Failure to possess the specified license shall render the bid non-responsive.
The successful bidder will be required to furnish a Payment bond in the amount equal to one hundred percent (100%) of the Contract price, as well as a Faithful Performance Bond, in the amount equal to one hundred percent (100%) of the Contract price. All bonds submitted shall be from admitted sureties.
Each bidder shall submit with its bid a statement setting forth its experience on the forms included in the Bid Proposal.
Telephones will not be available to bidders for the preparation of the bids or for calling in bid results. Bid forms received after the designated time will not be accepted. Bidders and their authorized agents are invited to attend the bid opening.
No bidder may withdraw its bid for one hundred twenty (120) calendar days after the date set for the opening of bids.
The successful bidder must insure that employees and applicants for employment are not discriminated against on the basis of age, color, race, national origin, ancestry, religion, sex, sexual preference, marital status, and comply with the Americans With Disabilities Act.
The City reserves the right to reject any or all bids; to make any awards or any rejections in what it alone considers to be in the best interest of the City; and waive any irregularities in the bids.
Each bid must be signed by or on behalf of the bidder and must be enclosed in a SEALED ENVELOPE with the following information on the outside:
1. Name and address of bidder
2. Project for which the bid is being submitted
3. Date and time of bid opening
The envelope shall be addressed to the City of Manteca, City Clerk, 1001 West Center Street, Manteca, California 95337.
Dated: City of Manteca
Cassandra Candini-Tilton, Director of Legislative Services / City Clerk
*** END OF SECTION ***
Section 00 21 13 (00100)
INSTRUCTIONS TO BIDDERS
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS (00100)
1. WORK TO BE DONE
It is the intention of the City to construct improvements as shown and set forth on the plans, and in the particular locations shown on the plans. All of the work is particularly set forth in the plans and specifications, and all of said work, together with all other work incidental thereto, is included. Insurance requirements shall be as specified in the attached EXHIBIT 1, INSURANCE REQUIREMENTS FOR
CONSTRUCTION CONTRACTS
The Work includes the furnishing of labor, materials, incidentals and equipment necessary for the construction of the Well 22 Treatment Project CIP 26033. The Bidder shall be required to provide, at its own cost and expense, all necessary insurance, as required by law or these specifications, and shall pay the cost and expense of any and all incidental matters herein required.
2. EXAMINATION OF CONTRACT DOCUMENTS
Each bidder shall thoroughly examine and be familiar with the contract documents.
The submission of a bid shall constitute an acknowledgment, upon which the City may rely, that the bidder has thoroughly examined and is familiar with the contract documents. The failure or neglect of a bidder to receive or examine any of the contract documents shall in no way relieve it from any obligation with respect to its proposal or to the Contract. No claim for additional compensation will be allowed which is based upon a lack of knowledge of any contract documents.
3. INSPECTION OF SITE
Bidders are required to inspect the site of the work to satisfy themselves by personal examination or by such other means, as they may prefer, of the location of the proposed work, and of the actual conditions, including subsurface, of and at the site of work. If, during the course of its examination, a bidder finds facts or conditions which appear to be in conflict with the letter or spirit of the bidding documents, the Bidder may apply to the City, in writing, for additional information and explanation before submitting its bid.
Submission of a bid by the bidder shall constitute conclusive evidence that, if awarded the Contract, it has relied and is relying on its own examination of (1) the site of the work, (2) access to the site, (3) all other data and matters requisite to the fulfillment of the work and on its own knowledge of existing facilities on and in the vicinity of the site of the work to be constructed under the Contract, (4) the conditions to be encountered,(5) the character, quality and scope of the proposed work, (6) the quality and quantity of the materials to be furnished, and (7) the requirements of the bid, the plans, the specifications, and the other contract documents.
The information provided by the City is not intended to be a substitute for, or a supplement to the independent verification by the bidder to the extent such independent investigation of site conditions is deemed necessary or desirable by the bidder.
4. INTERPRETATION OF CONTRACT DOCUMENTS
No oral representations or interpretations will be made to any bidder as to the meaning of the contract documents. Requests for an interpretation shall be made in writing and received at least ten (10) calendar days before the time announced for opening the bids to:
Department of Engineering Attention: Gui Chang 1001 West Center Street Manteca, CA 95336 Fax: (209) 923-8940 Email: gchang@manteca.gov
Requests to clarify possible ambiguous or incomplete statements or designs require issuance of an addendum by the City for the interpretation to become effective. All requests for clarifications shall be made in writing.
5. POSTPONEMENT OF OPENING
The City reserves the right to postpone the date and time for receiving and/or opening of bids at any time prior to the date and time established in the Invitation to Bid.
Postponement notices shall be mailed to plan-holders of record in the form of an addendum.
6. OPENING OF BIDS
All bids, irrespective of any irregularities or informalities, if received on time, will be opened and publicly read aloud at the time and place set forth in the Invitation to Bid. Bidders, their representatives and other interested persons may be present at the opening and reading of bids.
Any bids received after the scheduled closing time as set forth in the Invitation to Bid or as postponed by addenda will be considered non-responsive and will not be opened. Any such bids will be returned unopened to the Bidder. The public reading of each bid will include at least the following:
A. Name and address of bidder.
B. The total amount of bid.
C. The nature and amount of the security furnished with the bid.
7. PREPARATION OF BID FORMS
Bid shall be made on the bound bid forms provided in the contract documents and must be submitted at the time and place stated in the Invitation to Bid. All blanks in the bid forms must be appropriately filled in either in ink or typed, and all prices must be stated in figures. All bid forms must be submitted in sealed envelopes bearing on the outside the name of the bidder, its address, and the name of the project for which the bid is submitted. It is the sole responsibility of the bidder to see that its bid is received in proper time. Any bid received after the scheduled closing time for receipt of bids will be returned to the bidder unopened. City shall not be responsible for errors or omissions in the bid. Bidders shall write their names on each bid form at the space provided.
To ensure submittal of a complete bid, bidders are encouraged to NOT detach the bid forms from the bound contract documents and to submit the volume of specifications.
8. BIDDER'S SIGNATURE AND AUTHORITY
If the bid is made by an individual, this person's name, signature, and post office address must be shown; if made by a firm or partnership, the name and post office address of the firm or partnership, a list of the general partners, and the signature of at least one of the general partners must be shown, if made by a corporation, the bid shall show the name of the state under the laws of which the corporation is chartered, the name and post office address of the corporation, and the title of the person who signs on behalf of the corporation. If the bid is made by the corporation, a certified copy of the bylaws or resolution of the Board of Directors of the corporation shall be furnished showing the authority of the officer or agent signing the bid to execute Contracts on behalf of the corporation. If the bid is made by a joint venture, the bid shall be signed by a representative of one of the joint venture firms. Additionally, the bid shall include a copy of the resolution or agreement empowering the representative to execute the bid and bind the joint venture.
9. ERASURES AND CORRECTIONS
The bid submitted must not contain any erasure, interlineations, or other corrections unless each such correction is suitably authenticated by affixing, in the margin immediately opposite the correction, the initials of the person or persons submitting the bid.
10. BID IRREGULARITIES
Changes in or additions to the bid form, recapitulations of the work bid upon, alternative bids, omissions, or any other modifications of the bid form which are not specifically called for in the contract documents may result in rejection of the bid by the City, as not being responsive to the Invitation to Bid. No oral or telephonic modification of any bid submitted will be considered.
11. MODIFICATION OF BID
On written request filed with the City, a bid already received may be modified or withdrawn at any time prior to the time established for receiving bids. The request must be executed by the bidder or its authorized representative as described in Paragraph 00 21 13-8.00, BIDDER'S SIGNATURE AND AUTHORITY.
Modifications shall be made in writing, executed, and submitted in the same form and manner as the original bid.
