Bid Notice-Trail Bridge Fire Detection System.pdf

PDF 9 MB Posted

Attached to
Trail Bridge Fire Detection System
Solicitation number
26-111-PW
Issued by
Lane County, Mcminnville City, Oregon

About this file

Summary

This Formal Invitation to Bid (ITB No. 26-111-PW) issued by the Eugene Water & Electric Board (EWEB) solicits construction services for the design, provision, and installation of a fire detection system at EWEB's Trail Bridge hydroelectric powerhouse located in Linn County, Oregon. The project encompasses aspirating smoke detection systems, CO2 fire protection equipment, control panels, alarm systems, electrical wiring, and associated installation labor. A mandatory pre-bid conference is scheduled for Friday, May 29, 2026, at 10:00 AM PT at the Carmen Smith Office parking lot (59727 Hwy 126, McKenzie Bridge, OR 97413); attendance is required for general contractor bidders unless they have attended a pre-bid conference at Trail Bridge within the past 12 months. Electronic bid submissions via the OregonBuys website are required and must be received by Tuesday, June 9, 2026, at 2:00 PM PT. The Board approval is estimated for July 7, 2026, with a Notice to Proceed targeted for July 10, 2026.

Bidders must meet specific minimum qualifications including five years of experience performing substantially similar work on projects valued at least $75,000, with references from three completed projects. The fire protection engineer must be licensed in Oregon, and the project superintendent must provide supervisory performance information for three similar projects completed since 2008. Bids exceeding $100,000 must include a certified bid bond equal to 10 percent of the total bid amount as security. The successful contractor will be required to provide performance and payment bonds equal to 100 percent of the contract award if the bid price exceeds $100,000. All bidders must comply with Oregon BOLI prevailing wage requirements and Construction Contractors Board (CCB) registration. A First-Tier Subcontractor Disclosure Form must be submitted either with the bid via OregonBuys or by email to the Purchasing Contact within two working hours of the bid closing deadline. The single point of contact for all questions is Wendy Lopez, EWEB Purchasing Contact, at wendy.lopez@eweb.org or (541) 685-7150.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rev 9/24

Eugene Water & Electric Board

FORMAL INVITATION TO BID

For

Trail Bridge Fire Detection System

Bid No.: 26-111-PW Closing Date: Tuesday, June 9th, 2026 Time: 2:00 PM PT Description: EWEB requires construction services to provide and install a fire detection system at EWEB’s Trail Bridge hydroelectric powerhouse in Linn County.

Pre-bid Conference: YES -Mandatory* Date: Friday, May 29th, 2026 Time: 10:00 AM PT Location: Eugene Water & Electric Board, Carmen Smith Office parking lot, 59727 Hwy 126, McKenzie Bridge, OR 97413 *See additional details in Section 00200

Purchasing Contact: Wendy Lopez Phone: (541) 685-7150 Email: wendy.lopez@eweb.org

This is a COMPETITIVE SEALED PROCUREMENT. ELECTRONIC PROPOSALS SUBMITTED VIA THE OREGONBUYS

BID SITE ARE REQUIRED. EMAILED SUBMITTALS WILL NOT BE ACCEPTED.

To ensure your submission is received prior to the closing date and time, it is recommended that you begin the submittal process on the OregonBuys website at least 24-hours prior to the closing date and time listed above

SINGLE POINT OF CONTACT: There will be only one point of contact for the entire Invitation to Bid process. The contact point is the EWEB Purchasing Office, and the contact person is the Purchasing Contact listed above, unless otherwise stated. Any questions or issues that may arise regarding the specifications, the bidding process, and/or the award process shall be directed to the Purchasing Contact listed above. EWEB’s official response to any questions or requests will be addressed via the Addendum process.

FOR MORE INFORMATION please refer to Section 00200 “Instructions to Bidders”.

TABLE OF CONTENTS

This solicitation is organized and written in a manner consistent with the Construction Specification Institute (CSI) format. The following is a list of all Divisions, Sections, and Details that are included in the Project Manual.

DIVISION 0 - BIDDING DOCUMENTS & CONTRACT FORMS

00100 Invitation to Bid - Legal Advertisement

00200 Instructions to Bidders

00300 Information Available to Bidders

00400 Bid Form

00430-A First-tier Sub-Contractor Disclosure Form

00430-B Drug Testing Requirements

00450 Minimum Qualifications

00610 Bid, Performance, & Payment Bonds

00620-A Completion Notices (Contractor Affidavit, Certificate of Substantial Completion, Notice of Final

Completion)

00620-B Certificate for Payment

00700 General Conditions (Public Works)

00830 BOLI Prevailing Wage Rates

00900 Addenda / Modifications to Solicitation

00930 Change Order

00930-FCO Field Change Order

DIVISION 1 - SPECIFICATIONS

011113 Summary of Work

011216 Work Sequence and Schedule

013119 Project Meetings

013000 Submittals

013333 Reference Forms

013529 Health, Safety, and Emergency Response Procedures

014300 Quality, Testing, and Equipment Protection

017700 Contract Closeout

017823 Training and Operation and Maintenance Data

017836 Warranty

260511 Electrical

283133 Fire Detection and Alarm Interfaces

DRAWINGS:

1. Electrical Contract Drawings

EWEB

Drawing No. Description

38174-E2 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE FLOOR EL 2014.0 –

ELECTRICAL EQUIPMENT PLAN

38174-E30 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – SCHEMATICS – UNIT 1 DPAC

(DPAC1)

38174-E31 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – SCHEMATICS – BALANCE-OF-PLANT

DPAC (DPAC2)

38174-E88 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – RTAC PANEL – PANEL WIRING

DIAGRAM – RTAC PANEL SH 3

38174-N15 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– SCHEMATIC DIAGRAM – UNIT AND

PLANT PLC SH 6

38174-N52 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– PANEL WIRING DIAGRAM – UNIT

AND PLANT PLC PANEL SH 3

38174-N53 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT –– PANEL WIRING DIAGRAM – UNIT

AND PLANT PLC PANEL SH 4

38174-E252 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – DC POWER PANELS – CONNECTION

DIAGRAM

2. Structural & Mechanical Contract Drawings

EWEB

Drawing No. Description

D-43624-M01 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TRAIL BRIDGE POWERHOUSE

TURBINE-GENERATOR - ASPIRATING SMOKE DETECTION SYSTEM – NETWORK SAMPLING

PLAN

FD-6156-3 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT –

TURBINE FLOOR

FD-6156-5 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT -

TRANSVERSE SECTION AT CENTERLINE OF UNIT

FD-6156-7 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERAL ARRANGEMENT -

LONGITUDINAL SECTION AT CENTERLINE OF UNIT

Additional Attachments:

1. Preferred Location of Panels

Rev. 09/24 Section 00100

ADVERTISEMENT

ITB 26-111-PW

Trail Bridge Fire Detection System

The Eugene Water & Electric Board (EWEB) requests bids for construction services to provide and install a fire detection system at EWEB’s Trail Bridge hydroelectric powerhouse in Linn County.

Bidders shall meet Minimum Qualifications for Contractor and specialty sub-contractors, as defined in the bid packages. In summary, these Minimum Qualifications include:

• Contractor:

• Must have been in business performing substantially similar work to the scope of this project for at least the last five (5) years for projects worth at least $75,000. Contractor will provide a description of how they meet this requirement and in addition, provide references for three (3) projects that demonstrate substantially similar work.

• The Fire Protection Engineer must be licensed in the State of Oregon.

• Supervisor/Superintendent

• The Project Superintendent must be able to provide past Supervisory performance information for at least three (3) projects completed in the past five (5) years since no earlier than year 2008, worth at least $75,000, similar in nature to the scope of this project.

• Sub-Contractor:

• The Sub-Contractor must have been in business performing substantially similar work to the scope of this project for at least five (5) years for projects worth at least $75,000.

Contractor will provide a description of how the sub-contractor meets this requirement and in addition, provide references for three (3) projects that demonstrate substantially similar work.

Bidders shall comply with all BOLI and CCB requirements, as outlined in www.oregon.gov/BOLI and http://www.oregon.gov/ccb/Pages/index.aspx.

