About this file
Summary
This Formal Invitation to Bid (ITB No. 26-111-PW) issued by the Eugene Water & Electric Board (EWEB) solicits construction services for the design, provision, and installation of a fire detection system at EWEB's Trail Bridge hydroelectric powerhouse located in Linn County, Oregon. The project encompasses aspirating smoke detection systems, CO2 fire protection equipment, control panels, alarm systems, electrical wiring, and associated installation labor. A mandatory pre-bid conference is scheduled for Friday, May 29, 2026, at 10:00 AM PT at the Carmen Smith Office parking lot (59727 Hwy 126, McKenzie Bridge, OR 97413); attendance is required for general contractor bidders unless they have attended a pre-bid conference at Trail Bridge within the past 12 months. Electronic bid submissions via the OregonBuys website are required and must be received by Tuesday, June 9, 2026, at 2:00 PM PT. The Board approval is estimated for July 7, 2026, with a Notice to Proceed targeted for July 10, 2026.
Bidders must meet specific minimum qualifications including five years of experience performing substantially similar work on projects valued at least $75,000, with references from three completed projects. The fire protection engineer must be licensed in Oregon, and the project superintendent must provide supervisory performance information for three similar projects completed since 2008. Bids exceeding $100,000 must include a certified bid bond equal to 10 percent of the total bid amount as security. The successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract award if the bid price exceeds $100,000. All bidders must comply with Oregon BOLI prevailing wage requirements and Construction Contractors Board (CCB) registration. A First-Tier Subcontractor Disclosure Form must be submitted either with the bid via OregonBuys or by email to the Purchasing Contact within two working hours of the bid closing deadline. The single point of contact for all questions is Wendy Lopez, EWEB Purchasing Contact, at wendy.lopez@eweb.org or (541) 685-7150.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev 9/24
Eugene Water & Electric Board
FORMAL INVITATION TO BID
For
Trail Bridge Fire Detection System
Bid No.: 26-111-PW Closing Date: Tuesday, June 9th, 2026 Time: 2:00 PM PT Description: EWEB requires construction services to provide and install a fire detection system at EWEB’s Trail Bridge hydroelectric powerhouse in Linn County.
Pre-bid Conference: YES -Mandatory* Date: Friday, May 29th, 2026 Time: 10:00 AM PT Location: Eugene Water & Electric Board, Carmen Smith Office parking lot, 59727 Hwy 126, McKenzie Bridge, OR 97413 *See additional details in Section 00200
Purchasing Contact: Wendy Lopez Phone: (541) 685-7150 Email: wendy.lopez@eweb.org
This is a COMPETITIVE SEALED PROCUREMENT. ELECTRONIC PROPOSALS SUBMITTED VIA THE OREGONBUYS
BID SITE ARE REQUIRED. EMAILED SUBMITTALS WILL NOT BE ACCEPTED.
To ensure your submission is received prior to the closing date and time, it is recommended that you begin the submittal process on the OregonBuys website at least 24-hours prior to the closing date and time listed above
SINGLE POINT OF CONTACT: There will be only one point of contact for the entire Invitation to Bid process. The contact point is the EWEB Purchasing Office, and the contact person is the Purchasing Contact listed above, unless otherwise stated. Any questions or issues that may arise regarding the specifications, the bidding process, and/or the award process shall be directed to the Purchasing Contact listed above. EWEB’s official response to any questions or requests will be addressed via the Addendum process.
FOR MORE INFORMATION please refer to Section 00200 “Instructions to Bidders”.
TABLE OF CONTENTS
This solicitation is organized and written in a manner consistent with the Construction Specification Institute (CSI) format. The following is a list of all Divisions, Sections, and Details that are included in the Project Manual.
DIVISION 0 - BIDDING DOCUMENTS & CONTRACT FORMS
00100 Invitation to Bid - Legal Advertisement
00200 Instructions to Bidders
00300 Information Available to Bidders
00400 Bid Form
00430-A First-tier Sub-Contractor Disclosure Form
00430-B Drug Testing Requirements
00450 Minimum Qualifications
00610 Bid, Performance, & Payment Bonds
00620-A Completion Notices (Contractor Affidavit, Certificate of Substantial Completion, Notice of Final
Completion)
00620-B Certificate for Payment
00700 General Conditions (Public Works)
00830 BOLI Prevailing Wage Rates
00900 Addenda / Modifications to Solicitation
00930 Change Order
00930-FCO Field Change Order
DIVISION 1 - SPECIFICATIONS
011113 Summary of Work
011216 Work Sequence and Schedule
013119 Project Meetings
013000 Submittals
013333 Reference Forms
013529 Health, Safety, and Emergency Response Procedures
014300 Quality, Testing, and Equipment Protection
017700 Contract Closeout
017823 Training and Operation and Maintenance Data
017836 Warranty
260511 Electrical
283133 Fire Detection and Alarm Interfaces
DRAWINGS:
1. Electrical Contract Drawings
EWEB
Drawing No. Description
38174-E2 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE FLOOR EL 2014.0 –
ELECTRICAL EQUIPMENT PLAN
38174-E30 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – SCHEMATICS – UNIT 1 DPAC
(DPAC1)
38174-E31 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – SCHEMATICS – BALANCE-OF-PLANT
DPAC (DPAC2)
38174-E88 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – RTAC PANEL – PANEL WIRING
DIAGRAM – RTAC PANEL SH 3
38174-N15 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– SCHEMATIC DIAGRAM – UNIT AND
PLANT PLC SH 6
38174-N52 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– PANEL WIRING DIAGRAM – UNIT
AND PLANT PLC PANEL SH 3
38174-N53 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– PANEL WIRING DIAGRAM – UNIT
AND PLANT PLC PANEL SH 4
38174-E252 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – DC POWER PANELS – CONNECTION
DIAGRAM
2. Structural & Mechanical Contract Drawings
EWEB
Drawing No. Description
D-43624-M01 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TRAIL BRIDGE POWERHOUSE
TURBINE-GENERATOR - ASPIRATING SMOKE DETECTION SYSTEM – NETWORK SAMPLING
PLAN
FD-6156-3 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT –
TURBINE FLOOR
FD-6156-5 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT -
TRANSVERSE SECTION AT CENTERLINE OF UNIT
FD-6156-7 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT -
LONGITUDINAL SECTION AT CENTERLINE OF UNIT
Additional Attachments:
1. Preferred Location of Panels
Rev. 09/24 Section 00100
ADVERTISEMENT
ITB 26-111-PW
Trail Bridge Fire Detection System
The Eugene Water & Electric Board (EWEB) requests bids for construction services to provide and install a fire detection system at EWEB’s Trail Bridge hydroelectric powerhouse in Linn County.
Bidders shall meet Minimum Qualifications for Contractor and specialty sub-contractors, as defined in the bid packages. In summary, these Minimum Qualifications include:
• Contractor:
• Must have been in business performing substantially similar work to the scope of this project for at least the last five (5) years for projects worth at least $75,000. Contractor will provide a description of how they meet this requirement and in addition, provide references for three (3) projects that demonstrate substantially similar work.
• The Fire Protection Engineer must be licensed in the State of Oregon.
• Supervisor/Superintendent
• The Project Superintendent must be able to provide past Supervisory performance information for at least three (3) projects completed in the past five (5) years since no earlier than year 2008, worth at least $75,000, similar in nature to the scope of this project.
• Sub-Contractor:
• The Sub-Contractor must have been in business performing substantially similar work to the scope of this project for at least five (5) years for projects worth at least $75,000.
Contractor will provide a description of how the sub-contractor meets this requirement and in addition, provide references for three (3) projects that demonstrate substantially similar work.
Bidders shall comply with all BOLI and CCB requirements, as outlined in www.oregon.gov/BOLI and http://www.oregon.gov/ccb/Pages/index.aspx.
The bid package may be inspected online on the State of Oregon's bid site ("Oregon Buys"):
https://oregonbuys.gov/bso/. (On OregonBuys home page, search for bid # 26-086-PW. For navigation help, please call 1-855-800-5046.)