Withdrawal of a bid does not prejudice a bidder's right to submit a new bid within the time designated for the submission of bids. No bid may be withdrawn after the scheduled closing time except as provided in Paragraph 00 21 13-12.00, WITHDRAWAL OF BIDS.
12. WITHDRAWAL OF BIDS
In accordance with Public Contract Code 5103, within five calendar days after the opening of bids, a bidder may withdraw its bid providing the bidder can establish to the City's satisfaction that a mistake was made in preparing the bid. A bidder desiring to withdraw shall give written notice to the City, specifying, in detail, how the mistake occurred and how the mistake made the bid materially different than it was intended to be. Withdrawal will not be permitted for mistakes resulting from errors in judgment or carelessness in inspecting the site of the work or in reading the contract documents.
13. ADDENDA
Addenda issued during the time of bidding shall become a part of the documents furnished bidders for the preparation of bids, shall be covered in the bids, and shall be made a part of the Contract. Each bid shall include specific acknowledgment in the space provided of receipt of all Addenda issued during the bidding period.
Failure to so acknowledge may result in the bid being rejected as not responsive.
Failure of any bidder to receive such Addenda shall not be grounds for non-compliance with the terms of the instructions.
14. BID PRICES
Bid prices shall include everything necessary for the completion of the work including but not limited to providing the materials, equipment, tools, plant and other facilities, and the management, superintendence, labor and services. Bid prices shall include allowance for all federal, state and local taxes
In the event of a difference between a price quoted in words and a price quoted in figures for the same quotation, the words shall be the amount bid. In the event that the product of a unit price and an estimated quantity does not equal the extended amount quoted, the unit price shall govern, and the correct product of the unit price and the estimated quantity shall be deemed to be the amount bid. If the sum of two or more items in a bidding schedule does not equal the total amount quoted, the individual item amounts shall govern and the correct total shall be deemed to be the amount bid.
The award of contract, if it is awarded, will be awarded to the lowest responsive, responsible Bidder whose proposal complies with all the requirements prescribed.
15. BID GUARANTY
The bid form shall be accompanied by a bid guaranty bond provided by an admitted surety insurer authorized to carry on business in the State of California with a minimum a Class IV rating with Best's Rating Guide for payment to the City or meeting the following minimum requirements:
If the Best's Rating for any surety company who has furnished a bid guaranty for the bidder is less than A - Class IV and/or not Treasury Rated, bidder may be required to, within 5 calendar days of bid opening, submit to the City an original or certified copy of each of the following documents for each surety company which has furnished a bid guaranty for that bidder:
1. Appropriate authorization of the signatory to execute each bid guaranty.
2. A certificate of authority issued by the State Insurance Commissioner.
3. A certificate from the County Clerk that the above certificate is not ineffective; and
4. The surety company's financial statement for the prior quarter as specified in Section 995.670 of the California Code of Civil Procedure.
Simultaneously with the submission of the documents described in the preceding paragraphs, the bidder shall also submit an affidavit or declaration, under penalty of perjury under the laws of the State of California, demonstrating the following facts for each bid guaranty submitted or to be submitted on the bidder's behalf.
1. That the surety company's assets exceed its liabilities by more than the amount of the bid guaranty or guaranties submitted on the bidder's behalf, and
2. That in issuing the bid guaranty or guaranties submitted on the bidder's behalf, the surety company shall be in full compliance with California Insurance Code Section 12090, supported by appropriate references to the surety company's most recent financial statement on file in the office of the State Insurance Commissioner.
Any bidder wishing to object to the sufficiency of any surety company used by another bidder shall comply fully with the provisions of Section 995.650 of the California Code of Civil Procedure.
The bid guaranty bond shall be in the sum of at least ten (10) percent of the total amount of the bid price, or, alternatively, by a certified or cashier's check, payable to the City in the sum of at least ten (10) percent of the total amount of the bid price. The bid guaranty bond shall be provided on the form included in Section 00 43 13 - Bid Guaranty Bond, of these contract documents.
The amount payable to the City under the bid guaranty bond, or the certified or cashier's check and the amount thereof, as the case may be, shall be forfeited to the City as liquidated damages in case of a failure or neglect of the bidder to furnish, execute, and deliver to the City the required performance and payment bonds, evidences of insurance, and to enter into, execute, and deliver to the City the Agreement on the form provided herewith, within ten (10) calendar days after receiving written notice from the City that the award has been made and the Agreement is ready for execution.
The bid guarantees of the three lowest bidders will be retained until the Agreement is signed, evidence of insurance provided, and satisfactory bonds furnished or other disposition made thereof. The bid guarantees of all bidders except the three lowest responsive bids will be returned within 15 calendar days after the bids are opened.
16. QUALIFICATION OF BIDDER
Each bidder shall complete and submit with their bid Section 00 45 13 - Certification of Bidder's Experience and Qualifications.
Upon the request of City, any bidder whose bid is under consideration for the award of the Contract shall promptly submit satisfactory evidence showing the bidder's financial resources, its construction experience, and its organization's availability for the performance of the Contract.
The bidder may be required to establish, to the satisfaction of the City, the reliability and responsibility of the persons or entities proposed to furnish and perform the work described in the contract documents.
17. SUBCONTRACTORS
In accordance with California Public Contracting Code Section 4100, et. seq., the bidder shall list, in Section 00 43 36 - Proposed Subcontractors, the name, portion of work to be performed, and location of the place of business for the following.
1) Each subcontractor who will perform work or labor or render service to the bidder in or about the construction of the work or improvement, in an amount in excess of one-half of one percent of the bidder's total bid.
2) Any subcontractor licensed by the State of California who, under subcontract to the bidder, will specially fabricate and install a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one-half of one percent of the bidder's total bid.
Failure to list the subcontractors defined in subparts 1) and 2) above will render the bid non-responsive and will be grounds for rejection of the bid. Failure to comply with the provisions of the California "Subletting and Subcontracting Fair Practices Act" shall make the Contractor subject to the sanctions as set forth in the Act.
18. SUBSTITUTIONS DURING BIDDING
Manufacturers or suppliers of materials and equipment may offer an alternative product to the Contractor and request that alternatives to specified products be considered equal. Inclusion of such alternatives in the bid is the responsibility of the Contractor. Inclusion should only be considered if the Contractor believes the offered alternative is equal in quality and performance to the specified product.
After award of the Contract, such offers of alternative products will be reviewed and processed as a substitution as provided under Section 00 70 00 - General Conditions.
19. BIDDERS INTERESTED IN MORE THAN ONE BID
No person, firm, or corporation, under the same or different name, shall make, file, or be interested in more than one bid for the same work unless alternate bids are called for.
Pursuant to Public Contract Code Section 7106, bidders shall execute and furnish with their bids Section 00 45 19 - Non-Collusion Affidavit. Reasonable grounds to believe that any individual, partnership, corporation, or combination is interested in more than one bid for the proposed work may cause rejection of all bids for parties involved.
A person, firm, or corporation may, however, submit subproposals or quote prices on materials to more than one bidder.
20. SHEETING, SHORING AND BRACING
Pursuant to the provisions of California Labor Code Section 6707, each bid submitted shall contain, in the bid item indicated, the amount included in the bid for adequate sheeting, shoring, and bracing, or equivalent method, for the protection of life and limb in trenches and open excavation, which shall conform to applicable safety orders. By listing this sum, the bidder warrants that its actions pursuant to this bid item shall not impose tort liability on the City, the Designer, the Construction Manager, or their employees, agents, and subconsultants.
Pursuant to California Labor Code Section 6705, the Contractor shall submit a detailed plan showing the design of shoring, bracing, sloping, or other provisions to be made for worker protection from the hazard of caving ground during the excavation of such trench or trenches. If such plan varies from the shoring system standards, the plan shall be prepared by a registered civil or structural engineer.
21. WAGE RATES
Pursuant to provisions of the Labor Code Section 1770, et. seq., of the State of California, the Director of the Department of Industrial Relations has ascertained the prevailing rate of wages of the locality in which the Work is to be performed and applicable to the work to be done. Prevailing wage for each job category shall be as published by Department of Industrial Relations at the time of project work.
This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. Bidders shall complete the form in SB 96 COMPLIANCE AFFIDAVIT and submit with their Bid.
No Contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5 [with limited exceptions form this requirement for bid purposes only under Labor code section 1771.1(a)]
No Contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5.
Contractor shall post job site notices prescribed by regulation.
All Contractors and subcontractors shall furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement).
22. OFFER OF ASSIGNMENT OF ANTITRUST ACTIONS
As provided by Section 7103.5, of the California Public Contract Code, in entering into a public works contract or subcontract, the Contractor or subcontractor offers and agrees to assign to the City all rights, title and interest in, and all causes of action it may have under Section 4 of the Clayton Act (15 U. S.C. Section 15) or under the Cartwright Act (Chapter 2) commencing with Section 16700 (of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services or materials pursuant to the public works contract or subcontract.
This assignment shall be made and become effective at the time the City tenders final payment to the Contractor, without further acknowledgment by the parties.
23. ASSIGNMENT OF CONTRACT
Any attempted assignment by the Contractor of any contract to be entered into hereunder, or any part thereof, or of funds to be received thereunder by the Contractor, is void unless such assignment has had prior written approval of City and the Surety has been given due notice of such assignment in writing and has consented thereto in writing.
24. REJECTION OF BIDS
The City reserves the right, at its sole discretion, to reject any and all bids and further reserves the right to reject any bids which are:
a) non-responsive (e.g.: bids which are incomplete, obscure, or irregular-, bids which omit a bid on any one or more items on which the bids are required, bids which are unbalanced-, bids accompanied by insufficient or irregular bid guaranties),
b) any bids from bidders who have previously failed to perform properly or to complete on time contracts of any nature with the City; or c)any bid which fails to provide satisfactory documentation of the bidder's qualifications as required by Section 00 21 13-16, QUALIFICATION OF BIDDER. The City reserves the right to waive irregularities.
25. BONDS AND INSURANCE
The successful bidder, simultaneously with the execution of the Agreement, will be required to furnish a Payment Bond on forms provided by the City in an amount equal to one hundred percent (100%) of the Contract Price, a Faithful Performance Bond in an amount equal to one hundred percent (100%) of the Contract Price, the Workers Compensation Insurance Certificate, and evidences of insurance.
Said insurance and bonds shall only use the forms attached and shall be secured from a surety company satisfactory to City with a minimum A -Class IV rating with Best's Rating Guide or meeting the following minimum requirements:
If the Best's Rating for any surety company from which the bidder intends to procure the payment bond, performance bond, or both, is less than A - Class IV and/or not Treasury Rated, bidder may be required to, within 5 working days after bid opening, submit to the City an original or certified copy of each of the following documents for each surety company from which the bidder intends to procure such bond or bonds:
1. Appropriate authorization of the signatory to execute each bond.
2. A certificate of authority issued by the State Insurance Commissioner.
3. A certificate from the County Clerk that the above certificate is not ineffective; and
4. The surety company's financial statement for the prior quarter as specified in Section 995.670 of the California Code of Civil Procedure.
Simultaneously with the submission of the documents described in the preceding paragraphs, the bidder shall also submit an affidavit or declaration, under penalty of perjury under the laws of the State of California, demonstrating the following facts for the bond or bonds submitted or to be submitted on the bidder's behalf.
1. That the surety company's assets exceed its liabilities by more than the amount of the bond or bonds submitted on the bidder's behalf, and
2. That in issuing the bond or bonds submitted on the bidder's behalf, the surety company shall be in full compliance with California Insurance Code Section 12090, supported by appropriate references to the surety company's most recent financial statement on file in the office of the State Insurance Commissioner.
Any bidder wishing to object to the sufficiency of any surety company used by another bidder shall comply fully with the provisions of Section 995.650 of the California Code of Civil Procedure.
The form of Agreement, as provided in Section 00 50 00 - Agreement, which the successful bidder as Contractor will be required to execute, and the forms of bonds as provided in Sections 00 61 10 - Faithful Performance Bond and 00 61 20 - Payment Bond, which it will be required to furnish, shall be carefully examined by the bidder. The Faithful Performance Bond is to secure the faithful performance of the Contract, and the Payment Bond is to secure the payment of those to whom the bidder may become legally indebted for labor, materials, tools, equipment, or services of any kind used or employed by the bidder in performing the work.
26. AWARD OF CONTRACT
Within ninety (90) calendar days after the time of opening of the bids, the City will act either to accept a bid, to reject all bids or with the consent of the bidders and their sureties to extend the time in which the City may act. The acceptance of a bid will be evidenced by a Notice of Award of Contract in writing, delivered in person or by certified mail to the bidder whose bid is accepted. No other act of City will constitute acceptance of a bid. The issuance of a Notice of Award of Contract shall obligate the bidder whose bid is accepted to furnish performance and payment bonds and evidences of insurance, and to execute the Agreement in the form set forth in the contract documents. The Agreement will require the completion of the work according to the contract documents.
If award is made, it will be based on the lowest responsive, responsible bid.
27. EXECUTION OF CONTRACT
The Agreement shall be executed by the successful bidder and returned, together with the Contract bonds and evidences of insurance, within ten (10) calendar days after receiving written Notice of the Award of the Contract. Time is of the essence in this regard. After execution by City, one copy of the Agreement shall be returned to Contractor.
Failure or refusal to enter into a Contract as herein provided or to conform to any of the stipulated requirements in connection therewith shall be just cause for annulment of the award and the forfeiture of the proposal guaranty. If the successful bidder refuses or fails to execute the agreement, the City may award the contract to the second lowest responsible bidder. If the second lowest responsible bidder refuses or fails to execute the agreement, the City may award the contract to the third lowest responsible bidder. On the failure or refusal of such second or third lowest bidder to execute the agreement, such bidder's guarantees shall be likewise forfeited to the City. The work may then be re-advertised.
28. CONSTRUCTION DOCUMENTS
Within five (5) calendar days after the execution of the Agreement by the City, the City will furnish electronic copies (PDF’s) of the Plans and Specifications to the Contractor for their use.
Section 00 31 00 (00200)
INFORMATION AVAILABLE TO BIDDERS
SECTION 00 31 00 - INFORMATION AVAILABLE TO BIDDERS (00200)
1. SUBSURFACE CONDITIONS
Subsurface investigation has/has previously been conducted at the site of the Work. The geotechnical report with the records of borings made at the work site is included in the Project Manual. These records pertain to conditions at the boring locations. Upon review of the Contract Documents, the geotechnical report(s) and personal site inspection, the Bidders may develop reasonable interpretation of subsurface conditions.
Contractors, as bidders, are expected to make a personal inspection of the site and otherwise satisfy themselves as to the conditions affecting the work as detailed in these Contract Documents. The subsurface investigation and geotechnical report were developed for design purposes, and as such may not include necessary information for, any or all, construction related activities including, but not limited to, excavations, sheeting, shoring, bracing and dewatering.
The City disclaims responsibility for the Bidder’s interpretation of data, such as, projecting or extrapolating from the test holes to other locations on the site of the Work, soil bearing values and profiles, and soil stability, as well as the presence, level, and extent of underground water for subsurface conditions during construction operations.
There are no anticipated underground excavation, drilling, or dewatering activities for this project.
2. RECORD DRAWINGS AND ADDITIONAL INFORMATION
Previous construction activities have occurred at portions of the site. Below is a list of known available information for review by Bidders.
• Attachment A: Geotechnical Report: Geotechnical Desktop Evaluation Report: PFAS Water Treatment System – Well 22
• Attachment B: Wells 21 & 22 Improvements (year 2000)
• Attachment C: Wells 12, 15, & 22 Surface Water Project (year 2010)
• Attachment D: Drilling Log (year 1965)
• Attachment E: Drilling Log (year 1999)
• Attachment F: Existing 12 ft Vessel – P&ID and Shop Drawings
• Attachment G: Walnut Place Park Sewer System
• Attachment H: Existing 10 ft Vessel Exhibit
Section 00 30 00 (00300)
BID FORM
SECTION 00 30 00 - BID FORM (00300)
1. Enter Into Agreement
The undersigned, as bidder, declares that we have received and examined the Contract Documents entitled Well 22 Treatment Project CIP 26033 (Project), and will contract with the City, on the form of Agreement provided herewith, to do everything required for the fulfillment of the Contract Document for the construction of said Project at the prices and on the terms and conditions herein contained.
2. Bidder Accepts
Bidder accepts all of the terms and conditions of the Invitation to Bid and Instructions to Bidders, including, without limitation, those dealing with the disposition of Bid security.
This Bid will remain subject to acceptance for the period specified for Notice of Award after the day of Bid opening. Bidder will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents as detailed in the Instruction to Bidders.
3. Bidder's Representations
In submitting this Bid, Bidder represents, as more fully set forth in the Agreement, that:
a. Bidder has examined and carefully studied the Bidding Documents and the Addenda.
We acknowledge that the following addenda numbers have been received and have been examined as part of the Contract Documents.
Addenda No. Date Received Initials
b. Bidder has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work.
c. Bidder is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work.
d. Bidder has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except Underground Facilities) which have been identified in the Supplementary Conditions as provided in Paragraph 4.02.A. of the General Conditions.
Bidder accepts the determination set forth in Paragraph SC-4.02. of the
Supplementary Conditions of the extent of the "technical data" contained in such reports and drawings upon which Bidder is entitled to rely as provided in Paragraph 00 70 00-4.02. of the General Conditions.
Bidder acknowledges that such reports and drawings are not Contract Documents and may not be complete for Bidder's purposes.
Bidder acknowledges that Owner and Engineer do not assume responsibility for the accuracy or completeness of information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the site.
e. Bidder has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by Bidder and safety precautions and programs incident thereto.
Bidder does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents.
f. Bidder is aware of the general nature of Work to be performed by Owner and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.
g. Bidder has correlated the information known to Bidder, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents.
h. Bidder has given Construction Manager written notice of all conflicts, errors, ambiguities or discrepancies in the Contract Documents and the written resolution thereof by Engineer is acceptable to Bidder, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
Where conflicts, errors, ambiguities or discrepancies have been discovered in or between Contract Documents and/or other related documents, and where said conflicts, etc., have not been resolved through the interpretations or clarifications by Engineer as described in the Instructions to Bidders, because of insufficient time or otherwise, Bidder has included in the Bid the greater quantity or better quality of Work, or compliance with the more stringent requirement resulting in a greater cost.
i. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid; Bidder has not solicited or induced any person, firm or corporation to refrain from bidding; and Bidder has not sought by collusion to obtain for itself any advantage over any other Bidder or over Owner.
4. Bid Prices
Bidder will complete the Work in accordance with the Contract Documents for the following prices(s):
BASE BID SCHEDULE
Bid Item
Item Description Unita Estimated Quantity
Unit Price Subtotal
1 Mobilization & Contractors Facilities (Assume 12 Month Duration) LS
2 Demolition of Existing Site Improvements - Paving LS 1
3 Demolition of Existing Site Improvements - Fencing LS 1
4 Demolition of Existing Site Improvements - Landscape & Irrigation LS 1
5 Demolition of Existing Site Improvements - PFAS/Arsenic Tie In LS 1
6 Earthwork LS 1
7 Concrete (Mat Slab for Vessels) LS 1
8 Landscaping LS 1
9 Misc. Site Improvements LS 1
10 12" Treated Water Line (Civil - Piping & Appurtenances Buried) LS 1
11 12" Backwash Waste Water Line (Civil - Piping & Appurtenances Buried) LS 1
12 12" Treated Water Line (Mechanical - Piping & Appurtenances Above Ground) LS 1
13 12" Ground Water Line (Mechanical - Piping & Appurtenances Above Ground) LS 1
14 12" Backwash Waste Water Line (Mechanical - Piping & Appurtenances Above Ground) LS 1
15 Start Up & Testing (Mechanical - Piping & Appurtenances Above Ground) LS 1
16 Filter Vessels LS 1
17 Start Up & Testing (Filter Vessels) LS 1
18 Electrical and Instrumentation & Control LS 1
19 Start Up & Testing (Electrical and Instrumentation & Control) LS 1
20 Delivery LS 1
21 Close Out LS 1
22 Clean Up & Demobilization LS 1
TOTAL BASE BID
a LS=Lump Sum, LF=Linear Feet, EA=Each, HR=Hour; VF=Vertical Feet, MO=Month, CY=Cubic Yard, SF=Square Foot, EA=Each
Date Contractor is available to start work:
The City reserves the right to select the lowest responsible bidder based on the total base bid and/or based upon the date the Contractor is available to start work, regardless of the lowest bid amount.
5. Attached Documents
We agree that the following shall be attached hereto and made a part of this bid.
SECTION TITLE
00 44 00 Site Visit Affidavit (00440) 00 30 01 Authority to Bid (00301) 00 41 00 Bid Guaranty Bond (00410) 00 43 25 Schedule of Major Equipment and Material Supplies (00450) 00 43 36 Proposed Subcontractors (00430) 00 45 13 Certification of Bidder’s Experience and Qualifications (00420) 00 45 19 Non-Collusion Affidavit (00480) 00 45 25 CA Government Code Section 14310 Questionnaire (00425) 00 45 31 Equal Employment Opportunity Certification (00431) 00 45 35 Local Business Enterprise (00435) 00 45 32 Public Contract Code Section 10285.1 Certification (00432) 00 45 33 Public Contract Code Section 10232 Certification (00433) 00 45 34 Debarment and Suspension Certification (00434) 00 45 36 Nonlobbying Certification (00436) 00 45 46 Department of Industrial Relations Compliance Affidavit (00490) 00 45 47 Statement Acknowledging Penal and Civil Penalties Concerning the Contractors’
Licensing Laws (00491) 00 45 70 Acknowledgement of Insurance Requirements (00470)
6. Completion
We agree, if our bid is accepted and a Contract for Performance of the Work is entered into with the City, to so plan work and to prosecute it with such diligence that the work shall be completed within the time stipulated.
If our bid is accepted, we agree to sign the Agreement without qualifications and to furnish the performance and payment bonds and the required evidences of insurance within 10 calendar days after receiving written Notice of Award of the Contract.
Attached is a bid guaranty bond as required.
Name of Bidder
7. Contractor’s License and Address for Communications
The undersigned certifies that the undersigned holds California Contractor’s License, Class , number , expiration date .
Signature of Bidder
Title of Signatory
Address of Bidder
Witness
Title of Witness State of Incorporation
Phone Number
FAX Number
**END OF SECTION**
Section 00 30 01 (00301)
AUTHORITY TO BID
SECTION 00 30 01 - AUTHORITY TO BID (00301)
(To be submitted with bid)
I, the bidder, am a (check one below)
☐ An individual, bidder’s name, signature, and physical address (not P.O Box) must be shown.
☐ A firm or partnership, a list of the partners, and the…