The bid package may be inspected online on the State of Oregon's bid site ("Oregon Buys"):

https://oregonbuys.gov/bso/. (On OregonBuys home page, search for bid # 26-086-PW. For navigation help, please call 1-855-800-5046.)

Bid Submission Deadline: Bids shall be submitted on the State of Oregon - OregonBuys website (https://oregonbuys.gov/bso/), before 2:00 PM Pacific Standard Time, on Tuesday, June 9th, 2026. Bids will be opened immediately thereafter and recorded. Emailed bids will not be accepted.

First-tier Sub-contractor Disclosure Form (Section 00430) shall be submitted either with Bid submission via OregonBuys, or via email to the Purchasing Contact listed above by 4:00 PM PST, on Tuesday, June 9th, 2026.

Rev. 09/24 Section 00100

Bids and required Sub-contractor Disclosure Form received after their respective deadlines will NOT be considered.

A mandatory pre-bid meeting will be held at 10:00 a.m., on Friday, May 29th, 2026, at EWEB’s Trail Bridge Plant. Since the Trail Bridge Plant does not have its own address, bidders shall meet at the Carmen Smith Office parking lot located at, 59727 HWY 126, McKenzie Bridge, OR 97413. Attendance is mandatory for General Contractor Bidders. Bidders who have visited or attended a pre-bid conference at the Trail Bridge Power Plant (for fire detection systems) in the last 12 months, do not need to attend again. The prior attendance will satisfy the mandatory pre-bid attendance for this ITB. Sub-contractors are encouraged to attend, but their attendance is not mandatory.

By submission of a bid, the Bidder agrees to comply with the provisions of 279C.800 through 279C.870 relating to the latest version of State of Oregon’s BOLI Prevailing Wage Rates.

EWEB may cancel the Invitation to Bid or reject any or all bids pursuant to EWEB Rule 5-0440.

Single point of contact: Submit all technical, bidding, website access, and contract questions to the Purchasing Contact, Wendy Lopez, in writing via email at wendy.lopez@eweb.org. DO NOT contact the project team without prior approval by the Purchasing Contact.

BY:

Wendy Lopez, EWEB Purchasing Contact ISSUED: May 21, 2026

PUBLISHED:

Eugene Water & Electric Board Section 00200

Rev 09-2024 Section 00200

INSTRUCTIONS TO BIDDERS

INFORMATION OF RECORD

The official source of information for this project until the Intent to Award is posted is located at the State of Oregon's bid site, located at: https://oregonbuys.gov/bso/. IT IS

THE SOLE RESPONSIBILITY OF THE BIDDER TO CHECK THE WEBSITE ON A TIMELY BASIS.

BID SCHEDULE

MANDATORY PRE-BID CONFERENCE

A Mandatory pre-bid conference is scheduled for this Invitation to Bid. Bidders are required to attend the mandatory pre-bid conference. Bids will NOT be accepted from Bidders who did not attend the conference. Bidders who have visited, or attended a pre-bid conference at the Trail Bridge Power Plant (for fire detection systems) in the last 12 months, do not need to attend again. The prior attendance will satisfy the mandatory pre-bid attendance for this ITB. Sub-contractors are encouraged to attend, but their attendance is not mandatory.

Pre-bid conference will be held at 10:00am Pacific Time, on Friday, May 29th, 2026 at the Eugene Water & Electric Board, Carmen Smith Office parking lot, 59727 Hwy 126, McKenzie Bridge, OR 97413. The purpose of the conference is to discuss the work to be performed with the prospective offerors and allow them to ask questions concerning the ITB.

Statements Not Binding: Statements made by EWEB at the pre-bid conference do not change the bid document unless EWEB confirms such statements with a written addendum to the bid documents.

1.1 Bid Preparation:

The Eugene Water & Electric Board's environmental policy directs the utility to conduct its business in an environmentally sensitive, sustainable and responsible way. Pursuant to this

Mandatory Pre-Bid Meeting May 29, 2026

Last Day for EWEB to Receive Questions June 2, 2026

Last Day for EWEB to Receive Request for Substitution

June 2, 2026

Last Day for EWEB to Issue Addenda June 4, 2026

Bid Close Date June 9, 2026

Board Approval July 7, 2026

Estimated Date of Notice to Proceed July 10, 2026 policy, Bidder shall submit their bid electronically via the OregonBuys website, https://oregonbuys.gov/bso, Bidders are responsible for all costs they may incur in connection with submitting a bid.

a. Compliance. All bids must be submitted on the Oregon Buys website and received by

EWEB’s Purchasing Department (“EWEB” herein used synonymously with the term "OWNER" as used in the General Conditions) prior to the bid closing time and date. Bids that are received after the bid closing time and date may not be considered.

b. Method of Bidding - Unit and Total Price. The price per item shall be clearly shown in the space provided. The pricing shall be extended to show the total when required. In case of errors in extension, the unit price shall prevail. The written unit price shall prevail over the numerical unit price.

c. Completion. The Bidder shall show in the space, when provided in the bid form, the earliest completion date on which completion of the work can be guaranteed.

Otherwise the Bidder certifies that the work will be complete according to the completion time stated in the bidding documents.

EWEB reserves the right to consider availability and delivery (completion) time in determining award of this Contract.

d. Examination of Plans, Specifications, and Work Site. It is understood that a Bidder, before submitting a bid, has made a careful examination of all plans, specifications and Contract documents, that the Bidder has a complete understanding of the quality and quantity of materials and the character of the work required; and that the Bidder has made a careful examination of the location and conditions of the worksite and the sources of supply for materials.

It is further understood that a bid awarded hereunder is subject to EWEB being able to

(1) comply with all zoning ordinances, or obtain rezoning of the property where necessary; and (2) comply with local building code restrictions and conditions for the structure or structures contemplated in the bid, any or all of which conditions may be contained in the Contract and may result in termination of the Contract, if such conditions are not satisfied. EWEB will in no case be responsible for any loss or for any unanticipated costs that may be incurred by the Contractor as a result of the Contractor's failure to acquire full information about work conditions prior to submitting an offer to perform the work.

e. Substitutions. When a brand name is required by the specifications, all Bidders shall provide the specified product unless an alternative product is allowed per the specifications and in which case, must be of equal quality, merit and utility (as determined in EWEB's sole judgment). Bidders may be required to provide information to EWEB to determine product acceptability prior to award of Contract.

f. Interpretation of Contract Documents. If a Bidder finds discrepancies in errors or omissions from the plans, specifications, or Contract documents, or has doubt as to their meaning, the Bidder shall at once notify EWEB. EWEB will then investigate the validity of the claim and will determine whether an Addendum will be issued (see Protest or Request for Clarification and Changes to the Bid Specifications below).

g. Protest or Request for Clarification/Changes of Specifications and/or Bidding

Requirements (EWEB Rule 5-0260).

Request for Clarification and Changes to the Bid Specifications Prior to the deadline for submitting questions, Bidders may, in writing/email, request clarification of or changes to any bid specifications or Contract terms. Questions and responses that present material information to all Bidders will be posted via formal, written Addendum. EWEB’s clarification to an Offeror, whether orally or in writing, does not change the terms of the solicitation and is not binding on EWEB unless EWEB amends the solicitation document by written Addendum.

Protest of Specifications/Bid Requirements Bidders may, in writing, protest bid specifications or Contract terms and conditions.

Unless stated differently in the bidding document, this written request for change must be received by the Purchasing Contact indicated in the solicitation document no later than ten (10) days prior to the bid closing date. The written protest shall include the reasons for the protest. Email containing bid protests shall be marked as follows:

Bid Specification Protest Bid Number 26-111-PW

h. Filling in Bid Forms. The bid response shall be made on the form provided in the

Invitation to Bid (Section 00400) and as prescribed by EWEB. The Bidder may not alter, modify or change the bid form, except as directed by bid Addendum. Any other form of offer is invalid.