Bid Submission Deadline: Bids shall be submitted on the State of Oregon - OregonBuys website (https://oregonbuys.gov/bso/), before 2:00 PM Pacific Standard Time, on Tuesday, June 9th, 2026. Bids will be opened immediately thereafter and recorded. Emailed bids will not be accepted.
First-tier Sub-contractor Disclosure Form (Section 00430) shall be submitted either with Bid submission via OregonBuys, or via email to the Purchasing Contact listed above by 4:00 PM PST, on Tuesday, June 9th, 2026.
Rev. 09/24 Section 00100
Bids and required Sub-contractor Disclosure Form received after their respective deadlines will NOT be considered.
A mandatory pre-bid meeting will be held at 10:00 a.m., on Friday, May 29th, 2026, at EWEB’s Trail Bridge Plant. Since the Trail Bridge Plant does not have its own address, bidders shall meet at the Carmen Smith Office parking lot located at, 59727 HWY 126, McKenzie Bridge, OR 97413. Attendance is mandatory for General Contractor Bidders. Bidders who have visited or attended a pre-bid conference at the Trail Bridge Power Plant (for fire detection systems) in the last 12 months, do not need to attend again. The prior attendance will satisfy the mandatory pre-bid attendance for this ITB. Sub-contractors are encouraged to attend, but their attendance is not mandatory.
By submission of a bid, the Bidder agrees to comply with the provisions of 279C.800 through 279C.870 relating to the latest version of State of Oregon’s BOLI Prevailing Wage Rates.
EWEB may cancel the Invitation to Bid or reject any or all bids pursuant to EWEB Rule 5-0440.
Single point of contact: Submit all technical, bidding, website access, and contract questions to the Purchasing Contact, Wendy Lopez, in writing via email at wendy.lopez@eweb.org. DO NOT contact the project team without prior approval by the Purchasing Contact.
BY:
Wendy Lopez, EWEB Purchasing Contact ISSUED: May 21, 2026
PUBLISHED:
Eugene Water & Electric Board Section 00200
Rev 09-2024 Section 00200
INSTRUCTIONS TO BIDDERS
INFORMATION OF RECORD
The official source of information for this project until the Intent to Award is posted is located at the State of Oregon's bid site, located at: https://oregonbuys.gov/bso/. IT IS
THE SOLE RESPONSIBILITY OF THE BIDDER TO CHECK THE WEBSITE ON A TIMELY BASIS.
BID SCHEDULE
MANDATORY PRE-BID CONFERENCE
A Mandatory pre-bid conference is scheduled for this Invitation to Bid. Bidders are required to attend the mandatory pre-bid conference. Bids will NOT be accepted from Bidders who did not attend the conference. Bidders who have visited, or attended a pre-bid conference at the Trail Bridge Power Plant (for fire detection systems) in the last 12 months, do not need to attend again. The prior attendance will satisfy the mandatory pre-bid attendance for this ITB. Sub-contractors are encouraged to attend, but their attendance is not mandatory.
Pre-bid conference will be held at 10:00am Pacific Time, on Friday, May 29th, 2026 at the Eugene Water & Electric Board, Carmen Smith Office parking lot, 59727 Hwy 126, McKenzie Bridge, OR 97413. The purpose of the conference is to discuss the work to be performed with the prospective offerors and allow them to ask questions concerning the ITB.
Statements Not Binding: Statements made by EWEB at the pre-bid conference do not change the bid document unless EWEB confirms such statements with a written addendum to the bid documents.
1.1 Bid Preparation:
The Eugene Water & Electric Board's environmental policy directs the utility to conduct its business in an environmentally sensitive, sustainable and responsible way. Pursuant to this
Mandatory Pre-Bid Meeting May 29, 2026
Last Day for EWEB to Receive Questions June 2, 2026
Last Day for EWEB to Receive Request for Substitution
June 2, 2026
Last Day for EWEB to Issue Addenda June 4, 2026
Bid Close Date June 9, 2026
Board Approval July 7, 2026
Estimated Date of Notice to Proceed July 10, 2026 policy, Bidder shall submit their bid electronically via the OregonBuys website, https://oregonbuys.gov/bso, Bidders are responsible for all costs they may incur in connection with submitting a bid.
a. Compliance. All bids must be submitted on the Oregon Buys website and received by
EWEB’s Purchasing Department (“EWEB” herein used synonymously with the term "OWNER" as used in the General Conditions) prior to the bid closing time and date. Bids that are received after the bid closing time and date may not be considered.
b. Method of Bidding - Unit and Total Price. The price per item shall be clearly shown in the space provided. The pricing shall be extended to show the total when required. In case of errors in extension, the unit price shall prevail. The written unit price shall prevail over the numerical unit price.
c. Completion. The Bidder shall show in the space, when provided in the bid form, the earliest completion date on which completion of the work can be guaranteed.
Otherwise the Bidder certifies that the work will be complete according to the completion time stated in the bidding documents.
EWEB reserves the right to consider availability and delivery (completion) time in determining award of this Contract.
d. Examination of Plans, Specifications, and Work Site. It is understood that a Bidder, before submitting a bid, has made a careful examination of all plans, specifications and Contract documents, that the Bidder has a complete understanding of the quality and quantity of materials and the character of the work required; and that the Bidder has made a careful examination of the location and conditions of the worksite and the sources of supply for materials.
It is further understood that a bid awarded hereunder is subject to EWEB being able to
(1) comply with all zoning ordinances, or obtain rezoning of the property where necessary; and (2) comply with local building code restrictions and conditions for the structure or structures contemplated in the bid, any or all of which conditions may be contained in the Contract and may result in termination of the Contract, if such conditions are not satisfied. EWEB will in no case be responsible for any loss or for any unanticipated costs that may be incurred by the Contractor as a result of the Contractor's failure to acquire full information about work conditions prior to submitting an offer to perform the work.
e. Substitutions. When a brand name is required by the specifications, all Bidders shall provide the specified product unless an alternative product is allowed per the specifications and in which case, must be of equal quality, merit and utility (as determined in EWEB's sole judgment). Bidders may be required to provide information to EWEB to determine product acceptability prior to award of Contract.
f. Interpretation of Contract Documents. If a Bidder finds discrepancies in errors or omissions from the plans, specifications, or Contract documents, or has doubt as to their meaning, the Bidder shall at once notify EWEB. EWEB will then investigate the validity of the claim and will determine whether an Addendum will be issued (see Protest or Request for Clarification and Changes to the Bid Specifications below).
g. Protest or Request for Clarification/Changes of Specifications and/or Bidding
Requirements (EWEB Rule 5-0260).
Request for Clarification and Changes to the Bid Specifications Prior to the deadline for submitting questions, Bidders may, in writing/email, request clarification of or changes to any bid specifications or Contract terms. Questions and responses that present material information to all Bidders will be posted via formal, written Addendum. EWEB’s clarification to an Offeror, whether orally or in writing, does not change the terms of the solicitation and is not binding on EWEB unless EWEB amends the solicitation document by written Addendum.
Protest of Specifications/Bid Requirements Bidders may, in writing, protest bid specifications or Contract terms and conditions.
Unless stated differently in the bidding document, this written request for change must be received by the Purchasing Contact indicated in the solicitation document no later than ten (10) days prior to the bid closing date. The written protest shall include the reasons for the protest. Email containing bid protests shall be marked as follows:
Bid Specification Protest Bid Number 26-111-PW
h. Filling in Bid Forms. The bid response shall be made on the form provided in the
Invitation to Bid (Section 00400) and as prescribed by EWEB. The Bidder may not alter, modify or change the bid form, except as directed by bid Addendum. Any other form of offer is invalid.
Bids may be rejected if they contain any recapitulation or restating of the work to be done, disclaimers, exceptions or other limitations or stipulations.
i. Bids are Offers. The bid is the Bidder's offer to enter into a contract, which, if the bid is accepted for award, binds the Bidder to a contract and the terms and conditions contained in the Invitation to Bid. A Bidder shall not make the bid contingent upon EWEB's acceptance of specifications or Contract terms that conflict with or are in addition to those required in the bid Documents (except as noted in Time for Bid Acceptance, Section 1.3(g) below).
j. Proprietary Information/Public Disclosure. Materials submitted in response to this
Invitation to Bid and/or the Contract shall become the property of EWEB and are, therefore, subject to public records laws.
In the event that a Bidder desires to claim that portions of its submittal are exempt from public disclosure, under the provisions of ORS 192.501, it is incumbent upon the Bidder to identify those portions in a transmittal letter. The transmittal letter must identify the page and the particular exemption(s) from disclosure upon which the claim is made.
Each page claimed to be exempt from disclosure must be clearly identified, on the page, by the words: "This data constitutes a trade secret under ORS 192.501(2), and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS 192.
If EWEB receives a request for public records disclosure of the information so designated as confidential by Bidder, EWEB will make a reasonable attempt to notify Bidder of the request so Bidder/Contractor may claim any exemption Bidder is entitled to under applicable laws.
The Oregon Public Records Law exempts from disclosure trade secrets, and the exemption from disclosure applies "unless the public interest requires disclosure in the particular instance," ORS 192.501(2). Therefore, non-disclosure of documents or any portion of a document submitted as part of this solicitation may depend upon official or judicial determinations made pursuant to the Oregon Public Records Law.
In any event, EWEB will, to the fullest extent permitted by Oregon Law, assist the Bidder in protecting proprietary information submitted pursuant to this Invitation to Bid.
1.2 Bid Submission:
a. OREGON BUYS ELECTRONIC RESPONSE
All bid documents should be combined into one pdf document except that the First Tier Subcontractor form may be submitted as a separate document.
In order to submit an electronic bid on the OregonBuys website, Bidder must be registered with OregonBuys and able to submit an electronic bid.
If you experience any issues registering, please contact OregonBuys at:
Phone: 1-855-800-5046 Email: support.oregonbuys@das.oregon.gov
Proposer should follow the procedures outlined in https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20 Solicitation%20Response.pdf for electronic submission.
A video presentation on submitting an electronic bid may be found at: Supplier - Submitting a Quote - Overview (periscopeholdings.com)
Terminology specific to the OregonBuys system may be found at:
https://www.oregon.gov/das/ORBuys/Documents/Phase1TerminologyCrosswalk.pdf
b. Bid Submission. The bid response shall be submitted electronically via the OregonBuys website prior to the bid closing time and date stated in the Invitation to Bid/Advertisement (Section 00100). Bids received after the bid closing time and date will not be considered for award. EWEB is not responsible for any delays by transmission errors or interruptions, or for any mis-delivery for any reason.
The First-Tier Subcontractor disclosure must be submitted with the bid response or Bidders must email the disclosure to the Purchasing Contact within two (2) working hours of the bid closing date and time.
c. Addenda. EWEB reserves the right to make changes to the Invitation to Bid and the resulting Contract by written Addenda, prior to the closing time and date. Addenda shall only be issued by EWEB and upon issuance, are incorporated into the Invitation to Bid or the resulting Contract. If required by Addendum, Bidders shall sign and return all Addenda with their bid prior to the bid closing time and date or acknowledge them on the 00400 Bid Form. Addenda shall be obtained electronically at the State of Oregon bid site at: https://oregonbuys.gov/bso/. The Bidder is responsible for ensuring that all Addenda have been acknowledged in their bid response.
d. Security to be Furnished by Each Bidder. When the bid price exceeds $100,000, or when otherwise required by the Contract Documents, the bid shall be accompanied by a certified bid bond in an amount equal to 10% of the total amount of the bid as bid security to ensure that the Bidder, if offered, will execute the Contract agreement and provide the performance bond and payment bond as required. If Bidder wishes to use a cashier's check as the bid bond, Bidder must schedule the delivery of the bid bond with Purchasing Contact prior to bid closing date and time. The lowest responsible and responsive Bidder will be required to provide a performance/payment bond in an amount equal to 100% of the Contract award if the bid price exceeds $100,000 or if otherwise required in the bid documents.
EWEB reserves the right to hold the bid security of all Bidders until the Notice to Proceed is issued or for ninety (90) calendar days after bid closing, whichever is sooner (unless a longer or shorter period is specified in the Invitation to Bid.)
Should the Bidder fail to execute the Contract agreement and furnish the satisfactory performance bond and payment bond after the bid has been accepted, the bid security shall become the property of EWEB.
e. Modification of Bids. If a Bidder wishes to make modifications to a submitted Bid, Bidder must do so through OregonBuys prior to the Bid Due Date and Time stated on the Cover Page for this ITB. For help, please call OregonBuys at 1-855-800-5046.
f. Withdrawal of Bids. If a Bidder wishes to withdraw a submitted Bid, Bidder must do so through OregonBuys, using the “Withdraw Quote” button prior to the Bid Due Date and Time stated on the Cover Page for this ITB. Bids may not be withdrawn after the bid opening date and time. For help, please call OregonBuys at 1-855-800- 5046.
1.3 Bid Review & Award:
a. Bid Review / Minimum Requirements. After bid opening, EWEB may conduct discussions with Bidders for the purpose of clarification to assure full understanding of the bid.
Bidder Responsibility shall partially be based on their response to any minimum requirements established by the specifications and compliance with conditions of the Invitation to Bid and shall be subject to Oregon Revised Statutes (ORS) 279A, 279C, and EWEB Public Contracting Rules, Divisions 1, 2, 5 & 6.
EWEB may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of EWEB that it is in the public interest to do so. (ORS 279C.395)
b. Method of Award: EWEB reserves the right to award the BASE BID only, BASE BID and any ALTERNATES [1 through 3] listed, and to reject all Bids.
Award shall be made to one Bidder and one Bidder only.
c. Oregon Preference. Award shall be subject to preference for goods or services that have been manufactured or produced in Oregon if price, fitness, availability and quality are determined by EWEB to be equal (ORS 279A.120).
d. Reciprocal Law. In determining the lowest responsible Bidder, a nonresident Bidder eligible to receive a preference in the state in which the Bidder resides, shall have that same percentage preference added to the bid amount in accordance with EWEB
Rule 5-0390(5)(a).
e. Responsiveness / Responsibility. The Responsiveness and Responsibility of Bidders and of their proposed subcontractors will be considered in making the award.
A “Responsive” bid is one that substantially complies with the Invitation to Bid instructions and requirements.
A “Responsible” Bidder can demonstrate ability to meet the requirements of the project specifications, has the appropriate experience, is legally qualified to do the Work, has the required certifications required, has a satisfactory record of integrity and can meet the other requirements described in Rule 5-0390(2).
f. Certification of Alteration or Erasure. A bid may be rejected if it contains any material alteration or erasure. Nothing in this paragraph shall be construed as allowing the Bidder to alter or otherwise change the form of the offer, the form of the Contract, the conditions of the bid, the specifications, and/or plans attached to the bid documents.
Unless otherwise specifically allowed in the bidding documents, no changes or modifications to an offer may be made after the bid closing date & time.
g. Time for Bid Acceptance. EWEB reserves the right to consider a bid response containing a condition that limits its time for bid acceptance. EWEB may, solely at its option, accept a shorter time for bid acceptance, even though the Invitation to Bid may state a longer period. EWEB reserves the right either to accept or reject the bid response containing the time condition if the bid response is otherwise the lowest responsible and responsive Bidder.
h. Bid Reading and Review. Bids received in response to this Invitation to Bid shall be opened at the scheduled closing date and time by EWEB Purchasing Department.
Bidders wishing to view the Bid Opening remotely shall contact the Purchasing Contact listed above at least 24 hours prior to the bid opening to receive a MS Teams link for the bid opening. Be sure to have MS Teams access available on your computer or mobile phone and follow the provided link.
Award decisions will not be made at bid opening. Only the name of the Bidder(s) and the bid item(s) to be considered for award purposes will be read at the bid opening.
After bid opening, EWEB may conduct discussions with Bidders for the purpose of clarification to assure full understanding of the bid. EWEB will review each bid for Bidder Responsiveness and Responsibility.
EWEB reserves the right to waive or allow correction of minor informalities and errors (EWEB Rule 5-0350).
i. Bid Results. To obtain bid results, notes may be taken at the public bid opening, or a personal inspection may be made of the bid files at a later date, BY APPOINTMENT.
Bid tabulations and bid status shall be obtained electronically at https://oregonbuys.gov/bso/.
j. Right of Rejection. EWEB reserves the right to reject stipulated and/or unbalanced bids that are determined by EWEB to not be in its best interest.
EWEB reserves the right to reject any bid not in compliance with all prescribed public contracting procedures and requirements and may reject for good cause all bids upon a finding that it is in the public interest to do so. (ORS 279C.395)
EWEB may cancel the Invitation to Bid pursuant to EWEB Rule 5-0440.
k. Protest of Award. EWEB Rule 5-0450(4)(a). A Bidder may protest the award or intent to award a Contract if: The Bidder is adversely affected because the Bidder would be eligible to be awarded the Contract in the event that the protest were successful; and the reason for the protest is that all lower bids are nonresponsive; or EWEB has failed to conduct the evaluation of bids in accordance with the criteria or processes described in the solicitation document; or EWEB has abused its discretion in rejecting the protestor's bid as nonresponsive; or EWEB's evaluation of bids or EWEB's subsequent determination of award is otherwise in violation of EWEB Rules.
Eligible Bidders protesting award shall follow the procedures described herein. Protests that do not follow these procedures shall not be considered. This protest procedure constitutes the sole administrative remedy available to Bidders.
1. Protests must be received within seven (7) days after issuance of the notice of intent to award the Contract. EWEB will not consider late protests.
2. All protests must be in writing, signed by the protesting party or an authorized Agent and submitted to the EWEB Purchasing Analyst listed on page 1. The protest must state all facts and arguments on which the protesting party is basing the protest.
3. Only protests stipulating an issue of fact concerning a matter of bias, discrimination or conflict of interest, non-compliance with procedures described in the procurement documents, or EWEB policy shall be considered. Protests based on procedural matters will not be considered.
4. EWEB’s Purchasing Supervisor will review the protest and will email or mail the protesting party a written response within three (3) business days of receipt of the written protest to the email or postal address provided in the bid or proposal. Any written response may be comprised of a determination of the protest, a notice to the protesting party of the need for additional time in which to evaluate the matter, or other notice to the protesting party.
5. If the Purchasing Supervisor’s determination (response) is adverse to the protester, any further appeal of the Purchasing Supervisor’s determination by the party must be submitted in writing to EWEB’s General Manager within three (3) business days of issuance of the Purchasing Supervisor’s determination (response).
6. EWEB’s General Manager will review any appeal of the Purchasing Supervisor’s determination and shall email or mail, in accordance with the email or postal address provided in the bid, the protesting party a written response within three
(3) business days of receipt of written appeal.
7. If the determination of the General Manager is adverse to the protesting party’s interest, the protesting party may only appeal to EWEB’s Board of Commissioners by filing a written notice of appeal to the Board with the General Manager within two (2) business days of issuance of the General Manager’s written determination.
8. The Contract Review Board, in considering the protest, shall review the documentation presented to the Purchasing Supervisor and the General Manager on or before the next regularly scheduled Board Meeting, but in no event shall they be required to review in less than ten (10) business days, and thereafter, base their decision on such material. The Board review will be limited to the evaluation of compliance with EWEB’s policies and procedures, requirements of the RFP or ITB and the equal and fair application of EWEB’s contracting rules. The Contract Review Board's determination shall be EWEB's final decision.
An adversely affected or aggrieved Bidder must exhaust all avenues of administrative review procedures and relief before seeking judicial review of EWEB's Contractor selection or Contract Award decision.
1.4 Registration Requirements (i.e. Construction Contractors Board/State Landscape Board):
Bidders shall certify that all parties performing work described in ORS 701.005(2) (i.e.
construction work) will be registered with the Oregon Construction Contractors Board
(CCB), and the State Landscape Contractors Board (LCB), if applicable, in accordance with ORS 701.035 and 701.055, or the appropriate authority pertaining to the trade before the bid opening time and date set in this Invitation. Bids not meeting this requirement will not be considered.
1.5 Scope of Work. The work contemplated under this Contract includes all labor, tools, machinery, materials, transportation, mobilization/demobilization, equipment and services necessary for, and reasonably incidental to, the completion of all work in connection with the project described in the Contract, the General Conditions, all applicable special conditions, plans, specifications, or any supplementals.
End of Section 00200
REFERENCE DOCUMENTS
1. Reference Drawings
EWEB
Drawing No.
Description
FD-6156-21 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – FINISH FLOOR
PLAN & EQUIPMENT ARRANGEMENT
D-6156-42 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR & OIL
ROOM CO2 FIRE PROTECTION
FD-6156-45 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL STORAGE
ROOM PIPING PLANS & SECTIONS
FD-6169-57 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE
EXTINGUISHER PIPING
FD-6180-5 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – FIRE PROTECTION
SYSTEM CO2 PIPING LAYOUT AND SCHEMATIC
D-31140 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2
FIRE PROTECTION WIRING DIAGRAM
D-31156 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2
FIRE PROTECTION SCHEMATIC DIAGRAM
D-31157 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE
PROTECTION AUX RELAY PANEL CONNECTION DIAGRAM
D-31158 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL ROOM CO2
FIRE PROTECTION - SCHEMATIC DIAGRAM
D-31159 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL ROOM CO2
FIRE PROTECTION - CONNECTION DIAGRAM
D-31219 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE
PROTECTION COMMON ALARMS- SCHEMATIC DIAGRAM
D-7140-6 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – EQUIPMENT
LOCATIONS & DRAINAGE SOUTHWEST SECTION VIEW
D-7140-7 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE DECK,
EQUIPMENT LOCATIONS & DRAINAGE PLAN VIEW
D-7140-8 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – ACCESS DECK,
EQUIPMENT LOCATIONS & DRAINAGE PLAN VIEW
D-38174-D16 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2
FIRE PROTECTION - WIRING DIAGRAM
D-38174-D17 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR FIRE
PROTECTION AUX RELAY PANEL
D-38174-E300 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE FLOOR EL
2014.00 – RACEWAY LAYOUT
2. EWEB Standards
a. EWEB Consultant CAD Standards
SECTION 00300
INFORMATION AVAILABLE TO BIDDERS
BYPASS
STORAGE TANKS
LUBE OIL
È
TURBINE
PIT
GENERATOR
HOUSING
GOVERNOR
ACTUATOR
& UNWATERING PIT
COOLING WATER
UNWATERING PIT
UNIT
DRIP OIL
TANK
TUBE
DRAFT
GENERATOR FLOOR ELEV. 2028.50
TURBINE FLOOR ELEV. 2014.00
DRIP OIL TANK ELEV. 1998.00
ELEV. 1978.25
È
SOUTHWEST SECTION
NOT TO SCALE
KEY PLAN
FIGURE 4A
FIRE EXTINGUISHER LOCATIONS
TELEPHONE LOCATIONS
OIL DRAIN LINES
WATER DRAIN LINES
Hç2æ0
OIL
LEGEND
PLANE OF
THIS SECTION
O
I
L
OIL
OIL
GAL.
OIL
INTERCEPTOR
GAL.
GAL.
O
I
L
NOTE
: O
IL TA
NK I
S IN
FRON
T OF
CUT
-LIN
E
Hç2æ0
Hç2æ0
GAL.
ELEV. 1982.00
LOWER CONDUCTIVITY
PROBES
PROBES
UPPER CONDUCTIVITY
ELEV. 1987.00
CONFINED SPACE LOCATIONS
DOORDOOR
CS-35
CS-37
CS-36
CS-32
CS-42
CS-31
CS-40
CS-34
CS-00
CONFINED SPACE NUMBER
SCROLL CASE
HOUSING
AIR HOUSING
BRAKE HOUSING
HOWEL-BUNGER VALVE PIT
FUNC BY CHK APP
DES
DWN
SPONSOR
REV DATE BY CHK APP
SCALE:
DWG NO REV
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
CO2 SYSTEM AS BUILT
MDL06/25/07
TJN GHL
NONE
D-7140-6
BW/RS
WALL
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
EQUIPMENT LOCATIONS & DRAINAGE
SOUTHWEST SECTION VIEW
CO2 DISCHARGE AUDIBLE/STROBE ALARM
4-C
1-G1
FOR BIDDING PURPOSES
DOWN
DN.
LUBE OIL
STORAGE TANKS
COç2æ BOTTLES
TURBINE PIT
BATTERY ROOM
GOVERNOR
ACTUATOR
DRIP OIL
TANK
GROUND
REACTOR
SWITCHGEAR
MOTOR CONTROL
CENTER
TURBINE DECK PLAN
M.H.
M.H.
STORAGE ROOM
LUBE OIL
NOT TO SCALE
PRESSURE TANK
GOVERNOR
H ç æ
O I L
ELEV. 2014.00
ELEV. 2028.50
ELEV. 1998.00
THIS PLAN
PLANE OF
KEY PLAN
FIGURE 4B
LEGEND
OIL
Hç2æ0
WATER DRAIN LINES
OIL DRAIN LINES
TELEPHONE LOCATIONS
FIRE EXTINGUISHER LOCATIONS
GENERATOR DECK
TURBINE DECK
DRIP OIL TANK
SUMP
FIRE WATER
SUMP
COOLING WATER
PIT
UNWATERING
BATTERY BANK
COç2æ BOTTLES
UNWATERING PIT
ELEV. 1978.25
GAL.
F/ GENERATOR
F/ OIL ROOM
O I L
H ç æ
O I L
Hç2æ0
OIL INTERCEPTOR
EMERGENCY
LADDER/HATCH
GAL.
16" DIKE
M.H.
ESCAPE LADDER/HATCH
COMPRESSOR
TANK
SINK
EYE-WASH
CONFINED SPACE LOCATIONS
DOORDOOR
CS-42
CS-43
CS-44
CS-31
CS-39
CS-32
CS-38A
CS-38B
CS-40
CS-33
CS-00
CONFINED SPACE NUMBER
M.H.
CS-41
SCROLL CASE
BUTTERFLY VALVE ACCESS
HOWEL-BUNGER
VALVE PIT
SPILL KIT
SK
SK
FUNC BY CHK APP
DES
DWN
SPONSOR
REV DATE BY CHK APP
SCALE:
DWG NO REV
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
CO2 SYSTEM AS BUILT
MDL06/25/07
TJN GHL
NONE
D-7140-7
BW/RS
WALL
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
TURBINE DECK, EQUIPMENT LOCATIONS & DRAINAGE
PLAN VIEW
3-C
1-O
1-C
1-G1
CO2 DISCHARGE AUDIBLE/STROBE ALARM
UP
SCROLL CASE
UNWATERING
PIT
COOLING WATER
SUMP
FIRE WATER
SUMP
DRIP OIL
TANK
DRAFT TUBE ACCESS
M.H.
M.H.
NOT TO SCALE
VALVE PIT
DRAIN
DRIP OIL TANK
BYPASS
TURBINE DECK
GENERATOR DECK
FIRE EXTINGUISHER LOCATIONS
TELEPHONE LOCATIONS
OIL DRAIN LINES
WATER DRAIN LINES
Hç2æ0
OIL
LEGEND
FIGURE 4C
KEY PLAN
PLANE OF
THIS PLAN
INSPECTION GALLERY ELEV. 1998.00'
OIL FROM GENERATOR BRGS.
ELEV. 1998.00
ELEV. 2028.50
ELEV. 2014.00
O
I
L
Hç2æ0
O I L
H ç æ
H ç æ
WATER FROM WICKET GATE
PACKING GLAND
FROM OIL
INTERCEPTOR
O I L
H ç æ
ELEV. 1978.25
UNWATERING PIT
CONFINED SPACE LOCATIONS
H ç æ O
DRAIN
DOORDOOR
CS-39
CS-44
CS-43
CS-42
CS-31
CS-40
CS-00
CONFINED SPACE NUMBER
BUTTERFLY VALVE ACCESS
HOWEL-BUNGER
VALVE PIT
FUNC BY CHK APP
DES
DWN
SPONSOR
REV DATE BY CHK APP
SCALE:
DWG NO REV
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
CO2 SYSTEM AS BUILT
MDL06/25/07
TJN GHL
NONE
D-7140-8
BW/RS
WALL
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
ACCESS DECK, EQUIPMENT LOCATIONS & DRAINAGE
PLAN VIEW
CO2 DISCHARGE AUDIBLE/STROBE ALARM
2-C
TB1
1. BA-H
2. BA-N
3. BA-G
4.
5.
6. BA-7
7. BA-8
8.
9.
13. BA-11
14. BA-12
15. BA-15
16. BA-16
17. BA-21
18. BA-22
19. BA-23
20. BA-24
18.
19.
20.
1.
2.
3.
4.
5.
6.
7. AA-6
8. AA-7
9.
10.
11. AA-13
12. AA-14
13. BA-27
14.
15. AA-15
16. AA-16
17.
18.
19.
20.
21. AA-17
22. AA-18
23. AA-19
24. AA-20
25.
26.
27. BA-30, BA-13
28.
29.
30. BA-27
31.
32.
33.
34.
35.
36.
12 VDC
7 AH
BATTERY
F2 BATTERY FUSE
12 VDC
7 AH
BATTERY
G
H N N
H
F2
F1
PUSH TO RESET
CIRCUIT BREAKER
SN-7-022-0126
TYPE AGC-4
TROUBLE
SILENCE
ALARM
SILENCE
ALARM
AC POWER
CHEMETRON
MICRO 1-EV
POWER SUPPLY
100 WATT 24 VOLT
BATTERY
TROUBLE
Y
R
GENERAL
PANEL
GROUND
FAULT
TROUBLE
TROUBLE
Y
Y
Y
R
R
R
1 AMP AGC
+3
AUX 1
BUZZER
AUX 2
+1 -2
ZONE 2
SOL 3
SOL 2
SOL 1
ZONE 1
-6-4 +5 +7 -8
F1 AC POWER
AMPS
Y
NC34
AUX
RELAY
AUX 2
OUT
C
NO
RELAY
AUX
OUT
AUX 1
RELAY
ALARM
ALARM
NO
C
NC
NO
C
C
NC
SOLENOID
XXXX
F7 F6 F4F5 F3
VOLTS
SECONDS
MINUTES
Y
Y
Y
SWITCH
DISCONNECT
1.5 AMP AGC
ABORTMANUAL
DISCHG
-10+9 +11 -12
1 AMP
AUX POWER
CKT BREAKER
ALARM 2
ALARM 1
SOL 2
SOL 1
TROUBLE
TROUBLE
RELAY
NO
NC
+23
-24
-22
+21
ALARM 2
SOL 3
24VDC ALARM 1
+13 -14 -16+15 +17
+19
-20
-18
63C1
5C1
WHEELOCK MT-2475W
20CI
20CS
AA
BA
5C2
CHEMETRON MICRO 1-EV CO2 CONTROL PANEL
BA
R D
W H
G N
BK
RD
B K
B K
R D
B K
R D
B K
R D
R D
V A C
N E U T R A L
G N D
63C1-2
63C1-1
C
C
C
C
G
G
C
C
S E E
D
H. AA-1
N. AA-2
G. AA-3
RD
CTB1-1
BK
CTB1-2
RD
5C1-6
BK
TB1-20
RD
5C2-6
BK
TB1-18
RD
TBA-18
BK
TBA-19
1-G1
RD
TB1-15
BK
TB1-16
RD
TB1-13
BK
TB1-14
RD
5C1-1
BK
5C1-2
RD
BK
5C2-1
5C2-2
2.7K OHM
1/2 W
EOLR
RD
TB1-8
BK
TB1-9
PANEL (SEE D-31157)
#18 AWG TO AUX RELAY
R D
W H
G N
T B O
T B O
T B O
A W G
S E E
D
87GX
49G1
1C1
5C1 & 5C2
AUX 1
AUX 2
ZONE 1
MAN DIS
ABORT
SOL 1
SOL 2
20CI
20CS
ALARM 1
ALARM
TROUBLE
30CX1
30CTX1
63C1
GENERATOR 1 DIFFERENTIAL SHUTDOWN RELAY
GENERATOR 1 THERMAL DETECTOR
GENERATOR 1 MANUAL DISCHARGE SWITCH
CO2 LOCKOUT VALVE POSITION SWITCH
CO2 CONTROL PANEL ALARM ONLY INPUT
CO2 CONTROL PANEL TROUBLE SIGNAL INPUT
CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT
CO2 CONTROL PANEL MANUAL DISCHARGE INPUT
CO2 CONTROL PANEL ABORT DISCHARGE INPUT
CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT
CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT
INITIAL CO2 SOLENOID RELEASE VALVE
SUSTAIN CO2 SOLENOID RELEASE VALVE
CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT
CO2 CONTROL PANEL AUX ALARM OUTPUT
CO2 CONTROL PANEL TROUBLE OUTPUT
GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY
GENERATOR 1 CO2 CONTROL PANEL FAILURE AUX RELAY
GENERATOR 1 CO2 PRESSURE SWITCH
LEGEND
CTB1
2.7K OHM
1/2 W
10K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
AA
BK
RD
63C1-6
63C1-5
B K
R D
T B
T B
C
T O
G E N
T E R M
B O X
A
EOLR
RD
BK
1C1-1
1C1-2
2.7K OHM
1/2 W
EOLR
1C1
BK
CTB1-9
2.7K OHM
1/2 W
EOLR
RD
CTB1-10
RD
TB1-17
RD
20CS-1
RD
TB1-19
RD
20CI-1
T O
O I L
R M
C O
P N L
T B
B U C K E T
S E E
D
A W G
C
C u
T O
M C C
10.
11.
12.
TBA-11
TBA-12
T B A
RD
WH
B K
#18 AWG 3C Cu TO AUX RELAY PANEL (SEE D-31157)
6 8
T O
T B P B A T T P P
C
B K
B K
C S
C I
DESCRIPTION
10K OHM
1/2 W
EOLR
REFERENCE DRAWINGS DRAWING
GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM
OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM
D-31156
D-31140
D-31158
D-31219
D-31157
T B P P L N T P C B L
D E
R D
B K
T O
T B P U N I T C P
C
T B P G E N C C B L
D N
P C
N C
P L C
TO TBP_PROT_PNL2
3/C #14
TBP_GEN_CCBL006
D-38174-E85
C
C
B K
R D
T B A
T B A
G E N
C
A U X
R E L A Y
P A N E L
D
FUNC BY CHK APP
DES
DWN
SPONSOR
DATE:
REV DATE BY CHK APP
SCALE:
DWG NO REV
EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON
IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
6/16/2022 10:47 PM
EWEB WORK ORDER NO. 2001183
AHMED06/26/07
AM DAS
NONE
12/27/06
D-31140
TJN
NICE
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
GENERATOR CO2 FIRE PROTECTION
WIRING DIAGRAM
CONFORMED TO CONSTRUCTION RECORDS SHB CR
02/2023
REV NO. REV DATE REVISION DESCRIPTION DWN STD CHK APP
63C1 49G1
AUX 2 ZONE 1
G E N E R A T O R
D I F F E R E N T I A L
R E L A Y
T H E R M A L
D E T E C T O R S
CHEMETRON MICRO 1-EV CO2 CONTROL PANEL INPUTS
N O R M A L
P O S I T I O N
1C1
5C1
ABORT
M A N U A L
D I S C H A R G E
S W I T C H
L O C K O U T
V A L V E
P O S I T I O N
2.7K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
MANUAL DISCHARGE
ZONE 1 AUX 2
ABORT
SOL 1
SOL 2
C
10K OHM
1/2 W
EOLR
WHEELOCK
MT-2475W
CHEMETRON
MICRO 1-EV
20CI 20CS
CHEMETRON MICRO 1-EV CO2 CONTROL PANEL OUTPUTS
ALARM
30CX1
A U X I L L A R Y
A L A R M
O U T P U T
TROUBLE
30CTX1
T R O U B L E
A L A R M
O U T P U T
1-G1
CHEMETRON
MICRO 1-EV
ALARM 1
ALARM 1
ALARM 1
ALARM 1
CHEMETRON
MICRO 1-EV
CHEMETRON
MICRO 1-EV
5C2
AIR HOUSING
DOOR SWITCHES
TB1
TB1
TB1
TB1
TBA
TB1
TB1
TB1
TB1
CTB1
CTB1
CTB1
CTB1
CTB1
CTB1
CTB1
CTB1
A
B
A
B
CHEMETRON
MICRO 1-EV
CTB1
CTB1
CTB1
CTB1
CTB1
CTB1
87GX
49G1
1C1
5C1 & 5C2
AH1N
AUX 1
AUX 2
ZONE 1
MAN DIS
ABORT
SOL 1
SOL 2
20CI
20CS
ALARM 1
ALARM
TROUBLE
30CX1
30CTX1
63C1
GENERATOR DIFFERENTIAL SHUTDOWN RELAY
GENERATOR 1 THERMAL DETECTOR
GENERATOR 1 MANUAL DISCHARGE SWITCH
CO2 LOCKOUT VALVE POSITION SWITCH
GENERATOR 1 NORTH AIR HOUSING DOOR SWITCH
CO2 CONTROL PANEL ALARM ONLY INPUT
CO2 CONTROL PANEL TROUBLE SIGNAL INPUT
CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT
CO2 CONTROL PANEL MANUAL DISCHARGE INPUT
CO2 CONTROL PANEL ABORT DISCHARGE INPUT
CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT
CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT
INITIAL CO2 SOLENOID RELEASE VALVE
SUSTAIN CO2 SOLENOID RELEASE VALVE
CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT
CO2 CONTROL PANEL AUX ALARM OUTPUT
CO2 CONTROL PANEL TROUBLE OUTPUT
GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY
GENERATOR 1 CO2 CONTROL PANEL FIALURE AUX RELAY
GENERATOR 1 CO2 PRESSURE SWITCH
LEGEND
TBA
C O
P R E S S U R E
S W I T C H
TBA
24VDC+
24VDC-
CHEMETRON
MICRO 1-EV
POWER SUPPLY
120VAC-
120VAC+
H
N
G
SINGLE POLE
DISCONNECT
IN MCC
SEE D-7135
TO OIL RM CO2
CONTROL PANEL
(SEE D-31158)
TB1
TB1
TB1
GND
AH1N
AH1S
TB1
AH1S GENERATOR 1 SOUTH AIR HOUSING DOOR SWITCH
I N
P A R A L L E L
I N
A I R
H O U S I N G
ZONE 1 MAN DIS
5C1
5C2
C03
C04
20A
20A
DESCRIPTION
REFERENCE DRAWINGS DRAWING
GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM
OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM
D-31156
D-31140
D-31158
D-31219
D-31157
I N I T I A L
C O
S O L E N O I D
R E L E A S E
V A L V E
S U S T A I N
C O
S O L E N O I D
R E L E A S E
V A L V E
A L A R M
R E V E R S E
P O L A R I T Y
O U T P U T
A U X
C O
D I S C H A R G E
R E L A Y
A U X
C O N T R O L
P A N E L
F A I L U R E
R E L A Y
G E N E R A T O R
C O
D I S C H A R G E
H O R N S T R O B E S
30CXT1
TB4-30
TBA-7
GEN CO2
CONTROL PANEL
FAILURE
1.2.3.13
30CX1
TB4-29
TBA-6
GEN CO2
DISCHARGE
ALARM
1.2.3.12
PLC
D-38174-N16
TO 30CXTO
D-31158
11G1A
OUT302
MANUAL
DISCHARGE
C03
C04
11G1B
OUT302
SW5A
SW5A
SW5B
SW5B
CO2+
CO2
63C1
TB4-20
TB1-9
GEN CO2
PRESSURE
SWITCH
1.2.3.3
TB2-7
TB1-8
11G1A, 11G1B MULTI-FUNCTION GENERATOR 1 RELAYS
VERIFY
FUNC BY CHK APP
DES
DWN
SPONSOR
DATE:
REV DATE BY CHK APP
SCALE:
DWG NO REV
EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON
IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
6/16/2022 10:49 PM
EWEB WORK ORDER NO. 2001183
AHMED06/25/07
AM DAS
NONE
12/27/06 D-31156
TJN
NICE
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
GENERATOR CO2 FIRE PROTECTION
SCHEMATIC DIAGRAM
CONFORMED TO CONSTRUCTION RECORDS SHB CR
02/2023
30CXO
A. TBA-9
B. CR2-B, TBA-10
1.
2.
3.
4. TBA-4
5.
6. CR3-6, TBA-17
7. CR2-7,
8.
9. CR3-9, TBA-14
CR1
CR1
30CX1
A. TBA-12
B. CR4-B, TBA-13
1.
2.
3.
4. TBA-6
5.
6. CR1-6
7. CR2-7, CR4-7
8.
9. CR1-9
CR3
CR3
30CXTO
A. TBA-8
B. CR1-B
1.
2.
3.
4. TBA-5
5.
6.
7. CR1-7, CR3-7
8.
9.
CR2
CR2
30CXT1
A. TBA-11
B. CR3-B
1.
2.
3.
4. TBA-7
5.
6.
7. CR3-7
8.
9.
CR4
CR4
CR1-4
CR2-4
CR3-4
CR4-4
CR2-A
CR1-A
CR1-B
CR4-A
CR3-A
CR3-B
TBA-16
TBA-20
TBA-14
CR1-6
TBA-16
TBA-21
TBA
TBA-15
TBA-19
TBA-24
TBA-25
TBA-22
TBA-23
OR
TB4-8
YL
TB4-9
RD
TB4-29
BL
TB4-30
RD
TBO-10
BK
TBO-11
BL
TBO-12
RD
CTB1-25
BK
CTB1-29
BL
CTB1-14
DCC1-5
DCC1-9
RD
63CO-3
BK
63CO-4
RD
63C1-3
BK
63C1-4
BK
1-C (-)
RD
1-C (+)
BK
3-C (-)
RD
3-C (+)
BK
4-C (-)
RD
4-C (+)
DCC1-1
DCC1-4
RD
125VDC - TB1-4
BK
NEUTRAL - TB1-5
WHEELOCK MT-2475W
RD
TBA-21
BK
TBA-20
1-C
WHEELOCK MT-2475W
2-C
WHEELOCK MT-2475W
RD
TBA-23
BK
TBA-22
3-C
30CXO
30CX1
30CTXO
30CTX1
63CO
63C1
OIL ROOM CO2 DISCHARGE AUX ALARM RELAY
GENERATOR CO2 DISCHARGE AUX ALARM RELAY
OIL ROOM CO2 CONTROL PANEL FIALURE AUX RELAY
GENERATOR CO2 CONTROL PANEL FIALURE AUX RELAY
OIL ROOM CO2 PRESSURE SWITCH
GENERATOR CO2 PRESSURE SWITCH
LEGEND
CR1-9
TBA-18
TBA-19
TBA-17
TBA-22
TBA-23
TBA-20
TBA-21
5(OUT).
4(IN-).
1(IN+).
9(OUT-).
CONVERTER
125VDC-24VDC
VICOR
TBA-14
TBA-2
TBA-1
TBA-15
DCC1
TO AUX
RELAY PANEL
TO AUX
RELAY PANEL
GEN CO2 PANEL TERM BLOCK
(SEE D-31140)
TO OIL RM CO2 PANEL
(SEE D-31159)
TO GEN CO2 PANEL
(SEE D-31140)
TO OIL RM CO2 PRESS
SWITCH (SEE D-31159)
TO GEN CO2 PRESSURE
SWITCH (SEE D-31140)
BK
TB2-4
7/C #14
DESCRIPTION
NOTES
1. AUX CO2 RELAYS, TBA, & DCC2 CONTAINED IN 12"X12"X6" ENCLOSURE
MOUNTED TO RIGHT OF GEN CO2 PANEL.
2. VICOR DC/DC CONVERTER IS 100W, HORN/STROBES HAVE 5W MAX POWER
CONSUMPTION
3. ALARMS LOCATED IN PLANT AND WILL ALARM ON DISCHARGE OF CO2 IN EITHER
GENERATOR OR OIL ROOM.
4. TBA-1 & TBA-2 ARE DISCONNECTABLE 10 AMP FUSES.
5. COMMON ALARMS LOCATED IN PLANT AND WILL ALARM UPON DISCHARGE OF
CO2 IN EITHER GENERATOR OR OIL ROOM.
6. FOR LOCATIONS OF COMMON ALARMS SEE D-7140-6 THROUGH D-7140-8 FOR
PLANT PLAN VIEW.
FU10A
FU10A
WHEELOCK MT-2475W
RD
TBA-5
BK
TBA-4
4-C
TO AUX
RELAY PANEL
CR1-7
1-C DOOR ENTRY CO2 DISCHARGE COMMON ALARM
2-C
INSPECTION GALLERY CO2 DISCHARGE COMMON ALARM
3-C TURBINE ROOM CO2 DISCHARGE COMMON ALARM
4-C GENERATOR AIR HOUSING CO2 DISCHARGE COMMON ALARM
TO PLANT CO2 SYSTEM
COMMON ALARMS SEE
D-7140-6 THROUGH
D-7140-8 FOR LOCATIONS
RD
BK
2-C (-)
2-C (+)
RD
BK
TO TBA-20
TO TBA-21
9B
7A
9B
7A
9B
7A
9B
7A
REFERENCE DRAWINGS DRAWING
GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM
OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM
D-31156
D-31140
D-31158
D-31219
D-31157
1.2.2.7
1.2.2.8
1.2.2.12
1.2.2.13
PLC+
TBP_BLDG_CCBL001
TO TBP_UNIT1_CP
D-38174-N52
TBA-3
FUNC BY CHK APP
DES
DWN
SPONSOR
DATE:
REV DATE BY CHK APP
SCALE:
DWG NO REV
EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON
IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT
INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.
6/16/2022 10:27 PM
EWEB WORK ORDER NO. 2001183
AHMED06/26/07
AM DAS
NONE
12/27/06 D-31157
TJN
NICE
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
CO2 FIRE PROTECTION AUX RELAY PANEL
WIRING DIAGRAM
CONFORMED TO CONSTRUCTION RECORDS SHB CR
02/2023
TB1
1. BA-H
2. BA-N
3. BA-G
4.
5.
6. BA-7
7. BA-8
8.
9.
13. BA-11
14. BA-12
15. BA-15
16. BA-16
17. BA-21
18. BA-22
19. BA-23
20. BA-24
18.
19.
20.
1.
2.
3.
4.
5.
6.
7. AA-6
8. AA-7
9.
10.
11. AA-13
12. AA-14
13. BA-27
14.
15. AA-15
16. AA-16
17.
18.
19.
20.
21. AA-17
22. AA-18
23. AA-19
24. AA-20
25.
26.
27. BA-30, BA-13
28.
29.
30. BA-27
31.
32.
33.
34.
35.
36.
F2 BATTERY FUSE
G
H N N
H
F2
F1
PUSH TO RESET
CIRCUIT BREAKER
SN-7-022-0126
TYPE AGC-4
TROUBLE
SILENCE
ALARM
SILENCE
ALARM
AC POWER
CHEMETRON
MICRO 1-EV
POWER SUPPLY
100 WATT 24 VOLT
BATTERY
TROUBLE
Y
R
GENERAL
PANEL
GROUND
FAULT
TROUBLE
TROUBLE
Y
Y
Y
R
R
R
1 AMP AGC
+3
AUX 1
BUZZER
AUX 2
+1 -2
ZONE 2
SOL 3
SOL 2
SOL 1
ZONE 1
-6-4 +5 +7 -8
F1 AC POWER
AMPS
Y
NC34
AUX
RELAY
AUX 2
OUT
C
NO
RELAY
AUX
OUT
AUX 1
RELAY
ALARM
ALARM
NO
C
NC
NO
C
C
NC
SOLENOID
XXXX
F7 F6 F4F5 F3
VOLTS
SECONDS
MINUTES
Y
Y
Y
SWITCH
DISCONNECT
1.5 AMP AGC
ABORTMANUAL
DISCHG
-10+9 +11 -12
1 AMP
AUX POWER
CKT BREAKER
ALARM 2
ALARM 1
SOL 2
SOL 1
TROUBLE
TROUBLE
RELAY
NO
NC
+23
-24
-22
+21
ALARM 2
SOL 3
24VDC ALARM 1
+13 -14 -16+15 +17
+19
-20
-18
63C1
5C1
WHEELOCK MT-2475W
20CI
20CS
AA
BA
5C2
CHEMETRON MICRO 1-EV CO2 CONTROL PANEL
BA
R D
W H
G N
BK
RD
B K
B K
R D
B K
R D
B K
R D
R D
V A C
N E U T R A L
G N D
63C1-2
63C1-1
C
C
C
C
G
G
C
C
S E E
D
H. AA-1
N. AA-2
G. AA-3
RD
CTB1-1
BK
CTB1-2
RD
5C1-6
BK
TB1-20
RD
5C2-6
BK
TB1-18
RD
TBA-18
BK
TBA-19
1-G1
RD
TB1-15
BK
TB1-16
RD
TB1-13
BK
TB1-14
RD
5C1-1
BK
5C1-2
RD
BK
5C2-1
5C2-2
2.7K OHM
1/2 W
EOLR
RD
TB1-8
BK
TB1-9
PANEL (SEE D-31157)
#18 AWG TO AUX RELAY
R D
W H
G N
T B O
T B O
T B O
A W G
S E E
D
87GX
49G1
1C1
5C1 & 5C2
AUX 1
AUX 2
ZONE 1
MAN DIS
ABORT
SOL 1
SOL 2
20CI
20CS
ALARM 1
ALARM
TROUBLE
30CX1
30CTX1
63C1
GENERATOR 1 DIFFERENTIAL SHUTDOWN RELAY
GENERATOR 1 THERMAL DETECTOR
GENERATOR 1 MANUAL DISCHARGE SWITCH
CO2 LOCKOUT VALVE POSITION SWITCH
CO2 CONTROL PANEL ALARM ONLY INPUT
CO2 CONTROL PANEL TROUBLE SIGNAL INPUT
CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT
CO2 CONTROL PANEL MANUAL DISCHARGE INPUT
CO2 CONTROL PANEL ABORT DISCHARGE INPUT
CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT
CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT
INITIAL CO2 SOLENOID RELEASE VALVE
SUSTAIN CO2 SOLENOID RELEASE VALVE
CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT
CO2 CONTROL PANEL AUX ALARM OUTPUT
CO2 CONTROL PANEL TROUBLE OUTPUT
GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY
GENERATOR 1 CO2 CONTROL PANEL FAILURE AUX RELAY
GENERATOR 1 CO2 PRESSURE SWITCH
LEGEND
CTB1
2.7K OHM
1/2 W
10K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
2.7K OHM
1/2 W
EOLR
AA
BK
RD
63C1-6
63C1-5
B K
B K
G G
G G
S E E
D
C
T O
C A B I N E T
U N I T
C
T O
G E N
T E R M
B O X
A
EOLR
RD
BK
1C1-1
1C1-2
2.7K OHM
1/2 W
EOLR
1C1
BK
CTB1-9
2.7K OHM
1/2 W
EOLR
RD
CTB1-10
RD
TB1-17
RD
20CS-1
RD
TB1-19
RD
20CI-1
T O
O I L
R M
C O
P N L
T B
B U C K E T
S E E
D
A W G
C
C u
T O
M C C
10.
11.
12.
TBA-11
TBA-12
T B A
RD
WH
B K
#18 AWG 3C Cu TO AUX RELAY PANEL (SEE D-31157)
P
N
S E E
D
T O
D C
P A N E L
B K
B K
C S
C I
DESCRIPTION
10K OHM
1/2 W
EOLR
REFERENCE DRAWINGS DRAWING
GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM
OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM
CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM
D-31156
D-31140
D-31158
D-31219
D-31157
BATTERY
12 VDC
7AH
BATTERY
12 VDC
7AH
G E N
C O
A U X
R E L A Y
P A N E L
D
T B A
T B A
ORIGINAL DWG NO.: D-31140
FUNC BY CHK APP
DES
DWN
EWEB WORK ORDER NO.
DATE:
REV DATE DWN CHK APP
DWG NO:
REV
6/
/2
5:
P
M H
ER
RE
RA
, A
LE
X
A.
A B C D E F G H I J K L M N
STD
STANDARDS CHECK
EWEB PROJECT SHEET NO:
SCALE:
REVISION DESCRIPTION
LINE IS 2 INCHES
AT FULL SIZE
(IF NOT 2" - SCALE ACCORDINGLY)
REV NO.
2001183
AS SHOWN
05/31/22
D-38174-D16
AHMED AM DAS
JKS AM DAS
GENERATION SYSTEMS
TRAIL BRIDGE POWER PLANT
GENERATOR CO2 FIRE PROTECTION
WIRING DIAGRAM
DEMOLITION
CONFORMED TO CONSTRUCTION RECORDS SHB CR
02/2023
30CXO
A. TBA-9
B. CR2-B, TBA-10
1.
2.
3.
4. TBA-4
5.
6. CR3-6, TBA-17
7. CR2-7, TBA-1
8.
9. CR3-9, TBA-14
CR1
CR1
30CX1
A. TBA-12
B. CR4-B, TBA-13
1.
2.
3.
4. TBA-6
5.
6. CR1-6
7. CR2-7, CR4-7
8.
9. CR1-9
CR3
CR3
30CXTO
A. TBA-8
B. CR1-B
1.
2.
3.
4. TBA-5
5.
6.
7. CR1-7, CR3-7
8.
9.
CR2
CR2
30CXT1
A. TBA-11
B. CR3-B
1.
2.
3.
4. TBA-7
5.
6.
7. CR3-7
8.
9.
CR4
CR4
CR1-4
CR2-4
CR3-4
CR4-4
CR2-A
CR1-A
CR1-B
CR4-A
CR3-A
CR3-B
TBA-16
TBA-20
TBA-14
CR1-6
TBA-16
TBA-21
TBA
TBA-15
TBA-19
TBA-24
TBA-25
TBA-22
TBA-23
RD
AK-11
BK
AK-10
BL
AK-9
OR
AK-8
RD
TBO-10
BK
TBO-11
BL
TBO-12
RD
CTB1-25
BK
CTB1-29
BL
CTB1-14
DCC1-5
DCC1-9
RD
63CO-3
BK
63CO-4
RD
63C1-3
BK
63C1-4
BK
1-C (-)
RD
1-C…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .