About this file

Simmons Island Habitat Restoration Project Summary

This Bid Notice and Project Manual pertains to a public works construction contract issued by the Stockton Port District in California for the Simmons Island Habitat Restoration Project (Project No. 220002). The project entails regrading previously placed dredged material, scarifying subsoil, salvaging and importing vegetation, hydroseeding upland and wetland areas, planting plugs, and improving the Rich Island Duck Club's wetland habitats and water management capabilities on Simmons Island in Suisun Bay. The project includes 14 bid items ranging from mobilization and surveying to earthwork, clearing and grubbing, plant salvaging, mulch application (723 cubic yards), upland and transitional wetland hydroseeding (18 acres combined), and 505 plant plugs, with three additive bid items for subsoil scarification, soil amendments, and additional plant procurement. Sealed bids are due by 3:00 p.m. on July 1, 2026, with a mandatory pre-bid conference scheduled for 10:00 a.m. on June 9, 2026, at the Port Administration Building. Grading work is required between April 15 and October 31, 2026, with all work to be completed by October 31, 2026. Contract award is anticipated within 90 days of bid opening. Bidders must hold a California "A" Contractor License and must submit required documentation including a 10 percent bid bond, bidder registration form, subcontractors list, non-collusion affidavit, bidder certifications, three completed similar projects from the last 10 years, and proposed key personnel qualifications and project schedule.

Bidders must submit bids on the provided Bid Form reflecting the lowest combination of all bid items, with discrepancies resolved in favor of unit prices and written words over figures. The contract will be awarded to the lowest responsible responsive bidder. Successful bidders must execute the Agreement (Document 00520), Construction Performance Bond, Construction Labor and Material Payment Bond, and provide insurance certificates within seven days of the Notice of Award. Insurance requirements include Commercial General Liability of $5,000,000 per occurrence, Automobile Liability of $5,000,000 per accident, Workers' Compensation with statutory limits and Employers' Liability of $1,000,000, and Contractors' Pollution Legal Liability of $1,000,000 per occurrence. All work is subject to prevailing wage requirements under California law, and bidders and subcontractors must be eligible under California Labor Code Sections 1777.1 and 1777.7. Bid protests must be filed in writing within 10 days of the Notice of Intent to Award posting. The Port reserves the right to reject any or all bids, waive informalities, rebid the project, and modify the commencement date or perform independent work at the site. Bidding documents are available for download from the Port's website at www.portofstockton.com beginning May 27, 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DOCUMENT 00001

00001- 1

PROJECT MANUAL

SIMMONS ISLAND HABITAT

RESTORATION PROJECT

PROJECT NO. 220002

STOCKTON PORT DISTRICT

Issued: May 27, 2026 Bids Due: July 1, 2026

MAILING ADDRESS:

P.O. Box 2089 Stockton, CA 95201 procurement@stocktonport.com

ADMINISTRATION BUILDING:

315 Fyffe Avenue Stockton, CA 95203

(209) 946-0246

Project No. 220002

Stockton Port District Table of Contents Simmons Island Habitat Restoration Project 00010- 1

DOCUMENT 00010

TABLE OF CONTENTS

DIVISION I

SECTION TITLE

INTRODUCTORY INFORMATION

00001 Title Page

00010 Table of Contents

BIDDING REQUIREMENTS

00100 Advertisement for Bids

00200 Instructions to Bidders

00320 Geotechnical Data and Existing Conditions

00400 Bid Form

00411 Bond Accompanying Bid

00420 Bidder Registration Form

00430 Subcontractors List

00481 Non-Collusion Affidavit

00482 Bidder Certifications

CONTRACT FORMS

00505 Notice of Intent to Award

00510 Notice of Award

00520 Agreement

00550 Notice to Proceed

00610 Construction Performance Bond

00620 Construction Labor and Material Payment Bond

00630 Guaranty

00650 Agreement and Release of Any and All Claims

00660 Substitution Request Form

00680 Escrow Agreement for Security Deposits in Lieu of Retention

CONDITIONS OF THE CONTRACT

00700 General Conditions

00800 Supplementary General Conditions

00821 Insurance and Indemnification

00822 Apprenticeship Program

00910 Addenda

Stockton Port District Table of Contents Simmons Island Habitat Restoration Project 00010- 2

SECTION TITLE

GENERAL REQUIREMENTS

01100 Summary

01100-A Special Provisions - Attachment A

01200 Price and Payment Procedures

01250 Modification Procedures

01315 Project Meetings

01320 Progress Schedules and Reports

01330 Submittal Procedures

01340 Safety Submittals

01410 Regulatory Requirements

01420 References and Definitions

01500 Temporary Facilities and Controls

01540 Site Security and Safety

01600 Product Requirements

01740 Cleaning

01770 Contract Closeout

01780 Project Record Documents

ATTACHMENTS

A. Appendix A: September 2022 San Francisco Bay Conservation and Development Commission Permit Application Supplement

B. Project Drawings

C. Caltrans Standard Specifications

D. Permit: USACOE

E. Permit: Bay Conservation and Development Commission (BCDC)

F. Permit: 401 - RWQCB

END OF DOCUMENT

Stockton Port District Advertisement for Bids Simmons Island Habitat Restoration Project 00100 - 1

DOCUMENT 00100

ADVERTISEMENT FOR BIDS

1. NOTICE. The STOCKTON PORT DISTRICT, a municipal corporation of the State of California (“Port”) hereby gives notice that it will accept Bids for construction of the following public work:

PORT PROJECT NUMBER 220002

SIMMONS ISLAND HABITAT RESTORATION PROJECT

2. BID SUBMISSION. Port will receive sealed Bids no later than 3:00 p.m. on Wednesday, July 1, 2026 Port’s representative will call out the designated time in the Port Administration Building lobby, stating that the period for accepting Bids is closed. The Bid opening will be in accordance with procedures set forth in Document 00200 (Instructions to Bidders).

3. CONTACT INFORMATION.

Mailing Address:

Janice Dias P.O. Box 2089 Stockton, California 95201

Website address for more information:

www.portofstockton.com

Owner’s Representative:

Jason Cashman Director of Environmental Affairs Or Port Designated Representative

Telephone: (209) 946-0246 Email: procurement@stocktonport.com

4. DESCRIPTION OF THE WORK. The Port of Stockton (Port), in coordination with the Rich Island Duck Club (Duck

Club), U.S. Army Corps of Engineers, San Francisco Bay Conservation and Development Commission, and Suisun Resource Conservation District, is implementing the Simmons Island Habitat Restoration Project (Project). The area for restoration is located in the southern portion of Simmons Island within the Duck Club’s managed wetlands inside the exterior levee, along Suisun Cutoff, which joins Suisun Bay and Grizzly Bay. This area received dredged sediment from the Stockton Deep Water Ship Channel between 1986 and 1996, and the sediment has been stockpiled on the island since that time. The Project entails regrading the previously placed dredged material, salvaging, importing, and planting vegetation, improving and expanding wetland habitats, and improving the Duck Club’s water management capabilities to maintain the wetlands.

5. CONTRACT TIME. Grading is required to occur between April 15 – October 31, 2026; all work must be complete by

October 31, 2026.

6. REQUIRED CONTRACTOR’S LICENSE(S). A California “A” Contractor License is required to Bid this Contract.

Joint ventures must secure a joint venture license prior to award of this Contract.

7. PREVAILING WAGE LAWS. The successful Bidder must comply with all prevailing wage laws applicable to the Project, and related requirements contained in the Contract Documents.

8. INSTRUCTIONS. Bidders shall refer to Document 00200 (Instructions to Bidders) for required documents and items to be submitted in sealed envelopes for deposit at the Stockton Port District administration building lobby.

9. SUBSTITUTION OF SECURITIES. Port will permit successful Bidder to substitute securities for retention monies withheld to ensure performance of Contract, as set forth in Document 00680 (Escrow Agreement for Security Deposits in Lieu of Retention), in accordance with California Public Contract Code, Section 22300. By this reference, Document 00680 (Escrow Agreement for Security Deposits in Lieu of Retention) is incorporated in full in this Document 00100.

Stockton Port District Advertisement for Bids Simmons Island Habitat Restoration Project 00100 - 2

10. MANDATORY PRE-BID CONFERENCE. Port will conduct a MANDATORY Pre-Bid Conference at 10:00 a.m. on Tuesday, June 9, 2026, meeting at the Port Administration Building, 315 FYFFE AVENUE, Stockton, California.

Bidders must attend Pre-bid Conference and sign an attendance roster as a condition to the bidding. Any Bidder wishing to investigate subsurface conditions at the Site must schedule such a visit with the Port in accordance with Document 00200 (Instructions to Bidders).

11. PROCUREMENT OF BIDDING DOCUMENTS. Bidders may examine the Bidding Documents, including the Instructions to Bidders and the plans and specifications for the work at the Port’s offices. Documents will be available for download from the Port’s website, www.portofstockton.com – Business section, Bids & Proposals, Out to Bid. Port expects documents to be available on or after May 27, 2026. The Bidders’ attention is drawn to the Instructions to Bidders for complete instructions regarding submission of a Bid.

12. BID PREPARATION COST. Bidders are solely responsible for the cost of preparing their Bids.

13. INELIGIBLE CONTRACTORS AND SUBCONTRACTORS: Port shall not accept a Bid from a Bidder who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code Section 1777.1 or

1777.7. Bidder shall not include in its Bid any subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code Section 1777.1 or 1777.7. Federal ineligible listings are located on the System for Award Management (SAM) at https://sam.gov.

14. RESERVATION OF RIGHTS. Port specifically reserves the right, in its sole discretion, to reject any or all Bids, or rebid, or to waive inconsequential deviations from Bid requirements not involving time, price, or quality of the Work.

By order of the Board of Commissioners of the Stockton Port District.

Stockton Port District Instructions to Bidders Simmons Island Habitat Restoration Project 00200- 1

DOCUMENT 00200

INSTRUCTIONS TO BIDDERS

Bids are requested by the Stockton Port District, a California Port District with municipal powers organized pursuant to Harbors and Navigations Code Sections 6200 et seq. (“Port”), for a general construction contract, or work described in general, as follows:

PORT PROJECT NUMBER 220002

SIMMONS ISLAND HABITAT RESTORATION PROJECT

1. RECEIPT OF BIDS: Sealed Bids will be received by Port at Port’s office (see paragraph 2 below) on

Wednesday, July 1, 2026. Port will accept Bids only from Bidders duly licensed in accordance with the California Business & Professions Code. Port will receive Bids in opaque sealed 10 inch x 13 inch envelope(s), containing the respective items described in Paragraph 6 below. All Bid envelopes will be time-stamped to reflect their submittal time. Envelope shall be due by 3:00 p.m. Port shall reject all Bids received after the specified time and will return such Bids to Bidders unopened. Bidders must submit Bids in accordance with this Document 00200.

2. CONTACT INFORMATION: Sealed Bids shall be received at Port’s Administration Building lobby located at 2201 West Washington Street, Stockton, California 95203. The telephone number for Port is (209) 946- 0246.

3. PROCUREMENT OF BID DOCUMENTS: Bidders may obtain Bidding Documents from the Port’s website at www.portofstockton.com, Business section, Bids/Proposals, Out to Bid.

4. MANDATORY PRE-BID CONFERENCE: Port will conduct a MANDATORY Pre-Bid Conference at 10:00 a.m. on Tuesday, June 9, 2026, meeting at the Port Administration Building, 315 FYFFE AVENUE, Stockton, California, to consider such matters as Bidders may request. Bidders must attend Pre-bid Conference and sign an attendance roster as a condition to the bidding.

4.1. Site Visits may be scheduled at Port’s sole discretion, depending on staff availability.

4.2. Port will transmit to all parties recorded as having received Bidding Documents such Addenda as Port in its discretion considers necessary in response to questions arising at the Pre-Bid Conference. Bidders shall not rely on oral statements. Oral statements will not be binding or legally effective. Port will issue Minutes of the Pre-Bid Conference, which shall constitute the sole and exclusive record and statement of the results of the Pre-Bid Conference. The Minutes issued by Port are not Contract Documents.

4.3. While Bidders may be allowed to observe Site conditions, invasive testing will not be allowed.

5. BID SUBMISSION: Bidder shall mark its Bid envelope as BID FOR THE STOCKTON PORT DISTRICT, SIMMONS ISLAND HABITIAT RESTORATION PROJECT, PROJECT NUMBER 220002. Bids shall be deemed to include the written responses of the Bidder to any questions or requests for information of Port made as part of Bid evaluation process after submission of Bid. Bidder’s failure to submit all required documents strictly as required entitles Port to reject the Bid as non-responsive.

5.1. The submission of a Bid does not commit Port to award a contract for the Project, to pay costs incurred in the preparation of a Bid, or to procure or contract for any goods or services.

6. REQUIRED CONTENTS OF BIDS: All Bidders must submit Bids containing each of the fully executed documents supplied in this Project Manual.

6.1. Bidders must submit Bids on Document 00400 Bid Form in accordance with the provisions of Document 00400. Port will reject as non-responsive any Bid not submitted on the required form. Bids must be full and

Simmons Island Habitat Restoration Project 00200- 2 complete. Bidders must complete all Bid items and supply all information required by Bid documents and specifications. Port reserves the right in its sole discretion to reject any Bid as non-responsive as a result of any error or omission in the Bid. Bidders must submit clearly written Bids without erasure or interlineation.

Bidders must clearly make any changes in the Bid. Bidders shall make any change in the Bid by crossing out the original entry, entering and initialing the new entry. Port reserves the right to reject any Bid not clearly written. Bidders may not modify the Bid Form or qualify their Bids.

6.2. Bidders must submit Document 00411 (Bond Accompanying Bid) accompanied by a cashier’s check, certified check (certified without qualification and drawn on a solvent bank of the State of California or a National Bank doing business in the State of California) or surety bond of not less than 10% of the Total Bid Price payable to “Stockton Port District,” and completed in accordance with the provisions of Document 00411. (Port may retain Bid securities and Bid bonds of other than the Apparent Low Bidder for a period of 90 Days after award or full execution of the Contract, whichever first occurs.)

6.3. Bidders must submit Document 00420 (Bidder Registration Form) completed in accordance with the provisions of Document 00420. Bidder must complete this form and include comprehensive answers to all questions. Port shall reject as non-responsive any Bid submitted without the Bidder Registration and Experience Form.

6.4. Bidders must submit Document 00430 (Subcontractors List) completed in accordance with the provisions of Document 00430. The Subcontractors List must include the names of all subcontractors and their respective Bid item sub-Bids for those subcontractors who will perform any portion of work, including labor, rendering of service, or specially fabricating and installing a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in excess of one half of one percent (0.5%) of the total Bid amount. Any violation of this requirement may result in a Bid being deemed non-responsive and not being considered.

6.5. Bidders must submit Document 00481 (Non-Collusion Affidavit) completed in accordance with the provisions of Document 00481. Port shall reject as non-responsive any Bid submitted without the Non- Collusion Affidavit.

6.6. Bidders must submit Document 00482 (Bidder Certifications) completed in accordance with the provisions of Document 00482. Port shall reject as non-responsive any Bid submitted without the Bidder Certifications.

6.7. Bidders must submit a list of at least three completed projects of similar nature to the scope of work covered by this contract. Projects must have been performed in the last 10 years. For each project, Bidder must include the project name, location, client, overall construction value, client reference name and phone number, and Bidder’s role as prime or subcontractor.

6.8. Bidders must submit the proposed names and qualifications of the Project Manager, Superintendent, and

Site Safety Officer.

6.9. Bidders must submit a proposed schedule for completing the work in Gantt or similar format, indicating durations of each major work element, precedent tasks, and dependent tasks.

6.10. Any item required by the Special Conditions.

7. OTHER REQUIREMENTS PRIOR TO BIDDING: Submission of Bid signifies Bidder’s careful examination of Bidding Documents and complete understanding of the nature, extent, and location of Work to be performed. As a condition to Bidding, Bidder must complete tasks listed in Document 00520 (Agreement), Article 5. Submission of Bid shall constitute Bidder’s express representation to Port that Bidder has fully completed these tasks.

8. EXISTING CONDITIONS INFORMATION AND GEOTECHNICAL DATA: Bidders may examine any available existing conditions information (e.g., record documents, specifications, studies, drawings of previous

Simmons Island Habitat Restoration Project 00200- 3 work), as well as applicable environmental assessment information (if any) regarding the Project, by giving Port reasonable advanced notice. Document 00320 (Geotechnical Data and Existing Conditions) applies to all supplied existing conditions information. Port will make copies available for a fee. A Bidder must give five (5) days advanced notice if copies are desired.

9. ADDENDA: Bidders must direct all questions about the meaning or intent of Bidding Documents to Port

(Attention: Procurement Officer) in writing. Interpretations or clarifications considered necessary by Port in response to such questions will be issued by Addenda mailed, faxed, or electronically delivered to all parties recorded by Port as having received Bidding Documents. Addenda will be written and will be issued to each Bidder to the address or fax number supplied Port by Bidder. Port may not answer questions received less than ten Days prior to the date for opening Bids. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.

9.1. Addenda may also be issued to modify the Bidding Documents as deemed advisable by Port.

9.2. Addenda shall be acknowledged by number with signature in Document 00400 (Bid Form) and shall be part of the Contract Documents. A complete listing of Addenda may be secured from Port.

10. DEPARTMENT OF HOMELAND SECURITY REQUIREMENTS:

This project is not subject to Transportation Worker Identification Credential (TWIC) requirements.

11. EQUAL EMPLOYMENT OPPORTUNITY: Contractor shall comply with all applicable federal, state, and local laws, rules, and regulations in regard to nondiscrimination in employment because of race, color, ancestry, national origin, religion, sex, marital status, age, medical conditions, disability, or any other reason.

12. WAGE RATES: The Contractor acknowledges that it has examined the prevailing rate of per diem wages as established by California Director of Industrial Relations. The Contractor agrees to pay workers not less than the applicable prevailing rate of per diem wages, as set forth in these requirements.

13. WITHDRAWAL OF BIDS: Bidders may withdraw their Bids at any time prior to the Bid opening time fixed in this Document 00200, only by written request for the withdrawal of Bid filed with the Port at the Port’s office. Bidder or its duly authorized representative shall execute request to withdraw Bid. The submission of a Bid does not commit the Port to award a contract for the Project, to pay costs incurred in the preparation of a Bid, or to procure or contract for any goods or services.

14. BID OPENING: Port will open all Bidders’ Envelopes immediately after 3:00 p.m. on the date specified in

Paragraph 1 above, initially evaluate them for responsiveness, and determine an Apparent Low Bidder as specified herein.

15. DETERMINATION OF APPARENT LOW BIDDER: Apparent Low Bid will be determined as provided in

Document 00400 (Bid Form). All Bidders are required to submit Bids on all Bid items.

15.1 If any Apparent Low Bidder is determined to be non-responsive or non-responsible, Port may proceed to the next Apparent Low Bidder’s Bid pursuant to any procedures determined in its reasonable discretion, and proceed for all purposes as if this Apparent Low Bidder were the original Apparent Low Bidder.

16. BID EVALUATION: Port may reject any or all Bids and waive any informalities or minor irregularities in the Bids. Port also reserves the right, in its discretion, to reject any or all Bids and to re-Bid the Project. Port reserves the right to reject any or all nonconforming, non-responsive, unbalanced, or conditional Bids, and to reject the Bid of any Bidder if Port believes that it would not be in the best interest of Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by Port. For purposes of this paragraph, an “unbalanced Bid” is one having nominal prices for some Bid items and enhanced prices for other Bid items.

Simmons Island Habitat Restoration Project 00200- 4

a. In evaluating Bids, Port will consider Bidders’ qualifications, whether or not the Bids comply with the prescribed requirements, bid item prices, and other data, as may be requested in Document 00400 (Bid Form) or prior to the Notice of Award.

b. Port may conduct reasonable investigations and reference checks of Bidder and other persons and organizations as Port deems necessary to assist in the evaluation of any Bid and to establish Bidder’s responsibility, qualifications, financial ability and ability to perform the Work in accordance with the Contract Documents to Port’s satisfaction within the prescribed time.

Submission of a Bid constitutes Bidder’s consent to the foregoing. Port shall have the right to consider information provided by sources other than Bidder. Port shall also have the right to communicate directly with Bidder’s surety regarding Bidder’s bonds.

c. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between written words and figures will be resolved in favor of the words.

d. Port may determine whether a Bidder is qualified in its sole discretionary judgment.

17. BID PROTEST: Any Bid protest must be submitted in writing to the Port’s offices (Attention: Procurement

Officer), before 5:00 p.m. of the tenth Day following posting in the front and back entrances of the Administration Building of Document 00505 (Notice of Intent to Award for Construction). Time will be determined by the clock on the wall of the Administration Building lobby. Port will use reasonable efforts to deliver by facsimile a copy of Document 00505 to all Bidders who submitted Bids no later than the business Day after issuance, although any delay or failure to do so will not extend the Bid protest deadline described above.

a. The initial protest document must contain a complete statement of the basis for the protest.

b. The protest must refer to the specific portion of the document that forms the basis for the protest.

c. The protest must include the name, address, and telephone number of the person representing the protesting party.

d. Only Bidders who Port otherwise determines are responsive and responsible are eligible to protest a Bid; protests from any other Bidder will not be considered. In order to determine whether a protesting Bidder is responsive and responsible, Port may evaluate all information contained in any protesting Bidder’s Bid, and conduct the same investigation and evaluation as Port is entitled to take regarding an Apparent Low Bidder.

e. The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest that may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.

f. The procedure and time limits set forth in this paragraph are mandatory and are Bidder’s sole and exclusive remedy in the event of Bid protest. Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government Code Claim or legal proceedings. A Bidder may not rely on a protest submitted by another Bidder, but must timely pursue its own protest.

Simmons Island Habitat Restoration Project 00200- 5

18. AWARD: It is the intent of the Port to award a contract to accomplish the Work described in the Contract Documents. If a Contract is awarded, it will be awarded to the lowest responsible responsive Bidder within ninety (90) days after the opening of the Bids.

19. PERMITS: It is the bidder’s responsibility to furnish prior to the start of work any and all applicable permits to this project that have not already been obtained by the Port. Actual costs of permits will be reimbursed upon receipt of appropriate documentation.

20. SUBSTITUTIONS: Bidders must base their Bids on products and systems specified in Contract Documents or listed by name in Addenda.

a. Except as provided in Paragraph 20.4 below, Port will consider substitution requests only for “or equal items.” Bidders wanting to use “or equal” item(s) may submit Document 00660 (Substitution Request Form) no later than 5 Days before the Bid Date. After that date, Port will not accept “or equal” substitution requests. To assess “or equal” acceptability of product or system, submittals of substitutions shall contain the information required in Document 00660 (Substitution Request Form). Insufficient information will be grounds for rejection of substitution. Port shall, within a reasonable period of time after having received a Request for Substitution, issue in writing its decision as to whether the proposed substitute item is an Equal item. Port’s decision shall be conclusive on all Bidders.

b. Approved substitutions shall be listed in Addenda and become part of Contract Documents.

c. Substitutions may be requested after submitting Bids and Award of Contract only in accordance with requirements specified in the Contract Documents.

d. As a limitation on Bidder's privilege to substitute “or equal” items, Port has found that certain items are designated as Port standards and certain items are designated to match existing items in use on a particular public improvement either completed or in the course of completion or are available from one source. As to such items, Port will not permit substitution. Such items are:

i. N/A

21. POST NOTICE OF AWARD REQUIREMENTS: Successful Bidder must execute and submit the documents set forth in this Document to Port by 5:00 p.m. of the 7th Day following the Notice of Award.

Execution of Contract by Port depends upon approval of these documents.

a. Document 00520 (Agreement) must be executed by successful Bidder. Submit two originals, each bearing an original signature and initials on each page.

b. Document 00610 (Construction Performance Bond) must be executed by successful Bidder and surety, in the amount set forth in Document 00610 (Construction Performance Bond). Submit one original.

c. Document 00620 (Construction Labor and Material Payment Bond) must be executed by successful Bidder and surety, in the amount set forth in Document 00620 (Construction Labor and Material Payment Bond). Submit one original.

d. Document 00630 (Guaranty) must be executed by successful Bidder.

e. Insurance certificates and endorsements required by Document 00821 (Insurance and

Indemnification) must be submitted by successful Bidder. Submit one original set

f. Port shall have the right to communicate directly with Apparent Low Bidder’s proposed performance bond surety, to confirm the performance bond. Port may elect to extend the time to receive faithful performance and labor and material payment bonds.

Simmons Island Habitat Restoration Project 00200- 6

g. Successful Bidder’s failure to submit the documents required herein, in a proper and timely manner, entitles Port to rescind its award, and to cause Bidder’s Bid security to be forfeited as provided herein.

22. FAILURE TO EXECUTE AND DELIVER DOCUMENTS: If Bidder to whom Contract is awarded shall, within the period described in Paragraph 19 of this Document 00200, fails or neglects to execute and deliver all required Contract Documents and file all required bonds, insurance certificates, and other documents, Port may, in its sole discretion, foreclose on Bidder’s surety bond, or deposit Bidder’s cashier’s check or certified check for collection, and retain the proceeds thereof as liquidated damages for Bidder’s failure to enter into the Contract Documents. Bidder agrees that calculating the damages Port may suffer as a result of Bidder’s failure to execute and deliver all required Contract Documents would be extremely difficult and impractical and that the amount of Bidder’s required Bid security shall be the agreed and presumed amount of Port’s damages.

a. Upon such failure to timely deliver all required Contract Documents as set forth in Paragraph 21 through Paragraph 21.8 of this Document 00200, Port may determine the next Apparent Low Bidder and proceed accordingly. Such Award, if made, will be made within the time described in paragraph 19 above.

23. MODIFICATION OF COMMENCEMENT OF WORK: Port expressly reserves the right to modify the date for the Commencement of Work under the Contract and to independently perform and complete work related to the Project. Port accepts no responsibility to Contractor for any delays attributed to its need to complete independent work at the Site.

24. CONFORMED PROJECT MANUAL: Following Award of Contract, Port may prepare a conformed Project

Manual reflecting Addenda issued during bidding, which will, failing objection, constitute the approved Project Manual.

25. INELIGIBLE CONTRACTORS AND SUBCONTRACTORS: Port shall not accept a Bid from a Bidder who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code section 1777.1 or 1777.7. Bidders and the Contractor who is awarded the project contract shall not utilize, or allow work by, any subcontractor who is ineligible to bid or work on, or be awarded, a public works project pursuant to California Labor Code Section 1777.1 or 1777.7. (See California Public Contract Code Section 6109.) The California Division of Labor Standards Enforcement publishes a list of debarred contractors and subcontractors on the Internet at https://www.dir.ca.gov/DLSE/debar.html. Federal government listings are located at https://www.sam.gov/SAM/.

26. DEFINITIONS: All abbreviations and definitions of terms used in this Document 00200 are set forth in

Document 00700 (General Conditions) and Section 01420 (References and Definitions).

Stockton Port District Geotechnical Data and Existing Conditions Simmons Island Habitat Restoration Project 00320- 1

DOCUMENT 00320

GEOTECHNICAL DATA AND EXISTING CONDITIONS

1. REPORT AND INFORMATION

1.1 Existence of Reports: The Port, its consultants, and prior contractors may have collected documents providing a general description of the Site and conditions of the Work. These documents may consist of geotechnical reports for and around the Site, contracts, contract specifications, tenant improvement contracts, as-built drawings, utility drawings, and information regarding Underground Facilities. These reports, documents and other information are not part of the Contract Documents. These reports are Appendix A (September 2022 San Francisco Bay Conservation and Development Commission Permit Application Supplement).

1.2 Inspection of Reports: Bidders may inspect geotechnical reports and information regarding existing conditions at the Site. These documents are available for review at the Port located at 2201 West Washington Street, Stockton, California 95203 and copies may be obtained for the cost of reproduction and handling upon Bidder’s payment for the costs. Nevertheless, by submitting a Bid, Bidder accepts full responsibility for reviewing, knowing and understanding the contents of all of these materials.

1.3 Inclusion in Project Manual: Geotechnical reports are included in Appendix A and information regarding existing conditions may also be included in the Project Manual, but neither shall be considered part of the Contract Documents.

1.4 Alternative Documentation Location: Documentation for PROJECT NUMBER 220002 referred to at paragraph 1.2 above is also available for review at the following website:

http://geotracker.waterboards.ca.gov/

2. USE OF INFORMATION ON EXISTING CONDITIONS

2.1 Aboveground Existing Conditions: Under no circumstances shall Port be deemed to make a warranty or representation of existing aboveground conditions, as-built conditions, or other aboveground actual conditions verifiable by reasonable independent investigation. These conditions are verifiable by Bidder by the performance of its own independent investigation that Bidder must perform prior to bidding and Bidder must not rely on the information supplied by Port regarding existing conditions. Bidder represents and agrees that in submitting its Bid, it is not relying on any information regarding existing conditions supplied by Port.

2.2 Underground Facilities: Information supplied regarding existing Underground Facilities at or contiguous to the Site is based on information furnished to Port by others (e.g., the builders of such Underground Facilities or others). Except as expressly set forth in this Document 00320, Port does not assume responsibility for the accuracy, completeness or thoroughness of this information, and Bidder is solely responsible for any interpretation or conclusion drawn from this information.

Except as expressly set forth in this Document 00320, Port will be responsible only for the general accuracy of information regarding Underground Facilities, and only for those Underground Facilities that are owned by Port. This express assumption of responsibility applies only if Bidder has conducted the independent investigation required of it and discrepancies were not apparent.

3. LIMITED RELIANCE PERMITTED ON CERTAIN GEOTECHNICAL INFORMATION

3.1 Geotechnical Data: Except as expressly set forth in this Document 00320, Port does not warrant, and makes no representation regarding, the accuracy or thoroughness of any geotechnical data.

Bidder represents and agrees that in submitting its Bid, it is not relying on any geotechnical data supplied by Port, except as specifically set forth herein.

A. Bidder may rely upon the general accuracy of the “technical data” contained in the geotechnical reports and drawings identified above, but only insofar as it relates to subsurface conditions, provided Bidder has conducted the independent investigation

Stockton Port District Geotechnical Data and Existing Conditions Simmons Island Habitat Restoration Project 00320- 2 required of it and discrepancies were not apparent. The term “technical data” in the referenced reports and drawings shall be limited as follows:

1. The term “technical data” shall include actual reported depths, reported quantities, reported soil types, reported soil conditions, and reported material, equipment, or structures that were encountered during subsurface exploration.

2. The term “technical data” does not include, and Bidder may not rely upon, any other data, interpretations, opinions or information shown or indicated in such drawings or reports that otherwise relate to subsurface conditions or described structures.

3. The term “technical data” shall not include the location of Underground Facilities.

4. Bidder may not rely on the completeness of reports and drawings for the purposes of bidding or construction. Bidder may rely upon the general accuracy of the “technical data” contained in such reports or drawings.

5. Bidder is solely responsible for any interpretation or conclusion drawn from any “technical data” or any other data, interpretations, opinions, or information contained in supplied geotechnical data.

4. INVESTIGATIONS

4.1 Before submitting a Bid, each Bidder shall be responsible to obtain such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the Site or otherwise, which may affect cost, progress, performance or furnishing of Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or which Bidder deems necessary to determine its Bid for performing and furnishing the Work in accordance with the time, price and other terms and conditions of Contract Documents. Bidders shall advise Port in writing during the Bid period of any questions, suppositions, inferences or deductions Bidders may have for Port’s review and response.

4.2 Port has provided time in the period during bidding for Bidder to perform these investigations.

5. ACCESS TO SITE FOR INVESTIGATIONS

5.1 During the Pre-Bid Site Visit(s), Port will provide each Bidder access to the Site to conduct such examinations, investigations, explorations, tests, and studies, as each Bidder deems necessary for submission of a Bid. Bidders must fill all holes and clean up and restore the Site to its former conditions upon completion of such explorations, investigations, tests, and studies. Such investigations may be performed only under the provisions of Document 00200 (Instructions to Bidders) and Document 00700 (General Conditions) including, but not limited to, proof of insurance and obligation to indemnify against claims arising from such investigation work. Each Bidder shall supply all equipment required to perform any investigations as each Bidder deems necessary. Port has the right to limit the number of pieces of machinery operating at one time due to safety concerns.

Port of Stockton Bid Form Simmons Island Habitat Restoration Project 00400-1

DOCUMENT 00400

BID FORM

TO THE PORT OF STOCKTON

THIS BID IS SUBMITTED BY:

(Contractor Name)

Re: Port of Stockton, Simmons Island Habitat Restoration Project, Project Number 220002

1. The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an agreement with the Port of Stockton (Port), in the form included in the Contract Documents, Document 00520 (Agreement), to perform and furnish all Work as specified or indicated in the Contract Documents for the Contract Sum and within the Contract Time indicated in this Bid and in accordance with all other terms and conditions of the Contract Documents.

2. Bidder accepts all of the terms and conditions of the Contract Documents, Document 00100 (Notice Inviting

Bids), and Document 00200 (Instructions to Bidders), including, without limitation, those dealing with the disposition of Bid Security. This Bid will remain subject to acceptance for 90 Days after the day of Bid opening.

3. In submitting this Bid, Bidder represents:

(a) Bidder has examined all of the Contract Documents and the following Addenda (receipt of all of which is hereby acknowledged):

Addendum Number Addendum Date Signature of Bidder

(b) Bidder acknowledges receipt of Pre-Bid Conference minutes, if any.

(c) Bidder has visited the Site and performed all tasks, research, investigation, reviews, examinations, and analyses and given notices, regarding the Project and the Site, as set forth in Document 00520 (Agreement), Article 5.

(d) Bidder has given Port prompt written notice of all conflicts, errors, ambiguities, or discrepancies that it has discovered in or among the Contract Documents and as-built drawings and actual conditions, and the written resolution thereof through Addenda issued by Port is acceptable to Contractor.

4. All Bid items, including lump sums, must be filled in completely. Bid items are described in Section 10110

(Special Provisions) and the Caltrans Standard Specifications. Quote in figures only, unless words are specifically requested.

Simmons Island Habitat Restoration Project 00400-2

ITEM

NO. ITEM DESCRIPTION ESTIMATED QUANTITY UNIT PRICE ITEM TOTAL

1 Mobilization 1 LS

2 Surveying 1 LS

3 Earthwork 1 LS

4 Clearing and Grubbing 1 LS

5 Salvaging Plants 1 LS

6 Mowing Pickleweed 1 LS

7 Mulch 723 CY

8 Upland Hydroseed Mix 10 AC

9 High/Transitional Wetland Hydroseed Mix 8 AC

10 Plugs 505 EA

11 Temporary Erosion and Sedimentation Control 1 LS

12 Scarify Subsoil (Additive Bid Item) 50,000 SF

13 Soil Amendments (Additive Bid Item) 1,000 CY

14 Low Wetland Plant Procurement (Additive Bid Item) 600 EA

Total

Total Bid Price: _______________________________________________________________________________

(Words)

This amount shall constitute full compensation for furnishing all labor, materials, apparatus, facilities, transportation, tools, equipment, bonds, and insurance for performance of all the work contemplated and embraced in this contract, and for all risks of every description connected with the work, and for well and faithful completing the work and the whole thereof in the manner and according to the Contract Documents and the requirements of designated Port Project representative.

Discrepancies between the words and numbers will be resolved in favor for the words.

5. Selection of Apparent Low Bidder: The undersigned acknowledges that the Apparent Low Bidder will be the Bidder submitting the lowest combination of the Bid Items above, based on the assumptions (if any) set forth in Item 4 above.

6. Subcontractors for work included in all Bid items are listed on the attached Document 00430 (Subcontractors

List).

7. The undersigned Bidder understands that Port reserves the right to reject this Bid.

Simmons Island Habitat Restoration Project 00400-3

8. If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, is mailed or delivered to the undersigned Bidder within the time described in Paragraph 2 of this Document 00400 or at any other time thereafter before it is withdrawn, the undersigned Bidder will execute and deliver the documents required by Document 00200 (Instructions to Bidders) within the times specified therein. These documents include, but are not limited to, Document 00520 (Agreement), Document 00610 (Construction Performance Bond), Document 00620 (Construction Labor and Material Payment Bond), and Document 00821 (Insurance and Indemnification).

9. Notice of Award or request for additional information may be addressed to the undersigned Bidder at the address set forth below.

10. The undersigned Bidder herewith encloses cash, a cashier’s check, or certified check of or on a responsible bank in the United States, or a corporate surety bond furnished by a surety authorized to do a surety business in the State of California, in form specified in Document 00200 (Instructions to Bidders), in the amount of ten percent (10%) of the Total Bid Price and made payable to “Port of Stockton.”

11. The undersigned Bidder agrees to commence Work under the Contract Documents on the date established in

Document 00700 (General Conditions) and to complete all Work within the time specified in Document 00520 (Agreement). The undersigned Bidder acknowledges that Port has reserved the right to delay or modify the commencement date. The undersigned Bidder further acknowledges Port has reserved the right to perform independent work at the Site, the extent of such work may not be determined until after the opening of the Bids, and that the undersigned Bidder will be required to cooperate with such other work in accordance with the requirements of the Contract Documents.

12. The undersigned Bidder agrees that, in accordance with Document 00700 (General Conditions), liquidated damages for failure to complete all Work in the Contract within the time specified in Document 00520 (Agreement) shall be as set forth in Document 00520 (Agreement).

13. The names of all persons interested in the foregoing Bid as principals shall be listed below in Item 14.

14. Any Bid item may be deleted from the Work and Contract Sum, in total or in part, prior to or after award of

Contract without compensation in any form or adjustment of other Bid items or prices therefore. Addition or deletion of Work will be paid or deducted based on unit cost.

IMPORTANT NOTICE: If Bidder or other interested person is a corporation, give the legal name of corporation, state where incorporated, and names of president and secretary thereof; if a partnership, give name of the firm and names of all individual copartners composing the firm; if Bidder or other interested person is an individual, give first and last names in full.

NAME OF BIDDER: __________________________________________________________________________

Licensed in accordance with an act for the registration of Contractors, and with license number:

________________________________________________________________ Expiration: __________________.

(Place of Incorporation, if Applicable) (Principal)

(Principal)

Simmons Island Habitat Restoration Project 00400-4

I certify (or declare) under penalty of perjury under the laws of the State of California that the foregoing is true and correct.

x__________________________________________

(Signature of Bidder)

NOTE: If Bidder is a corporation, set forth the legal name of the corporation together with the signature of the officer or officers authorized to sign contracts on behalf of the corporation. If Bidder is a partnership, set forth the name of the firm together with the signature of the partner or partners authorized to sign contracts on behalf of the partnership.

Business Address:

Contractor’s Representative(s): __________________________________________

(Name/Title)

Officers Authorized to Sign Contracts: __________________________________________

Telephone Number(s): __________________________________________ (Area Code) (Number)

(Area Code) (Number)

Contact Email address(es): __________________________________________ (Email)

(Email)

Date of Bid: __________________________________________ (Date)

Stockton Port District Bond Accompanying Bid Simmons Island Habitat Restoration Project 00411- 1

DOCUMENT 00411

BOND ACCOMPANYING BID

KNOW ALL BY THESE PRESENTS:

That the undersigned ___________________________________________________________________ , (Name of Contractor) as Principal and the undersigned as Surety are held and firmly bound unto the Stockton Port District, (“Port”), as obligee, in the penal sum of Dollars ($ ______________) lawful money of the United States of America being at least ten percent (10%) of the aggregate amount of said Principal ____________________________________________________________’s base Bid, for the payment of which, well and truly to be made, we bind ourselves, our successors, executors, administrators, and assigns, jointly and severally, firmly by these presents.

WHEREAS, the said Principal is submitting a Bid for Port Project Number 220002, STOCKTON PORT

DISTRICT, SIMMONS ISLAND HABITAT RESTORATION PROJECT.

THE CONDITION OF THIS OBLIGATION IS SUCH that if the Bid submitted by the said Principal be accepted and the Contract be awarded to said Principal and said Principal shall within the required periods enter into the Contract so awarded and provide the required Construction Performance Bond, Construction Labor and Material Payment Bond, insurance certificates, and all other endorsements, forms, and documents required under Document 00200 (Instructions to Bidders), then this obligation shall be void, otherwise to remain in full force and effect.

IN WITNESS WHEREOF, the above bounden parties have executed this instrument this ______ day of (Month) (Year)

(Corporate Seal) By________________________________________________ ______________________________________________ Principal

By _______________________________________________ Surety

(Corporate Seal) By _______________________________________________

Attorney in Fact

Stockton Port District Bidder Registration Form Simmons Island Habitat Restoration Project 00420- 1

DOCUMENT 00420

BIDDER REGISTRATION FORM

INSTRUCTIONS

In order to register to undertake work for the Stockton Port District, Bidder must:

1) Fill out this registration form completely; do not leave blanks.

2) Provide certificates of insurance or a letter evidencing coverage complying with Paragraph 2.01of Document 00700 (General Conditions).

INDEPENDENT CONTRACTOR REGISTRATION

Contractor’s License #

Date: Fed I.D. #

Full Corporate Name of Company:

Street Address:

Mailing Address:

Phone: Fax:

Name of Principal Contact:

Type of Business: _____ Sole Proprietor _____ Partnership _____ Non-Profit 501(c)(3) _____ Corporation _____ other (please explain:__________________________________)

INSURANCE

Commercial General Liability:

Carrier:

Address:

Phone and Fax:

Policy Number:

Automobile Liability:

Carrier: ______________________________________________________________________________________

Address: _____________________________________________________________________________________

Phone and Fax: ________________________________________________________________________________

Policy Number: ________________________________________________________________________________

Simmons Island Habitat Restoration Project 00420- 2

Workers Compensation:

Carrier:

Address:

Phone and Fax:

Policy Number:

Policy Limits: $

A.M. Best Rating:

Professional Liability:

Carrier:

Address:

Phone and Fax:

Policy Number:

Policy Limits: $

A.M. Best Rating:

Contractors Pollution Legal Liability:

Carrier:

Address:

Phone and Fax:

Policy Number:

Policy Limits: $

A.M. Best Rating:

BIDDER CERTIFIES, UNDER PENALTY OF PERJURY, THAT THE COST OF ALL

INSURANCE IS INCLUDED IN THE BID AMOUNT, THE FOREGOING INFORMATION IS CURRENT

AND ACCURATE AND AUTHORIZES THE STOCKTON PORT DISTRICT, AND ITS AGENTS AND

REPRESENTATIVES TO OBTAIN A CREDIT REPORT AND/OR VERIFY ANY OF THE ABOVE

INFORMATION.

x

SIGNATURE

DATE

Simmons Island Habitat Restoration Project 00420- 3

SAFETY EXPERIENCE

The following statements as to the Bidder’s safety experience are submitted with the Bid, as part thereof, and the Bidder guarantees the truthfulness and accuracy of all information.

1. List Bidder’s interstate Experience Modification Rate for the last three years.

[20__] _____ [20__] _____ [20__] _____

2. Use Bidder’s last year's Cal/OSHA 200 log to fill in the following number of injuries and illnesses:

a. Number of lost workday cases _______________

b. Number of medical treatment cases _______________

c. Number of fatalities _______________

3. Employee hours worked last year _______________

4. State the name of Bidder’s safety engineer/manager:

Attach a resume or outline of this individual's safety and health qualifications and experience.

I CERTIFY, UNDER PENALTY OF PERJURY, THAT THE FOREGOING INFORMATION IS

CURRENT AND ACCURATE AND I AUTHORIZE THE STOCKTON PORT DISTRICT, AND ITS

AGENTS AND REPRESENTATIVES TO OBTAIN A CREDIT REPORT AND/OR VERIFY ANY OF THE

ABOVE INFORMATION.

[BIDDER’S NAME]

By: ________________________________________________ Signature

Its: _________________________________________________ Title

Date: _______________________________________________

Stockton Port District Subcontractors List Simmons Island Habitat Restoration Project 00430- 1

DOCUMENT 00430

SUBCONTRACTORS LIST

Bidder submits the following information as to the subcontractors Bidder intends to employ if awarded the Contract.

Full Name of Subcontractor and

Address of Mill or Shop Description of Work:

Reference To Bid Items Subcontractor’s License No.

(Bidder may attach additional sheets if necessary)

Stockton Port District Non-Collusion Affidavit Simmons Island Habitat Restoration Project 00481- 1

DOCUMENT 00481

NON-COLLUSION…

This is the start of the file's text. The full file is on GovTribe.