This is a Bid Notice and Specifications and Contract Documents package for the City of Bentonville, Arkansas, for the construction of Town Branch Basin Sewer Improvements - Alignment 3 (TB-40.1). The project involves the installation of approximately 1,600 linear feet of gravity sewer, primarily consisting of 24-inch diameter ductile iron and PVC sewer main, and approximately 501 linear feet of 36-inch steel encasement installed via multiple auger bores at select crossings. The work is divided into two separate Work Zones and includes upsizing existing gravity sewer, replacing associated appurtenances, and all related work to create a complete and operational system for the City of Bentonville Water Utilities Department. A mandatory pre-bid conference is scheduled for Thursday, May 21st, 2026, at 10:00 AM CST at Bentonville Municipal Complex, followed by a mandatory site visit. Bids are due Thursday, June 4th, 2026, at 1:00 PM CST at the City of Bentonville Administrative Services Building. Zone 1 must achieve substantial completion within 105 days after the contract commencement date, Zone 2 within 140 days, with the entire work completed and ready for final payment within 170 days.
Bidders must submit a bid security equal to five percent of the total base bid and provide performance, payment, and warranty bonds equal to one hundred percent of the contract price from an approved surety company. The contract is structured on a unit price basis with estimated quantities subject to adjustment based on actual quantities determined by the Engineer. Progress payments will be made monthly at 95 percent of the value of work completed, with retainage held until substantial completion. Liquidated damages are assessed at $1,500 per day for delays in achieving substantial completion and $2,000 per day for delays in completing remaining work after substantial completion. To be considered a responsible bidder, contractors must demonstrate documented experience directly related to the project scope, including successful completion of at least one municipal interceptor construction project of similar scope within Benton and/or Washington County in Northwest Arkansas within the past five years, and cumulative completion of a minimum of 20,000 linear feet of sanitary sewer interceptor installations with pipe diameters of 18 inches or greater within the past five years. The project is funded by the City of Bentonville Water Utilities Department, with bidding documents available through Beacon Bid at https://www.beaconbid.com/solicitations/city-of-bentonville-arkansas/open.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Prepared For:
City of Bentonville May 2026
SPECIFICATIONS AND
CONTRACT DOCUMENTS
For the Construction of
Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1)
Bentonville, Arkansas
City of Bentonville Project No. PIIP26-0001
Garver Project No. 2501941
ISSUED FOR BID - NOT FOR CONSTRUCTIONISSUED FOR BID
CERTIFICATIONS
Project No. 2501941 1 Section 00 00 01 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Certifications
TOWN BRANCH BASIN SEWER IMPROVEMENTS – ALIGNMENT 3 (TB-40.1)
GARVER PROJECT NO. 2501941
CITY OF BENTONVILLE PROJECT NO. PIIP26-0001
I hereby certify that the applicable portions of this project plans and specifications were prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Arkansas.
SEAL AND SIGNATURE
APPLICABLE DIVISION OR
PROJECT RESPONSIBILITY
Daniel Hollinger, P.E.
Digitally Signed:
Division 00 Division 01 Division 03 Division 31 Division 32 Division 33
GARVER, LLC CERTIFICATE OF AUTHORIZATION:
Expiration Date: 12/31/26
2026/05/10
Project No. 2501941 TOC - 1 Section 00 00 10 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Table of Contents
TOWN BRANCH BASIN SEWER IMPROVEMENTS – ALIGNMENT 3 (TB-40.1)
TABLE OF CONTENTS
CONTRACT DOCUMENTS AND GENERAL REQUIREMENTS
DIVISION 00 – BIDDING AND CONTRACTING REQUIREMENTS
00 00 00 COVER SHEET
00 00 01 CERTIFICATIONS
00 00 10 TABLE OF CONTENTS
PART 1 BIDDING REQUIREMENTS
00 11 00 ADVERTISEMENT FOR BIDS
00 21 00 INSTRUCTIONS TO BIDDERS
00 22 13 BIDDER’S CHECKLIST OF REQUIRED ITEMS
00 41 00 BID FORM
00 41 19 LIST OF PROPOSED SUBCONTRACTORS
00 43 13 BID BOND
00 45 13 QUALIFICATIONS STATEMENT
PART 2 CONTRACT DOCUMENTS
00 51 00 NOTICE OF AWARD
00 52 00 AGREEMENT STIPULATED PRICE
00 55 00 NOTICE TO PROCEED
00 61 13 PERFORMANCE BOND
00 61 16 PAYMENT BOND
00 61 19 WARRANTY BOND
00 65 16 CERTIFICATE OF SUBSTANTIAL COMPLETION
00 65 19 NOTICE OF ACCEPTABILITY OF WORK
PART 3 CONDITIONS OF THE CONTRACT
00 72 00 GENERAL CONDITIONS
00 73 00 SUPPLEMENTARY CONDITIONS
TECHNICAL SPECIFICATIONS
CITY OF BENTONVILLE WATER UTILITIES DEPARTMENT SPECIFICATIONS, DATED 10/22/2024,
ORDINANCE NO. 2024-151
AVAILABILE AT: HTTPS://WWW.BENTONVILLEAR.COM/1895/WATER-SEWER-SPECIFICATIONS
Project No. 2501941 TOC - 2 Section 00 00 10 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Table of Contents
SUPPLEMENTAL TECHNICAL SPECIFICATIONS
DIVISION 01 – GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 14 00 WORK RESTRICTIONS
01 20 00 PRICE AND PAYMENT PROCEDURES
01 25 00 SUBSTITUTION PROCEDURES
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 16 CONSTRUCTION PROGRESS SCHEDULE
01 32 33 PHOTOGRAPHIC DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 70 00 EXECUTION REQUIREMENTS
01 77 00 CLOSEOUT PROCEDURES
01 78 36 WARRANTIES AND BONDS
DIVISION 03 – CONCRETE
03 60 00 GROUT
DIVISION 31 – EARTHWORK
31 05 19.13 GEOTEXTILE FILTER FABRIC
31 23 16.20 ROCK EXCAVATION
31 23 19 DEWATERING
31 23 23.33 FLOWABLE FILL
31 37 00 RIPRAP
31 50 00 EXCAVATION SUPPORT SYSTEMS
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 91 13 SODDING
DIVISION 33 – UTILITIES
33 05 23.16 UTILITY PIPE JACKING
PART 1
BIDDING REQUIREMENTS
Project No. 2501941 1 Section 00 11 00 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Advertisement for Bids
ADVERTISEMENT FOR BIDS
Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) for
City of Bentonville Bentonville, Arkansas
General Notice
City of Bentonville (Owner) is requesting Bids for the construction of the following Project:
Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) 2501941
Bids for the construction of the Project will be received at the City of Bentonville Administrative Services Building (Bid Opening Room – 2nd Floor) attn Purchasing located at, 1000 SW 14th Street, Bentonville, AR 72712, until Thursday, June 4th, 2026, at 1:00 PM CST local time. At that time the Bids received will be publicly opened and read. Any bid received after the above time and date will be returned unopened.
The Project includes the following Work:
The work generally includes the installation of approximately 1,600 linear feet of gravity sewer, consisting primarily of 24‑inch diameter ductile iron and PVC sewer main and approximately 501 linear feet of 36‑inch steel encasement installed via multiple auger bores at select crossings. The construction of this interceptor improvement project is divided into two separate Work Zones and includes upsizing the existing gravity sewer, replacing associated appurtenances, and all other related work. All work shall be performed as required by the Contract Documents for a complete and operational system, for the City of Bentonville Water Utilities Department.
Obtaining the Bidding Documents
Information and Bidding Documents for the Project can be found at the following designated website:
https://www.beaconbid.com/solicitations/city-of-bentonville-arkansas/open
Bidding Documents may be downloaded from the designated website. Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website.
Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
Pre-bid Conference
A mandatory pre-bid conference for the Project will be held on Thursday, May 21st, 2026, at 10:00 AM CST local time at Bentonville Municipal Complex, Water Utilities Break and Training Room A119, 3200 SW Municipal Drive Bentonville, AR 72712. Mandatory Site visit to follow.
Instructions to Bidders
To be accepted, a bid must be accompanied by a bid security instrument payable to the Owner in an amount not less than five (5%) percent of the total base bid, in the form of either (a) a cashier’s check or certified check or (b) an acceptable bidder’s bond with a surety authorized to operate in the state of the project. The bid security shall be payable without condition to the City of Bentonville, as a guarantee that the Bidder will enter into a contract and execute performance and payment bonds after the Notice of Award has been issued. The bid security shall provide that the Bidder or surety must pay the damage, loss, cost, and expense subject to the amount of the Bid Bond directly arising out of the Bidder’s default in failing to execute and deliver the Contract and bonds. Personal checks and company checks are NOT acceptable as a Bid Guarantee. Any bid submitted shall be void unless accompanied by a cashier’s check drawn upon a bank or trust company doing business in the State of Arkansas or by a corporate bid bond.
Project No. 2501941 2 Section 00 11 00 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Advertisement for Bids
Performance, Payment and Warranty Bonds will be required on the forms provided in the amount of one hundred per cent (100%) of the contract price from an approved surety company holding a permit from the state of the project state to act as surety, or other surety or sureties acceptable to the Owner.
In case of ambiguity or lack of clearness in stating bid prices, the Owner reserves the right to adopt the most advantageous construction thereof, to reject any or all bids, and to waive formalities. No bid may be withdrawn within sixty (60) days after the date on which bids are opened. The Owner reserves the right to cancel this request at any time in accordance with the Owner’s best interest, to reject any Bid received, and to waive irregularities in accordance with the Owner’s best interest. Submitters agree that such rejection shall be without liability on the part of the Owner for any damage or claim brought by any Bidder because of such rejections, nor shall the Submitter seek any recourse of any kind against the City because of such rejections. The filing of any Bids in response to this Invitation shall constitute an agreement of the Bidder to these conditions.
Questions must be submitted through Beacon Bid or e-mailed to BWUCapital@Bentonville.ar.gov.
Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than ninety-six (96) hours prior to the date for opening of Bids may not be answered. The final addenda shall be issued at a minimum of forty-eight (48) hours prior to the date and time for opening of Bids. Failure of any bidder to receive any such addendum or interpretation shall not relieve the bidder from any obligation under his bid submitted.
For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
This Advertisement is issued by:
Owner: City of Bentonville By: Beau Thompson Title: Water Utilities Deputy Director Dates: May 10, 2026
May 17, 2026
EJCDC® C-111, Advertisement for Bids for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.
Project No. 2501941 i Section 00 21 00 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Instructions to Bidders
INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1— Defined Terms
Article 2— Bidding Documents
Article 3— Qualifications of Bidders
Article 4— Pre-Bid Conference
Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;
Other Work at the Site
Article 6— Bidder’s Representations and Certifications
Article 7— Interpretations and Addenda
Article 8— Bid Security
Article 9— Contract Times
Article 10— Substitute and “Or Equal” Items
Article 11— Subcontractors, Suppliers, and Others
Article 12— Preparation of Bid
Article 13— Basis of Bid
Article 14— Submittal of Bid
Article 15— Modification and Withdrawal of Bid
Article 16— Opening of Bids
Article 17— Bids to Remain Subject to Acceptance
Article 18— Evaluation of Bids and Award of Contract
Article 19— Bonds and Insurance
Article 20— Signing of Agreement
Article 21— Sales and Use Taxes
Article 22— Contracts to Be Assigned
Article 23— Wage Rates
Project No. 2501941 1 Section 00 21 00
ARTICLE 1—DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:
A. Bidder—Any individual, partnership, corporation, joint venture, or other combination thereof who submits a Bid to Owner for the Work contemplated, acting directly or through an authorized representative. As used in the Contract Documents, masculine pronouns refer to both masculine and feminine genders
B. Issuing Office—The office from which the Bidding Documents are to be issued.
C. Successful Bidder—The lowest responsible Bidder submitting a responsive Bid to whom Owner (on the basis of Owner’s evaluation as hereinafter provided) makes an award.
ARTICLE 2—BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Owner has established a Bidding Documents Website as indicated in the Advertisement or invitation to bid. Owner recommends that Bidder register as a plan holder with the Issuing Office at such website and obtain a complete set of the Bidding Documents from such website. Bidders may rely that sets of Bidding Documents obtained from the Bidding Documents Website are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.
2.04 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by the latest version of Adobe Acrobat Reader. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.06.A above. However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information
Project No. 2501941 2 Section 00 21 00 that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.
ARTICLE 3—QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit written evidence establishing its qualifications such as financial data, previous experience, and present commitments, as detailed in the Qualifications Statement, which must be completed in ink and returned for evaluation with the Bid, along with any Owner required documentation. Owner will review the submitted information to determine which contractors are qualified to bid on the Work.
3.02 The criteria which will be used to determine the lowest responsive and responsible Bidder are as follows:
A. Responsive Bidder: Means a Bidder who has submitted a Bid which conforms in all material respects to the Bidding Documents.
B. Responsible Bidder: Means a Bidder who has the capacity and capability in all respects to perform fully the contract requirements and who has the integrity and reliability to assure good faith performance. Among factors to be considered in determining whether the Bidder meets these standards, are:
1. Financial, material, equipment, facility, and personnel resources and expertise necessary to meet contractual requirements;
2. A record of integrity;
3. A record of Successful Completion defined as: completion of a project within a reasonable time and budget;
4. Qualified legally to contract with the Owner, and;
5. Has not failed to supply any necessary information in connection with the inquiry concerning responsibility.
3.03 Bidder is to submit the following information with its Bid to demonstrate Bidder’s qualifications to perform the Work:
A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments, as detailed in the Qualifications Statement.
B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.
C. Bidder’s state or other contractor license number, if applicable.
D. Subcontractor and Supplier information.
E. Other required information regarding qualifications.
3.04 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.05 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.
3.06 Project Team & Self Performance Information
A. To ensure the Bidder utilizes responsible key personnel for the project, the bidder shall identify and demonstrate documented experience of the proposed Project Team and shall submit the following information with the bid:
1. Identification of Project Team:
Project No. 2501941 3 Section 00 21 00
a. Identify the proposed Project Manager and key personnel who will be assigned to the Project. Submission of this information constitutes a representation that such personnel are committed to the Project at the time of bid submission. Replacement of identified key personnel after award shall require prior written approval of the Owner.
2. Relevant Experience and References:
a. Identify relevant experience and provide reference projects for the proposed Project Manager and key personnel sufficient to demonstrate capability to perform the Work.
3. Self-Performance:
a. Identify the anticipated percentage (%) of the Work to be self-performed by the Bidder.
b. Identify subcontractor and subcontractor project team and relevant experience for any subcontractors to the bidder that are anticipated to perform equal to or greater than 20% of the work.
3.07 Prior Similar Experience References:
A. To be considered a responsible bidder for this project, the bidder shall demonstrate documented experience directly related to the scope and risk of this Project and shall meet all of the following minimum requirements:
1. Municipal Interceptor Construction Experience
a. The bidder shall have successfully completed at least one (1) municipal interceptor construction project of similar scope, construction methods, and operational constraints to the Work contemplated under this Contract within Benton and/or Washington County in Northwest Arkansas within the past five (5) years.
b. The bidder shall have successfully completed a minimum cumulative total of 20,000 linear feet (LF) of sanitary sewer interceptor installations with pipe diameters of eighteen inches (18”) or greater within the past five (5) years.
ARTICLE 4—PRE-BID CONFERENCE
4.01 A mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project.
Proposals will not be accepted from Bidders who do not attend the conference. It is each Bidder’s responsibility to sign in at the pre-bid conference to verify its participation. Bidders must sign in using the name of the organization that will be submitting a Bid. A list of qualified Bidders that attended the pre-bid conference and are eligible to submit a Bid for this Project will be issued in an Addendum.
4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.
ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of
Project No. 2501941 4 Section 00 21 00 materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-related Documents
A. In addition to the documents regarding existing Site conditions referred to in Paragraph 5.02.A, the following other documents relating to conditions at or adjacent to the Site are known to Owner and made available to Bidders for reference:
1. Geotechnical Report
Owner will make copies of these other Site-related documents available to any Bidder on request.
B. Owner has not verified the contents of these other Site-related documents, and Bidder may not rely on the accuracy of any data or information in such documents. Bidder is responsible for any interpretation or conclusion Bidder draws from the other Site-related documents.
C. The other Site-related documents are not part of the Contract Documents.
D. Bidders are encouraged to review the other Site-related documents, but Bidders will not be held accountable for any data or information in such documents. The requirement to review and take responsibility for documentary Site information is limited to information in (1) the Contract Documents and (2) the Technical Data.
E. No other Site-related documents are available.
Project No. 2501941 5 Section 00 21 00
5.04 Site Visit and Testing by Bidders
A. Bidder is encouraged to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. A Site visit is scheduled following the pre-bid conference. Maps to the Site will be available at the pre-Bid conference.
C. Bidders visiting the Site are required to arrange their own transportation to the Site.
D. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the Owner or Engineer. Bidder must conduct the required Site visit during normal working hours.
E. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
F. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
G. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
H. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 Owner’s Safety Program
A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.
Project No. 2501941 6 Section 00 21 00
ARTICLE 7—INTERPRETATIONS AND ADDENDA
7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.
7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to BWUCapital@bentonville.ar.gov in writing.
7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than ninety-six (96) hours prior to the date for opening of Bids may not be answered. The final addenda shall be issued at a minimum of forty-eight (48) hours prior to the date and time for opening of Bids.
Failure of any bidder to receive any such addendum or interpretation shall not relieve the bidder from any obligation under his bid submitted.
7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
ARTICLE 8—BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.
8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 91 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9—CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS
10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without consideration during the bidding and Contract award process of possible substitute or “or-equal” items. In cases in which the Contract allows the
Project No. 2501941 7 Section 00 21 00
Contractor to request that Engineer authorize the use of a substitute or “or-equal” item of material or equipment, application for such acceptance may not be made to and will not be considered by Engineer until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 The Bidder, and any other Bidder so requested, must submit to Owner a List of Subcontractors proposed for the Work with the bid, using the form supplied in the bidding documents.
11.03 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.
11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.
Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12—PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form must be completed in ink and the Bid Form signed in ink. Erasures or alterations must be initialed in ink by the person signing the Bid Form. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 If Bidder has obtained the Bidding Documents as Electronic Documents, then Bidder shall prepare its Bid on a paper copy of the Bid Form printed from the Electronic Documents version of the Bidding Documents. The printed copy of the Bid Form must be clearly legible, printed on 8½ inch by 11-inch paper and as closely identical in appearance to the Electronic Document version of the Bid Form as may be practical. The Owner reserves the right to accept Bid Forms which nominally vary in appearance from the original paper version of the Bid Form, providing that all required information and submittals are included with the Bid.
12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate
Project No. 2501941 8 Section 00 21 00 address and state of incorporation must be shown. The corporate seal must be affixed and attested by the corporate secretary or an assistant corporate secretary.
12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.
12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.
12.06 A Bid by an individual must show the Bidder’s name and official address.
12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.08 All names must be printed in ink below the signatures.
12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.
12.11 The Bid must contain evidence of Bidder’s authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
12.12 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.
ARTICLE 13—BASIS OF BID
13.01 Unit Price
A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
13.02 Allowances
A. For cash allowances the Bid price must include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.
Project No. 2501941 9 Section 00 21 00
ARTICLE 14—SUBMITTAL OF BID
14.01 The Bidding Documents may include one separate unbound copy of the Bid Form and the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form.
14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid and must be enclosed in a plainly marked package with the Project title, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid must be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid must be addressed to the location designated in the Advertisement.
14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.
ARTICLE 16—OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of
Project No. 2501941 10 Section 00 21 00 the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.
18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.
18.05 Evaluation of Bids
A. In evaluating Bids, Owner will consider whether the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.
B. In the comparison of Bids, alternates will be applied in the same order of priority as listed in the Bid Form. To determine the Bid prices for purposes of comparison, Owner will announce to all bidders a “Base Bid plus alternates” budget after receiving all Bids, but prior to opening them. For comparison purposes alternates will be accepted, following the order of priority established in the Bid Form, until doing so would cause the budget to be exceeded. After determination of the Successful Bidder based on this comparative process and on the responsiveness, responsibility, and other factors set forth in these Instructions, the award may be made to said Successful Bidder on its base Bid and any combination of its additive alternate Bids for which Owner determines funds will be available at the time of award.
C. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.
18.06 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.
18.07 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.
ARTICLE 19—BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.
ARTICLE 20—SIGNING OF AGREEMENT
20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 10 days thereafter, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with
Project No. 2501941 11 Section 00 21 00 printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.
ARTICLE 21—SALES AND USE TAXES
21.01 Owner is not exempt from Arkansas state sales and use taxes on materials and equipment to be incorporated in the Work.
ARTICLE 22—CONTRACTS TO BE ASSIGNED
The successful bidder shall not sell, assign, transfer or convey this contract, in whole or in part, without the prior written consent of the Owner.
ARTICLE 23—WAGE RATES
There shall be paid on the project not less than the general prevailing rates of wages in the locality of the project, as determined by the U.S. Department of Labor.
For additional information on assigning a procurement contract, refer to EJCDC® P-001, Commentary on the 2018 EJCDC Procurement Documents (2018).
EJCDC® C-200, Instructions to Bidders for Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, Project No. 2501941 1 Section 00 22 13 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Bidder’s Checklist of Required Items
BIDDER’S CHECKLIST OF REQUIRED ITEMS
This Bidder’s Checklist is provided to ensure all required forms are completed and returned as part of the bid submission. All forms must be included as indicated for a bid to be considered a complete, responsive bid. Appropriate signatures and date are required on each document. If an item is missing, the bid may be declared unresponsive and therefore rejected. This sheet will serve as the cover sheet for the bid submission.
Completed* Spec. Section
Attended Pre-Bid (if mandatory) ☐ 00 11 00
Acknowledgement of All Addenda ☐
Bid contains the following forms: ☐
1. Bid Form/Proposal (including Unit Price Schedule – if applicable) ☐ 00 41 00
2. List of Proposed Subcontractors ☐ 00 41 19
3. Bid Bond ☐ 00 43 13
4. Qualifications Statement ☐ 00 45 13
*Check when filled out, signed, and included with submission of bid packet.
Within three (3) days after Bid Opening:
Bidder acknowledges to provide within three (3) days after Bid Opening (Low Bidder Only):
1. Bidder’s Qualifications of Subcontractor (if requested)
Within fifteen (15) days after Notice of Award:
Bidder acknowledges that within fifteen (15) days after Notice of Award, Successful Contractor is required to complete the following before execution and award of the contract:
1. Section 00 52 00, Agreement (all pages and supporting documents)
2. Section 00 61 13, Performance Bond
3. Section 00 61 16, Payment Bond
4. Section 00 61 19, Warranty Bond
5. Completed Certificates of Insurance
Project No. 2501941 2 Section 00 22 13 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Bidder’s Checklist of Required Items
Prior to Construction:
Awarded Contractor required to submit Construction Schedule before construction begins.
Seal (if incorporated) Bidder Name:
Address:
City, State, Zip Code:
Contractor Number:
Contact Name:
Title:
Contact Number:
Contact Email:
Signature of Authorized Agent for Bidder:
Date:
Project No. 2501941 1 Section 00 41 00 Town Branch Basin Sewer Improvements – Alignment 3 (TB-40.1) Bid Form
BID FORM FOR CONSTRUCTION CONTRACT
The terms used in this Bid with initial capital letters have the meanings stated in the Instructions to Bidders, the General Conditions, and the Supplementary Conditions.
ARTICLE 1—OWNER AND BIDDER
1.01 This Bid is submitted to: City of Bentonville, 1000 SW 14th Street, Bentonville, AR 72712.
1.02 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2—ATTACHMENTS TO THIS BID
2.01 The following documents are submitted with and made a condition of this Bid:
A. Required Bid security
B. List of Proposed Subcontractors
C. Evidence of authority to do business in the state of the Project; or a written covenant to obtain such authority within the time for acceptance of Bids
D. Contractor’s license number as evidence of Bidder’s State Contractor’s License or a covenant by Bidder to obtain said license within the time for acceptance of Bids
E. Required Bidder Qualification Statement with supporting data
ARTICLE 3—BASIS OF BID—LUMP SUM BID AND UNIT PRICES
3.01 Unit Price Bids
A. Bidder will perform the following Work at the indicated unit prices:
1. See attached Bid Form.
B. Bidder acknowledges that:
1. Each Bid Unit Price includes an amount considered by Bidder to be adequate to cover Contractor’s overhead and profit for each separately identified item, and
2. Estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Work will be based on actual quantities, determined as provided in the Contract Documents.
ARTICLE 4—TIME OF COMPLETION
4.01 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before the…