Bids may be rejected if they contain any recapitulation or restating of the work to be done, disclaimers, exceptions or other limitations or stipulations.

i. Bids are Offers. The bid is the Bidder's offer to enter into a contract, which, if the bid is accepted for award, binds the Bidder to a contract and the terms and conditions contained in the Invitation to Bid. A Bidder shall not make the bid contingent upon EWEB's acceptance of specifications or Contract terms that conflict with or are in addition to those required in the bid Documents (except as noted in Time for Bid Acceptance, Section 1.3(g) below).

j. Proprietary Information/Public Disclosure. Materials submitted in response to this

Invitation to Bid and/or the Contract shall become the property of EWEB and are, therefore, subject to public records laws.

In the event that a Bidder desires to claim that portions of its submittal are exempt from public disclosure, under the provisions of ORS 192.501, it is incumbent upon the Bidder to identify those portions in a transmittal letter. The transmittal letter must identify the page and the particular exemption(s) from disclosure upon which the claim is made.

Each page claimed to be exempt from disclosure must be clearly identified, on the page, by the words: "This data constitutes a trade secret under ORS 192.501(2), and shall not be disclosed except in accordance with the Oregon Public Records Law, ORS 192.

If EWEB receives a request for public records disclosure of the information so designated as confidential by Bidder, EWEB will make a reasonable attempt to notify Bidder of the request so Bidder/Contractor may claim any exemption Bidder is entitled to under applicable laws.

The Oregon Public Records Law exempts from disclosure trade secrets, and the exemption from disclosure applies "unless the public interest requires disclosure in the particular instance," ORS 192.501(2). Therefore, non-disclosure of documents or any portion of a document submitted as part of this solicitation may depend upon official or judicial determinations made pursuant to the Oregon Public Records Law.

In any event, EWEB will, to the fullest extent permitted by Oregon Law, assist the Bidder in protecting proprietary information submitted pursuant to this Invitation to Bid.

1.2 Bid Submission:

a. OREGON BUYS ELECTRONIC RESPONSE

All bid documents should be combined into one pdf document except that the First Tier Subcontractor form may be submitted as a separate document.

In order to submit an electronic bid on the OregonBuys website, Bidder must be registered with OregonBuys and able to submit an electronic bid.

If you experience any issues registering, please contact OregonBuys at:

Phone: 1-855-800-5046 Email: support.oregonbuys@das.oregon.gov

Proposer should follow the procedures outlined in https://www.oregon.gov/das/ORBuys/Documents/OregonBuys%20Vendor%20Formal%20 Solicitation%20Response.pdf for electronic submission.

A video presentation on submitting an electronic bid may be found at: Supplier - Submitting a Quote - Overview (periscopeholdings.com)

Terminology specific to the OregonBuys system may be found at:

https://www.oregon.gov/das/ORBuys/Documents/Phase1TerminologyCrosswalk.pdf

b. Bid Submission. The bid response shall be submitted electronically via the OregonBuys website prior to the bid closing time and date stated in the Invitation to Bid/Advertisement (Section 00100). Bids received after the bid closing time and date will not be considered for award. EWEB is not responsible for any delays by transmission errors or interruptions, or for any mis-delivery for any reason.

The First-Tier Subcontractor disclosure must be submitted with the bid response or Bidders must email the disclosure to the Purchasing Contact within two (2) working hours of the bid closing date and time.

c. Addenda. EWEB reserves the right to make changes to the Invitation to Bid and the resulting Contract by written Addenda, prior to the closing time and date. Addenda shall only be issued by EWEB and upon issuance, are incorporated into the Invitation to Bid or the resulting Contract. If required by Addendum, Bidders shall sign and return all Addenda with their bid prior to the bid closing time and date or acknowledge them on the 00400 Bid Form. Addenda shall be obtained electronically at the State of Oregon bid site at: https://oregonbuys.gov/bso/. The Bidder is responsible for ensuring that all Addenda have been acknowledged in their bid response.

d. Security to be Furnished by Each Bidder. When the bid price exceeds $100,000, or when otherwise required by the Contract Documents, the bid shall be accompanied by a certified bid bond in an amount equal to 10% of the total amount of the bid as bid security to ensure that the Bidder, if offered, will execute the Contract agreement and provide the performance bond and payment bond as required. If Bidder wishes to use a cashier's check as the bid bond, Bidder must schedule the delivery of the bid bond with Purchasing Contact prior to bid closing date and time. The lowest responsible and responsive Bidder will be required to provide a performance/payment bond in an amount equal to 100% of the Contract award if the bid price exceeds $100,000 or if otherwise required in the bid documents.

EWEB reserves the right to hold the bid security of all Bidders until the Notice to Proceed is issued or for ninety (90) calendar days after bid closing, whichever is sooner (unless a longer or shorter period is specified in the Invitation to Bid.)

Should the Bidder fail to execute the Contract agreement and furnish the satisfactory performance bond and payment bond after the bid has been accepted, the bid security shall become the property of EWEB.

e. Modification of Bids. If a Bidder wishes to make modifications to a submitted Bid, Bidder must do so through OregonBuys prior to the Bid Due Date and Time stated on the Cover Page for this ITB. For help, please call OregonBuys at 1-855-800-5046.

f. Withdrawal of Bids. If a Bidder wishes to withdraw a submitted Bid, Bidder must do so through OregonBuys, using the “Withdraw Quote” button prior to the Bid Due Date and Time stated on the Cover Page for this ITB. Bids may not be withdrawn after the bid opening date and time. For help, please call OregonBuys at 1-855-800- 5046.

1.3 Bid Review & Award:

a. Bid Review / Minimum Requirements. After bid opening, EWEB may conduct discussions with Bidders for the purpose of clarification to assure full understanding of the bid.

Bidder Responsibility shall partially be based on their response to any minimum requirements established by the specifications and compliance with conditions of the Invitation to Bid and shall be subject to Oregon Revised Statutes (ORS) 279A, 279C, and EWEB Public Contracting Rules, Divisions 1, 2, 5 & 6.

EWEB may reject any bid not in compliance with all prescribed public bidding procedures and requirements and may reject for good cause any or all bids upon a finding of EWEB that it is in the public interest to do so. (ORS 279C.395)

b. Method of Award: EWEB reserves the right to award the BASE BID only, BASE BID and any ALTERNATES [1 through 3] listed, and to reject all Bids.

Award shall be made to one Bidder and one Bidder only.

c. Oregon Preference. Award shall be subject to preference for goods or services that have been manufactured or produced in Oregon if price, fitness, availability and quality are determined by EWEB to be equal (ORS 279A.120).

d. Reciprocal Law. In determining the lowest responsible Bidder, a nonresident Bidder eligible to receive a preference in the state in which the Bidder resides, shall have that same percentage preference added to the bid amount in accordance with EWEB

Rule 5-0390(5)(a).

e. Responsiveness / Responsibility. The Responsiveness and Responsibility of Bidders and of their proposed subcontractors will be considered in making the award.

A “Responsive” bid is one that substantially complies with the Invitation to Bid instructions and requirements.

A “Responsible” Bidder can demonstrate ability to meet the requirements of the project specifications, has the appropriate experience, is legally qualified to do the Work, has the required certifications required, has a satisfactory record of integrity and can meet the other requirements described in Rule 5-0390(2).

f. Certification of Alteration or Erasure. A bid may be rejected if it contains any material alteration or erasure. Nothing in this paragraph shall be construed as allowing the Bidder to alter or otherwise change the form of the offer, the form of the Contract, the conditions of the bid, the specifications, and/or plans attached to the bid documents.

Unless otherwise specifically allowed in the bidding documents, no changes or modifications to an offer may be made after the bid closing date & time.

g. Time for Bid Acceptance. EWEB reserves the right to consider a bid response containing a condition that limits its time for bid acceptance. EWEB may, solely at its option, accept a shorter time for bid acceptance, even though the Invitation to Bid may state a longer period. EWEB reserves the right either to accept or reject the bid response containing the time condition if the bid response is otherwise the lowest responsible and responsive Bidder.

h. Bid Reading and Review. Bids received in response to this Invitation to Bid shall be opened at the scheduled closing date and time by EWEB Purchasing Department.

Bidders wishing to view the Bid Opening remotely shall contact the Purchasing Contact listed above at least 24 hours prior to the bid opening to receive a MS Teams link for the bid opening. Be sure to have MS Teams access available on your computer or mobile phone and follow the provided link.

Award decisions will not be made at bid opening. Only the name of the Bidder(s) and the bid item(s) to be considered for award purposes will be read at the bid opening.

After bid opening, EWEB may conduct discussions with Bidders for the purpose of clarification to assure full understanding of the bid. EWEB will review each bid for Bidder Responsiveness and Responsibility.

EWEB reserves the right to waive or allow correction of minor informalities and errors (EWEB Rule 5-0350).

i. Bid Results. To obtain bid results, notes may be taken at the public bid opening, or a personal inspection may be made of the bid files at a later date, BY APPOINTMENT.

Bid tabulations and bid status shall be obtained electronically at https://oregonbuys.gov/bso/.

j. Right of Rejection. EWEB reserves the right to reject stipulated and/or unbalanced bids that are determined by EWEB to not be in its best interest.

EWEB reserves the right to reject any bid not in compliance with all prescribed public contracting procedures and requirements and may reject for good cause all bids upon a finding that it is in the public interest to do so. (ORS 279C.395)

EWEB may cancel the Invitation to Bid pursuant to EWEB Rule 5-0440.

k. Protest of Award. EWEB Rule 5-0450(4)(a). A Bidder may protest the award or intent to award a Contract if: The Bidder is adversely affected because the Bidder would be eligible to be awarded the Contract in the event that the protest were successful; and the reason for the protest is that all lower bids are nonresponsive; or EWEB has failed to conduct the evaluation of bids in accordance with the criteria or processes described in the solicitation document; or EWEB has abused its discretion in rejecting the protestor's bid as nonresponsive; or EWEB's evaluation of bids or EWEB's subsequent determination of award is otherwise in violation of EWEB Rules.

Eligible Bidders protesting award shall follow the procedures described herein. Protests that do not follow these procedures shall not be considered. This protest procedure constitutes the sole administrative remedy available to Bidders.

1. Protests must be received within seven (7) days after issuance of the notice of intent to award the Contract. EWEB will not consider late protests.

2. All protests must be in writing, signed by the protesting party or an authorized Agent and submitted to the EWEB Purchasing Analyst listed on page 1. The protest must state all facts and arguments on which the protesting party is basing the protest.

3. Only protests stipulating an issue of fact concerning a matter of bias, discrimination or conflict of interest, non-compliance with procedures described in the procurement documents, or EWEB policy shall be considered. Protests based on procedural matters will not be considered.

4. EWEB’s Purchasing Supervisor will review the protest and will email or mail the protesting party a written response within three (3) business days of receipt of the written protest to the email or postal address provided in the bid or proposal. Any written response may be comprised of a determination of the protest, a notice to the protesting party of the need for additional time in which to evaluate the matter, or other notice to the protesting party.

5. If the Purchasing Supervisor’s determination (response) is adverse to the protester, any further appeal of the Purchasing Supervisor’s determination by the party must be submitted in writing to EWEB’s General Manager within three (3) business days of issuance of the Purchasing Supervisor’s determination (response).

6. EWEB’s General Manager will review any appeal of the Purchasing Supervisor’s determination and shall email or mail, in accordance with the email or postal address provided in the bid, the protesting party a written response within three

(3) business days of receipt of written appeal.

7. If the determination of the General Manager is adverse to the protesting party’s interest, the protesting party may only appeal to EWEB’s Board of Commissioners by filing a written notice of appeal to the Board with the General Manager within two (2) business days of issuance of the General Manager’s written determination.

8. The Contract Review Board, in considering the protest, shall review the documentation presented to the Purchasing Supervisor and the General Manager on or before the next regularly scheduled Board Meeting, but in no event shall they be required to review in less than ten (10) business days, and thereafter, base their decision on such material. The Board review will be limited to the evaluation of compliance with EWEB’s policies and procedures, requirements of the RFP or ITB and the equal and fair application of EWEB’s contracting rules. The Contract Review Board's determination shall be EWEB's final decision.

An adversely affected or aggrieved Bidder must exhaust all avenues of administrative review procedures and relief before seeking judicial review of EWEB's Contractor selection or Contract Award decision.

1.4 Registration Requirements (i.e. Construction Contractors Board/State Landscape Board):

Bidders shall certify that all parties performing work described in ORS 701.005(2) (i.e.

construction work) will be registered with the Oregon Construction Contractors Board

(CCB), and the State Landscape Contractors Board (LCB), if applicable, in accordance with ORS 701.035 and 701.055, or the appropriate authority pertaining to the trade before the bid opening time and date set in this Invitation. Bids not meeting this requirement will not be considered.

1.5 Scope of Work. The work contemplated under this Contract includes all labor, tools, machinery, materials, transportation, mobilization/demobilization, equipment and services necessary for, and reasonably incidental to, the completion of all work in connection with the project described in the Contract, the General Conditions, all applicable special conditions, plans, specifications, or any supplementals.

End of Section 00200

REFERENCE DOCUMENTS

1. Reference Drawings

EWEB

Drawing No.

Description

FD-6156-21 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – FINISH FLOOR

PLAN & EQUIPMENT ARRANGEMENT

D-6156-42 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR & OIL

ROOM CO2 FIRE PROTECTION

FD-6156-45 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL STORAGE

ROOM PIPING PLANS & SECTIONS

FD-6169-57 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE

EXTINGUISHER PIPING

FD-6180-5 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – FIRE PROTECTION

SYSTEM CO2 PIPING LAYOUT AND SCHEMATIC

D-31140 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2

FIRE PROTECTION WIRING DIAGRAM

D-31156 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2

FIRE PROTECTION SCHEMATIC DIAGRAM

D-31157 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE

PROTECTION AUX RELAY PANEL CONNECTION DIAGRAM

D-31158 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL ROOM CO2

FIRE PROTECTION - SCHEMATIC DIAGRAM

D-31159 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – OIL ROOM CO2

FIRE PROTECTION - CONNECTION DIAGRAM

D-31219 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – CO2 FIRE

PROTECTION COMMON ALARMS- SCHEMATIC DIAGRAM

D-7140-6 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – EQUIPMENT

LOCATIONS & DRAINAGE SOUTHWEST SECTION VIEW

D-7140-7 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE DECK,

EQUIPMENT LOCATIONS & DRAINAGE PLAN VIEW

D-7140-8 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – ACCESS DECK,

EQUIPMENT LOCATIONS & DRAINAGE PLAN VIEW

D-38174-D16 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR CO2

FIRE PROTECTION - WIRING DIAGRAM

D-38174-D17 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – GENERATOR FIRE

PROTECTION AUX RELAY PANEL

D-38174-E300 GENERATION SYSTEMS – TRAIL BRIDGE POWER PLANT – TURBINE FLOOR EL

2014.00 – RACEWAY LAYOUT

2. EWEB Standards

a. EWEB Consultant CAD Standards

SECTION 00300

INFORMATION AVAILABLE TO BIDDERS

BYPASS

STORAGE TANKS

LUBE OIL

È

TURBINE

PIT

GENERATOR

HOUSING

GOVERNOR

ACTUATOR

& UNWATERING PIT

COOLING WATER

UNWATERING PIT

UNIT

DRIP OIL

TANK

TUBE

DRAFT

GENERATOR FLOOR ELEV. 2028.50

TURBINE FLOOR ELEV. 2014.00

DRIP OIL TANK ELEV. 1998.00

ELEV. 1978.25

È

SOUTHWEST SECTION

NOT TO SCALE

KEY PLAN

FIGURE 4A

FIRE EXTINGUISHER LOCATIONS

TELEPHONE LOCATIONS

OIL DRAIN LINES

WATER DRAIN LINES

Hç2æ0

OIL

LEGEND

PLANE OF

THIS SECTION

O

I

L

OIL

OIL

GAL.

OIL

INTERCEPTOR

GAL.

GAL.

O

I

L

NOTE

: O

IL TA

NK I

S IN

FRON

T OF

CUT

-LIN

E

Hç2æ0

Hç2æ0

GAL.

ELEV. 1982.00

LOWER CONDUCTIVITY

PROBES

PROBES

UPPER CONDUCTIVITY

ELEV. 1987.00

CONFINED SPACE LOCATIONS

DOORDOOR

CS-35

CS-37

CS-36

CS-32

CS-42

CS-31

CS-40

CS-34

CS-00

CONFINED SPACE NUMBER

SCROLL CASE

HOUSING

AIR HOUSING

BRAKE HOUSING

HOWEL-BUNGER VALVE PIT

FUNC BY CHK APP

DES

DWN

SPONSOR

REV DATE BY CHK APP

SCALE:

DWG NO REV

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

CO2 SYSTEM AS BUILT

MDL06/25/07

TJN GHL

NONE

D-7140-6

BW/RS

WALL

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

EQUIPMENT LOCATIONS & DRAINAGE

SOUTHWEST SECTION VIEW

CO2 DISCHARGE AUDIBLE/STROBE ALARM

4-C

1-G1

FOR BIDDING PURPOSES

DOWN

DN.

LUBE OIL

STORAGE TANKS

COç2æ BOTTLES

TURBINE PIT

BATTERY ROOM

GOVERNOR

ACTUATOR

DRIP OIL

TANK

GROUND

REACTOR

SWITCHGEAR

MOTOR CONTROL

CENTER

TURBINE DECK PLAN

M.H.

M.H.

STORAGE ROOM

LUBE OIL

NOT TO SCALE

PRESSURE TANK

GOVERNOR

H ç æ

O I L

ELEV. 2014.00

ELEV. 2028.50

ELEV. 1998.00

THIS PLAN

PLANE OF

KEY PLAN

FIGURE 4B

LEGEND

OIL

Hç2æ0

WATER DRAIN LINES

OIL DRAIN LINES

TELEPHONE LOCATIONS

FIRE EXTINGUISHER LOCATIONS

GENERATOR DECK

TURBINE DECK

DRIP OIL TANK

SUMP

FIRE WATER

SUMP

COOLING WATER

PIT

UNWATERING

BATTERY BANK

COç2æ BOTTLES

UNWATERING PIT

ELEV. 1978.25

GAL.

F/ GENERATOR

F/ OIL ROOM

O I L

H ç æ

O I L

Hç2æ0

OIL INTERCEPTOR

EMERGENCY

LADDER/HATCH

GAL.

16" DIKE

M.H.

ESCAPE LADDER/HATCH

COMPRESSOR

TANK

SINK

EYE-WASH

CONFINED SPACE LOCATIONS

DOORDOOR

CS-42

CS-43

CS-44

CS-31

CS-39

CS-32

CS-38A

CS-38B

CS-40

CS-33

CS-00

CONFINED SPACE NUMBER

M.H.

CS-41

SCROLL CASE

BUTTERFLY VALVE ACCESS

HOWEL-BUNGER

VALVE PIT

SPILL KIT

SK

SK

FUNC BY CHK APP

DES

DWN

SPONSOR

REV DATE BY CHK APP

SCALE:

DWG NO REV

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

CO2 SYSTEM AS BUILT

MDL06/25/07

TJN GHL

NONE

D-7140-7

BW/RS

WALL

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

TURBINE DECK, EQUIPMENT LOCATIONS & DRAINAGE

PLAN VIEW

3-C

1-O

1-C

1-G1

CO2 DISCHARGE AUDIBLE/STROBE ALARM

UP

SCROLL CASE

UNWATERING

PIT

COOLING WATER

SUMP

FIRE WATER

SUMP

DRIP OIL

TANK

DRAFT TUBE ACCESS

M.H.

M.H.

NOT TO SCALE

VALVE PIT

DRAIN

DRIP OIL TANK

BYPASS

TURBINE DECK

GENERATOR DECK

FIRE EXTINGUISHER LOCATIONS

TELEPHONE LOCATIONS

OIL DRAIN LINES

WATER DRAIN LINES

Hç2æ0

OIL

LEGEND

FIGURE 4C

KEY PLAN

PLANE OF

THIS PLAN

INSPECTION GALLERY ELEV. 1998.00'

OIL FROM GENERATOR BRGS.

ELEV. 1998.00

ELEV. 2028.50

ELEV. 2014.00

O

I

L

Hç2æ0

O I L

H ç æ

H ç æ

WATER FROM WICKET GATE

PACKING GLAND

FROM OIL

INTERCEPTOR

O I L

H ç æ

ELEV. 1978.25

UNWATERING PIT

CONFINED SPACE LOCATIONS

H ç æ O

DRAIN

DOORDOOR

CS-39

CS-44

CS-43

CS-42

CS-31

CS-40

CS-00

CONFINED SPACE NUMBER

BUTTERFLY VALVE ACCESS

HOWEL-BUNGER

VALVE PIT

FUNC BY CHK APP

DES

DWN

SPONSOR

REV DATE BY CHK APP

SCALE:

DWG NO REV

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

CO2 SYSTEM AS BUILT

MDL06/25/07

TJN GHL

NONE

D-7140-8

BW/RS

WALL

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

ACCESS DECK, EQUIPMENT LOCATIONS & DRAINAGE

PLAN VIEW

CO2 DISCHARGE AUDIBLE/STROBE ALARM

2-C

TB1

1. BA-H

2. BA-N

3. BA-G

4.

5.

6. BA-7

7. BA-8

8.

9.

13. BA-11

14. BA-12

15. BA-15

16. BA-16

17. BA-21

18. BA-22

19. BA-23

20. BA-24

18.

19.

20.

1.

2.

3.

4.

5.

6.

7. AA-6

8. AA-7

9.

10.

11. AA-13

12. AA-14

13. BA-27

14.

15. AA-15

16. AA-16

17.

18.

19.

20.

21. AA-17

22. AA-18

23. AA-19

24. AA-20

25.

26.

27. BA-30, BA-13

28.

29.

30. BA-27

31.

32.

33.

34.

35.

36.

12 VDC

7 AH

BATTERY

F2 BATTERY FUSE

12 VDC

7 AH

BATTERY

G

H N N

H

F2

F1

PUSH TO RESET

CIRCUIT BREAKER

SN-7-022-0126

TYPE AGC-4

TROUBLE

SILENCE

ALARM

SILENCE

ALARM

AC POWER

CHEMETRON

MICRO 1-EV

POWER SUPPLY

100 WATT 24 VOLT

BATTERY

TROUBLE

Y

R

GENERAL

PANEL

GROUND

FAULT

TROUBLE

TROUBLE

Y

Y

Y

R

R

R

1 AMP AGC

+3

AUX 1

BUZZER

AUX 2

+1 -2

ZONE 2

SOL 3

SOL 2

SOL 1

ZONE 1

-6-4 +5 +7 -8

F1 AC POWER

AMPS

Y

NC34

AUX

RELAY

AUX 2

OUT

C

NO

RELAY

AUX

OUT

AUX 1

RELAY

ALARM

ALARM

NO

C

NC

NO

C

C

NC

SOLENOID

XXXX

F7 F6 F4F5 F3

VOLTS

SECONDS

MINUTES

Y

Y

Y

SWITCH

DISCONNECT

1.5 AMP AGC

ABORTMANUAL

DISCHG

-10+9 +11 -12

1 AMP

AUX POWER

CKT BREAKER

ALARM 2

ALARM 1

SOL 2

SOL 1

TROUBLE

TROUBLE

RELAY

NO

NC

+23

-24

-22

+21

ALARM 2

SOL 3

24VDC ALARM 1

+13 -14 -16+15 +17

+19

-20

-18

63C1

5C1

WHEELOCK MT-2475W

20CI

20CS

AA

BA

5C2

CHEMETRON MICRO 1-EV CO2 CONTROL PANEL

BA

R D

W H

G N

BK

RD

B K

B K

R D

B K

R D

B K

R D

R D

V A C

N E U T R A L

G N D

63C1-2

63C1-1

C

C

C

C

G

G

C

C

S E E

D

H. AA-1

N. AA-2

G. AA-3

RD

CTB1-1

BK

CTB1-2

RD

5C1-6

BK

TB1-20

RD

5C2-6

BK

TB1-18

RD

TBA-18

BK

TBA-19

1-G1

RD

TB1-15

BK

TB1-16

RD

TB1-13

BK

TB1-14

RD

5C1-1

BK

5C1-2

RD

BK

5C2-1

5C2-2

2.7K OHM

1/2 W

EOLR

RD

TB1-8

BK

TB1-9

PANEL (SEE D-31157)

#18 AWG TO AUX RELAY

R D

W H

G N

T B O

T B O

T B O

A W G

S E E

D

87GX

49G1

1C1

5C1 & 5C2

AUX 1

AUX 2

ZONE 1

MAN DIS

ABORT

SOL 1

SOL 2

20CI

20CS

ALARM 1

ALARM

TROUBLE

30CX1

30CTX1

63C1

GENERATOR 1 DIFFERENTIAL SHUTDOWN RELAY

GENERATOR 1 THERMAL DETECTOR

GENERATOR 1 MANUAL DISCHARGE SWITCH

CO2 LOCKOUT VALVE POSITION SWITCH

CO2 CONTROL PANEL ALARM ONLY INPUT

CO2 CONTROL PANEL TROUBLE SIGNAL INPUT

CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT

CO2 CONTROL PANEL MANUAL DISCHARGE INPUT

CO2 CONTROL PANEL ABORT DISCHARGE INPUT

CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT

CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT

INITIAL CO2 SOLENOID RELEASE VALVE

SUSTAIN CO2 SOLENOID RELEASE VALVE

CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT

CO2 CONTROL PANEL AUX ALARM OUTPUT

CO2 CONTROL PANEL TROUBLE OUTPUT

GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY

GENERATOR 1 CO2 CONTROL PANEL FAILURE AUX RELAY

GENERATOR 1 CO2 PRESSURE SWITCH

LEGEND

CTB1

2.7K OHM

1/2 W

10K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

AA

BK

RD

63C1-6

63C1-5

B K

R D

T B

T B

C

T O

G E N

T E R M

B O X

A

EOLR

RD

BK

1C1-1

1C1-2

2.7K OHM

1/2 W

EOLR

1C1

BK

CTB1-9

2.7K OHM

1/2 W

EOLR

RD

CTB1-10

RD

TB1-17

RD

20CS-1

RD

TB1-19

RD

20CI-1

T O

O I L

R M

C O

P N L

T B

B U C K E T

S E E

D

A W G

C

C u

T O

M C C

10.

11.

12.

TBA-11

TBA-12

T B A

RD

WH

B K

#18 AWG 3C Cu TO AUX RELAY PANEL (SEE D-31157)

6 8

T O

T B P B A T T P P

C

B K

B K

C S

C I

DESCRIPTION

10K OHM

1/2 W

EOLR

REFERENCE DRAWINGS DRAWING

GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM

OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM

D-31156

D-31140

D-31158

D-31219

D-31157

T B P P L N T P C B L

D E

R D

B K

T O

T B P U N I T C P

C

T B P G E N C C B L

D N

P C

N C

P L C

TO TBP_PROT_PNL2

3/C #14

TBP_GEN_CCBL006

D-38174-E85

C

C

B K

R D

T B A

T B A

G E N

C

A U X

R E L A Y

P A N E L

D

FUNC BY CHK APP

DES

DWN

SPONSOR

DATE:

REV DATE BY CHK APP

SCALE:

DWG NO REV

EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON

IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

6/16/2022 10:47 PM

EWEB WORK ORDER NO. 2001183

AHMED06/26/07

AM DAS

NONE

12/27/06

D-31140

TJN

NICE

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

GENERATOR CO2 FIRE PROTECTION

WIRING DIAGRAM

CONFORMED TO CONSTRUCTION RECORDS SHB CR

02/2023

REV NO. REV DATE REVISION DESCRIPTION DWN STD CHK APP

63C1 49G1

AUX 2 ZONE 1

G E N E R A T O R

D I F F E R E N T I A L

R E L A Y

T H E R M A L

D E T E C T O R S

CHEMETRON MICRO 1-EV CO2 CONTROL PANEL INPUTS

N O R M A L

P O S I T I O N

1C1

5C1

ABORT

M A N U A L

D I S C H A R G E

S W I T C H

L O C K O U T

V A L V E

P O S I T I O N

2.7K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

MANUAL DISCHARGE

ZONE 1 AUX 2

ABORT

SOL 1

SOL 2

C

10K OHM

1/2 W

EOLR

WHEELOCK

MT-2475W

CHEMETRON

MICRO 1-EV

20CI 20CS

CHEMETRON MICRO 1-EV CO2 CONTROL PANEL OUTPUTS

ALARM

30CX1

A U X I L L A R Y

A L A R M

O U T P U T

TROUBLE

30CTX1

T R O U B L E

A L A R M

O U T P U T

1-G1

CHEMETRON

MICRO 1-EV

ALARM 1

ALARM 1

ALARM 1

ALARM 1

CHEMETRON

MICRO 1-EV

CHEMETRON

MICRO 1-EV

5C2

AIR HOUSING

DOOR SWITCHES

TB1

TB1

TB1

TB1

TBA

TB1

TB1

TB1

TB1

CTB1

CTB1

CTB1

CTB1

CTB1

CTB1

CTB1

CTB1

A

B

A

B

CHEMETRON

MICRO 1-EV

CTB1

CTB1

CTB1

CTB1

CTB1

CTB1

87GX

49G1

1C1

5C1 & 5C2

AH1N

AUX 1

AUX 2

ZONE 1

MAN DIS

ABORT

SOL 1

SOL 2

20CI

20CS

ALARM 1

ALARM

TROUBLE

30CX1

30CTX1

63C1

GENERATOR DIFFERENTIAL SHUTDOWN RELAY

GENERATOR 1 THERMAL DETECTOR

GENERATOR 1 MANUAL DISCHARGE SWITCH

CO2 LOCKOUT VALVE POSITION SWITCH

GENERATOR 1 NORTH AIR HOUSING DOOR SWITCH

CO2 CONTROL PANEL ALARM ONLY INPUT

CO2 CONTROL PANEL TROUBLE SIGNAL INPUT

CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT

CO2 CONTROL PANEL MANUAL DISCHARGE INPUT

CO2 CONTROL PANEL ABORT DISCHARGE INPUT

CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT

CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT

INITIAL CO2 SOLENOID RELEASE VALVE

SUSTAIN CO2 SOLENOID RELEASE VALVE

CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT

CO2 CONTROL PANEL AUX ALARM OUTPUT

CO2 CONTROL PANEL TROUBLE OUTPUT

GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY

GENERATOR 1 CO2 CONTROL PANEL FIALURE AUX RELAY

GENERATOR 1 CO2 PRESSURE SWITCH

LEGEND

TBA

C O

P R E S S U R E

S W I T C H

TBA

24VDC+

24VDC-

CHEMETRON

MICRO 1-EV

POWER SUPPLY

120VAC-

120VAC+

H

N

G

SINGLE POLE

DISCONNECT

IN MCC

SEE D-7135

TO OIL RM CO2

CONTROL PANEL

(SEE D-31158)

TB1

TB1

TB1

GND

AH1N

AH1S

TB1

AH1S GENERATOR 1 SOUTH AIR HOUSING DOOR SWITCH

I N

P A R A L L E L

I N

A I R

H O U S I N G

ZONE 1 MAN DIS

5C1

5C2

C03

C04

20A

20A

DESCRIPTION

REFERENCE DRAWINGS DRAWING

GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM

OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM

D-31156

D-31140

D-31158

D-31219

D-31157

I N I T I A L

C O

S O L E N O I D

R E L E A S E

V A L V E

S U S T A I N

C O

S O L E N O I D

R E L E A S E

V A L V E

A L A R M

R E V E R S E

P O L A R I T Y

O U T P U T

A U X

C O

D I S C H A R G E

R E L A Y

A U X

C O N T R O L

P A N E L

F A I L U R E

R E L A Y

G E N E R A T O R

C O

D I S C H A R G E

H O R N S T R O B E S

30CXT1

TB4-30

TBA-7

GEN CO2

CONTROL PANEL

FAILURE

1.2.3.13

30CX1

TB4-29

TBA-6

GEN CO2

DISCHARGE

ALARM

1.2.3.12

PLC

D-38174-N16

TO 30CXTO

D-31158

11G1A

OUT302

MANUAL

DISCHARGE

C03

C04

11G1B

OUT302

SW5A

SW5A

SW5B

SW5B

CO2+

CO2

63C1

TB4-20

TB1-9

GEN CO2

PRESSURE

SWITCH

1.2.3.3

TB2-7

TB1-8

11G1A, 11G1B MULTI-FUNCTION GENERATOR 1 RELAYS

VERIFY

FUNC BY CHK APP

DES

DWN

SPONSOR

DATE:

REV DATE BY CHK APP

SCALE:

DWG NO REV

EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON

IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

6/16/2022 10:49 PM

EWEB WORK ORDER NO. 2001183

AHMED06/25/07

AM DAS

NONE

12/27/06 D-31156

TJN

NICE

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

GENERATOR CO2 FIRE PROTECTION

SCHEMATIC DIAGRAM

CONFORMED TO CONSTRUCTION RECORDS SHB CR

02/2023

30CXO

A. TBA-9

B. CR2-B, TBA-10

1.

2.

3.

4. TBA-4

5.

6. CR3-6, TBA-17

7. CR2-7,

8.

9. CR3-9, TBA-14

CR1

CR1

30CX1

A. TBA-12

B. CR4-B, TBA-13

1.

2.

3.

4. TBA-6

5.

6. CR1-6

7. CR2-7, CR4-7

8.

9. CR1-9

CR3

CR3

30CXTO

A. TBA-8

B. CR1-B

1.

2.

3.

4. TBA-5

5.

6.

7. CR1-7, CR3-7

8.

9.

CR2

CR2

30CXT1

A. TBA-11

B. CR3-B

1.

2.

3.

4. TBA-7

5.

6.

7. CR3-7

8.

9.

CR4

CR4

CR1-4

CR2-4

CR3-4

CR4-4

CR2-A

CR1-A

CR1-B

CR4-A

CR3-A

CR3-B

TBA-16

TBA-20

TBA-14

CR1-6

TBA-16

TBA-21

TBA

TBA-15

TBA-19

TBA-24

TBA-25

TBA-22

TBA-23

OR

TB4-8

YL

TB4-9

RD

TB4-29

BL

TB4-30

RD

TBO-10

BK

TBO-11

BL

TBO-12

RD

CTB1-25

BK

CTB1-29

BL

CTB1-14

DCC1-5

DCC1-9

RD

63CO-3

BK

63CO-4

RD

63C1-3

BK

63C1-4

BK

1-C (-)

RD

1-C (+)

BK

3-C (-)

RD

3-C (+)

BK

4-C (-)

RD

4-C (+)

DCC1-1

DCC1-4

RD

125VDC - TB1-4

BK

NEUTRAL - TB1-5

WHEELOCK MT-2475W

RD

TBA-21

BK

TBA-20

1-C

WHEELOCK MT-2475W

2-C

WHEELOCK MT-2475W

RD

TBA-23

BK

TBA-22

3-C

30CXO

30CX1

30CTXO

30CTX1

63CO

63C1

OIL ROOM CO2 DISCHARGE AUX ALARM RELAY

GENERATOR CO2 DISCHARGE AUX ALARM RELAY

OIL ROOM CO2 CONTROL PANEL FIALURE AUX RELAY

GENERATOR CO2 CONTROL PANEL FIALURE AUX RELAY

OIL ROOM CO2 PRESSURE SWITCH

GENERATOR CO2 PRESSURE SWITCH

LEGEND

CR1-9

TBA-18

TBA-19

TBA-17

TBA-22

TBA-23

TBA-20

TBA-21

5(OUT).

4(IN-).

1(IN+).

9(OUT-).

CONVERTER

125VDC-24VDC

VICOR

TBA-14

TBA-2

TBA-1

TBA-15

DCC1

TO AUX

RELAY PANEL

TO AUX

RELAY PANEL

GEN CO2 PANEL TERM BLOCK

(SEE D-31140)

TO OIL RM CO2 PANEL

(SEE D-31159)

TO GEN CO2 PANEL

(SEE D-31140)

TO OIL RM CO2 PRESS

SWITCH (SEE D-31159)

TO GEN CO2 PRESSURE

SWITCH (SEE D-31140)

BK

TB2-4

7/C #14

DESCRIPTION

NOTES

1. AUX CO2 RELAYS, TBA, & DCC2 CONTAINED IN 12"X12"X6" ENCLOSURE

MOUNTED TO RIGHT OF GEN CO2 PANEL.

2. VICOR DC/DC CONVERTER IS 100W, HORN/STROBES HAVE 5W MAX POWER

CONSUMPTION

3. ALARMS LOCATED IN PLANT AND WILL ALARM ON DISCHARGE OF CO2 IN EITHER

GENERATOR OR OIL ROOM.

4. TBA-1 & TBA-2 ARE DISCONNECTABLE 10 AMP FUSES.

5. COMMON ALARMS LOCATED IN PLANT AND WILL ALARM UPON DISCHARGE OF

CO2 IN EITHER GENERATOR OR OIL ROOM.

6. FOR LOCATIONS OF COMMON ALARMS SEE D-7140-6 THROUGH D-7140-8 FOR

PLANT PLAN VIEW.

FU10A

FU10A

WHEELOCK MT-2475W

RD

TBA-5

BK

TBA-4

4-C

TO AUX

RELAY PANEL

CR1-7

1-C DOOR ENTRY CO2 DISCHARGE COMMON ALARM

2-C

INSPECTION GALLERY CO2 DISCHARGE COMMON ALARM

3-C TURBINE ROOM CO2 DISCHARGE COMMON ALARM

4-C GENERATOR AIR HOUSING CO2 DISCHARGE COMMON ALARM

TO PLANT CO2 SYSTEM

COMMON ALARMS SEE

D-7140-6 THROUGH

D-7140-8 FOR LOCATIONS

RD

BK

2-C (-)

2-C (+)

RD

BK

TO TBA-20

TO TBA-21

9B

7A

9B

7A

9B

7A

9B

7A

REFERENCE DRAWINGS DRAWING

GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM

OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM

D-31156

D-31140

D-31158

D-31219

D-31157

1.2.2.7

1.2.2.8

1.2.2.12

1.2.2.13

PLC+

TBP_BLDG_CCBL001

TO TBP_UNIT1_CP

D-38174-N52

TBA-3

FUNC BY CHK APP

DES

DWN

SPONSOR

DATE:

REV DATE BY CHK APP

SCALE:

DWG NO REV

EUGENE WATER & ELECTRIC BOARD - EUGENE, OREGON

IF THIS TEXT IS RED THEN THIS IS AN ORIGINAL PLOT

INFORMATION SHOWN IS FOR EWEB USE ONLY AND IS NOT WARRANTED TO BE ACCURATE FOR UNINTENDED PURPOSES.

6/16/2022 10:27 PM

EWEB WORK ORDER NO. 2001183

AHMED06/26/07

AM DAS

NONE

12/27/06 D-31157

TJN

NICE

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

CO2 FIRE PROTECTION AUX RELAY PANEL

WIRING DIAGRAM

CONFORMED TO CONSTRUCTION RECORDS SHB CR

02/2023

TB1

1. BA-H

2. BA-N

3. BA-G

4.

5.

6. BA-7

7. BA-8

8.

9.

13. BA-11

14. BA-12

15. BA-15

16. BA-16

17. BA-21

18. BA-22

19. BA-23

20. BA-24

18.

19.

20.

1.

2.

3.

4.

5.

6.

7. AA-6

8. AA-7

9.

10.

11. AA-13

12. AA-14

13. BA-27

14.

15. AA-15

16. AA-16

17.

18.

19.

20.

21. AA-17

22. AA-18

23. AA-19

24. AA-20

25.

26.

27. BA-30, BA-13

28.

29.

30. BA-27

31.

32.

33.

34.

35.

36.

F2 BATTERY FUSE

G

H N N

H

F2

F1

PUSH TO RESET

CIRCUIT BREAKER

SN-7-022-0126

TYPE AGC-4

TROUBLE

SILENCE

ALARM

SILENCE

ALARM

AC POWER

CHEMETRON

MICRO 1-EV

POWER SUPPLY

100 WATT 24 VOLT

BATTERY

TROUBLE

Y

R

GENERAL

PANEL

GROUND

FAULT

TROUBLE

TROUBLE

Y

Y

Y

R

R

R

1 AMP AGC

+3

AUX 1

BUZZER

AUX 2

+1 -2

ZONE 2

SOL 3

SOL 2

SOL 1

ZONE 1

-6-4 +5 +7 -8

F1 AC POWER

AMPS

Y

NC34

AUX

RELAY

AUX 2

OUT

C

NO

RELAY

AUX

OUT

AUX 1

RELAY

ALARM

ALARM

NO

C

NC

NO

C

C

NC

SOLENOID

XXXX

F7 F6 F4F5 F3

VOLTS

SECONDS

MINUTES

Y

Y

Y

SWITCH

DISCONNECT

1.5 AMP AGC

ABORTMANUAL

DISCHG

-10+9 +11 -12

1 AMP

AUX POWER

CKT BREAKER

ALARM 2

ALARM 1

SOL 2

SOL 1

TROUBLE

TROUBLE

RELAY

NO

NC

+23

-24

-22

+21

ALARM 2

SOL 3

24VDC ALARM 1

+13 -14 -16+15 +17

+19

-20

-18

63C1

5C1

WHEELOCK MT-2475W

20CI

20CS

AA

BA

5C2

CHEMETRON MICRO 1-EV CO2 CONTROL PANEL

BA

R D

W H

G N

BK

RD

B K

B K

R D

B K

R D

B K

R D

R D

V A C

N E U T R A L

G N D

63C1-2

63C1-1

C

C

C

C

G

G

C

C

S E E

D

H. AA-1

N. AA-2

G. AA-3

RD

CTB1-1

BK

CTB1-2

RD

5C1-6

BK

TB1-20

RD

5C2-6

BK

TB1-18

RD

TBA-18

BK

TBA-19

1-G1

RD

TB1-15

BK

TB1-16

RD

TB1-13

BK

TB1-14

RD

5C1-1

BK

5C1-2

RD

BK

5C2-1

5C2-2

2.7K OHM

1/2 W

EOLR

RD

TB1-8

BK

TB1-9

PANEL (SEE D-31157)

#18 AWG TO AUX RELAY

R D

W H

G N

T B O

T B O

T B O

A W G

S E E

D

87GX

49G1

1C1

5C1 & 5C2

AUX 1

AUX 2

ZONE 1

MAN DIS

ABORT

SOL 1

SOL 2

20CI

20CS

ALARM 1

ALARM

TROUBLE

30CX1

30CTX1

63C1

GENERATOR 1 DIFFERENTIAL SHUTDOWN RELAY

GENERATOR 1 THERMAL DETECTOR

GENERATOR 1 MANUAL DISCHARGE SWITCH

CO2 LOCKOUT VALVE POSITION SWITCH

CO2 CONTROL PANEL ALARM ONLY INPUT

CO2 CONTROL PANEL TROUBLE SIGNAL INPUT

CO2 CONTROL PANEL HEAT/FIRE DETECTOR INPUT

CO2 CONTROL PANEL MANUAL DISCHARGE INPUT

CO2 CONTROL PANEL ABORT DISCHARGE INPUT

CO2 CONTROL PANEL SOLENOID INITIAL RELEASE OUTPUT

CO2 CONTROL PANEL SOLENOID SUSTAIN RELEASE OUTPUT

INITIAL CO2 SOLENOID RELEASE VALVE

SUSTAIN CO2 SOLENOID RELEASE VALVE

CO2 CONTROL PANEL REVERSE POLARITY HORN/STROBE OUTPUT

CO2 CONTROL PANEL AUX ALARM OUTPUT

CO2 CONTROL PANEL TROUBLE OUTPUT

GENERATOR 1 CO2 DISCHARGE AUX ALARM RELAY

GENERATOR 1 CO2 CONTROL PANEL FAILURE AUX RELAY

GENERATOR 1 CO2 PRESSURE SWITCH

LEGEND

CTB1

2.7K OHM

1/2 W

10K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

2.7K OHM

1/2 W

EOLR

AA

BK

RD

63C1-6

63C1-5

B K

B K

G G

G G

S E E

D

C

T O

C A B I N E T

U N I T

C

T O

G E N

T E R M

B O X

A

EOLR

RD

BK

1C1-1

1C1-2

2.7K OHM

1/2 W

EOLR

1C1

BK

CTB1-9

2.7K OHM

1/2 W

EOLR

RD

CTB1-10

RD

TB1-17

RD

20CS-1

RD

TB1-19

RD

20CI-1

T O

O I L

R M

C O

P N L

T B

B U C K E T

S E E

D

A W G

C

C u

T O

M C C

10.

11.

12.

TBA-11

TBA-12

T B A

RD

WH

B K

#18 AWG 3C Cu TO AUX RELAY PANEL (SEE D-31157)

P

N

S E E

D

T O

D C

P A N E L

B K

B K

C S

C I

DESCRIPTION

10K OHM

1/2 W

EOLR

REFERENCE DRAWINGS DRAWING

GENERATOR CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

GENERATOR CO2 FIRE PROTECTION WIRING DIAGRAM

OIL ROOM CO2 FIRE PROTECTION SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION COMMON ALARMS SCHEMATIC DIAGRAM

CO2 FIRE PROTECTION AUX RELAY PANEL WIRING DIAGRAM

D-31156

D-31140

D-31158

D-31219

D-31157

BATTERY

12 VDC

7AH

BATTERY

12 VDC

7AH

G E N

C O

A U X

R E L A Y

P A N E L

D

T B A

T B A

ORIGINAL DWG NO.: D-31140

FUNC BY CHK APP

DES

DWN

EWEB WORK ORDER NO.

DATE:

REV DATE DWN CHK APP

DWG NO:

REV

6/

/2

5:

P

M H

ER

RE

RA

, A

LE

X

A.

A B C D E F G H I J K L M N

STD

STANDARDS CHECK

EWEB PROJECT SHEET NO:

SCALE:

REVISION DESCRIPTION

LINE IS 2 INCHES

AT FULL SIZE

(IF NOT 2" - SCALE ACCORDINGLY)

REV NO.

2001183

AS SHOWN

05/31/22

D-38174-D16

AHMED AM DAS

JKS AM DAS

GENERATION SYSTEMS

TRAIL BRIDGE POWER PLANT

GENERATOR CO2 FIRE PROTECTION

WIRING DIAGRAM

DEMOLITION

CONFORMED TO CONSTRUCTION RECORDS SHB CR

02/2023

30CXO

A. TBA-9

B. CR2-B, TBA-10

1.

2.

3.

4. TBA-4

5.

6. CR3-6, TBA-17

7. CR2-7, TBA-1

8.

9. CR3-9, TBA-14

CR1

CR1

30CX1

A. TBA-12

B. CR4-B, TBA-13

1.

2.

3.

4. TBA-6

5.

6. CR1-6

7. CR2-7, CR4-7

8.

9. CR1-9

CR3

CR3

30CXTO

A. TBA-8

B. CR1-B

1.

2.

3.

4. TBA-5

5.

6.

7. CR1-7, CR3-7

8.

9.

CR2

CR2

30CXT1

A. TBA-11

B. CR3-B

1.

2.

3.

4. TBA-7

5.

6.

7. CR3-7

8.

9.

CR4

CR4

CR1-4

CR2-4

CR3-4

CR4-4

CR2-A

CR1-A

CR1-B

CR4-A

CR3-A

CR3-B

TBA-16

TBA-20

TBA-14

CR1-6

TBA-16

TBA-21

TBA

TBA-15

TBA-19

TBA-24

TBA-25

TBA-22

TBA-23

RD

AK-11

BK

AK-10

BL

AK-9

OR

AK-8

RD

TBO-10

BK

TBO-11

BL

TBO-12

RD

CTB1-25

BK

CTB1-29

BL

CTB1-14

DCC1-5

DCC1-9

RD

63CO-3

BK

63CO-4

RD

63C1-3

BK

63C1-4

BK

1-C (-)

RD

1-C…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .